CN109024895A - It is a kind of to assemble the ash wall body plate for building being easily installed - Google Patents
It is a kind of to assemble the ash wall body plate for building being easily installed Download PDFInfo
- Publication number
- CN109024895A CN109024895A CN201810831706.0A CN201810831706A CN109024895A CN 109024895 A CN109024895 A CN 109024895A CN 201810831706 A CN201810831706 A CN 201810831706A CN 109024895 A CN109024895 A CN 109024895A
- Authority
- CN
- China
- Prior art keywords
- groove
- body plate
- wall body
- ash wall
- ash
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34315—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts
- E04B1/34321—Structures characterised by movable, separable, or collapsible parts, e.g. for transport characterised by separable parts mainly constituted by panels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/38—Connections for building structures in general
- E04B1/61—Connections for building structures in general of slab-shaped building elements with each other
- E04B1/6108—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
- E04B1/612—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
- E04B1/6145—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element
- E04B1/6158—Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with recesses in both frontal surfaces co-operating with an additional connecting element the connection made by formlocking
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The ash wall body plate for building being easily installed is assembled the invention discloses a kind of, including the first ash wall body plate, the right side of first ash wall body plate offers the first groove, the left side of first groove inner wall offers the second groove, the right side of first ash wall body plate and the left side of the second ash wall body plate overlap, the front of the second ash wall body plate and position of corresponding first groove offers third groove, the right side of third groove inner wall offers card slot.The assembly ash wall body plate for building being easily installed, pass through the first ash wall body plate, the second ash wall body plate, the second motion bar, spring, connecting rod, shaft, the collective effect of bearing, kelly, handle, the first groove, the second groove, card slot, third groove and the 4th groove, to realize the fixed installation between the first ash wall body plate and the second ash wall body plate, the process that worker is installed by time-consuming and laborious troublesome operation is avoided, and facilitates installation and replacement of the worker for the first ash wall body plate and the second ash wall body plate.
Description
Technical field
It is specially a kind of to assemble the ash wall body plate for building being easily installed the present invention relates to assembly technical field of buildings.
Background technique
It is built made of assemble in site as prefabricated component component, referred to as assembled architecture.By prefabricated components form and
Construction method is divided into building block building, plate building, boxlike building, frame board material construction structural and lift slab and rises five seed types such as layer building.
There are many classification of ash wall body plate, are a kind of important achievements of wall innovation, be it is a kind of green, environmental protection, energy conservation, heat preservation,
Moisture-proof, sound insulation and the superior novel big board wall body of fire protecting performance, performance can be arbitrarily cut, convenient for combination, one-pass molding
And can effectively solve building wall crack problem, can with frame structure both domestic and external, steel construction and it is abnormally-structured obtain sufficiently
It is good fit.
It is cumbersome in the fixation in building assembly work progress between traditional ash wall body plate, it usually needs worker's screw or nut
Etc. structures installed by time-consuming and laborious operation, and be not easy to dismantle, thus to worker for ash wall body plate installation with more
Changing makes troubles.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the ash wall body plate for building being easily installed is assembled the present invention provides a kind of, solved
It is cumbersome in the fixation in building assembly work progress between traditional ash wall body plate, it usually needs the structures such as worker's screw or nut are logical
It crosses time-consuming and laborious operation to be installed, and is not easy to dismantle, to be brought not to worker for the installation and replacement of ash wall body plate
Just the problem of.
(2) technical solution
To achieve the above object, the invention provides the following technical scheme: a kind of assemble the ash wall body plate for building being easily installed,
Including the first ash wall body plate, the right side of first ash wall body plate offers the first groove, the left side of first groove inner wall
The second groove is offered, the right side of first ash wall body plate and the left side of the second ash wall body plate overlap, second ash wall body plate
Front and the position of corresponding first groove offer third groove, the right side of the third groove inner wall offers card slot,
The front of second ash wall body plate offers the 4th groove, the left side of the 4th groove inner wall and the right side phase of card slot inner wall
Connection, the right side of second groove inner wall are fixedly connected there are two telescopic device, and the left end of two telescopic devices with
The right side of second motion bar is fixedly connected, and the right side of second motion bar is connected with rotating device, the rotating device
Right end be fixedly connected with connecting rod, the right end of the connecting rod sequentially passes through the first groove and third groove and the left side with kelly
Side is fixedly connected, and the outer wall of the kelly is contacted with the inner wall of card slot, and the right side of the kelly is provided with handle, and described
The front of two ash wall body plates is opened up there are two mounting groove, and two mounting grooves are located above and below the 4th groove.
Preferably, the telescopic device includes telescopic rod, and the outer wall of the telescopic rod is socketed with spring, the spring and is stretched
The left and right ends of contracting bar are fixedly connected with the right side of the right side of the second motion bar and the second groove inner wall respectively.
Preferably, the telescopic rod includes shell, the right side of the right side of the housing exterior walls and the second groove inner wall
It is fixedly connected, and the upper and lower surfaces of inner walls offer sliding slot, and the inner wall of two sliding slots slidably connects
Sliding block, and the opposite face of two sliding blocks is fixedly connected with the upper and lower surfaces of the first motion bar respectively, first activity
The left end of bar extends to hull outside and is fixedly connected with the right side of the second motion bar.
Preferably, the rotating device includes bearing, and the bearing is connected to the right side of the second motion bar, and bearing
Inner wall is socketed with shaft, and the right end of the shaft is fixedly connected with the left end of connecting rod.
Preferably, the shape of the third groove is rectangle, and the width of third groove is greater than the height of kelly.
Preferably, the shape of first groove is rectangle, and the size of the first groove is identical as the size of third groove.
(3) beneficial effect
Assemble the ash wall body plate for building being easily installed the present invention provides a kind of, have it is following the utility model has the advantages that
(1), the assembly ash wall body plate for building being easily installed passes through the first ash wall body plate, the second ash wall body plate, the second activity
Bar, spring, connecting rod, shaft, bearing, kelly, handle, the first groove, the second groove, card slot, third groove and the 4th groove
Collective effect, then the first ash wall body plate and the contact of the second ash wall body plate pass through handle pulling so that kelly is located in third groove
Kelly, so that kelly is moved right with connecting rod, the second motion bar is moved right, and spring and telescopic rod shorten, when kelly position
When the position of the 4th groove, worker rotates kelly by handle, and when kelly turns to groove position, worker unclamps handle,
Second motion bar is moved downward in the effect of spring force, so that connecting rod is moved downward with kelly, so that kelly and card slot
Contact, to realize the fixed installation between the first ash wall body plate and the second ash wall body plate, avoid worker pass through it is time-consuming and laborious
The process that troublesome operation is installed, and facilitate installation and replacement of the worker for the first ash wall body plate and the second ash wall body plate.
(2), the assembly ash wall body plate for building being easily installed is kept away by setting card slot to facilitate the placement of kelly
The rotation of the first ash wall body plate and the second ash wall body plate kelly itself in fixation procedure is exempted from, so that the first ash wall body plate and second
Fixation between ash wall body plate is more stable.
(3), the assembly ash wall body plate for building being easily installed, by setting sliding slot and sliding block, so that the first activity
The side-to-side movement of bar is more steady, so that the side-to-side movement of the second motion bar is more steady, and prevents the second motion bar
Rotation, and structure of the invention is compact, and design is rationally, practical.
(4), the assembly ash wall body plate for building being easily installed, by the way that mounting groove is arranged, so that worker be facilitated to install ornaments
For blocking and beautifying third groove and the 4th groove.
Detailed description of the invention
Fig. 1 is the schematic diagram of the section structure that the present invention faces;
Fig. 2 is the structural schematic diagram of the portion A of the present invention amplification;
Fig. 3 is the structural schematic diagram of the portion B of the present invention amplification;
Fig. 4 is the schematic diagram of the section structure that telescopic rod of the present invention is faced.
In figure: the first ash wall body plate of A1, the second ash wall body plate of A2, the first groove of A3, the second groove of A4, A5 third groove, A6 card
Slot, the 4th groove of A7, A8 telescopic device, A81 telescopic rod, A811 shell, A812 sliding slot, A813 sliding block, the first motion bar of A814,
A82 spring, the second motion bar of A9, A10 rotating device, A101 bearing, A102 shaft, A11 connecting rod, A12 kelly, A13 handle,
A14 mounting groove.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
As shown in Figs 1-4, the present invention provides a kind of technical solution: a kind of to assemble the ash wall body plate for building being easily installed, packet
Include the first ash wall body plate 1, the right side of the first ash wall body plate 1 offers the first groove 3, and the shape of the first groove 3 is rectangle, and first
The size of groove 3 is identical as the size of third groove 5, and the left side of 3 inner wall of the first groove offers the second groove 4, the first wall
The right side of body plate 1 and the left side of the second ash wall body plate 2 overlap, the position of the front of the second ash wall body plate 2 and corresponding first groove 3
Offer third groove 5, the right side of 5 inner wall of third groove offers card slot 6, and the shape of third groove 5 is rectangle, and third
The width of groove 5 is greater than the height of kelly 12, by the way that the width of third groove 5 is arranged, to facilitate kelly 12 and card slot 6
Separation, so that kelly 12 passes through third groove 5, so that the disassembly between the first ash wall body plate 1 and the second ash wall body plate 2 is facilitated, the
The front of two ash wall body plates 2 offers the 4th groove 7, is connected on the right side of the left side of 7 inner wall of the 4th groove and 6 inner wall of card slot,
The right side of second groove, 4 inner wall is fixedly connected there are two telescopic device 8, and the left end of two telescopic devices 8 is living with second
The right side of lever 9 is fixedly connected, and telescopic device 8 includes telescopic rod 81, by the way that telescopic rod 81 is arranged, so that the second motion bar 9
Side-to-side movement it is more steady, and prevent the rotation of the second motion bar 9, telescopic rod 81 includes shell 811,811 outer wall of shell
Right side be fixedly connected with the right side of 4 inner wall of the second groove, and the upper and lower surfaces of 811 inner wall of shell offer
Sliding slot 812, and the inner wall of two sliding slots 812 slidably connects sliding block 813, by setting sliding slot 812 and sliding block 813, thus
So that the side-to-side movement of the first motion bar 814 is more steady, so that the side-to-side movement of the second motion bar 9 is more steady, and
Prevent the rotation of the second motion bar 9, and the opposite face of two sliding blocks 813 respectively with the upper surface of the first motion bar 814 and under
Surface is fixedly connected, and the left end of the first motion bar 814 extends to 811 outside of shell and fixes with the right side of the second motion bar 9
Connection, the outer wall of telescopic rod 81 is socketed with spring 82, by the collective effect of spring 82, kelly 12 and the second motion bar 9, first
Then ash wall body plate 1 and the contact of the second ash wall body plate 2 pass through handle 13 and pull kelly 12 so that kelly 12 is located in third groove 5,
So that kelly 12 is moved right with connecting rod 11, the second motion bar 9 is moved right, and spring 82 and telescopic rod 81 shorten, and works as card
When bar 12 is located at the position of the 4th groove 7, worker rotates kelly 12 by handle 13, when kelly 12 turns to 6 position of card slot,
Worker unclamps handle 13, and the second motion bar 9 moves downward in the effect of 82 elastic force of spring so that connecting rod 11 with kelly 12 to
Left movement, so that kelly 12 is contacted with card slot 6, to realize the fixed peace between the first ash wall body plate 1 and the second ash wall body plate 2
Dress, avoids the process that worker is installed by time-consuming and laborious troublesome operation, and facilitate worker for the first ash wall body plate 1
With the installation and replacement of the second ash wall body plate 2, the left and right ends of spring 82 and telescopic rod 81 right side with the second motion bar 9 respectively
It is fixedly connected with the right side of 4 inner wall of the second groove, the right side of the second motion bar 9 is connected with rotating device 10, rotating device
10 right end is fixedly connected with connecting rod 11, and rotating device 10 includes bearing 101, and bearing 101 is connected to the right side of the second motion bar 9
Side, and the inner wall of bearing 101 is socketed with shaft 102, by setting bearing 101 and shaft 102, to realize connecting rod 11
Rotation, to realize the rotation of kelly 12, thus realize kelly 12 and the separation of card slot 6 with contact, the right side of shaft 102
End is fixedly connected with the left end of connecting rod 11, and the right end of connecting rod 11 sequentially passes through the first groove 3 and third groove 5 and and kelly
12 left side is fixedly connected, and the outer wall of kelly 12 is contacted with the inner wall of card slot 6, by the way that card slot 6 is arranged, to facilitate kelly
12 placement avoids the rotation of the first ash wall body plate 1 and the second ash wall body plate 2 kelly 12 itself in fixation procedure, so that
Fixation between first ash wall body plate 1 and the second ash wall body plate 2 is more stable, and the right side of kelly 12 is provided with handle 13, by setting
Handle 13 is set, kelly 12 is pulled by handle 13 to facilitate worker, the front of the second ash wall body plate 2 is opened up there are two mounting groove
14, and two mounting grooves 14 are located above and below the 4th groove 7, by the way that mounting groove 14 is arranged, to facilitate worker
Installation ornaments are used to block and beautify third groove 5 and the 4th groove 7.
In use, worker passes through pull handle 13 to the right, so that handle 13 is moved right with kelly 12, so that connecting rod
11 move right with the second motion bar 9, and kelly 12 is separated with card slot 6, then kelly 12 are rotated by handle 13, so that kelly
12 rotate with connecting rod 11, and when kelly 12 turns to 90 degree, worker unclamps handle 13, and the second motion bar 9 is in spring 82
It is moved downward under the action of elastic force, so that connecting rod 11 is moved downward with kelly 12, so that kelly 12 is far from card
Slot 6, so that the first ash wall body plate 1 and the separation of the second ash wall body plate 2, when needing to install the first ash wall body plate 1 and the second ash wall body plate 2
When, so that then the first ash wall body plate 1 and the contact of the second ash wall body plate 2 pass through handle 13 so that kelly 12 is located in third groove 5
Kelly 12 is pulled, so that kelly 12 is moved right with connecting rod 11, the second motion bar 9 is moved right, spring 82 and telescopic rod
81 shorten, and when kelly 12 is located at the position of the 4th groove 7, worker rotates kelly 12 by handle 13, when kelly 12 turns to
When 6 position of card slot, worker unclamps handle 13, and the second motion bar 9 is moved downward in the effect of 82 elastic force of spring, so that connecting rod 11
Moved downward with kelly 12 so that kelly 12 is contacted with card slot 6, thus realize the first ash wall body plate 1 and the second ash wall body plate 2 it
Between fixed installation.
Can to sum up obtain, 1, the assembly ash wall body plate for building being easily installed, by the first ash wall body plate 1, the second ash wall body plate 2,
Second motion bar 9, spring 82, connecting rod 11, shaft 102, bearing 101, kelly 12, handle 13, the first groove 3, the second groove
4, the collective effect of card slot 6, third groove 5 and the 4th groove 7, the first ash wall body plate 1 and the contact of the second ash wall body plate 2, so that kelly
12 are located in third groove 5, then pull kelly 12 by handle 13, so that kelly 12 is moved right with connecting rod 11, the
Two motion bars 9 move right, and spring 82 and telescopic rod 81 shorten, and when kelly 12 is located at the position of the 4th groove 7, worker passes through
Handle 13 rotates kelly 12, and when kelly 12 turns to 6 position of card slot, worker unclamps handle 13, and the second motion bar 9 is in spring 82
The effect of elastic force moves downward, so that connecting rod 11 is moved downward with kelly 12, so that kelly 12 is contacted with card slot 6, thus
The fixed installation between the first ash wall body plate 1 and the second ash wall body plate 2 is realized, worker is avoided and passes through time-consuming and laborious troublesome operation
The process installed, and facilitate installation and replacement of the worker for the first ash wall body plate 1 and the second ash wall body plate 2.
2, the assembly ash wall body plate for building being easily installed, by the way that card slot 6 is arranged, so that the placement of kelly 12 is facilitated,
The rotation for avoiding the first ash wall body plate 1 and the second ash wall body plate 2 kelly 12 itself in fixation procedure, so that the first ash wall body plate
1 and the second fixation between ash wall body plate 2 it is more stable.
3, the assembly ash wall body plate for building being easily installed, by setting sliding slot 812 and sliding block 813, so that first
The side-to-side movement of motion bar 814 is more steady, so that the side-to-side movement of the second motion bar 9 is more steady, and prevents
The rotation of two motion bars 9, and structure of the invention is compact, design is rationally, practical.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of assemble the ash wall body plate for building being easily installed, including the first ash wall body plate (1), it is characterised in that: first wall
The right side of body plate (1) offers the first groove (3), and the left side of the first groove (3) inner wall offers the second groove
(4), the left side overlap joint of the right side Yu the second ash wall body plate (2) of first ash wall body plate (1), second ash wall body plate (2)
The position of front and corresponding first groove (3) offers third groove (5), and the right side of third groove (5) inner wall opens up
Have card slot (6), the front of second ash wall body plate (2) offers the 4th groove (7), the left side of the 4th groove (7) inner wall
It is connected on the right side of face and card slot (6) inner wall, the right side of the second groove (4) inner wall is fixedly connected there are two telescopic device
(8), and the left end of two telescopic devices (8) is fixedly connected with the right side of the second motion bar (9), second motion bar
(9) right side is connected with rotating device (10), and the right end of the rotating device (10) is fixedly connected with connecting rod (11), described
The right end of connecting rod (11) sequentially passes through the first groove (3) and third groove (5) and is fixedly connected with the left side of kelly (12),
The outer wall of the kelly (12) is contacted with the inner wall of card slot (6), and the right side of the kelly (12) is provided with handle (13), described
The front of second ash wall body plate (2) is opened up there are two mounting groove (14), and two mounting grooves (14) are located at the 4th groove (7)
Above and below.
2. a kind of the ash wall body plate for building being easily installed is assembled according to claim 1, it is characterised in that: the flexible dress
Setting (8) includes telescopic rod (81), and the outer wall of the telescopic rod (81) is socketed with spring (82), the spring (82) and telescopic rod
(81) left and right ends are fixedly connected with the right side of the right side of the second motion bar (9) and the second groove (4) inner wall respectively.
3. a kind of the ash wall body plate for building being easily installed is assembled according to claim 2, it is characterised in that: the telescopic rod
It (81) include shell (811), the right side of shell (811) outer wall is fixedly connected with the right side of the second groove (4) inner wall,
And the upper and lower surfaces of shell (811) inner wall offer sliding slot (812), and the inner wall of two sliding slots (812) slides
It is connected with sliding block (813), and the opposite face of two sliding blocks (813) upper and lower surfaces with the first motion bar (814) respectively
It is fixedly connected, the left end of first motion bar (814) extends to shell (811) outside and the right side with the second motion bar (9)
Face is fixedly connected.
4. a kind of the ash wall body plate for building being easily installed is assembled according to claim 1, it is characterised in that: the rotation dress
Setting (10) includes bearing (101), and the bearing (101) is connected to the right side of the second motion bar (9), and bearing (101) is interior
Wall is socketed with shaft (102), and the right end of the shaft (102) is fixedly connected with the left end of connecting rod (11).
5. a kind of described in -4 according to claim 1 assemble the ash wall body plate for building being easily installed, it is characterised in that: the third
The shape of groove (5) is rectangle, and the width of third groove (5) is greater than the height of kelly (12).
6. a kind of described in -5 according to claim 1 assemble the ash wall body plate for building being easily installed, it is characterised in that: described first
The shape of groove (3) is rectangle, and the size of the first groove (3) is identical as the size of third groove (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810831706.0A CN109024895B (en) | 2018-07-26 | 2018-07-26 | Wall body board convenient to install for assembly building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810831706.0A CN109024895B (en) | 2018-07-26 | 2018-07-26 | Wall body board convenient to install for assembly building |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109024895A true CN109024895A (en) | 2018-12-18 |
CN109024895B CN109024895B (en) | 2020-10-16 |
Family
ID=64645464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810831706.0A Active CN109024895B (en) | 2018-07-26 | 2018-07-26 | Wall body board convenient to install for assembly building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024895B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055976A (en) * | 2019-04-25 | 2019-07-26 | 宿州云宏建设安装有限公司 | A kind of reinforced concrete precast member |
CN110130549A (en) * | 2019-05-22 | 2019-08-16 | 中国十七冶集团有限公司 | A kind of ceramic plate curtain wall structure being easily installed combination and installation method |
CN110387979A (en) * | 2019-08-26 | 2019-10-29 | 邵珠江 | Brace type vacuum heat-insulation plate |
CN110499854A (en) * | 2019-09-03 | 2019-11-26 | 何淑敏 | A kind of assembled architecture curtain wall and installation method |
CN111236532A (en) * | 2020-03-10 | 2020-06-05 | 唐明利 | Prefabricated building wallboard structure |
WO2020248268A1 (en) * | 2019-06-14 | 2020-12-17 | 胡永生 | Assembled integrated connecting device for building equipment |
CN112252558A (en) * | 2020-11-06 | 2021-01-22 | 绍兴宝城建筑工业化制造有限公司 | Node connection structure of prefabricated floor slab and construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1343941A1 (en) * | 2000-11-24 | 2003-09-17 | Ove Kornelius Guttormsen | Device and method for joining panel-equipped building elements |
US20110265310A1 (en) * | 2009-03-25 | 2011-11-03 | Charles Beaulieu | Fastening device template |
CN105090708A (en) * | 2015-06-12 | 2015-11-25 | 桐乡市太阁灯具有限公司 | Advertising board mounting device with guide sliding groove |
CN207159455U (en) * | 2017-08-01 | 2018-03-30 | 新昌县七星街道云迪机械厂 | A kind of spinning machine joint dolly |
CN207453208U (en) * | 2017-10-06 | 2018-06-05 | 白宁 | A kind of sliceable building energy conservation curtain wall |
CN207553496U (en) * | 2017-09-13 | 2018-06-29 | 同成七彩建筑科技有限公司 | A kind of decorative panel convenient for splicing |
-
2018
- 2018-07-26 CN CN201810831706.0A patent/CN109024895B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1343941A1 (en) * | 2000-11-24 | 2003-09-17 | Ove Kornelius Guttormsen | Device and method for joining panel-equipped building elements |
US20110265310A1 (en) * | 2009-03-25 | 2011-11-03 | Charles Beaulieu | Fastening device template |
CN105090708A (en) * | 2015-06-12 | 2015-11-25 | 桐乡市太阁灯具有限公司 | Advertising board mounting device with guide sliding groove |
CN207159455U (en) * | 2017-08-01 | 2018-03-30 | 新昌县七星街道云迪机械厂 | A kind of spinning machine joint dolly |
CN207553496U (en) * | 2017-09-13 | 2018-06-29 | 同成七彩建筑科技有限公司 | A kind of decorative panel convenient for splicing |
CN207453208U (en) * | 2017-10-06 | 2018-06-05 | 白宁 | A kind of sliceable building energy conservation curtain wall |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110055976A (en) * | 2019-04-25 | 2019-07-26 | 宿州云宏建设安装有限公司 | A kind of reinforced concrete precast member |
CN110130549A (en) * | 2019-05-22 | 2019-08-16 | 中国十七冶集团有限公司 | A kind of ceramic plate curtain wall structure being easily installed combination and installation method |
WO2020248268A1 (en) * | 2019-06-14 | 2020-12-17 | 胡永生 | Assembled integrated connecting device for building equipment |
CN110387979A (en) * | 2019-08-26 | 2019-10-29 | 邵珠江 | Brace type vacuum heat-insulation plate |
CN110499854A (en) * | 2019-09-03 | 2019-11-26 | 何淑敏 | A kind of assembled architecture curtain wall and installation method |
CN110499854B (en) * | 2019-09-03 | 2020-06-26 | 山东雄狮建筑装饰股份有限公司 | Assembled building curtain wall and mounting method |
CN111236532A (en) * | 2020-03-10 | 2020-06-05 | 唐明利 | Prefabricated building wallboard structure |
CN112252558A (en) * | 2020-11-06 | 2021-01-22 | 绍兴宝城建筑工业化制造有限公司 | Node connection structure of prefabricated floor slab and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN109024895B (en) | 2020-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109024895A (en) | It is a kind of to assemble the ash wall body plate for building being easily installed | |
CN207405796U (en) | A kind of insulating board for building being easily installed | |
CN209443632U (en) | A kind of curtain wall based on articulated constuction | |
CN209579936U (en) | A kind of prefabricated assembling type reinforced concrete air-conditioning plate particular manufacturing craft | |
CN213234251U (en) | Combined building splicing template for building | |
CN207344830U (en) | A kind of building mixed mud mixer of high-efficiency environment friendly | |
CN108870942A (en) | A kind of drying unit for liquid crystal display processing | |
CN211899239U (en) | Integrated building wall structure | |
CN108021211A (en) | A kind of mobile Internet computer heat dissipation fixing bracket | |
CN208067170U (en) | A kind of novel mechanical automation device for discharging | |
CN207218882U (en) | For the CCD camera assembly on building door-phone | |
CN210624854U (en) | Louver air port | |
CN219913318U (en) | Plastic vent dust keeper | |
CN216379928U (en) | Simply build green lightweight steel assembled steel construction house frame | |
CN108480503A (en) | A kind of novel mechanical automation device for discharging | |
CN219118633U (en) | Gypsum board lining skeleton | |
CN112012505B (en) | Prefabricated building wall assembly structure and assembly equipment thereof | |
CN217128022U (en) | Cement mortar fills mould for bridge engineering heel post | |
CN218405823U (en) | Packing type folding house | |
CN216043364U (en) | Rotatable window structure suitable for assembled wall body | |
CN205637510U (en) | Quick -witted special orientation lever of plastering wall | |
CN215173540U (en) | Security protection monitoring device for building engineering | |
CN219748445U (en) | Concrete brick piece demoulding mechanism | |
CN214035287U (en) | Connection structure of window board and window table top | |
CN209718094U (en) | A kind of integrated house wall mold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200630 Address after: Room f1017, 1 / F, 223 Jianghan Road, Minhang District, Shanghai 201100 Applicant after: Shanghai Mujin Construction Development Co.,Ltd. Address before: 342400 Ganzhou Xingshun Technology Co., Ltd., A District, Xingguo County, Ganzhou, Jiangxi Applicant before: GANZHOU XINGSHUNHUI TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |