CN109057245A - A kind of small bore vertical shaft exempts from the construction method of demoulding - Google Patents

A kind of small bore vertical shaft exempts from the construction method of demoulding Download PDF

Info

Publication number
CN109057245A
CN109057245A CN201810929219.8A CN201810929219A CN109057245A CN 109057245 A CN109057245 A CN 109057245A CN 201810929219 A CN201810929219 A CN 201810929219A CN 109057245 A CN109057245 A CN 109057245A
Authority
CN
China
Prior art keywords
vertical shaft
thin wall
demoulding
annular thin
wall concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810929219.8A
Other languages
Chinese (zh)
Other versions
CN109057245B (en
Inventor
田忠庆
张培军
卢大文
樊传刚
彭忠凡
梁浩
赵成林
许长征
杨康
丁兰
周丹纤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 8 Co Ltd
Original Assignee
Sinohydro Bureau 8 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 8 Co Ltd filed Critical Sinohydro Bureau 8 Co Ltd
Priority to CN201810929219.8A priority Critical patent/CN109057245B/en
Publication of CN109057245A publication Critical patent/CN109057245A/en
Application granted granted Critical
Publication of CN109057245B publication Critical patent/CN109057245B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention discloses the construction methods that a kind of small bore vertical shaft exempts from demoulding, the multiple annular thin wall concrete inner moulds with certain length of pre-production, the small bore vertical shaft exempts from the construction method of demoulding the following steps are included: S1: in next layer of casting of concrete in mass, determine Shaft Location, and pre-buried fixed internal formwork reinforcing member;S2: according to this layer of casting of concrete in mass thickness, the annular thin wall concrete inner mould of the corresponding length of pre-production is chosen, is lifted to Shaft Location, is positioned and reinforce using fixed internal formwork reinforcing member;S3: this layer of mass concrete, the fixed internal formwork reinforcing member of pre-buried upper one layer of vertical shaft are poured;S4: repeating step S2 and step S3, until Construction of Silo is completed.The present invention had without the advantages of carrying out demoulding in the vertical shaft of narrow space, reducing form removable process, greatly accelerate construction speed.

Description

A kind of small bore vertical shaft exempts from the construction method of demoulding
Technical field
The present invention relates to the constructions that the construction method of vertical shaft in architectural engineering more particularly to a kind of small bore vertical shaft exempt from demoulding Method.
Background technique
In large volume concrete structural, various forms of small bore vertical shafts are often reserved with, vertical shaft inner space is narrow Small, the construction of existing vertical shaft is mainly to reserve vertical shaft hole, according to the size of vertical shaft hole inner wall, makes vertical shaft mold, pours substantially Before product concrete, vertical shaft mold is put into vertical shaft hole, is removed after having poured mass concrete.This construction method, Assembly and disassembly bracket, template installation are the confined space operation when construction, and form removal operation is cumbersome after construction, and working efficiency is low, Security risk is big.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the deficiencies in the prior art, provide a kind of without in the perpendicular of narrow space Demoulding is carried out in well, reduces form removable process, the small bore vertical shaft for greatly accelerating construction speed exempts from the construction party of demoulding Method.
In order to solve the above technical problems, the invention adopts the following technical scheme:
A kind of small bore vertical shaft exempts from the construction method of demoulding, the multiple annular thin wall coagulations with certain length of pre-production Native internal model, the small bore vertical shaft exempt from the construction method of demoulding the following steps are included:
S1: in next layer of casting of concrete in mass, Shaft Location, and pre-buried fixed internal formwork reinforcing member are determined;
S2: according to this layer of casting of concrete in mass thickness, the annular thin wall coagulation of the corresponding length of pre-production is chosen Native internal model lifts to Shaft Location, positions and reinforce using fixed internal formwork reinforcing member;
S3: this layer of mass concrete, the fixed internal formwork reinforcing member of pre-buried upper one layer of vertical shaft are poured;
S4: repeating step S2 and step S3, until Construction of Silo is completed.
As a further improvement of the above technical scheme:
The step of pre-production annular thin wall concrete inner mould are as follows:
S01: it according to the size and depth of vertical shaft, calculates to prefabricated annular thin wall concrete inner mould quantity and size;
S02: prefabricated annular thin wall concrete inner mould is waited for according to each, makes corresponding molding die;
S03: pouring annular thin wall concrete inner mould one by one, demould after molding, completes all annular thin wall concrete inner moulds Pre-production.
Preferably, in the step S03, when pouring single annular thin wall concrete inner mould, it is arranged in molding die Single layer steel mesh, for increasing the intensity of annular thin wall concrete inner mould.
Preferably, in the step S03, when pouring single annular thin wall concrete inner mould, reserved a pair is for hanging The lifting hole(eyelet) of dress.
Preferably, in the step S03, after annular thin wall concrete inner mould shaping and demoulding, covering humidification maintenance is carried out, To reach design concrete grade intensity.
Preferably, in the step S2, the fixed internal formwork reinforcing member is positioning fashioned iron, is arranged four, is divided into vertical shaft Surrounding or quadrangle, annular thin wall concrete inner mould are arranged in four positioning fashioned iron.
Compared with the prior art, the advantages of the present invention are as follows:
A kind of small bore vertical shaft of the invention exempts from the construction method of demoulding, and core is, make multiple has one in advance The annular thin wall concrete inner mould of measured length gradually mixes single annular thin wall when pouring mass concrete in layer Solidifying soil internal model is overlapped, and is spliced to form vertical shaft, in this way after pouring casting of concrete in mass, is not needed to narrow space Vertical shaft carry out demoulding, reduce form removable process, reduce security risk, meanwhile, greatly accelerate construction speed.This hair The internal model of vertical shaft is changed to concentration pre-casting outside storehouse by the bright internal model by pre-production vertical shaft, and batch production processing is easy to carry out quality Control.
Detailed description of the invention
Fig. 1 is the construction method flow diagram that small bore vertical shaft of the invention exempts from demoulding.
Fig. 2 is vertical shaft schematic cross-section of the invention.
Each label indicates in figure:
1, annular thin wall concrete inner mould;2, mass concrete;3, vertical shaft;4, fixed internal formwork reinforcing member.
Specific embodiment
Below in conjunction with Figure of description and specific embodiment, invention is further described in detail.
As depicted in figs. 1 and 2, the small bore vertical shaft of the present embodiment exempts from the construction method of demoulding, and pre-production is multiple to be had The annular thin wall concrete inner mould 1 of certain length, small bore vertical shaft exempt from the construction method of demoulding the following steps are included:
S1: when next layer of mass concrete 2 pours, 3 position of vertical shaft, and pre-buried fixed internal formwork reinforcing member 4 are determined;
S2: thickness is poured according to this layer of mass concrete 2, chooses the annular thin wall coagulation of the corresponding length of pre-production Native internal model 1, lifting to 3 position of vertical shaft are positioned and are reinforced using fixed internal formwork reinforcing member 4;
S3: this layer of mass concrete 2, the fixed internal formwork reinforcing member 4 of pre-buried upper one layer of vertical shaft 3 are poured;
S4: repeating step S2 and step S3, until the construction of vertical shaft 3 is completed.
A kind of small bore vertical shaft of the invention exempts from the construction method of demoulding, and core is, make multiple has one in advance The annular thin wall concrete inner mould 1 of measured length, when pouring mass concrete 2 in layer, gradually by single annular thin wall Concrete inner mould 1 is overlapped, and is spliced to form vertical shaft 3, in this way after pouring mass concrete 2 and pouring, is not needed to sky Between narrow vertical shaft 3 carry out demoulding, reduce form removable process, reduce security risk, meanwhile, greatly accelerate construct into Degree.
In the present embodiment, in step S2, fixed internal formwork reinforcing member 4 is positioning fashioned iron, is arranged four, is divided into vertical shaft four Angle, annular thin wall concrete inner mould 1 are arranged in four positioning fashioned iron, not only can be to annular thin wall concrete inner mould 1 It is positioned, after the mass concrete 2 of current layer pours, positioning fashioned iron is to entire superimposed annular thin wall concrete Internal model 1 has the function of reinforcing.
In the present embodiment, the step of pre-production annular thin wall concrete inner mould 1 are as follows:
S01: it according to the size and depth of vertical shaft 3, calculates to prefabricated 1 quantity of annular thin wall concrete inner mould and ruler It is very little;
S02: prefabricated annular thin wall concrete inner mould 1 is waited for according to each, makes corresponding molding die;
S03: preparing a prefabricated place outside storehouse surface, pour annular thin wall concrete inner mould 1 one by one, demould after molding, Complete the pre-production of all annular thin wall concrete inner moulds 1.
Wherein, in the step S03, when pouring single annular thin wall concrete inner mould 1, it is arranged in molding die single Layer steel mesh, for increasing the intensity of annular thin wall concrete inner mould 1.A pair of symmetrically lifting hole(eyelet) for lifting reserved simultaneously. In the step S03, after 1 shaping and demoulding of annular thin wall concrete inner mould, covering humidification maintenance is carried out, to reach design coagulation Native grade strength.
The present invention passes through the internal model of pre-production vertical shaft 3, the internal model of vertical shaft 3 is changed to concentration pre-casting outside storehouse, batch production adds Work is easy to carry out quality control.The length of each annular thin wall concrete inner mould 1 can be all the same, can also be all different, or Person is a part of identical.It designs according to actual needs.
Although the present invention has been disclosed as a preferred embodiment, however, it is not intended to limit the invention.It is any to be familiar with ability The technical staff in domain, without deviating from the scope of the technical scheme of the present invention, all using the technology contents pair of the disclosure above Technical solution of the present invention makes many possible changes and modifications or equivalent example modified to equivalent change.Therefore, all Without departing from the content of technical solution of the present invention, according to the present invention technical spirit any simple modification made to the above embodiment, Equivalent variations and modification, all shall fall within the protection scope of the technical scheme of the invention.

Claims (6)

1. the construction method that a kind of small bore vertical shaft exempts from demoulding, which is characterized in that the multiple rings with certain length of pre-production Shape thin wall concrete internal model (1), the small bore vertical shaft exempt from the construction method of demoulding the following steps are included:
S1: when next layer of mass concrete (2) pours, vertical shaft (3) position, and pre-buried fixed internal formwork reinforcing member (4) are determined;
S2: thickness is poured according to this layer of mass concrete (2), chooses the annular thin wall concrete of the corresponding length of pre-production Internal model (1), lifting to vertical shaft (3) position are positioned and are reinforced using fixed internal formwork reinforcing member (4);
S3: pouring this layer of mass concrete (2), the fixed internal formwork reinforcing member (4) of pre-buried upper one layer of vertical shaft (3);
S4: repeating step S2 and step S3, until vertical shaft (3) construction is completed.
2. the construction method that small bore vertical shaft according to claim 1 exempts from demoulding, which is characterized in that pre-production annular is thin The step of wall concrete inner mould (1) are as follows:
S01: it according to the size and depth of vertical shaft (3), calculates to prefabricated annular thin wall concrete inner mould (1) quantity and ruler It is very little;
S02: prefabricated annular thin wall concrete inner mould (1) is waited for according to each, makes corresponding molding die;
S03: pouring annular thin wall concrete inner mould (1) one by one, demould after molding, completes all annular thin wall concrete inner moulds (1) pre-production.
3. the construction method that small bore vertical shaft according to claim 2 exempts from demoulding, which is characterized in that in the step S03, When pouring single annular thin wall concrete inner mould (1), single layer steel mesh is set in molding die, for increasing annular thin wall The intensity of concrete inner mould (1).
4. the construction method that small bore vertical shaft according to claim 2 exempts from demoulding, which is characterized in that in the step S03, When pouring single annular thin wall concrete inner mould (1), a pair of lifting hole(eyelet) for lifting is reserved.
5. the construction method that small bore vertical shaft according to claim 2 exempts from demoulding, which is characterized in that in the step S03, After annular thin wall concrete inner mould (1) shaping and demoulding, covering humidification maintenance is carried out, to reach design concrete grade intensity.
6. the construction method that small bore vertical shaft according to claim 1 exempts from demoulding, which is characterized in that in the step S2, The fixed internal formwork reinforcing member (4) is positioning fashioned iron, is arranged four, is divided into vertical shaft surrounding or quadrangle, annular thin wall concrete Internal model (1) is arranged in four positioning fashioned iron.
CN201810929219.8A 2018-08-15 2018-08-15 Construction method for small-section vertical shaft without formwork removal Active CN109057245B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810929219.8A CN109057245B (en) 2018-08-15 2018-08-15 Construction method for small-section vertical shaft without formwork removal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810929219.8A CN109057245B (en) 2018-08-15 2018-08-15 Construction method for small-section vertical shaft without formwork removal

Publications (2)

Publication Number Publication Date
CN109057245A true CN109057245A (en) 2018-12-21
CN109057245B CN109057245B (en) 2020-05-05

Family

ID=64686106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810929219.8A Active CN109057245B (en) 2018-08-15 2018-08-15 Construction method for small-section vertical shaft without formwork removal

Country Status (1)

Country Link
CN (1) CN109057245B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06170818A (en) * 1991-10-07 1994-06-21 Mitsuo Tosaka Production of form made of concrete
CN102493647A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for high-rise concrete structure
CN103628883A (en) * 2013-12-18 2014-03-12 中铁隧道集团二处有限公司 Non-bracket overlong steel bar binding mobile molding method of deep-narrow vertical shaft
CN106837341A (en) * 2017-01-11 2017-06-13 中铁十六局集团地铁工程有限公司 A kind of construction method of Metro construction shaft wall
CN107237637A (en) * 2017-07-12 2017-10-10 福州大学 Suitable for the concrete supporting structure and construction method of small-sized Construction of Silo

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06170818A (en) * 1991-10-07 1994-06-21 Mitsuo Tosaka Production of form made of concrete
CN102493647A (en) * 2011-12-05 2012-06-13 中冶天工集团有限公司 Construction method for high-rise concrete structure
CN103628883A (en) * 2013-12-18 2014-03-12 中铁隧道集团二处有限公司 Non-bracket overlong steel bar binding mobile molding method of deep-narrow vertical shaft
CN106837341A (en) * 2017-01-11 2017-06-13 中铁十六局集团地铁工程有限公司 A kind of construction method of Metro construction shaft wall
CN107237637A (en) * 2017-07-12 2017-10-10 福州大学 Suitable for the concrete supporting structure and construction method of small-sized Construction of Silo

Also Published As

Publication number Publication date
CN109057245B (en) 2020-05-05

Similar Documents

Publication Publication Date Title
CN110126082A (en) A kind of concrete box girder internal model stripper apparatus and release method
CN104226915B (en) Casting method of hollow shaft and casting mold
CN106142335B (en) A kind of production method and particular manufacturing craft of rectangular gas flue
CN204867312U (en) Reduce gate stick of foundry goods crackle
CN204772928U (en) Cement flower bucket is pour and is used centre form
CN109057245A (en) A kind of small bore vertical shaft exempts from the construction method of demoulding
CN102699273A (en) Precision casting method for large-scale aluminium alloy impeller
CN202555770U (en) Bimetal casting vertical parting string pouring type pouring system
CN207526118U (en) For pre-buried and closure unwrapping wire hole unwrapping wire punch die
CN104942231B (en) A kind of preparation method of casting ceramic pouring cup
CN207997396U (en) One kind exempting from formwork constructional column shaper
CN205704637U (en) A kind of cement products or concrete structural surface imaging decoration lining mould
CN216801590U (en) Frameless sand pouring basin
CN107350426A (en) A kind of blank preparation method of bearing block
CN103266769B (en) A kind of construction method of spherical vault lid
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs
CN206404395U (en) A kind of filter tank V-groove
CN207288809U (en) A kind of upper mold of bucket tooth precoated sand mould
CN218748409U (en) Device for manufacturing concrete floor thickness control block
CN106316328A (en) Method for producing autoclaved aerated concrete building blocks
CN106825405B (en) A kind of vertical pouring structure for producing well lid in batches
CN218149893U (en) Hoisting structure for prefabricated part suspender
CN220920849U (en) Casting molding device for spheroidized steel plate
CN206928146U (en) A kind of railway cement prefabricated component
CN202248543U (en) Reinforcing cage shelf

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant