CN109025358A - A kind of installation elevator at through resident's original gate - Google Patents

A kind of installation elevator at through resident's original gate Download PDF

Info

Publication number
CN109025358A
CN109025358A CN201811153902.3A CN201811153902A CN109025358A CN 109025358 A CN109025358 A CN 109025358A CN 201811153902 A CN201811153902 A CN 201811153902A CN 109025358 A CN109025358 A CN 109025358A
Authority
CN
China
Prior art keywords
elevator
platform
stair
resident
gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811153902.3A
Other languages
Chinese (zh)
Other versions
CN109025358B (en
Inventor
白先放
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Original Assignee
Guangxi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University filed Critical Guangxi University
Priority to CN201811153902.3A priority Critical patent/CN109025358B/en
Publication of CN109025358A publication Critical patent/CN109025358A/en
Application granted granted Critical
Publication of CN109025358B publication Critical patent/CN109025358B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Types And Forms Of Lifts (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The present invention proposes a kind of installation elevator at through resident's original gate, elevator setting is on the outside of aging blocks half storey position of platform, the difference in height on elevator doorway and resident doorway is no more than the 15% of story height, retain and reinforces the side stair in the stair of two sides and part half storey platform, new stair are built to elevator doorway platform in the side, stair, half storey platform and the crossbeam of the other side are removed, is arranged and connects this layer of gate platform and elevator doorway platform without ladder aisle.Effect of the invention is: resident takes elevator without next stage stair in walking again, thoroughly solves the problems, such as on old man downstairs;The elevator aisle before parlor is not built, reduces cost, solves the problems, such as that elevator aisle keeps off parlor daylighting;Former gate can be continued to use, without newly opening a gate, parlor original cloth office is will not influence, fits up parlor, window and new gate again without spending, construction period can ensure unobstructed downstairs, and without building dedicated interim aisle, resident need not temporarily be moved.

Description

A kind of installation elevator at through resident's original gate
[technical field]
The present invention relates to elevator construction field, in particular to a kind of old multi-story installs elevator additional.
[background technique]
The multi-storey residential buildings and other buildings (referred to as: aging blocks) that many one's early years build are fitted without elevator, to the day of resident Often life causes downstairs to be more difficult on the not flexible old man of inconvenience, especially legs and feet.With the development of economy, the people pursue more beautiful Good living condition requires to install elevator additional in recent years, make the life better, it has also become a kind of trend.Due to aging blocks structure at Type, corridor is narrow to be difficult to install elevator, has some elevators and door-opened elevators of installing additional outside building in the technology of stair half storey platform Scheme, these schemes also walking half storey stair will get to door, not solve really again after coming out resident from elevator Family (the especially not flexible old man of legs and feet) is without the convenient trip requirements of stair activity.
There are also some technical solutions to propose: installing elevator additional outside building, elevator doorway platform is changed to elevator aisle, and should Elevator aisle extends to before the parlor (or house) on side, breaks the window (or exterior wall) in parlor (or house), and construction should live One new gate at family, resident walk out newly greatly behind the door, can pass through elevator aisle and pass in and out elevator;Meanwhile former stair are constant, former resident Gate is constant, may continue to using.Elevator aisle is built in front of parlor (or house) by these schemes, can significantly affect daylighting; And a new gate newly is opened in parlor (or house), the original structure in house is destroyed, the parlor (or house) can be seriously affected Layout;To redesign, fitting up parlor (or house) and window, new gate, many money are probably needed.
Still other technical solution proposes: it needs to be transformed, build stair when installing elevator additional, it construction period, can serious shadow Sound even completely cuts through the upper channel downstairs of resident, so that resident is forced interim move and arrives to live in 1-2 months or some months elsewhere.
Some technical solutions also propose: when installing Retrofit of Elevator additional, building stair, building dedicated interim aisle, can protect It goes downstairs on barrier construction period resident unobstructed, resident need not temporarily move;After the completion of installing elevator completion or layer construction additional, then tear open Except the dedicated interim aisle.
[summary of the invention]
The purpose of the present invention is overcoming the above-mentioned deficiency for installing elevator outside existing building additional, providing one kind need not move, need not take Dedicated interim aisle is built, a new gate need not be newly opened, can directly reach the installation elevator at door without walking stair activity.
The present invention proposes a kind of installation elevator at through resident's original gate, and the stair for installing the every floor of elevator aging blocks additional have two The opposite stair of side stair, both direction, the former big gate platform (also referred to as: floor platform) in front of the door of resident are located at the interior of stair Side, stair half storey platform are located at the outside of stair, it is characterised in that the elevator setting of installation is in the outer of aging blocks half storey position of platform Side, the height of elevator doorway platform are no more than the 15% of story height with the difference in height with floor resident gate podium level, protect The side stair in the stair of two sides are stayed and reinforced, retain the side half storey platform of 20 centimetres or more length, as the side stair Level-one stair step, to ensure that the stair can pass through in construction period;Each floor can simultaneously reservation the side half storey platform with New stair, connection gate platform and elevator doorway platform are built between the platform of elevator doorway, and as resident in construction period Interim aisle (can ensure on resident downstairs unobstructed in construction period), and resident need to pass by the interim aisle and walking first floor Afterwards, the elevator doorway of another floor is got to, it is upper to go downstairs;Without needing the dedicated interim aisle removed, resident after building completion It need not temporarily move;It removes the stair of the other side, half storey platform, staircase exterior wall and (or removes half storey platform, the stair of the side again Between exterior wall crossbeam and stair beam), built between the side gate platform and elevator doorway platform This floor without ladder aisle, Connect gate platform and elevator doorway platform.Hereafter, resident can pass in and out This floor elevator without ladder aisle by This floor, without First floor of going further is terraced, removes disengaging elevator to another floor without mentioned-above so-called " interim aisle " is gone further.
Resident can be by the following method using the installation elevator built up: resident returns from the outside, ground floor open elevator door into Enter elevator to open elevator door when elevator rises the arrival floor to be gone and go to elevator doorway platform, went further without ladder aisle, The gate platform of through resident, so that it may open gate and go home.Equally, resident will go out, and execute by process in turn, at all Next stage stair in walking are not needed.
In case of emergency, it or when out of power, can walk up;The former stair of reservation are first covered, then cover newly-built stair, Into elevator doorway platform, the aisle without ladder of then going further, the gate platform for the resident that goes directly, so that it may open gate and go home.Instead ?.
The present invention installs elevator additional and is suitble to various types of aging blocks, is led in emergency circumstances or when out of power using urgent from design From the perspective of road (pedestrian stairway), it is particularly suitable for stair exterior wall indent in the aging blocks of stair both sides exterior wall in the same direction, is particularly suitable for The longer aging blocks of stair half storey platform;Such building type can create longer new stair, so as to reduce the steepness of new stair, drop The difficulty of stair is gone on when low walking.
Preferred embodiment of the invention is: installed additional elevator aging blocks belong to stair exterior wall indent in stair both sides exterior wall in the same direction Aging blocks.
Preferred embodiment of the invention is: installed additional elevator aging blocks belong to the longer aging blocks of stair half storey platform.
Preferred embodiment of the invention is: no stepped-slope aisle is provided between gate platform and elevator doorway platform, and The ratio between the total height of inclined walks whole process and total length are less than 15%.
Note 1: floor refers to including from this layer of top surface to the spatial position of this layer of flooring base.Without stepped-slope aisle, refer to Not apparent unexpected protrusion, not apparent protrusion barrier, and the height of the height of aisle terminal and aisle starting point Different aisle.
Note 2: the present invention installs elevator additional and includes at least following construction project: elevator purchase and installation, elevator shaft, elevator Door, elevator doorway platform, without ladder aisle, newly-built stair, the projects of part aging blocks ladder etc..
The present invention proposes a kind of installation elevator construction method at through resident's original gate, it is characterised in that its step are as follows: 1, type of construction elevators hoistway, elevator door, elevator doorway platform;Elevator doorway platform and no ladder aisle need to be reserved, newly build stair Interface and support construction;2, it installs, debug elevator;3, retain and reinforce the side stair in the stair of two sides, (remove the side Half storey platform exterior wall, exterior wall crossbeam and part half storey platform) the side half storey platform that retains 20 centimetres or more length, as this The level-one stair step of side stair or short half storey platform, to ensure that the stair can pass through, can turn in construction period.4, each building Layer can build new stair between side half storey platform and elevator doorway platform of reservation simultaneously, after building up, the stair of original reservation One has been formed from gate platform to the complete stair of elevator doorway platform with newly-built stair, connects gate platform and elevator doorway Platform, resident can be by going downstairs on elevator.But at this moment do not have also Xiu Tongben layers of gate platform to This floor elevator doorway platform Channel, resident, which can not arrive, goes to This floor elevator, and therefore, above-mentioned complete stair can only can be regarded as the interim aisle of resident.As The interim aisle of resident can ensure on resident downstairs unobstructed in construction period, and resident does not have to interim resettlement;But above and below resident Building also needs walking first floor, gets to the elevator doorway platform of another floor, passes in and out elevator, upper to go downstairs.Since the complete building Ladder can be used as interim aisle, therefore, there is no need to need the dedicated interim aisle removed after building completion again, cost-saved.5, Stair, the staircase exterior wall (or the half storey platform, staircase exterior wall crossbeam and stair beam for removing the side again) of the other side are removed, Built between the side gate platform and elevator doorway platform This floor without ladder aisle, connect gate platform and elevator doorway Platform, can Accelerating The Construction speed using prefabricated component.Hereafter, resident can pass in and out This floor elevator without ladder aisle by This floor, Need not go further first floor ladder, remove disengaging elevator to another floor without mentioned-above so-called " interim aisle " is gone further.
The beneficial effects of the present invention are: 1, resident takes elevator without next stage stair in walking again, thoroughly solve old Problem difficult downstairs on people;2, any building need not be built before parlor (or house), solves elevator aisle and build visitor in The problem of daylighting is significantly affected before the Room;3, former gate can be directly continued to use, newly opens a gate in parlor without spending, no Parlor and window are fitted up without spending again by the original cloth office that will affect parlor;4, it is extended to before the parlor of side without building Elevator aisle can be reduced and install elevator expenditure additional;5, retain the side stair in the stair of two sides, reduce project amount, be effectively reduced Installation elevator cost;6, dedicated interim aisle is built without in addition spending;7, it is installing elevator construction period additional, can ensure That goes downstairs on family is unobstructed, and therefore, resident can not have to interim resettlement.
[Detailed description of the invention]
Fig. 1 is to install elevator structure schematic diagram additional;Wherein: elevator 1, elevator doorway platform 2, no ladder aisle 3, gate platform 4, resident's original gate 5, the stair 6 of reservation, the stair 7 newly built.
[specific embodiment]
Embodiment one
Referring to Fig. 1, a kind of installation elevator at through resident's original gate, the stair for installing the every floor of elevator aging blocks additional have two sides The opposite stair of stair, both direction, the gate platform 4 before resident's original gate 5 are located at the inside of stair, stair half storey platform position In the outside of stair, the elevator setting of installation is in the outside of aging blocks half storey position of platform, the height of elevator doorway platform 2 and same building The difference in height of 4 height of layer resident gate platform is no more than the 15% of the story height, retains and reinforces the side in the stair of two sides Stair 6 retain the side half storey platform of 20 centimetres or more length, ensure that the stair can pass through in construction period;In being somebody's turn to do for reservation New stair 7, connection gate platform 4 and elevator doorway platform 2 are built between side half storey platform and elevator doorway platform 2, as firmly In the interim aisle of construction period, resident need to pass by after the interim aisle and walking first floor at family, get to another floor Elevator doorway, it is upper to go downstairs;Without needing the dedicated interim aisle removed after building completion, resident need not temporarily be moved;It removes another After the stair of side, half storey platform, stair exterior wall, stair exterior wall crossbeam and stair beam, in the side gate platform 4 and elevator doorway Built between platform 2 This floor without ladder aisle 3, after connecting gate platform 4 and elevator doorway platform 2, resident passes through this building Layer passes in and out This floor elevator 1 without ladder aisle 3, without first floor ladder of going further.

Claims (3)

1. a kind of installation elevator at through resident's original gate, the stair for installing the every floor of elevator aging blocks additional have two sides stair, two Contrary stair, the former big gate platform in front of the door of resident is located at the inside of stair, stair half storey platform is located at the outer of stair Side, it is characterised in that the elevator setting of installation is in the outside of aging blocks half storey position of platform, the height of elevator doorway platform and same building The difference in height of layer resident gate podium level is no more than the 15% of the story height, retains and reinforces the side building in the stair of two sides Ladder retains the side half storey platform of 20 centimetres or more length, ensures that the stair can pass through in construction period;Each floor can exist simultaneously New stair, connection gate platform and elevator doorway platform are built between the side half storey platform and elevator doorway platform retained, and As resident in the interim aisle of construction period, resident need to pass by after the interim aisle and walking first floor, get to another The elevator doorway of floor, it is upper to go downstairs;Without needing the dedicated interim aisle removed after building completion, resident need not temporarily be moved;It tears open Except the stair of the other side, half storey platform, staircase exterior wall, staircase exterior wall crossbeam and stair beam, the side gate platform with Built between the platform of elevator doorway This floor without ladder aisle, connect gate platform and elevator doorway platform, resident passes through this Floor passes in and out This floor elevator without ladder aisle.
2. a kind of installation elevator at through resident's original gate according to claim 1, it is characterised in that gate platform and electricity No stepped-slope aisle is provided between terraced doorway platform, and ramp height and length ratio are less than 15%.
3. a kind of installation elevator at through resident's original gate according to claim 1, it is characterised in that installed additional elevator is old Building belongs to stair exterior wall indent in the aging blocks of stair both sides exterior wall in the same direction.
CN201811153902.3A 2018-09-29 2018-09-29 Additional elevator for directly reaching original resident gate Active CN109025358B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811153902.3A CN109025358B (en) 2018-09-29 2018-09-29 Additional elevator for directly reaching original resident gate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811153902.3A CN109025358B (en) 2018-09-29 2018-09-29 Additional elevator for directly reaching original resident gate

Publications (2)

Publication Number Publication Date
CN109025358A true CN109025358A (en) 2018-12-18
CN109025358B CN109025358B (en) 2024-05-14

Family

ID=64615606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811153902.3A Active CN109025358B (en) 2018-09-29 2018-09-29 Additional elevator for directly reaching original resident gate

Country Status (1)

Country Link
CN (1) CN109025358B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042571A (en) * 2020-01-07 2020-04-21 陈艳彬 Flat-layer entrance added elevator and construction method thereof
CN112079235A (en) * 2020-10-13 2020-12-15 朱幕松 Economical building is plus installs elevator

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050361A (en) * 1990-10-22 1991-04-03 周如 Improve the method downstairs that goes up with installing the outer elevator of wall additional
WO2007079655A1 (en) * 2006-01-06 2007-07-19 Jianhua Liu A residence with yard
CN107826936A (en) * 2017-12-01 2018-03-23 李孝兵 A kind of car external passenger elevators
CN207363302U (en) * 2017-10-27 2018-05-15 湖南升华电梯销售有限公司 Multi-storey residential buildings install the building structure after elevator additional
CN108316668A (en) * 2018-03-05 2018-07-24 郑牧之 Aging blocks fill elevator innovation scheme
CN108412221A (en) * 2018-03-15 2018-08-17 北京正华建筑设计有限公司 A kind of aging blocks install the passage unobstructed construction of elevator additional
CN209637262U (en) * 2018-09-29 2019-11-15 广西大学 A kind of installation elevator at through resident's original gate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050361A (en) * 1990-10-22 1991-04-03 周如 Improve the method downstairs that goes up with installing the outer elevator of wall additional
WO2007079655A1 (en) * 2006-01-06 2007-07-19 Jianhua Liu A residence with yard
CN207363302U (en) * 2017-10-27 2018-05-15 湖南升华电梯销售有限公司 Multi-storey residential buildings install the building structure after elevator additional
CN107826936A (en) * 2017-12-01 2018-03-23 李孝兵 A kind of car external passenger elevators
CN108316668A (en) * 2018-03-05 2018-07-24 郑牧之 Aging blocks fill elevator innovation scheme
CN108412221A (en) * 2018-03-15 2018-08-17 北京正华建筑设计有限公司 A kind of aging blocks install the passage unobstructed construction of elevator additional
CN209637262U (en) * 2018-09-29 2019-11-15 广西大学 A kind of installation elevator at through resident's original gate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111042571A (en) * 2020-01-07 2020-04-21 陈艳彬 Flat-layer entrance added elevator and construction method thereof
CN112079235A (en) * 2020-10-13 2020-12-15 朱幕松 Economical building is plus installs elevator

Also Published As

Publication number Publication date
CN109025358B (en) 2024-05-14

Similar Documents

Publication Publication Date Title
CN207526020U (en) A kind of new-type stair
CN109019256A (en) First build the plug-in installation elevator in the through former gate in aisle
CN109025358A (en) A kind of installation elevator at through resident's original gate
CN111186752B (en) Additional elevator structure combining flat-layer entrance and split-layer entrance and working method thereof
CN109505386A (en) A kind of new-type stair and its implementation
CN209637262U (en) A kind of installation elevator at through resident's original gate
CN109455597A (en) New center pillar supports through resident's original gate to install elevator additional
CN209620664U (en) Double race stair lead to the plug-in installation elevator in former gate
CN109132792A (en) The installation elevator at the through resident's original gate in slightly-inclined slope
JP3760133B2 (en) How to add lifting equipment for dwelling unit access
CN109019255A (en) The new-type installation elevator at through resident's original gate
JP4242040B2 (en) Elevator installation method for existing staircase type multi-story house and multi-story house with elevator
CN212295749U (en) Flat-floor-to-home elevator additionally installed in existing residence
CN109184250A (en) Flat corridor adds slope to go directly the plug-in installation elevator in resident's original gate
CN109184251A (en) Double race stair lead to the plug-in installation elevator in former gate
CN211851007U (en) Longitudinal cantilever beam support direct-to-original large door external hanging additional elevator
CN109235920A (en) The plug-in installation elevator in the through former gate of oblique Cantilever Beams support
CN109162475A (en) The plug-in installation elevator in the through former gate of the safe double slanted stair of wheelchair
CN109025359A (en) The plug-in installation elevator in the through former gate of longitudinal Cantilever Beams support
CN109160402A (en) Saving land used outside building can go directly the installation elevator at resident's original gate
CN109184252A (en) Slope stair parallel go directly the plug-in installation elevator in resident's original gate
CN211257898U (en) Building structure for old house reconstruction after elevator is additionally installed in multi-storey residential building
CN109162481A (en) The plug-in installation elevator in the through former gate in aisle is first built entirely
CN109081219A (en) The installation elevator at through resident's original gate of center pillar support
CN109267710B (en) Large half-floor platform multi-section barrier-free entrance and external hanging elevator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant