CN109029154A - The production method of fireworks casing - Google Patents
The production method of fireworks casing Download PDFInfo
- Publication number
- CN109029154A CN109029154A CN201811109021.1A CN201811109021A CN109029154A CN 109029154 A CN109029154 A CN 109029154A CN 201811109021 A CN201811109021 A CN 201811109021A CN 109029154 A CN109029154 A CN 109029154A
- Authority
- CN
- China
- Prior art keywords
- paper
- fireworks
- fireworks casing
- scrap
- stalk
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42B—EXPLOSIVE CHARGES, e.g. FOR BLASTING, FIREWORKS, AMMUNITION
- F42B4/00—Fireworks, i.e. pyrotechnic devices for amusement, display, illumination or signal purposes
- F42B4/30—Manufacture
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- General Engineering & Computer Science (AREA)
- Paper (AREA)
- Processing Of Solid Wastes (AREA)
- Dry Formation Of Fiberboard And The Like (AREA)
Abstract
The invention discloses a kind of production methods of fireworks casing, including select poplar sawdust, a scrap of paper, stalk and chitin fiber silk as shell filler;Poplar sawdust, a scrap of paper are screened, stalk is rinsed, the stalk after rinsing well is placed under sunlight drying of being sufficiently exposed to the sun;Stalk after a scrap of paper, chitin fiber silk and cleaning-drying is subjected to cutting and grinding respectively;Poplar sawdust and smashed a scrap of paper, chitin fiber silk, stalk are adequately mixed, adhesive is added in mixing process;Shell filler after mixing bonding is pressed and molded, columnar fireworks casing is pressed into;Fireworks casing after molding is dried;Iron wire ball is placed in the inner wall of fireworks casing, pulls the inner sidewall of iron wire ball friction fireworks casing;It is coated with adhesive-layer on the lateral wall of fireworks casing, flexible reinforcing mat is bonded on adhesive-layer, then clings the flexible reinforcing mat of package around the circle of fireworks casing one using plastic film.
Description
Technical field
The present invention relates to fireworks and firecrackers preparation technical fields, and in particular to a kind of production method of fireworks casing.
Background technique
Fireworks are also known as firework, pyrotechnics, fireworks, are more early invented by Chinese working people, are usually used in grand ceremony or performance
In.Fireworks are in fact similar with the structure of firecracker, and structure all includes black powder and efficacy-enhancing ingredient.For the performance effect reached, flame
The gunpowder for being largely used to emit and explode is filled in fire and display shell, for example, the display shell that a diameter is 20 centimetres exists
After transmitting, to rise to general 200 meters of high-altitude can just explode, and the radius that these are fragmentarily covered can about have 80 meters
Left and right.
In firework structure, the fireworks casing for wrapping up lead, gunpowder and soil is particularly significant, and the structure of fireworks casing is steady
It is qualitative very big for the storage of fireworks and the release safety effects of fireworks, therefore, for the structural soundness of fireworks casing
Suitable promotion be the problem of many fireworks enterprises all pay close attention to.
Summary of the invention
The technical problem to be solved by the present invention is to provide a kind of producer of more stable safe fireworks casing of structure
Method.
The technical scheme is that providing a kind of production method of fireworks casing, comprising the following steps:
S1, it selects filler: selecting poplar sawdust, a scrap of paper, stalk and chitin fiber silk as shell filler;
S2, screening are rinsed: poplar sawdust, a scrap of paper being screened, stalk is rinsed, by the straw after rinsing well
Stalk is placed under sunlight drying of being sufficiently exposed to the sun;
S3, filler crush: the stalk after a scrap of paper, chitin fiber silk and cleaning-drying is carried out cutting powder respectively
It is broken;
S4, mixing: poplar sawdust and smashed a scrap of paper, chitin fiber silk, stalk are carried out sufficient
It is mixed, adhesive is added in mixing process, mixed shell filler is bonded;
S5, compression molding: the shell filler after mixing bonding is pressed and molded, columnar fireworks casing is pressed into;
S6, drying process: fireworks casing after molding is dried;
S7, internal layer roughening: being placed in the inner wall of tubular fireworks casing using iron wire ball, pulls iron wire ball friction fireworks back and forth
The inner sidewall of shell 5~10 minutes;
S8, outer layer are reinforced: it be coated with adhesive-layer on the lateral wall of fireworks casing, flexible reinforcing mat is bonded on adhesive-layer,
Then the flexible reinforcing mat of package is clinged around the circle of fireworks casing one using plastic film.
Specifically, by making fireworks after selecting poplar sawdust, a scrap of paper, stalk and chitin fiber silk to be pulverized and mixed
Shell, cooperation adhesive are sufficiently mixed so that the cost of manufacture of fireworks casing is lower, and shell mechanism is very firm, during storage
Safety is good.
Further, in step s 4, in the shell filler of mixing, the crushing shredded paper of 30~50 parts by weight is taken
Piece, the poplar sawdusts of 30~45 parts by weight, 8~15 parts by weight crush chitin fiber silk, 15~30 parts by weight
Crushing straw.
Further, the crushing a scrap of paper, the poplar sawdust of 35 parts by weight, 12 weights of 35 parts by weight are taken in shell filler
Measure the crushing straw for crushing chitin fiber silk, 20 parts by weight of number.
Further, before step S6 dries fireworks casing, using in moisture tester measurement fireworks casing
Water content,
When water content is less than 7%, paper is placed in 35~45 degree of environment and is preheated 10~15 minutes, then to paper into
The drying of row high temperature, drying condition continue 20~22 minutes at 55~65 degree;
When water content is in 7%~12%, paper is placed in 40~50 degree of environment and is preheated 18~25 minutes, then is right
Paper carries out high temperature drying, and drying condition continues 40~50 minutes at 65~70 degree;
When water content is greater than 12%, paper is placed in 48~54 degree of environment and is preheated 15~20 minutes, then to paper
High temperature drying is carried out, drying condition continues 70~90 minutes at 70~80 degree;
The fireworks casing dried finally is placed in natural cooling under cool environment.
Further, in step s 8, the flexible reinforcing mat is degreasing cotton gauze.
Specific embodiment
The present invention is further explained in the light of specific embodiments.
The present invention provides a kind of production methods of fireworks casing, comprising the following steps:
S1, it selects filler: selecting poplar sawdust, a scrap of paper, stalk and chitin fiber silk as shell filler;
S2, screening are rinsed: poplar sawdust, a scrap of paper being screened, stalk is rinsed, by the straw after rinsing well
Stalk is placed under sunlight drying of being sufficiently exposed to the sun;
S3, filler crush: the stalk after a scrap of paper, chitin fiber silk and cleaning-drying is carried out cutting powder respectively
It is broken;
S4, mixing: poplar sawdust and smashed a scrap of paper, chitin fiber silk, stalk are carried out sufficient
It is mixed, adhesive is added in mixing process, mixed shell filler is bonded;
S5, compression molding: the shell filler after mixing bonding is pressed and molded, columnar fireworks casing is pressed into;
S6, drying process: fireworks casing after molding is dried;
S7, internal layer roughening: being placed in the inner wall of tubular fireworks casing using iron wire ball, pulls iron wire ball friction fireworks back and forth
The inner sidewall of shell 5~10 minutes;
S8, outer layer are reinforced: it be coated with adhesive-layer on the lateral wall of fireworks casing, flexible reinforcing mat is bonded on adhesive-layer,
Then the flexible reinforcing mat of package is clinged around the circle of fireworks casing one using plastic film.Preferably, in this step, flexible reinforcing mat
It can be absorbent cotton gauze.
Specifically, by making fireworks after selecting poplar sawdust, a scrap of paper, stalk and chitin fiber silk to be pulverized and mixed
Shell, cooperation adhesive are sufficiently mixed so that the cost of manufacture of fireworks casing is lower, and shell mechanism is very firm, during storage
Safety is good.
It is improved as one of which, in step s 4, in the shell filler of mixing, takes the powder of 30~50 parts by weight
Broken a scrap of paper, the poplar sawdust of 30~45 parts by weight, the crushing chitin fiber silk of 8~15 parts by weight, 15~30 weight
The crushing straw of number.It is matched by suitable parts by weight, the casing rigidity of molding fireworks casing can be improved, prevent reel
Excessively easy to break, compressional deformation of the fireworks casing of shape etc..
Preferably, the crushing a scrap of paper, the poplar sawdust of 35 parts by weight, 12 weight of 35 parts by weight are taken in shell filler
The crushing straw for crushing chitin fiber silk, 20 parts by weight of number.
As one of embodiment, before step S6 dries fireworks casing, measured using moisture tester
Paper is placed in 35~45 degree of environment when water content is less than 7% and preheats 10~15 points by the water content in fireworks casing
Clock, then high temperature drying is carried out to paper, drying condition continues 20~22 minutes at 55~65 degree;When water content be in 7%~
When 12%, paper is placed in 40~50 degree of environment and is preheated 18~25 minutes, then high temperature drying, drying condition are carried out to paper
Continue 40~50 minutes at 65~70 degree;When water content is greater than 12%, paper is placed in 48~54 degree of environment and preheats 15
~20 minutes, then high temperature drying is carried out to paper, drying condition continues 70~90 minutes at 70~80 degree;It will finally dry
Fireworks casing is placed in natural cooling under cool environment.The mild preheating of lower temperature is first carried out to fireworks casing, then is carried out higher
The high temperature of temperature is dried, and drying course is more mild.
The above is only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment,
All technical solutions belonged under thinking of the present invention all belong to the scope of protection of the present invention.It should be pointed out that for the art
For those of ordinary skill, several improvements and modifications without departing from the principles of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (5)
1. a kind of production method of fireworks casing, which comprises the following steps:
S1, it selects filler: selecting poplar sawdust, a scrap of paper, stalk and chitin fiber silk as shell filler;
S2, screening are rinsed: poplar sawdust, a scrap of paper being screened, stalk is rinsed, the stalk after rinsing well is set
It is sufficiently exposed to the sun under sunlight drying;
S3, filler crush: the stalk after a scrap of paper, chitin fiber silk and cleaning-drying is carried out cutting and grinding respectively;
S4, mixing: poplar sawdust and smashed a scrap of paper, chitin fiber silk, stalk are adequately mixed
Stirring is added adhesive in mixing process and bonds to mixed shell filler;
S5, compression molding: the shell filler after mixing bonding is pressed and molded, columnar fireworks casing is pressed into;
S6, drying process: fireworks casing after molding is dried;
S7, internal layer roughening: being placed in the inner wall of tubular fireworks casing using iron wire ball, pulls iron wire ball friction fireworks casing back and forth
Inner sidewall 5~10 minutes;
S8, outer layer are reinforced: being coated with adhesive-layer on the lateral wall of fireworks casing, flexible reinforcing mat is bonded on adhesive-layer, then
The flexible reinforcing mat of package is clinged around the circle of fireworks casing one using plastic film.
2. a kind of production method of fireworks casing according to claim 1, which is characterized in that in step s 4, mixing is stirred
In the shell filler mixed, the crushing a scrap of paper, the poplar sawdust of 30~45 parts by weight, 8~15 weights of 30~50 parts by weight are taken
Measure the crushing straw for crushing chitin fiber silk, 15~30 parts by weight of number.
3. a kind of production method of fireworks casing according to claim 2, which is characterized in that take 35 weight in shell filler
Crushing a scrap of paper, the poplar sawdust of 35 parts by weight, the crushing chitin fiber silk of 12 parts by weight, 20 parts by weight of number
Crushing straw.
4. a kind of production method of fireworks casing according to claim 1, which is characterized in that step S6 to fireworks casing into
Before row drying, the water content in fireworks casing is measured using moisture tester,
When water content is less than 7%, paper is placed in 35~45 degree of environment and is preheated 10~15 minutes, then paper carried out high
Temperature drying, drying condition continue 20~22 minutes at 55~65 degree;
When water content is in 7%~12%, paper is placed in 40~50 degree of environment and is preheated 18~25 minutes, then to paper
High temperature drying is carried out, drying condition continues 40~50 minutes at 65~70 degree;
When water content is greater than 12%, paper is placed in 48~54 degree of environment and is preheated 15~20 minutes, then paper is carried out
High temperature drying, drying condition continue 70~90 minutes at 70~80 degree;
The fireworks casing dried finally is placed in natural cooling under cool environment.
5. a kind of production method of fireworks casing according to claim 1, which is characterized in that in step s 8, described soft
Property reinforcing mat be degreasing cotton gauze.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811109021.1A CN109029154B (en) | 2018-09-21 | 2018-09-21 | Production method of firework shell |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811109021.1A CN109029154B (en) | 2018-09-21 | 2018-09-21 | Production method of firework shell |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109029154A true CN109029154A (en) | 2018-12-18 |
CN109029154B CN109029154B (en) | 2020-07-14 |
Family
ID=64617876
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811109021.1A Active CN109029154B (en) | 2018-09-21 | 2018-09-21 | Production method of firework shell |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109029154B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1067116A (en) * | 1991-05-23 | 1992-12-16 | 张宗贤 | Method for pressing special shell of fireworks and firecrackers by using waste paper fiber |
CN1392388A (en) * | 2001-06-20 | 2003-01-22 | 刘文富 | Method for producing fireworks shell |
CN1595045A (en) * | 2004-07-14 | 2005-03-16 | 黄焱生 | Firework outer cylinder with bottoms and method for making same |
US20170081255A1 (en) * | 2015-09-17 | 2017-03-23 | I P Creations Limited | Conceled amalgamated explosive neutralizer and method of manufacture |
-
2018
- 2018-09-21 CN CN201811109021.1A patent/CN109029154B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1067116A (en) * | 1991-05-23 | 1992-12-16 | 张宗贤 | Method for pressing special shell of fireworks and firecrackers by using waste paper fiber |
CN1392388A (en) * | 2001-06-20 | 2003-01-22 | 刘文富 | Method for producing fireworks shell |
CN1595045A (en) * | 2004-07-14 | 2005-03-16 | 黄焱生 | Firework outer cylinder with bottoms and method for making same |
US20170081255A1 (en) * | 2015-09-17 | 2017-03-23 | I P Creations Limited | Conceled amalgamated explosive neutralizer and method of manufacture |
Also Published As
Publication number | Publication date |
---|---|
CN109029154B (en) | 2020-07-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207640842U (en) | A kind of unmanned plane hand throwing type fire-fighting bomb for forest | |
CN101270015B (en) | Blasting fuse of high-safety firecracker and preparation method thereof | |
CN102226030B (en) | Preparation method of crop straw based high power water absorbent | |
CN108981494A (en) | A kind of production method of fireworks casing | |
CN106938455A (en) | A kind of nailing fastener nail shooting pill and its manufacture method | |
CN109029154A (en) | The production method of fireworks casing | |
CN107629780A (en) | A kind of resinae is hollow or porous propping agent and preparation method thereof | |
CN201572464U (en) | Hand liquid fire-extinguishing bomb | |
CN104944423A (en) | High-energy-point gunpowder and preparation method | |
CN102786369B (en) | Production process for firecracker fuse | |
CN106669072B (en) | The rotating carbon dioxide colloidal foam fire extinguisher bomb in ground | |
CN107367206B (en) | A kind of blast charging method | |
CN208606648U (en) | A kind of fireworks shooting pipe | |
US3047441A (en) | Hydrogen peroxide explosives | |
CN113074592B (en) | Copper core lead wire for fireworks and preparation method thereof | |
CN206469785U (en) | The firework launching device that safety and environmental protection can be recycled | |
CN113582783A (en) | Composite ignition powder head of electronic detonator and preparation method thereof | |
CN104710252A (en) | Firework initiating explosive and preparation method thereof | |
CN210833271U (en) | Safety delay ignition device capable of setting high precision | |
CN108036679B (en) | Environment-friendly firecracker | |
CN206989835U (en) | A kind of environment-friendly type artillery fire hits imitating shell | |
CN208003295U (en) | A kind of fuse formula fire extinguisher bomb | |
CN214074781U (en) | Formula forest extinguishing device is thrown to hand | |
CN2171383Y (en) | Wave-liquid superposing type fire-extinguishing bomb | |
RU83606U1 (en) | IGNITION-EXPLOSIVE CHARGE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |