CN109056801A - A kind of pipe gallery Slab Waterproof Construction technique - Google Patents

A kind of pipe gallery Slab Waterproof Construction technique Download PDF

Info

Publication number
CN109056801A
CN109056801A CN201811022724.0A CN201811022724A CN109056801A CN 109056801 A CN109056801 A CN 109056801A CN 201811022724 A CN201811022724 A CN 201811022724A CN 109056801 A CN109056801 A CN 109056801A
Authority
CN
China
Prior art keywords
adhesive membrane
waterproof roll
prespreading
macromolecular self
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811022724.0A
Other languages
Chinese (zh)
Inventor
苏光明
张光军
倪代俊
向海保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Corp
Original Assignee
China 19th Metallurgical Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Corp filed Critical China 19th Metallurgical Corp
Priority to CN201811022724.0A priority Critical patent/CN109056801A/en
Publication of CN109056801A publication Critical patent/CN109056801A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Abstract

The present invention relates to the technical fields of infrastructure construction, provide a kind of pipe gallery Slab Waterproof Construction technique, comprising: step S10, preparation of construction;Step S20, base cleaning, specifically: remove dust, the sundries of substrate surface;Step S30, base's snap the line, specifically: by the width of prespreading Macromolecular self-adhesive membrane waterproof roll, bullet sets the control line of prespreading Macromolecular self-adhesive membrane waterproof roll paving in base;Step S40, sky paving prespreading Macromolecular self-adhesive membrane waterproof roll, specifically: prespreading Macromolecular self-adhesive membrane waterproof roll is layered in base by the good control line positioning sky of bullet, and the smooth smooth surface of high density polyethylene (HDPE) plate of prespreading Macromolecular self-adhesive membrane waterproof roll is towards base, weather-proof particle layer surface is to construction personnel;Step S50 is checked and accepted.Pipe gallery Slab Waterproof Construction technique provided by the invention, is effectively prevented Groundwater infiltration, and the settlement influence not generated by concrete ground flowering structure, construction technology are simple.

Description

A kind of pipe gallery Slab Waterproof Construction technique
Technical field
The present invention relates to the technical fields of infrastructure construction, are that be related to a kind of pipe gallery bottom plate anti-more specifically Water construction technology.
Background technique
Pipe gallery is the important component in urban pipeline engineering, the normal operation in city is played most important Effect.In the construction and management process of pipe gallery, the waterproof of pipe gallery, antiseepage are the most important thing, pipe gallery one Denier leak will directly affect the operation and maintenance of piping lane, and severe one is even more so that pipe gallery is scrapped, city is paralysed, and consequence is very Seriously.Different waterproof constructions and different Waterproof Construction Techniques can generate different waterproof effects, synthesis in the prior art The Waterproof Construction Technique of piping lane bottom plate is complicated, and waterproof effect is bad.
The above deficiency, has much room for improvement.
Summary of the invention
In order to overcome the shortcomings of that existing technology, the present invention provide a kind of pipe gallery Slab Waterproof Construction technique.
Technical solution of the present invention is as described below:
A kind of pipe gallery Slab Waterproof Construction technique, comprising:
Step S10, preparation of construction, specifically: material and equipment needed for preparing the construction of pipe gallery bottom plate coiled material;
Step S20, base cleaning, specifically: remove dust, the sundries of substrate surface;
Step S30, base's snap the line, specifically: by the width of prespreading Macromolecular self-adhesive membrane waterproof roll, bullet is set in base The control line of prespreading Macromolecular self-adhesive membrane waterproof roll paving;
Step S40, sky paving prespreading Macromolecular self-adhesive membrane waterproof roll, specifically: prespreading Macromolecular self-adhesive membrane is prevented Water coiled material is layered in base by the good control line positioning sky of bullet, and the high density of prespreading Macromolecular self-adhesive membrane waterproof roll is poly- The smooth smooth surface of vinyl plate is towards base, and weather-proof particle layer surface is to construction personnel;
Step S50 is checked and accepted.
It further, further include step S60 after the step S30, the step S60 is detail treatment processing, specifically Are as follows: in detail treatment brushing water-repellent paint, after water-repellent paint parches completely, carry out the step S40.
Further, water-repellent paint Yu prespreading the Macromolecular self-adhesive membrane waterproof roll handover of the detail treatment brushing Place is sealed using sealing material.
Further, in the step S40, when prespreading Macromolecular self-adhesive membrane waterproof roll carries out lap works, After lap width of having good positioning between adjacent prespreading Macromolecular self-adhesive membrane waterproof roll, then certainly by prespreading macromolecule Barrier paper on adhesive film waterproof roll is torn, and is overlapped and is connected with adjacent prespreading Macromolecular self-adhesive membrane waterproof roll, and It is bonded with roller compaction.
Further, the lap width between the adjacent prespreading Macromolecular self-adhesive membrane waterproof roll is 80mm.
It further, further include step S70 after the step S50, the step S70 are as follows: assembling reinforcement.
It further, further include step S80 after the step S70, the step S80 are as follows: casting concrete.
A kind of beneficial effect of waterproof structure for deformation seams provided by the invention is: pipe gallery waterproof slab provided by the invention Construction technology is effectively prevented Groundwater infiltration, and the settlement influence not generated by concrete ground flowering structure, construction technology letter It is single.
Detailed description of the invention
It to describe the technical solutions in the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art Needed in attached drawing be briefly described, it should be apparent that, the accompanying drawings in the following description is only of the invention some Embodiment for those of ordinary skill in the art without creative efforts, can also be attached according to these Figure obtains other attached drawings.
Fig. 1 is process flow chart one of the invention;
Fig. 2 is process flow chart two of the invention;
Fig. 3 is process flow chart three of the invention.
Specific embodiment
In order to which technical problems, technical solutions and advantages to be solved are more clearly understood, tie below Accompanying drawings and embodiments are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
It should be noted that be referred to as " being fixed on " or " being set to " another component when component, it can directly or It is located on another component indirectly.When a component referred to as " is connected to " another component, it can be directly or It is connected on another component in succession.Term " on ", "lower", "left", "right", "front", "rear", "vertical", "horizontal", "top", The orientation or position of the instructions such as "bottom", "inner", "outside" are orientation based on the figure or position, are merely for convenience of describing, It should not be understood as the limitation to the technical program.Term " first ", " second " are used merely to facilitate description purpose, and should not be understood as Indication or suggestion relative importance or the quantity for implicitly indicating technical characteristic.The meaning of " plurality " is two or more, Unless otherwise specifically defined.
Referring to Fig. 1, a kind of pipe gallery Slab Waterproof Construction technique, comprising:
Step S10, preparation of construction, specifically: material and equipment needed for preparing the construction of pipe gallery bottom plate coiled material, including overlay Near the transport of materials to construction site such as formula Macromolecular self-adhesive membrane waterproof roll, water-repellent paint, sealing material, and stack whole Together.
Step S20, base cleaning, specifically: dust, the sundries of substrate surface are removed, is looked at uneven base using mortar It is flat.
Step S30, base's snap the line, specifically: by the width of prespreading Macromolecular self-adhesive membrane waterproof roll in base Bullet sets the control line of prespreading Macromolecular self-adhesive membrane waterproof roll paving, to ensure prespreading Macromolecular self-adhesive membrane waterproof roll Material paving is straight, smooth.
Step S40, sky paving prespreading Macromolecular self-adhesive membrane waterproof roll, specifically: by prespreading adhesive polymer glue Film waterproof roll is layered in base by the good control line positioning sky of bullet, and prespreading Macromolecular self-adhesive membrane waterproof roll is highly dense Spend the smooth smooth surface of polyethylene board towards base, weather-proof particle layer surface is to construction personnel.
Step S50 is checked and accepted.
Referring to Fig. 2, further including step S60, step S60 after step S30 preferably are as follows: detail treatment processing, specifically Are as follows: in detail treatment brushing water-repellent paint, after water-repellent paint parches completely, carry out step S40.
Preferably, the water-repellent paint of detail treatment brushing and prespreading Macromolecular self-adhesive membrane waterproof roll junction use Sealing material is sealed.The waterproof effect for improving detail treatment is set in this way.
Preferably, water-repellent paint is cement based penetration crystallization type water proofing paint.
In one embodiment, for pile crown plane and pile body position, brushing cement based penetration crystallization type water proofing paint is applied Pass is scraped to be no less than 3 times, it is every all over must can be into after the cement based penetration crystallization type water proofing paint that last time brushes parches completely Next time construction of row, direction is scraped in every time painting to be mutually perpendicular to, and every to scrape dosage about 0.6kg/ ㎡ all over painting, brushing dosage is no less than 1.5kg/ ㎡ can large area paving prespreading height after cement based penetration crystallization type water proofing paint construction is completed and parched completely Molecule self-adhesion glue film waterproof roll, after the completion of prespreading Macromolecular self-adhesive membrane waterproof roll paving, the cement base of pile body is seeped Saturating crystalline waterproof coating and prespreading Macromolecular self-adhesive membrane waterproof roll junction are sealed using mating Special seal material, Mating Special seal material construction is constructed at pile crown reinforcing bar and is met before reinforcing bar binding is completed with a thickness of 10mm, width 30mm Water expansion water-stop glue, water-swellable water-stop glue width of constructing is 20mm, thickness 10mm, water-swellable water-stop glue should it is continuous, uniformly, Completely.
It preferably, in step s 40, will be adjacent when prespreading Macromolecular self-adhesive membrane waterproof roll carries out lap works Prespreading Macromolecular self-adhesive membrane waterproof roll between have good positioning after lap width, then by prespreading Macromolecular self-adhesive membrane Barrier paper on waterproof roll is torn, and is overlapped and is connected with adjacent prespreading Macromolecular self-adhesive membrane waterproof roll, and uses pressure roller Compacting bonding.
Preferably, the lap width between adjacent prespreading Macromolecular self-adhesive membrane waterproof roll is 80mm.
In one embodiment, adjacent second width prespreading Macromolecular self-adhesive membrane waterproof roll and the first width prespreading are high The lap width of molecule self-adhesion glue film waterproof roll is 80mm, but no more than overlap joint guide line, when overlap joint raises prespreading height The isolation film of molecule self-adhesion glue film waterproof roll lap-joint guarantees that lap-joint is clean, dries no dust, is compacted prespreading high score The overlap edge of sub- self-adhesion glue film waterproof roll squeezes out the bubble of overlap edge, and is cemented with roller compaction, when prespreading macromolecule from After the completion of adhesive film waterproof roll overlap joint, the isolation film on prespreading Macromolecular self-adhesive membrane waterproof roll can be torn, be repeated Aforesaid operations are completed until the prespreading Macromolecular self-adhesive membrane waterproof roll of entire plane is laid with.
It should be understood that when base is moist or construction environment temperature is lower prespreading high score can be carried out with air-heater Sub- self-adhesion glue film waterproof roll overlap edge heat treatment, to guarantee to overlap effect.
Referring to Fig. 3, further including step S70, step S70 are as follows: assembling reinforcement after step S50 preferably.
It preferably, further include step S80, step S80 are as follows: casting concrete after step S70.
In step s 50, before baseplate reinforcing bar welding procedure, first by the prespreading adhesive polymer glue in welding position region The waterproof layer that film waterproof roll is formed sufficiently is soaked with water, is destroyed accidentally when local individually, repairing measures can be taken to repair. Before assembling reinforcement and casting concrete, the anti-of completed prespreading Macromolecular self-adhesive membrane waterproof roll formation is gone through Water layer, discovery breakage must repair in time, in order to avoid leave percolating water hidden danger.When repairing breaking point, cut not less than 150 × 150mm Prespreading Macromolecular self-adhesive membrane waterproof roll, be covered on damaged area, with prespreading Macromolecular self-adhesive membrane waterproof roll Material special adhesive tape is repaired and is compacted cement, and forms entirety with place where troops were originally stationed water layer.In prespreading Macromolecular self-adhesive membrane waterproof roll Material be laid with after the completion of should in 21 days pouring structure concrete, answer careful operation during assembling reinforcement and casting concrete, Prevent artificial destruction prespreading Macromolecular self-adhesive membrane waterproof roll.Approved prespreading Macromolecular self-adhesive membrane waterproof roll Surface is clean, no-sundries, reaches coiled material with concrete and forms effective Nian Jie purpose.
The technological principle of pipe gallery Slab Waterproof Construction technique provided by the invention is as follows:
This engineering comprehensive piping lane bottom plate uses pre-installed and inverted adhered waterproof coiled material system, and pre-installed and inverted adhered waterproof coiled material system is using scene It constructs pre- paving mode, i.e., prespreading Macromolecular self-adhesive membrane waterproof roll adhesive glue one is facing towards operator, and laying is in base Layer (is not required to making cement mortar levelling layer or receives light), then assembling reinforcement, then casting concrete, prespreading Macromolecular self-adhesive membrane Waterproof roll is prevented together with cast-in-place concrete enduringly tight bond, while using dedicated mating cement-base infiltration crystallization type The complete sealing structure waterproof system of the formation such as water paint, sealing material.
Pipe gallery Slab Waterproof Construction technique provided by the invention has the beneficial effect that pipe gallery provided by the invention Slab Waterproof Construction technique is effectively prevented Groundwater infiltration, and the settlement influence not generated by concrete ground flowering structure, construction Simple process.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (7)

1. a kind of pipe gallery Slab Waterproof Construction technique characterized by comprising
Step S10, preparation of construction, specifically: material and equipment needed for preparing the construction of pipe gallery bottom plate coiled material;
Step S20, base cleaning, specifically: remove dust, the sundries of substrate surface;
Step S30, base's snap the line, specifically: by the width of prespreading Macromolecular self-adhesive membrane waterproof roll, bullet is set in base The control line of prespreading Macromolecular self-adhesive membrane waterproof roll paving;
Step S40, sky paving prespreading Macromolecular self-adhesive membrane waterproof roll, specifically: prespreading Macromolecular self-adhesive membrane is prevented Water coiled material is layered in base by the good control line positioning sky of bullet, and the high density of prespreading Macromolecular self-adhesive membrane waterproof roll is poly- The smooth smooth surface of vinyl plate is towards base, and weather-proof particle layer surface is to construction personnel;
Step S50 is checked and accepted.
2. pipe gallery Slab Waterproof Construction technique as described in claim 1, it is characterised in that: after the step S30 also Including step S60, the step S60 is detail treatment processing, specifically: in detail treatment brushing water-repellent paint, applied to waterproof After material parches completely, the step S40 is carried out.
3. pipe gallery Slab Waterproof Construction technique as claimed in claim 2, it is characterised in that: the detail treatment brushing Water-repellent paint is sealed with prespreading Macromolecular self-adhesive membrane waterproof roll junction using sealing material.
4. pipe gallery Slab Waterproof Construction technique as described in claim 1, it is characterised in that: in the step S40, in advance When paving formula Macromolecular self-adhesive membrane waterproof roll carries out lap works, by adjacent prespreading Macromolecular self-adhesive membrane waterproof roll Between have good positioning after lap width, then the barrier paper on prespreading Macromolecular self-adhesive membrane waterproof roll is torn, and it is adjacent Prespreading Macromolecular self-adhesive membrane waterproof roll overlap connection, and be bonded with roller compaction.
5. pipe gallery Slab Waterproof Construction technique as claimed in claim 4, it is characterised in that: the adjacent prespreading high score Lap width between sub- self-adhesion glue film waterproof roll is 80mm.
6. pipe gallery Slab Waterproof Construction technique as described in claim 1, it is characterised in that: after the step S50 also Including step S70, the step S70 are as follows: assembling reinforcement.
7. pipe gallery Slab Waterproof Construction technique as claimed in claim 6, it is characterised in that: after the step S70 also Including step S80, the step S80 are as follows: casting concrete.
CN201811022724.0A 2018-09-04 2018-09-04 A kind of pipe gallery Slab Waterproof Construction technique Pending CN109056801A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811022724.0A CN109056801A (en) 2018-09-04 2018-09-04 A kind of pipe gallery Slab Waterproof Construction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811022724.0A CN109056801A (en) 2018-09-04 2018-09-04 A kind of pipe gallery Slab Waterproof Construction technique

Publications (1)

Publication Number Publication Date
CN109056801A true CN109056801A (en) 2018-12-21

Family

ID=64759530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811022724.0A Pending CN109056801A (en) 2018-09-04 2018-09-04 A kind of pipe gallery Slab Waterproof Construction technique

Country Status (1)

Country Link
CN (1) CN109056801A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763520A (en) * 2018-12-27 2019-05-17 中建四局第六建筑工程有限公司 A kind of sole plate waterproof roll pastes construction technology again
CN112343093A (en) * 2020-10-10 2021-02-09 上海建工七建集团有限公司 Construction method for pre-laying reverse-adhesion waterproof coiled material of basement raft plate
CN114809112A (en) * 2022-04-19 2022-07-29 中铁建工集团有限公司 Basement waterproof construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002983A (en) * 2010-10-19 2011-04-06 卢桂才 Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
KR101606433B1 (en) * 2015-08-24 2016-03-25 주식회사 알엠이엔씨 Asphalt waterproof sheet of self-adhesion
CN105544617A (en) * 2015-09-24 2016-05-04 中建四局第一建筑工程有限公司 Integration construction method for basement soleplate and waterproof roll as well as waterproof structure
CN105888702A (en) * 2016-05-09 2016-08-24 中国建筑第五工程局有限公司 Waterproof construction method in underground engineering
CN107165290A (en) * 2017-07-18 2017-09-15 上海宝冶集团有限公司 Basement bottom board prespreading Macromolecular self-adhesive membrane waterproof roll non-bituminous base construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102002983A (en) * 2010-10-19 2011-04-06 卢桂才 Wet lay-up and edge-jointing construction method of single-sided adhesive wet lay-up waterproof coiled material
KR101606433B1 (en) * 2015-08-24 2016-03-25 주식회사 알엠이엔씨 Asphalt waterproof sheet of self-adhesion
CN105544617A (en) * 2015-09-24 2016-05-04 中建四局第一建筑工程有限公司 Integration construction method for basement soleplate and waterproof roll as well as waterproof structure
CN105888702A (en) * 2016-05-09 2016-08-24 中国建筑第五工程局有限公司 Waterproof construction method in underground engineering
CN107165290A (en) * 2017-07-18 2017-09-15 上海宝冶集团有限公司 Basement bottom board prespreading Macromolecular self-adhesive membrane waterproof roll non-bituminous base construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109763520A (en) * 2018-12-27 2019-05-17 中建四局第六建筑工程有限公司 A kind of sole plate waterproof roll pastes construction technology again
CN112343093A (en) * 2020-10-10 2021-02-09 上海建工七建集团有限公司 Construction method for pre-laying reverse-adhesion waterproof coiled material of basement raft plate
CN114809112A (en) * 2022-04-19 2022-07-29 中铁建工集团有限公司 Basement waterproof construction process

Similar Documents

Publication Publication Date Title
CN110607809B (en) Waterproof construction method for basement of building engineering
CN106120873B (en) A kind of construction method of pile-raft foundation pre-installed and inverted adhered composite high-molecular waterproof roll
CN109056801A (en) A kind of pipe gallery Slab Waterproof Construction technique
CN104912119A (en) Close jointing method for pre-paving macromolecular self-adhesion film waterproof roll
CN107190783A (en) A kind of construction method of basement waterproofing structure and its outer wall of basement waterproof construction
CN105887923A (en) Construction method for pre-paving and invertedly adhering waterproof coiled material in large underground waterproof project
CN211547827U (en) Waterproof structure at joint of concrete bottom plates of new and old buildings
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN108643230A (en) A kind of outer waterproof construction of underground pipe gallery and construction method
CN106968451A (en) A kind of prestressing force roof boarding leakage maintaining method and its system and surface waterproofing construction method
CN104251140A (en) Composite waterproof layer for underground construction and manufacturing and construction method thereof
CN107165290A (en) Basement bottom board prespreading Macromolecular self-adhesive membrane waterproof roll non-bituminous base construction
CN105401962B (en) The hermetically sealed waterproof construction method of side wall, engineering top surface
CN107386298A (en) A kind of depth hole composite supporting construction and its construction method with water-proof function
CN208618582U (en) A kind of lapped configuration of self-adhering-type polymer membranes
CN207647524U (en) A kind of new-old concrete crossover node bottom deformation seam water proof structure
CN110004883A (en) A kind of compound core-wall structure of earth and rockfill dam and construction method
CN105780816B (en) A kind of water-proofing treatment mode for solving underground position subsiding crack in existed building enlarging construction
DE102014112159A1 (en) Process for producing water-sealed surfaces from cement-based materials
CN208056489U (en) A kind of parapet percolating water repairerment system
CN206916791U (en) A kind of basement waterproofing structure
CN109736360A (en) Tunnel open excavation section waterproof construction method
CN215253039U (en) Pre-paving and anti-sticking construction structure for bottom plate modified asphalt base pre-paving waterproof coiled material
CN206616587U (en) A kind of underground structrue engineering bottom plate dowel anti-floating sealing structure
CN114150712A (en) Pre-paved anti-adhesion waterproof structure and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221