CN109057392A - A kind of reinforce uses Construction of Steel Structure method - Google Patents
A kind of reinforce uses Construction of Steel Structure method Download PDFInfo
- Publication number
- CN109057392A CN109057392A CN201810995893.6A CN201810995893A CN109057392A CN 109057392 A CN109057392 A CN 109057392A CN 201810995893 A CN201810995893 A CN 201810995893A CN 109057392 A CN109057392 A CN 109057392A
- Authority
- CN
- China
- Prior art keywords
- steel plate
- steel
- plate
- concrete floor
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0237—Increasing or restoring the load-bearing capacity of building construction elements of storey floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0288—Repairing or restoring floor slabs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of reinforcing steel knot construction methods, are mainly used in the building structure strengthening transformation in building science and technology field.Its structure includes steel plate, the steel plate includes plate top steel plate and board bottom steel plate, plate top steel plate is located on the top surface of concrete floor, the board bottom steel plate is located on the bottom surface of concrete floor, plate top steel plate and board bottom steel plate are aligned in the longitudinal direction, and plate top steel plate and board bottom Interal fixation are mounted on the edge at the position that punches on the concrete floor to realize the reinforcing of concrete floor;The conducting wire rigid-connecting device for connecting the two is equipped between plate top steel plate and board bottom steel plate.Steel construction three-dimensional system of the invention is combined as a whole with concrete floor, and anchoring effect is good, bearing capacity and rigidity is available largely improves;Construction and installation are convenient, solve steel plate anchorage problem;It is not take up use space, steel using amount is few, at low cost.
Description
Technical field
The present invention relates to building science and technology field, specifically a kind of reinforcing steel knot construction method is main to apply
In building structure strengthening transformation.
Background technique
In concrete structure engineering strengthening reconstruction project, sometimes because for installation equipment, adding the consideration such as stair afterwards, need
It punches on concrete floor.Floor with opening destroys the globality of original floor, reduces the bearing capacity of floor;And it installs
Equipment, stair etc. increase the load on floor, it is necessary to carry out reinforcing the safety and applicability that just can guarantee structure.
In national standard " Code for design of concrete structures " GB50010-2010, for new construction, when concrete is existing
When pouring reserved opening on plate, hole periphery, which generally requires, adds arrangement of reinforcement, when hole is larger, can add beams of concrete.
In national standard " concrete structure reinforcement design specification " GB50367-2013 not to the rear processing side for setting hole
Method, in existing reinforcement means, only Enlargement of Section, surface mount steel plate or complex fiber material (FRP) method can be fitted
With.
In existing reinforcement means, there is the method for adding section steel beam reinforcing, this method is that fashioned iron is placed in board bottom, for undertaking
The load that plate face transmits, can be improved structural bearing capacity, but this method reduce using headroom, and section steel beam both ends need to add
Support.
In existing reinforcement means, there is the reinforcement means of plate surface affixing steel plate, plate top and (or) board bottom steel plate in this method
Certain pressure is deformed and generates with the deformation of plate, to improve the bearing capacity of plate, but this method light plate only depends on
The deformation of floor and deform, relatively independent three-dimensional system cannot be formed, increasing the rigidity of floor influences smaller, and improves and holds
Carry the limitation of power.
And Enlargement of Section inevitably sacrifices use space, the methods of surface mount to strengthening floor slab rigidity increase compared with
It is small, and it is limited to improve bearing capacity.
A kind of existing roofing reinforces leak-proof device, makes full use of wafer type flange to add roofing using roof leakage technology
Gu the side for cutting hole is converted into face contact by line contact, contact area is increased, to reach board-like roofing resistance to compression and prevent
The purpose of leakage;The construction method that pre-stress floor punches in a kind of existing structural fortification adds steel structure on the inside of newly-increased hole
Part support pad, installation anchorage and tensioning, the truncation and anchoring of presstressed reinforcing steel when punching for pre-stress floor;It is directed in the prior art
Shear wall punching internal has and carries out strengthening reconstruction using angle steel, but shear wall stress is different from floor stress, and its remodeling method
Cannot preferably solve because after punching problem of stress concentration caused by floor two sides.
The above prior art, which cannot play, reinforces floor, it is made to increase bearing capacity, and helps to eliminate prestressed
Effect.
Summary of the invention
In view of the above-mentioned problems, in order to make up in concrete structure reinforcement transformation, bearing capacity after concrete floor punches
Deficiency guarantees the safety of structure after concrete floor punches, applicability, and the purpose of the present invention is to provide a kind of reinforcing steel
Structure space system and construction method.
It includes: a kind of reinforcing steel construction three-dimensional system that the present invention, which solves the technical solution that its technical problem is taken, packet
Steel plate is included, the steel plate includes plate top steel plate and board bottom steel plate, and plate top steel plate is located on the top surface of concrete floor, described
Board bottom steel plate is located on the bottom surface of concrete floor, and plate top steel plate and board bottom steel plate are aligned in the longitudinal direction, plate top steel
Plate and board bottom Interal fixation are mounted on the edge at the position that punches on the concrete floor to realize the reinforcing of concrete floor;
The conducting wire rigid-connecting device for connecting the two is equipped between plate top steel plate and board bottom steel plate, conducting wire rigid-connecting device is equipped with
The bolt cap of two settings symmetrical above and below, bolt cap is in concrete floor, ruler of the bolt cap close to floor top surface or one end of bottom surface
The very little size greater than the other end, for the stress concentration phenomenon for reducing junction, spy's setting bolt cap, because of the setting at hole, hole week
It encloses concrete floor stress more to concentrate, especially the top and bottom of floor, the bolt cap of the other end is greater than using one end, preferably
Stress is distributed in steel construction three-dimensional system by ground by bolt cap, and the service life of flat slab with opening has been effectively ensured.
Angularly consider from economy, practicability and the reliability of connection, further technical solution are as follows: described is rigid
Property attachment device be steel bolt, the both ends of the steel bolt are equipped with screw thread, and the steel bolt is also cross plate top steel plate, concrete building
The both ends of plate and board bottom steel plate, the steel bolt pass through nut check.
Further technical solution are as follows: the junction of the steel plate and steel bolt is respectively equipped with bolt cap, and the bolt cap is steel plate
With the tapered connection between steel bolt, the bolt cap is located at the side opposite with nut, and to be easy to process, bolt cap can be taper,
Appearance is equipped with decorative pattern or screw thread to increase the contact area with floor.
In order to further constrain the relative displacement between steel plate and concrete floor, avoid between steel plate and concrete floor
Slip destroy, further technical solution are as follows: the junction of the steel plate and concrete floor be equipped with structure glue, the steel bolt with
Structure glue is equipped in gap between concrete floor.
Further technical solution are as follows: the steel plate is along the position that punches of concrete floor is unidirectional or bidirectional arrangements.When
When concrete floor is designed by one-way slabs, the steel construction three-dimensional system unidirectionally arranged, so-called unidirectional arrangement can be used, i.e. steel plate exists
Punch two lateral edge concrete floor effective span direction of position arrangement;When concrete floor is designed by two-way slab, can be used double
To the steel construction three-dimensional system of arrangement, so-called bidirectional arrangements are simutaneously arranged transverse direction along the punch surrounding at position of concrete floor
With longitudinal steel plate.
In order to guarantee the reliable of consolidation effect, further technical solution are as follows: the both ends of the steel plate extend to locating for it
Concrete floor end on.
It is preferable to use bar shaped steel bands for the steel plate of reinforcing.
The present invention solves the technical solution of its technical problem further include: a kind of to reinforce the construction party for using steel construction three-dimensional system
Method, comprising the following steps:
Step 1): the position line of the outside setting steel plate installation site at the position that punches on concrete floor;
Step 2): steel plate, the steel of floor top surface are respectively provided in the top and bottom of concrete floor according to the position line
Plate is plate top steel plate, and the steel plate of soffit is board bottom steel plate;
Step 3): plate top steel plate, concrete floor and board bottom steel plate are fixed with one by conducting wire rigid-connecting device.
Further technical solution are as follows: pass through steel bolt and knot between plate top steel plate, concrete floor and board bottom steel plate
Structure glue is connected, connection method the following steps are included:
Step a: need to install on concrete floor steel plate position drilling, also drill out on the steel plate same diameter and
Away from hole;
Step b: it needs to install the position of steel plate on polishing concrete floor, reaches the requirement of affixing steel plate;
Step c: it derusts in the adhesive surface of steel plate;
Step d: pasting boards bottom steel plate is connected steel bolt and board bottom steel plate using tapered plug cap, then Xiang Gangshuan and mixed
Injecting structure glue between the hole of steel bolt, then pasting boards top steel plate are installed, and using bolt cap connection steel bolt and Ban Ding on solidifying Tulou plate
Steel plate, tapered connection of the bolt cap between steel plate and steel bolt.
In order to play optimal consolidation effect, further technical solution are as follows: the position line is located at concrete floor
On punch position outside 50mm~100mm position.
To guarantee not influenced by existing reinforcing bar in boring procedure, further technical solution are as follows: in the step a, mixed
Big 4mm~the 6mm of diameter of the aperture ratio steel bolt to drill on solidifying Tulou plate, spacing are 1~3 of bar spacing in concrete floor
Times.
The beneficial effects of the present invention are:
1, steel construction three-dimensional system and concrete floor being combined as a whole by conducting wire rigid-connecting device, anchoring effect is good,
Bearing capacity and rigidity is available largely improves;Meanwhile construction method strong operability of the invention, easy for installation, solution
It has determined steel plate anchorage problem, has not increased the section of concrete floor, be not take up use space, steel using amount is few, at low cost.
2, in addition relative displacement of the conducting wire rigid-connecting device operative constraint between steel plate and concrete is provided with structure glue, keeps away
The slippage exempted between steel plate and concrete destroys, and steel construction three-dimensional system passes through structure glue and conducting wire rigid-connecting device and concrete building
Plate is combined closely, and the entirety of common stress is formed, and structure bearing capacity and stiffness has been significantly increased.
3, steel construction three-dimensional system of the invention, structure is simple, using the bolt cap of taper, can preferably solve because excavating hole
Mouthful, lead to the problems in two middle side part slab stress collection of hole, implementation easy to spread.
Detailed description of the invention
Fig. 1 is the main view of the embodiment of the present invention;
Fig. 2 is the schematic perspective view of the embodiment of the present invention;
Fig. 3 is the schematic cross-sectional view after steel plate of the embodiment of the present invention and concrete floor assembling;
Fig. 4 is the structural schematic diagram that the embodiment of the present invention is unidirectionally arranged;
Fig. 5 is the structural schematic diagram of bidirectional arrangements of the embodiment of the present invention;
Fig. 6 is the structural schematic diagram of steel plate of the embodiment of the present invention;
Fig. 7 is the structural schematic diagram of steel of embodiment of the present invention bolt, bolt cap and nut;
Fig. 8 (a)~Fig. 8 (d) is the force analysis figure of the embodiment of the present invention;
Fig. 9 is the load-deflection curves figure of the embodiment of the present invention.
In figure: 1 steel plate, 2 steel bolts, 3 bolt caps, 4 nuts, 5 concrete floors, 6 punch position, 7 mounting holes.
Specific embodiment
The invention will be further described with specific embodiment with reference to the accompanying drawings of the specification:
As shown in Figure 1, Figure 2 and Figure 3, a kind of reinforce uses steel construction three-dimensional system, including steel plate 1, the steel plate include plate
Top steel plate and board bottom steel plate, plate top steel plate are located on the top surface of concrete floor 5, and the board bottom steel plate is located at concrete building
On the bottom surface of plate 5, plate top steel plate and board bottom steel plate are aligned in the longitudinal direction, plate top steel plate and the installation of board bottom Interal fixation
Punch on the concrete floor 5 position 6 edge to realize the reinforcing of concrete floor 5.
Steel plate 1 and concrete floor 5 are attached by steel bolt 2, bolt cap 3 and nut 4, as shown in fig. 6, setting on steel plate 1
There is the mounting hole 7 passed through for steel bolt 2, meanwhile, the hole passed through for steel bolt 2 also is provided on concrete floor 5.As shown in fig. 7, described
Steel bolt 2 is stud, and nut 4 is equipped with the screw thread matched with steel bolt 2, and steel bolt 2 is also cross plate top steel plate, concrete floor 5
It with board bottom steel plate, and is locked at both ends by nut 4, tapered connection of the bolt cap 3 between steel plate 1 and steel bolt 2 can reduce connection
The stress concentration phenomenon at place, the bolt cap 3 are located at the side opposite with nut 4.
The junction of steel plate 1 and concrete floor 5 is equipped with structure glue, in the gap between steel bolt 2 and concrete floor 5
Filled with structure glue.Steel construction three-dimensional system is combined closely by structure glue and steel bolt 2 with concrete floor 5, formation jointly by
Structure bearing capacity and stiffness has been significantly increased in the entirety of power.
When concrete floor 5 is designed by one-way slabs, the steel construction three-dimensional system unidirectionally arranged, so-called unidirectional cloth can be used
It sets, i.e., steel plate is transversely or longitudinally arranged along the punch opposite edge of any two at position 6 of concrete floor 5, such as Fig. 4 institute
Show;When concrete floor is designed by 5 two-way slabs, the steel construction three-dimensional system of bidirectional arrangements can be used, so-called bidirectional arrangements, i.e.,
It is simutaneously arranged horizontal and vertical steel plate along the punch surrounding at position 6 of concrete floor 5, as shown in Figure 5.
The both ends of the steel plate 1 extend on the end of the concrete floor 5 locating for it, and the steel plate 1 of reinforcing preferably makes
With bar shaped steel band.
The construction method of the present embodiment is, comprising the following steps:
Reinforcing preparation is carried out first:
Step 1): the spots localization to be punched of concrete floor 5 is determined into coagulation by consulting drawing and on-site land survey
The specification, model, quantity and sectional area of vertically and horizontally reinforcing bar are truncated when Tulou plate 5 punches;
Step 2): vertically and horizontally by equal principle to replace by force, and consider influence and certain safety that the drilling of steel plate 1 weakens
Redundancy determines the sectional area of board bottom steel plate;
Step 3): plate top steel plate specification and sectional area and board bottom steel plate comparable configuration;
Step 4): the both ends of newly-increased board bottom steel plate and plate top steel plate should extend on the end of concrete floor 5.
After reinforcing is ready to complete, the installation of three-dimensional system is carried out:
Step 5): in the position for punching 6 outside 50mm~100mm of position, the position line of 1 installation site of steel plate is set, is hung down
Straight concrete floor 5 drills, the 2 big 4mm~6mm of diameter of aperture ratio steel bolt, and spacing is 1~3 times of bar spacing in concrete slab,
150mm~400mm generally is taken, to guarantee not influenced by existing reinforcing bar in boring procedure;
Step 6): it needs to install the position of steel plate 1 on polishing concrete floor 5, reaches the requirement of affixing steel plate 1;
Step 7): it is respectively provided with steel plate 1 in the floor top surface on 6 periphery of position that punches and soffit, and in upper layer and lower layer steel
It is connected between plate 1 using several steel bolts 2 across concrete floor 5, sectional dimension, length and the floor span of steel plate 1, floor are opened
Hole size is related, should determine by calculating, to guarantee that anti-bending bearing capacity and the bending stiffness of steel construction three-dimensional system are not less than
The original concrete floor in hole;
Step 8): drilling on steel plate 1, to install steel bolt 2, coagulation in the mounting hole 7 drilled out on steel plate 1 and step 5)
The bore dia and spacing drilled out on Tulou plate 5 is equal, derusts in the adhesive surface of steel plate;
Step 9): configuration structure glue, structure glue use existing structure glue, are configured according to operation instruction;
Step 10): structure glue is uniformly applied on adhesive surface, pasting boards bottom steel plate, using bolt cap 3 by steel bolt 2 and plate
Bottom steel plate connects, and then to injecting structure glue between plate hole and steel bolt 2, then pasting boards top steel plate, and connects steel using bolt cap 3
Bolt 2 and plate top steel plate form steel construction three-dimensional system, are reinforced using steel construction three-dimensional system to the concrete floor 5 after punching.
Stress condition of the invention is analyzed below, which carries out by taking the three-dimensional system unidirectionally arranged as an example
Illustrate, ruggedized construction form is as shown in Figure 4:
Assuming that slab thickness is h, for effective span direction (concrete floor length direction), the opening width that punches is
B, truncation main reinforcement sectional area are nAs, compare floor with opening and carry out bearing capacity change and stiffness variation after reinforcement using the present invention.
One, bearing capacity change:
Floor anti-bending bearing capacity loses about after punching are as follows:
M0=0.85fy·nAs·h0
In formula: fyFor the tensile strength of reinforcing bar in concrete floor 5;
h0For the calculated thickness of concrete floor, the i.e. distance on plate top to reinforcing bar centroid.
When using steel construction three-dimensional system, steel plate model-t × b (- indicate that steel plate, t indicate that thickness, b indicate width),
Then totally two pieces of hole both side plate bottom steel plate, can be improved bearing capacity are as follows:
In formula: the tensile strength of f expression steel plate 1.
Two, stiffness variation:
The advantageous effect for not considering reinforcing bar is removed original concrete building panel stiffness at hole are as follows:
In formula: EcFor the elasticity modulus of concrete floor;
I0For the second moment of area of tranformed section of concrete floor.
It is unidirectionally arranged as example with steel plate 1, when using steel construction three-dimensional system, steel plate model-b × t, totally four pieces of steel plate 1,
The then rigidity that hole two sides steel plate 1 provides are as follows:
In formula: EsFor the elasticity modulus of steel plate;
I1For the second moment of area of tranformed section for the three-dimensional system that steel plate is constituted.
Three, reinforcement criteria:
Meet the bearing capacity and stiffness that improves after reinforcing be not less than the original concrete floor bearing capacity for removing hole and
Rigidity.For one-way slabs, single Impact direction can be only considered;For two-way slab, it is considered as the stress in two span directions.
That is: the condition that the reinforcing steel construction three-dimensional system needs of setting meet are as follows:
M1≥M0;
Es·I1≥Ec·I0
When determining the sectional dimension and length of steel plate, steel plate is made to meet the condition.
Still by taking the three-dimensional system unidirectionally arranged as an example, the present invention is made below with reference to implementation result of the invention further
Description:
One, experimental study:
Concrete building span of slab 4200mm, width 2000mm.Using C30 concrete, plate thickness 120mm, internal 10@of arrangement of reinforcement
100 (bar diameter 10mm, bar spacing 100mm).Quasi- punch width 1000mm, length (span direction) 2000mm, by unidirectional
Plate stress considers.Using steel construction three-dimensional system carry out reinforcement and strengthening, steel plate model Q235, having a size of-t × b=-10 ×
150。
(1) analysis is calculated:
1. floor weakens situation after punching:
As shown in Fig. 8 (a), concrete floor anti-bending bearing capacity is lost about are as follows:
M0=0.85fy·nAs·h0=0.85 × 300 × 10 × 78.5 × 90=18,015,750Nmm
As shown in Fig. 8 (b), the concrete building flexural rigidity of a plate is lost about are as follows:
2. carrying out reinforcement and strengthening, steel plate model-t × b=-10 × 120 using steel construction three-dimensional system.
As shown in Fig. 8 (c), bearing capacity is can be improved in the 6 two sides steel plate of position that punches (board bottom totally two blocks of steel plates) are as follows:
As shown in Fig. 8 (d), totally four pieces of steel plate bottom, plate top, then the rigidity that hole two sides steel plate provides are as follows:
(2) measured data
This test test specimen totally three considers that clear span is 4200mm, and plate width is 2000mm, plate thickness by one-way slabs
120mm.Test specimen A is intact concrete floor;It punches centered on test specimen B, span direction 2000mm, plate width direction 1000mm,
The concrete floor of reinforcement measure is not taken;Test specimen C is on the basis of test specimen B, using steel construction three-dimensional system of the invention
The concrete floor for carrying out reinforcement and strengthening, the reinforcing steel plate model Q235 used in test specimen C, having a size of-t × b=-10 ×
150。
By the way of the hierarchical loading of plate top, the bearing capacity and deflection deformation situation of three test specimens are tested.
1. bearing capacity situation is as shown in the table:
Test specimen title | Test specimen A | Test specimen B | Test specimen C |
Failing load kN/m | 16.0 | 10.5 | 35.5 |
2. deflection deformation situation is as shown in Figure 9.
Two, conclusion is analyzed:
By calculating analysis above, after carrying out reinforcement and strengthening using the present invention, the unguyed test specimen of the bearing capacity ratio of test specimen C
B improves 250%, than concrete floor (test specimen A) bearing power increase for not punching 100%;It is acted in plate original design load
Under (about 8kN/m), amount of deflection be test specimen A 11%, be test specimen B 42%.Bearing capacity and stiffness is all larger than concrete floor and punches
Before, it can satisfy safe handling and require.
Two-way slab force analysis is identical with this, repeats no more.
Structure glue in the present invention is not limited to using structure glue as described in the examples, can also be using other for building
Glue.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not whole embodiments of the invention, not to limit
The system present invention, all within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in
Within protection scope of the present invention.
In addition to the technical characteristic described in the specification, remaining technical characteristic is technology known to those skilled in the art, in order to prominent
Innovative characteristics of the invention out, details are not described herein for above-mentioned technical characteristic.
Claims (3)
1. a kind of reinforce the construction method for using steel construction three-dimensional system, characterized in that the following steps are included:
Step 1): the position line of the outside setting steel plate installation site at the position that punches on concrete floor;
Step 2): it is respectively provided with steel plate in the top and bottom of concrete floor according to the position line, the steel plate of floor top surface is
Plate top steel plate, the steel plate of soffit are board bottom steel plate;
Step 3): plate top steel plate, concrete floor and board bottom steel plate are fixed with one by conducting wire rigid-connecting device.
It is connected by steel bolt with structure glue between plate top steel plate, concrete floor and board bottom steel plate, connection method includes
Following steps:
Step a: it needs to install the position drilling of steel plate on concrete floor, also drills out same diameter and spacing on the steel plate
Hole;
Step b: it needs to install the position of steel plate on polishing concrete floor, reaches the requirement of affixing steel plate;
Step c: it derusts in the adhesive surface of steel plate;
Step d: pasting boards bottom steel plate is connected steel bolt and board bottom steel plate using tapered plug cap, then Xiang Gangshuan and concrete
Injecting structure glue between the hole of steel bolt, then pasting boards top steel plate are installed on floor, and steel bolt and plate top steel plate are connected using bolt cap,
Tapered connection of the bolt cap between steel plate and steel bolt.
2. construction method according to claim 1, characterized in that the position line is located on concrete floor the position that punches
Outside 50mm~100mm position.
3. construction method according to claim 1, characterized in that in the step a, the hole that drills on concrete floor
Diameter is 4mm~6mm bigger than the diameter of steel bolt, and spacing is 1~3 times of bar spacing in concrete floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810995893.6A CN109057392B (en) | 2016-04-15 | 2016-04-15 | Construction method of steel structure for reinforcement |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610237156.0A CN105863289B (en) | 2016-04-15 | 2016-04-15 | A kind of reinforce uses steel construction three-dimensional system and its construction method |
CN201810995893.6A CN109057392B (en) | 2016-04-15 | 2016-04-15 | Construction method of steel structure for reinforcement |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610237156.0A Division CN105863289B (en) | 2016-04-15 | 2016-04-15 | A kind of reinforce uses steel construction three-dimensional system and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109057392A true CN109057392A (en) | 2018-12-21 |
CN109057392B CN109057392B (en) | 2020-09-18 |
Family
ID=56633199
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610237156.0A Expired - Fee Related CN105863289B (en) | 2016-04-15 | 2016-04-15 | A kind of reinforce uses steel construction three-dimensional system and its construction method |
CN201810995893.6A Expired - Fee Related CN109057392B (en) | 2016-04-15 | 2016-04-15 | Construction method of steel structure for reinforcement |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610237156.0A Expired - Fee Related CN105863289B (en) | 2016-04-15 | 2016-04-15 | A kind of reinforce uses steel construction three-dimensional system and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN105863289B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284728A (en) * | 2019-07-19 | 2019-09-27 | 华侨大学 | A kind of the plate-column structure floor reinforcing construction and its construction method of anti-punching failure |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106592995B (en) * | 2016-11-01 | 2018-10-26 | 中国建筑第八工程局有限公司 | Open the installation method of overarm steel construction stress system |
CN107338861B (en) * | 2016-11-22 | 2019-08-02 | 浙江绿筑集成科技有限公司 | The method for improving staggered truss chord member part anti-bending bearing capacity |
CN107100376A (en) * | 2017-04-15 | 2017-08-29 | 福州大学 | Superstructure reinforcing device and its construction method |
CN108678417B (en) * | 2018-07-31 | 2023-07-21 | 天津市建筑设计院 | Steel construction floor reforms transform node |
CN112431436B (en) * | 2020-12-14 | 2022-10-21 | 东莞理工学院 | Anti-punching reinforcement construction method for flat slab |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104179364A (en) * | 2014-07-24 | 2014-12-03 | 北京筑福国际工程技术有限责任公司 | Reinforcing structure for rear opening in shear wall and construction method of reinforcing structure |
CN104763161A (en) * | 2014-09-24 | 2015-07-08 | 杭州江润科技有限公司 | Beam-adding reinforced structure of a reinforced concrete floor with an opening and construction method |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2819103B2 (en) * | 1995-11-27 | 1998-10-30 | ショーボンド建設株式会社 | How to attach steel plates to concrete structures |
KR20070056331A (en) * | 2005-11-29 | 2007-06-04 | 재단법인 포항산업과학연구원 | Extending system for wall-type structural apartment and method for constructing the same |
CN103321444B (en) * | 2013-06-14 | 2015-09-09 | 罗海军 | Concrete floor reinforced construction method |
CN103628698B (en) * | 2013-12-09 | 2015-11-25 | 中国建筑一局(集团)有限公司 | Construction method for opening prestressed floor slab in structural reinforcement engineering |
CN204703495U (en) * | 2015-04-01 | 2015-10-14 | 广东合迪科技股份有限公司 | Aluminum alloy pattern plate back cord system |
CN205476581U (en) * | 2016-04-15 | 2016-08-17 | 山东省建筑科学研究院 | Consolidate and use steel construction three -dimensional system |
-
2016
- 2016-04-15 CN CN201610237156.0A patent/CN105863289B/en not_active Expired - Fee Related
- 2016-04-15 CN CN201810995893.6A patent/CN109057392B/en not_active Expired - Fee Related
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104179364A (en) * | 2014-07-24 | 2014-12-03 | 北京筑福国际工程技术有限责任公司 | Reinforcing structure for rear opening in shear wall and construction method of reinforcing structure |
CN104763161A (en) * | 2014-09-24 | 2015-07-08 | 杭州江润科技有限公司 | Beam-adding reinforced structure of a reinforced concrete floor with an opening and construction method |
Non-Patent Citations (2)
Title |
---|
甘尚琼: "剪力墙及楼板后开洞粘钢加固法", 《建筑安全》 * |
赵一骏: "粘钢加固楼板开洞有限元分析", 《山西建筑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284728A (en) * | 2019-07-19 | 2019-09-27 | 华侨大学 | A kind of the plate-column structure floor reinforcing construction and its construction method of anti-punching failure |
CN110284728B (en) * | 2019-07-19 | 2023-12-29 | 华侨大学 | Slab-column structure floor reinforcing structure capable of preventing impact cutting damage and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN105863289B (en) | 2018-10-02 |
CN109057392B (en) | 2020-09-18 |
CN105863289A (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863289B (en) | A kind of reinforce uses steel construction three-dimensional system and its construction method | |
CN201172796Y (en) | Steel box girder bridge deck structure with upper longitudinal ribs | |
CN104878948B (en) | A kind of reinforcement means of rc-frame-beam hogging moment area | |
CN207331459U (en) | A kind of orthotropic plate-concrete combined bridge deck | |
CN203200914U (en) | Steel structure socle outward exposed connecting structure | |
CN105926423B (en) | It is a kind of applied to the combination beam type bridge floor continuation apparatus of Hollow Slab Beam Bridge and bridge floor continuation method | |
CN108643602A (en) | A kind of outsourcing anchor steel ruggedized construction suitable for concrete beam and column node | |
CN105604344B (en) | A kind of reinforcement means for having crack interior wall | |
KR100352646B1 (en) | Method to reinforce the endurance force of structure using tensile beam | |
CN205314589U (en) | Overhanging type discharging platform | |
CN105863257A (en) | Slab-beam separation type high-formwork support connected support building method of multilayered/high-rise reinforced concrete structure | |
CN102966113A (en) | Shallow buried steel column base and construction method thereof | |
CN104652244B (en) | A kind of Suspension bridge structure for reinforcing PSC Continuous Box Girder Bridge and construction method | |
CN109765017A (en) | Small hinge stitches blank board bridge composite reinforcement component transverse direction shear behavior test method | |
CN103291082A (en) | Wood beam reinforcing body external pre-stress construction method | |
CN104594189B (en) | The hinge seam structure of the compound shear connector of band and prefabricated slab bridge thereof | |
CN113585805A (en) | Connecting structure of layered steel column base | |
CN209555782U (en) | A kind of truss I steel composite type bent cap anchor ear construction bracket | |
CN104806031B (en) | Timber structure reinforced construction method | |
CN107503768B (en) | The method of the oblique Soil-nailed of overlying strata soil on Small Data Sets shallow embedding tunnel | |
CN205476581U (en) | Consolidate and use steel construction three -dimensional system | |
CN110284725A (en) | A kind of reinforced concrete frame node negative moment of girder assembly steel construction and its reinforcement means | |
CN102605945B (en) | Manufacturing method of big wood formwork | |
KR20120108328A (en) | Deck panel using reinforced strand and construction method therefor | |
CN113123811A (en) | Rock mass cavity protective structure suitable for high-altitude area based on tunnel engineering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200918 |