CN109056446A - A kind of construction method in shockproof on-slip lane - Google Patents

A kind of construction method in shockproof on-slip lane Download PDF

Info

Publication number
CN109056446A
CN109056446A CN201811048840.XA CN201811048840A CN109056446A CN 109056446 A CN109056446 A CN 109056446A CN 201811048840 A CN201811048840 A CN 201811048840A CN 109056446 A CN109056446 A CN 109056446A
Authority
CN
China
Prior art keywords
shockproof
slip
constructed
layer
lane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811048840.XA
Other languages
Chinese (zh)
Inventor
王海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811048840.XA priority Critical patent/CN109056446A/en
Publication of CN109056446A publication Critical patent/CN109056446A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/32Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
    • E01C7/325Joining different layers, e.g. by adhesive layers; Intermediate layers, e.g. for the escape of water vapour, for spreading stresses
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/24Methods or arrangements for preventing slipperiness or protecting against influences of the weather

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a kind of construction methods in shockproof on-slip lane, comprising the following steps: one, basal plane processing;Two, gluing layer is constructed;Three, on-slip resistance to compression layer is constructed;Four, it layout scribing line: crosses on on-slip resistance to compression layer according to detail of design, and side posts U.S. line gummed paper along the line;Five, skid resistant surface is constructed;Six, U.S. line gummed paper is cleared up;Seven, protective layer is constructed: when skid resistant surface is dry, roller coating or the transparency protected paint of spraying form protective layer, i.e., shockproof on-slip lane construction is completed.The present invention simply easily realizes, easy to promote and utilize;The shockproof on-slip lane that construction obtains has the advantage that wear-resisting, pressure-resistant, impact resistance, and service life is high;Non-skid property is good, steady comfortable shockproof;Vehicle driving noise can be reduced, driving condition is improved;Resistance to low temperature is good, and thermal ageing resistant performance is good;Seamless surface is not easy to peel off and crack.

Description

A kind of construction method in shockproof on-slip lane
Technical field
The present invention relates to shockproof on-slip lane technical field, the construction method in specifically a kind of shockproof on-slip lane.
Background technique
Shockproof on-slip lane is prepared by additives such as polymer (Brown Alundum), modified abrasion resistant resins, finished product With anti-skid wearable, protection tire, reduce tire make an uproar, it is comfortable it is shockproof, meet a variety of excellent performances such as rainwater is self-cleaning, and pattern Beautiful distinctness, guiding performance are strong, more eye-catching safety.Its color in common use has: yellow bottom (wide 15cm), and green surface layer is (wide 60cm), commonly using lane is 150 degree of two-way lanes.Shockproof on-slip lane is commonly used to basement parking garage entrance, bicycle on slope Road, bridge up and down ramp, bus platform, manway, concrete surface need non-slip parts.
Summary of the invention
The purpose of the present invention is to provide a kind of construction methods in shockproof on-slip lane, to solve in above-mentioned background technique The problem of proposition.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction method in shockproof on-slip lane, comprising the following steps:
One, basal plane is handled: greasy dirt and impurity on cleaning basal plane, the hole in washcoat, and the surface of basal plane is polished flat It is whole;
Two, gluing layer is constructed: whole roller coating binding material forms gluing layer on basal plane, and binding material penetrates into basal plane and closes base Gap on face;
Three, on-slip resistance to compression layer is constructed: after gluing layer is dry, integrally being criticized on gluing layer and is scraped the formation on-slip resistance to compression of on-slip resistance to compression paint Layer;
Four, it layout scribing line: crosses on on-slip resistance to compression layer according to detail of design, and side posts U.S. line gummed paper along the line;
Five, skid resistant surface is constructed: anti-skidding finishing coat of constructing on the on-slip resistance to compression layer for posting U.S. line gummed paper forms skid resistant surface;
Six, it clears up U.S. line gummed paper: in skid resistant surface initial set, throwing off U.S. line gummed paper;
Seven, protective layer is constructed: when skid resistant surface is dry, roller coating or the transparency protected paint of spraying form protective layer, i.e., shockproof to stop The construction of coaster road is completed.
As a further solution of the present invention: the binding material uses primary coat.
As a further solution of the present invention: in step 5, using spraying or batch painting mode is constructed anti-skidding finishing coat.
As a further solution of the present invention: the construction method in the shockproof on-slip lane further include: Step 8: protecting It supports and enables:, can upper people's walking after the natural curing of shockproof on-slip lane 2-3 days;The natural curing of shockproof on-slip lane 7 days It afterwards, can fleet vehicles.
As a further solution of the present invention: the transparency protected paint uses light-shielding agent.
Compared with prior art, the beneficial effects of the present invention are:
The construction method in shockproof on-slip lane of the invention is simply easily realized, easy to promote and utilize;Construction obtains shockproof On-slip lane has the advantage that 1, wear-resisting, pressure-resistant, impact resistance, and service life is high;2, non-skid property is good, steady comfortably without shake It is dynamic;3, the beautiful distinctness of pattern, guiding performance are strong, eye-catching safety;4, vehicle driving noise can be reduced, driving condition is improved;5, resistance to low Warm nature can be good, and thermal ageing resistant performance is good;6, seamless surface is not easy to peel off and crack.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the construction method in shockproof on-slip lane.
Wherein: 1- basal plane;2- gluing layer;3- on-slip resistance to compression layer;4- skid resistant surface;5- protective layer.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
Embodiment 1
Referring to Fig. 1, a kind of construction method in shockproof on-slip lane, comprising the following steps:
One, basal plane is handled: greasy dirt and impurity on cleaning basal plane 1, the hole in washcoat 1, and the surface of basal plane 1 is polished It is smooth;Basal plane 1 is concrete surface;
Two, gluing layer 2 is constructed: whole roller coating binding material forms gluing layer 2 on basal plane 1, and binding material can penetrate into basal plane 1 simultaneously Close the gap on basal plane 1;If binding material penetrates into the gap between basal plane and ground, it can also make basal plane 1 and ground securely whole It closes;
Three, on-slip resistance to compression layer 3 is constructed: after gluing layer 2 is dry, integrally being criticized on gluing layer 2 and is scraped the on-slip resistance to compression paint of yellow and formed On-slip resistance to compression layer 3, on-slip resistance to compression layer 3 have on-slip, effect of resist compression;
Four, it layout scribing line: crosses on on-slip resistance to compression layer 3 according to detail of design, and side posts U.S. line gummed paper along the line;Pass through U.S. line Gummed paper covers the designed lines for needing to show yellow on yellow on-slip resistance to compression layer 3, dirty when preventing the later period from spraying anti-skidding finishing coat Dye;Such as being typically designed the width of the designed lines of the yellow on-slip resistance to compression layer of display at present is 15cm, green skid resistant surface The width of designed lines is 60cm.The combination of yellow and green, beautiful appearance is distinct, guiding performance is strong, eye-catching safety.U.S. line glue Paper, U.S. line gummed paper are to be coated with pressure-sensitive adhesive as substrate using paper to be prepared, and U.S. line gummed paper allows to reuse not removing residual glue Water, use are very convenient;
Five, skid resistant surface 4 is constructed: the anti-skidding finishing coat for green of constructing on the on-slip resistance to compression layer 3 for posting U.S. line gummed paper forms anti-skidding Surface layer 4, skid resistant surface have antiskid effect;
Six, it clears up U.S. line gummed paper: in 4 initial set of skid resistant surface, U.S. line gummed paper is thrown off, so that the designed lines of yellow are revealed Out, place cleaning;
Seven, protective layer 5 is constructed: when skid resistant surface 4 is dry, roller coating or spraying light-shielding agent form protective layer 5, and light-shielding agent can also increase Add or improve coating surface gloss, shockproof on-slip lane construction is completed at this time;Protective layer can be used for protecting skid resistant surface 4 and on-slip anti- Pressurized layer 3, improves service life, and can also increase or improve coating surface gloss.
Embodiment 2
Binding material uses primary coat.Primary coat has the performance of good adhesion, cold resistance and anti-organic solvent.
Embodiment 3
In step 5, using spraying or batch painting mode is constructed anti-skidding finishing coat.Spraying be by spray gun or dish-style atomizer, by In pressure or centrifugal force, anti-skidding finishing coat is dispersed into uniform and fine droplet, is applied over 3 surface of on-slip resistance to compression layer.It criticizes and is coated in Using batch knife when construction, anti-skidding finishing coat batch is scraped to on-slip resistance to compression layer 3.
Embodiment 4
The construction method in the shockproof on-slip lane further include: Step 8: maintenance and enabling: shockproof on-slip lane is natural After maintenance 2-3 days, people's walking can be gone up;It, can fleet vehicles after shockproof on-slip lane natural curing 7 days.
The working principle of the invention is: primary coat penetrates into basal plane 1 and closes the gap on basal plane 1, keeps basal plane 1 and ground secured Integration;On-slip resistance to compression layer 3 has on-slip, effect of resist compression;The needs on yellow on-slip resistance to compression layer 3 are shown into Huang by U.S. line gummed paper The designed lines of color cover, pollution when preventing the later period from spraying anti-skidding finishing coat;Skid resistant surface has antiskid effect;Protective layer can be used for Skid resistant surface 4 and on-slip resistance to compression layer 3 are protected, improves service life, can also increase or improve coating surface gloss.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective Various changes can be made.

Claims (5)

1. a kind of construction method in shockproof on-slip lane, which comprises the following steps:
One, basal plane is handled: greasy dirt and impurity on cleaning basal plane, the hole in washcoat, and the surface of basal plane is polished flat It is whole;
Two, gluing layer is constructed: whole roller coating binding material forms gluing layer on basal plane, and binding material penetrates into basal plane and closes base Gap on face;
Three, on-slip resistance to compression layer is constructed: after gluing layer is dry, integrally being criticized on gluing layer and is scraped the formation on-slip resistance to compression of on-slip resistance to compression paint Layer;
Four, it layout scribing line: crosses on on-slip resistance to compression layer according to detail of design, and side posts U.S. line gummed paper along the line;
Five, skid resistant surface is constructed: anti-skidding finishing coat of constructing on the on-slip resistance to compression layer for posting U.S. line gummed paper forms skid resistant surface;
Six, it clears up U.S. line gummed paper: in skid resistant surface initial set, throwing off U.S. line gummed paper;
Seven, protective layer is constructed: when skid resistant surface is dry, roller coating or the transparency protected paint of spraying form protective layer, i.e., shockproof to stop The construction of coaster road is completed.
2. the construction method in shockproof on-slip lane according to claim 1, which is characterized in that the binding material uses Primary coat.
3. the construction method in shockproof on-slip lane according to claim 1, which is characterized in that in step 5, using spray It applies or batch painting mode is constructed anti-skidding finishing coat.
4. the construction method in shockproof on-slip lane according to claim 1, which is characterized in that the shockproof on-slip The construction method in lane further include: Step 8: maintenance and enabling:, can upper people's row after the natural curing of shockproof on-slip lane 2-3 days It walks;It, can fleet vehicles after shockproof on-slip lane natural curing 7 days.
5. the construction method in shockproof on-slip lane according to claim 1 to 4, which is characterized in that the transparent guarantor Vernix uses light-shielding agent.
CN201811048840.XA 2018-09-10 2018-09-10 A kind of construction method in shockproof on-slip lane Pending CN109056446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811048840.XA CN109056446A (en) 2018-09-10 2018-09-10 A kind of construction method in shockproof on-slip lane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811048840.XA CN109056446A (en) 2018-09-10 2018-09-10 A kind of construction method in shockproof on-slip lane

Publications (1)

Publication Number Publication Date
CN109056446A true CN109056446A (en) 2018-12-21

Family

ID=64760990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811048840.XA Pending CN109056446A (en) 2018-09-10 2018-09-10 A kind of construction method in shockproof on-slip lane

Country Status (1)

Country Link
CN (1) CN109056446A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853318A (en) * 2019-02-20 2019-06-07 李山 A kind of shockproof on-slip lane and its construction technology

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4145154A (en) * 1976-02-13 1979-03-20 Agence Nationale De Valorisation De La Recherche (Anvar) Non-skid highway surfacing
CN202298404U (en) * 2011-05-25 2012-07-04 浙江中富建筑集团股份有限公司 Non-vibration non-slip lane
CN102900004A (en) * 2012-11-09 2013-01-30 昆山华睿达净化科技有限公司 Vibration-free anti-slip lane and construction method thereof
CN203238512U (en) * 2012-11-09 2013-10-16 昆山华睿达净化科技有限公司 Vibration-free non-skid lane
CN103790085A (en) * 2012-10-30 2014-05-14 西安联合交通设施工程有限公司 Shockproof slip-prevention lane system
CN204825548U (en) * 2015-07-22 2015-12-02 云南鑫磊地坪材料科技有限公司 Friction antiskid lane terrace
CN205223780U (en) * 2015-12-17 2016-05-11 上海丰邦建材科技有限公司 Public transit limited slip lane terrace
JP2016135964A (en) * 2015-01-23 2016-07-28 大阪瓦斯株式会社 Asphalt pavement surface processing method
CN106988177A (en) * 2017-04-28 2017-07-28 青岛建设集团有限公司 A kind of shockproof on-slip ramp construction
CN108412153A (en) * 2018-02-01 2018-08-17 中国十七冶集团有限公司 A kind of construction method of Non-vibration non-slip lane
CN108412155A (en) * 2018-02-06 2018-08-17 广东乔本涂装工程有限公司 A kind of anti-skidding floor paint construction method in garage

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4145154A (en) * 1976-02-13 1979-03-20 Agence Nationale De Valorisation De La Recherche (Anvar) Non-skid highway surfacing
CN202298404U (en) * 2011-05-25 2012-07-04 浙江中富建筑集团股份有限公司 Non-vibration non-slip lane
CN103790085A (en) * 2012-10-30 2014-05-14 西安联合交通设施工程有限公司 Shockproof slip-prevention lane system
CN102900004A (en) * 2012-11-09 2013-01-30 昆山华睿达净化科技有限公司 Vibration-free anti-slip lane and construction method thereof
CN203238512U (en) * 2012-11-09 2013-10-16 昆山华睿达净化科技有限公司 Vibration-free non-skid lane
JP2016135964A (en) * 2015-01-23 2016-07-28 大阪瓦斯株式会社 Asphalt pavement surface processing method
CN204825548U (en) * 2015-07-22 2015-12-02 云南鑫磊地坪材料科技有限公司 Friction antiskid lane terrace
CN205223780U (en) * 2015-12-17 2016-05-11 上海丰邦建材科技有限公司 Public transit limited slip lane terrace
CN106988177A (en) * 2017-04-28 2017-07-28 青岛建设集团有限公司 A kind of shockproof on-slip ramp construction
CN108412153A (en) * 2018-02-01 2018-08-17 中国十七冶集团有限公司 A kind of construction method of Non-vibration non-slip lane
CN108412155A (en) * 2018-02-06 2018-08-17 广东乔本涂装工程有限公司 A kind of anti-skidding floor paint construction method in garage

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
KAKA8911: "无震动止滑坡道施工方案", 《HTTPS://WENKU.BAIDU.COM/VIEW/CCF83A88D1D233D4B14E852458FB770BF78A3B3C.HTML?FR=SEARCH》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853318A (en) * 2019-02-20 2019-06-07 李山 A kind of shockproof on-slip lane and its construction technology

Similar Documents

Publication Publication Date Title
US5380549A (en) Method for forming traffic surfaces having double-coated bonding of anti-slip particles and containing retro-reflective beads
CN106833203A (en) A kind of cold painting quick-dry type colorful pavement antiskid paint
CN110735371B (en) Weather-resistant colored resin cover and preparation method thereof
CN1726130A (en) Ultra-thin surface modification system
CN107345442A (en) A kind of anti-skidding PVC floor of novel high wear-resistant and its preparation technology
KR100713563B1 (en) Method of carrying out the road surface for preventing sliding
US4080228A (en) Aggregate product and method of applying to surfaces
CN109056446A (en) A kind of construction method in shockproof on-slip lane
CN105002801A (en) Color resin antiskid road surface and construction method thereof
KR100725759B1 (en) Mixture for preventing wheel from slipping on the paved-road
KR102069082B1 (en) Retro-reflective sheet of forming base layer having aluminum thin sheet
KR101344131B1 (en) Construction Method Of Elastic Pavement Material With Drawing
CN110079138A (en) A kind of high compactness anti-pollution gage mark coating
KR200423508Y1 (en) A Road Layer of Skid Prevent and a Spread Unit
KR101007707B1 (en) Retroreflection type slipping-proof pavement and method for consructing the same
CN214938925U (en) Colored reflective warning pavement material
US7191568B1 (en) Modular safety surface and method for preparing the same
CN103669168A (en) Walking anti-slip tape and application method thereof
CN107794812A (en) A kind of wear resistant corrosion resistant composite construction straddle type monorail rail tracks
KR200427777Y1 (en) Device for Non-Slipping of Road Line Marking
CN111996861A (en) Construction process of anti-skid pavement structure constructed by MMA (methyl methacrylate)
GB2270270A (en) Anti-slip surfaces
KR200420495Y1 (en) A Sliding Keeping Unit Using Vehicles
KR0126104B1 (en) A method of marking for a paved road lane
CN204570415U (en) A kind of parking lot non-slip ramp

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221

RJ01 Rejection of invention patent application after publication