CN205637510U CN201620502669.5U CN201620502669U CN205637510U CN 205637510 U CN205637510 U CN 205637510U CN 201620502669 U CN201620502669 U CN 201620502669U CN 205637510 U CN205637510 U CN 205637510U
Authority
CN
China
Prior art keywords
orientation lever
orientation
cavity
lever
main frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620502669.5U
Other languages
Chinese (zh)
Inventor
陈广杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Chenggong Machinery Technology Research Institute
Original Assignee
Beijing Chenggong Machinery Technology Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Chenggong Machinery Technology Research Institute filed Critical Beijing Chenggong Machinery Technology Research Institute
Priority to CN201620502669.5U priority Critical patent/CN205637510U/en
Application granted granted Critical
Publication of CN205637510U publication Critical patent/CN205637510U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

Quick -witted special orientation lever of plastering wall belong to construction machinery technical field, the orientation lever adopts the aluminum alloy aluminium material establishes four cavitys, a set of teeth of a cogwheel of peripheral hardware in, a white washed wall host computer is equipped with two piece left and right orientation levers, is equipped with the link between the left and right orientation lever, left and right orientation lever merogenesis setting and collapsible, left and right orientation lever is equallyd divide for the three section. The utility model has the advantages that: orientation lever merogenesis and collapsible when needs pass through construction hole or door opening, only needs folding orientation lever once to pass through, need not to disassemble first orientation lever, labour saving and time saving.

Description

The special orientation lever of plastering machine
Technical field
This utility model belongs to building machinery technical field, particularly relates to that a kind of to paint construction wall plastering machine special Orientation lever.
Background technology
Construction wall white washed wall is the most important engineering of building decoration, and the past, we generally used manual operations to complete Powder is plastered a wall body construction, and along with being continuously increased of labour cost, cost of labor brings up to unacceptable stage, and this artificial white washed wall is not But waste time and energy, dangerous big, and labor intensity is big, inefficiency, quality are uneven.Invent successively for this inventor Some machinery plastering machines, white washed wall efficiency is high, decreases human cost.Plastering machine relies on an orientation lever to be supported on top board and floor Between, move up and down by mortar powder on metope by plastering machine, the height of orientation lever be typically to be slightly less than floor to top board it Spacing, is namely slightly less than story height, and a room complete plastering machine of white washed wall needs to enter into through construction hole or door opening Construct in another room, but orientation lever height is far longer than construction hole or the height of door opening, and construction hole or door opening are the highest by 2 Rice, the height of orientation lever is 2.6 meters, sometimes also needs to increase, and certainly can't pass so the most mobile, it is common practice to will be fixed Removing to bar, be moved away, this both required time for, and also delays thing, often disassembles and be easily damaged plastering machine main frame and orientation lever, Cause irreversible damage.
Summary of the invention
It is to propose a kind of special orientation lever of plastering machine, by orientation lever to solve the problems referred to above the purpose of this utility model It is set to collapsible orientation lever, solves plastering machine and move to, from a room, the problem that another room inconvenience is moved.
This utility model be the technical scheme is that a kind of special orientation lever of plastering machine to achieve these goals, fixed Using aluminium alloy aluminium material to bar, inside set four cavitys, one group of gear teeth of peripheral hardware, four cavitys are followed successively by the first cavity, the second sky Chamber, the 3rd cavity and the 4th cavity, the first cavity is rail cavity, side opening in it, and the guide rail connecing white washed wall main frame in rail cavity turns Axle, white washed wall main frame is provided with upper and lower two guide rail rotating shafts, and upper and lower two guide rail rotating shafts are concurrently placed in rail cavity, prevent orientation lever from inclining Tiltedly;Described second cavity and the 4th cavity are built-in connecting rod chamber, and the 3rd cavity is circular cavity, and the 3rd cavity hypomere is plugged on On hydraulic stem;The described gear teeth are located at the orientation lever back side, the gear teeth on orientation lever and the engaged gears on white washed wall main frame, pass through gear White washed wall main frame is driven to move up and down along orientation lever;One white washed wall main frame is provided with left and right two orientation levers, between left and right orientation lever It is provided with link;Left and right orientation lever merogenesis is arranged and collapsible, when needing by construction hole or door opening, it is only necessary to fold one Lower orientation lever can pass through, it is not necessary to disassembles the first orientation lever, time saving and energy saving;Left and right orientation lever is divided into three joints, depends on from top to bottom Secondary is the 3rd orientation lever, the second orientation lever and the first orientation lever, and the first orientation lever is main orientation lever, and height is 1.9 meters;Second is fixed To bar for connecting orientation lever, height is 0.6 meter;3rd orientation lever is replaceable orientation lever, be provided with 0.2 meter, 0.4 meter, 0.6 meter, Four kinds of specifications of 0.8 meter;Described first orientation lever and the second orientation lever connect by hooking shaft connector, the first orientation lever top Lateral surface is provided with the connecting shaft that two ends are fixing, and the second orientation lever Basolateral face is provided with connection and hooks and fixing snap close, connects Being hooked on fixed connection shaft, fixing snap close is inserted between fixed connection shaft and orientation lever, is formed and hooks shaft connector;Second is fixed It is socketed by built-in connecting rod to bar and the 3rd orientation lever;Insert respectively in second cavity at the second orientation lever top and the 4th cavity Entering a connecting rod, connecting rod epimere inserts in the second cavity and the 4th cavity of the 3rd orientation lever respectively, forms built-in connection Bar socket join structure;Described first orientation lever lateral surface is provided with Autoamtic vertical determiner, and the second orientation lever lateral surface is provided with telescopic electric Push rod, Autoamtic vertical determiner is connected with telescopic electric push rod by circuit, and described telescopic electric putting back-end is fixed on orientation On bar, front end push rod stretches to metope, and push rod middle frame is located on a spring(-supported) mount, prevents handspike damaged;Described first orientation lever Lateral surface is provided with a bracing piece, and bracing piece height upwards is higher than the height of the first orientation lever, less than the height of the second orientation lever Degree, bracing piece is to prevent that the second orientation lever is unartificial to be rotated laterally;First orientation lever is respectively provided with a reinforcement lever lock up and down Button, bracing piece is placed in bracing piece snap close;The top lateral surface of described second orientation lever is provided with crashproof card.
Described link is fixed on the front of the first orientation lever.
Described first orientation lever is vertically plastered wall main frame and base, and described white washed wall main frame is presented herein below base, below described base Being provided with universal wheel, be arranged above with hydraulic stem, hydraulic stem is inserted in the 3rd cavity of orientation lever;Described orientation lever is by hydraulic stem even It is connected on base, realizes orientation lever up and down motion by controlling hydraulic stem up and down motion.
The gear teeth on described orientation lever and white washed wall main frame engaged gears, plaster wall main frame built-in control device, power set, biography Dynamic device and equipment, be provided with the gear being connected with orientation lever in actuating device, orientation lever is fixed, the transmission dress of white washed wall main frame Put drive white washed wall main frame to move up and down, it is achieved white washed wall function.
Described second orientation lever front is provided with a dismounting jack, and bracing piece is provided with a knockout screw, rolls at needs During folded or dismounting the second orientation lever, bracing piece is taken off, knockout screw is injected in dismounting jack, make the by bracing piece Two orientation levers rotate around fixed connection shaft, it is achieved fold or dismount.
The utility model has the advantages that: orientation lever merogenesis and collapsible, when needs are by construction hole or door opening, only need Fold orientation lever can pass through, it is not necessary to disassemble the first orientation lever, time saving and energy saving;Hook shaft connector is set, during installation Have only to live the hooking of the second orientation lever the fixed connection shaft of the first orientation lever, rotate up the second orientation lever, fixing snap close Automatically it is inserted between fixed connection shaft and orientation lever, it is achieved install and fix, has only to during dismounting pull up fixing snap close, to backspin Turn the second orientation lever;Four cavitys are set in orientation lever and can reduce orientation lever weight, connecting rod can be set in cavity, Convenient connection, in cavity, lower end is plugged on hydraulic stem, and convenient control orientation lever is upper and lower, arranges bracing piece, has both strengthened orientation lever Intensity, still prevent the second orientation lever and topple over.Autoamtic vertical determiner and telescopic electric push rod are set, can automatically adjust orientation The perpendicularity of bar.
Accompanying drawing explanation
Fig. 1 is front view of the present utility model;
Fig. 2 is left view of the present utility model;
Fig. 3 is the cross sectional representation of left orientation lever;
Fig. 4 is the assembling schematic diagram of left orientation lever;
Fig. 5 is the right view of left orientation lever;
Fig. 6 is the mounted inside structural representation of left orientation lever;
Fig. 7 is the rearview of left orientation lever;
Shown in figure: 1 the 3rd orientation lever, 2 second orientation levers, 3 links, 4 first orientation levers, 5 crashproof cards, 6 electronic push away Bar, 7 hook shaft connector, 8 bracing piece snap closes, 9 Autoamtic vertical determiners, 10 bracing pieces, 11 gear teeth, 12 the 4th cavitys, and 13 the 3rd is empty Chamber, 14 second cavitys, 15 first cavitys, 16 connecting rods, 17 hydraulic stems, 18 spring(-supported) mounts.
Detailed description of the invention
Below in conjunction with the accompanying drawings and detailed description of the invention the utility model is described in further detail:
Embodiment, as shown in figs. 1-7, a kind of special orientation lever of plastering machine, orientation lever uses aluminium alloy aluminium material, inside sets four Individual cavity, one group of gear teeth 11 of peripheral hardware, four cavitys are followed successively by the first cavity the 15, second cavity the 14, the 3rd cavity 13 and the 4th sky Chamber 12, the first cavity 15 is rail cavity, side opening in it, connects the guide rail rotating shaft of white washed wall main frame in rail cavity, and white washed wall main frame is provided with Upper and lower two guide rail rotating shafts, upper and lower two guide rail rotating shafts are concurrently placed in rail cavity, prevent orientation lever from tilting;Described second cavity 14 and the 4th cavity 12 be built-in connecting rod chamber, the 3rd cavity 13 is circular cavity, and the 3rd cavity 13 hypomere is plugged on hydraulic stem On 17;The described gear teeth 11 are located at the orientation lever back side, the gear teeth 11 on orientation lever and the engaged gears on white washed wall main frame, pass through gear White washed wall main frame is driven to move up and down along orientation lever;One white washed wall main frame is provided with left and right two orientation levers, between left and right orientation lever It is provided with link 3;Left and right orientation lever merogenesis is arranged and collapsible;Left and right orientation lever is divided into three joints, is followed successively by from top to bottom 3rd orientation lever the 1, second orientation lever 2 and the first orientation lever 4, the first orientation lever 4 is main orientation lever, and height is 1.9 meters;Second is fixed To bar 2 for connecting orientation lever, height is 0.6 meter;3rd orientation lever 1 is replaceable orientation lever, be provided with 0.2 meter, 0.4 meter, 0.6 Rice, four kinds of specifications of 0.8 meter;Described first orientation lever 4 is connected by hooking shaft connector 7 with the second orientation lever 2, the first orientation Bar 4 top lateral surface is provided with the connecting shaft that two ends are fixing, and the second orientation lever 2 Basolateral face is provided with connection and hooks and fixing lock Button, connects and is hooked on fixed connection shaft, and fixing snap close is inserted between fixed connection shaft and orientation lever, is formed and hooks shaft connector 7;Second orientation lever 2 and the 3rd orientation lever 1 are socketed by built-in connecting rod;Second cavity 14 at the second orientation lever 2 top and Inserting a connecting rod 16 in four cavitys 12 respectively, connecting rod 16 epimere inserts the second cavity 14 He of the 3rd orientation lever 1 respectively In 4th cavity 12, form built-in connecting rod socket join structure;Described first orientation lever 4 lateral surface is provided with Autoamtic vertical determiner 9, and second Orientation lever 2 lateral surface is provided with telescopic electric push rod 6, and Autoamtic vertical determiner 9 is connected with telescopic electric push rod 6 by circuit, institute Stating telescopic electric putting back-end to be fixed on orientation lever, front end push rod stretches to metope, and push rod middle frame is located at a spring(-supported) mount On 18, prevent handspike damaged;Described first orientation lever 4 lateral surface is provided with a bracing piece 10, and bracing piece 10 height upwards is high In the height of the first orientation lever 4, less than the height of the second orientation lever 2, bracing piece 10 be prevent the second orientation lever 2 unartificial to Outside rotates;First orientation lever about 4 is respectively provided with a bracing piece snap close 8, and bracing piece 10 is placed in bracing piece snap close 8;Described The top lateral surface of the second orientation lever 2 is provided with crashproof card 5.Described link 3 is fixed on the front of the first orientation lever 4.Described One orientation lever 4 is vertically plastered wall main frame and base, and described white washed wall main frame is presented herein below base, and described base is arranged below universal wheel, on Face is provided with hydraulic stem 17, and hydraulic stem 17 is inserted in the 3rd cavity 13 of orientation lever;Described orientation lever is connected to by hydraulic stem 17 On base, realize orientation lever up and down motion by controlling hydraulic stem 17 up and down motion.The gear teeth on described orientation lever are main with white washed wall Machine engaged gears, white washed wall main frame built-in control device, power set, actuating device and equipment, actuating device is provided with The gear that orientation lever connects, orientation lever fixes, and the actuating device of white washed wall main frame drives white washed wall main frame to move up and down, it is achieved white washed wall merit Energy.Described second orientation lever 2 front is provided with a dismounting jack, and bracing piece 10 is provided with a knockout screw.Plastering machine needs During by construction hole or door opening, bracing piece 10 is taken off, knockout screw is injected in dismounting jack, pull up fixing snap close, logical Crossing bracing piece 10 makes the second orientation lever 2 be rotated down around fixed connection shaft, it is achieved the second orientation lever 2 folds, it is only necessary to fold Once orientation lever can pass through, it is not necessary to disassembles the first orientation lever 4, time saving and energy saving;After construction hole or door opening, use bracing piece The hooking of the second orientation lever 2 is lived the fixed connection shaft of the first orientation lever 4 by 10, rotates up the second orientation lever 2, after putting in place, Gu Lock button is inserted between fixed connection shaft and orientation lever automatically, it is achieved install and fix.
It is last that it is noted that obviously above-described embodiment is only for clearly demonstrating this utility model example, And not restriction to embodiment.For those of ordinary skill in the field, the most also may be used To make other changes in different forms, the obvious change thus extended out or variation are still in this practicality Among novel protection domain.

Claims (5)

1. the special orientation lever of plastering machine, orientation lever uses aluminium alloy aluminium material, and feature is to set four cavitys, outward in orientation lever If one group of gear teeth, four cavitys are followed successively by the first cavity, the second cavity, the 3rd cavity and the 4th cavity, and the first cavity is guide rail Chamber, side opening in it, connect the guide rail rotating shaft of white washed wall main frame in rail cavity, white washed wall main frame is provided with upper and lower two guide rail rotating shafts, up and down Two guide rail rotating shafts are concurrently placed in rail cavity, prevent orientation lever from tilting;Described second cavity and the 4th cavity are built-in connection Bar chamber, the 3rd cavity is circular cavity, and the 3rd cavity hypomere is plugged on hydraulic stem;The described gear teeth are located at the orientation lever back side, fixed The gear teeth on bar and the engaged gears on white washed wall main frame, moved up and down along orientation lever by gear driven white washed wall main frame;One White washed wall main frame is provided with left and right two orientation levers, is provided with link between left and right orientation lever;Left and right orientation lever merogenesis arranges and can Fold;When needing by construction hole or door opening, it is only necessary to folding orientation lever can pass through, it is not necessary to disassemble the first orientation Bar is time saving and energy saving;Left and right orientation lever is divided into three joints, is followed successively by the 3rd orientation lever, the second orientation lever and first from top to bottom fixed To bar, the first orientation lever is main orientation lever, and height is 1.9 meters;Second orientation lever is for connecting orientation lever, and height is 0.6 meter;3rd Orientation lever is replaceable orientation lever, is provided with 0.2 meter, 0.4 meter, 0.6 meter, four kinds of specifications of 0.8 meter, according to the height plastered wall, The 3rd orientation lever required for selection;Described first orientation lever and the second orientation lever connect by hooking shaft connector, and first is fixed Being provided with, to masthead end lateral surface, the connecting shaft that two ends are fixing, the second orientation lever Basolateral face is provided with connection and hooks and fixing lock Button, connects and is hooked on fixed connection shaft, and fixing snap close is inserted between fixed connection shaft and orientation lever, is formed and hooks axle connection dress Put;Second orientation lever and the 3rd orientation lever are socketed by built-in connecting rod;Second cavity at the second orientation lever top and the 4th sky Intracavity inserts a connecting rod respectively, and connecting rod epimere inserts in the second cavity and the 4th cavity of the 3rd orientation lever respectively, shape Become built-in connecting rod socket join structure;Described first orientation lever lateral surface is provided with Autoamtic vertical determiner, and the second orientation lever lateral surface is provided with Telescopic electric push rod, Autoamtic vertical determiner is connected with telescopic electric push rod by circuit, described telescopic electric putting back-end Being fixed on orientation lever, front end push rod stretches to metope, and push rod middle frame is located on a spring(-supported) mount, prevents handspike damaged;Described First orientation lever lateral surface is provided with a bracing piece, and bracing piece height upwards is higher than the height of the first orientation lever, less than second The height of orientation lever, bracing piece is to prevent that the second orientation lever is unartificial to be rotated laterally;First orientation lever is respectively provided with one up and down Individual bracing piece snap close, bracing piece is placed in bracing piece snap close;The top lateral surface of described second orientation lever is provided with crashproof card.
The special orientation lever of plastering machine the most according to claim 1, is characterized in that described link is fixed on the first orientation lever Front.
The special orientation lever of plastering machine the most according to claim 1, is characterized in that described first orientation lever is vertically plastered wall main frame And base, described white washed wall main frame is presented herein below base, and described base is arranged below universal wheel, is arranged above with hydraulic stem, and hydraulic stem is inserted In the 3rd cavity of orientation lever;Described orientation lever is connected on base by hydraulic stem, moves up and down by controlling hydraulic stem Realize orientation lever to move up and down.
The special orientation lever of plastering machine the most according to claim 1, is characterized in that the gear teeth on described orientation lever are main with white washed wall Machine engaged gears, white washed wall main frame built-in control device, power set, actuating device and equipment, actuating device is provided with The gear that orientation lever connects, orientation lever fixes, and the actuating device of white washed wall main frame drives white washed wall main frame to move up and down, it is achieved white washed wall merit Energy.
The special orientation lever of plastering machine the most according to claim 1, is characterized in that described second orientation lever front is provided with one Dismounting jack, bracing piece is provided with a knockout screw, when needs fold or dismount the second orientation lever, is taken by bracing piece Under, knockout screw is injected in dismounting jack, by bracing piece, the second orientation lever is rotated around fixed connection shaft, it is achieved fold Or dismounting.
CN201620502669.5U 2016-05-30 2016-05-30 Quick -witted special orientation lever of plastering wall Withdrawn - After Issue CN205637510U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620502669.5U CN205637510U (en) 2016-05-30 2016-05-30 Quick -witted special orientation lever of plastering wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620502669.5U CN205637510U (en) 2016-05-30 2016-05-30 Quick -witted special orientation lever of plastering wall

Publications (1)

Publication Number Publication Date
CN205637510U true CN205637510U (en) 2016-10-12

Family

ID=57053134

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620502669.5U Withdrawn - After Issue CN205637510U (en) 2016-05-30 2016-05-30 Quick -witted special orientation lever of plastering wall

Country Status (1)

Country Link
CN (1) CN205637510U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863221A (en) * 2016-05-30 2016-08-17 北京程工机械技术研究院 Special oriented rod for wall whitewashing machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863221A (en) * 2016-05-30 2016-08-17 北京程工机械技术研究院 Special oriented rod for wall whitewashing machine

Similar Documents

Publication Publication Date Title
CN110185895B (en) Brace apparatus for supporting flexible display panel
CN206667808U (en) A kind of building can use the support meanss of hoisting depth
CN109850822A (en) A kind of dykes and dams detection platform based on collision avoidance system
CN107215715A (en) A kind of electrical equipment winder
CN205637510U (en) Quick -witted special orientation lever of plastering wall
CN208168430U (en) A kind of architectural engineering support device
CN207166050U (en) A kind of construction project special isolation hook
CN113067282B (en) Building electromechanical installation auxiliary device and working method thereof
CN206191185U (en) Which comprises a housin,
CN105863221B (en) The special orientation lever of plastering machine
CN110260118B (en) Television bracket
CN208920387U (en) Built is used in a kind of installation of Fang Jianzhong outdoor machine of air-conditioner
CN108756316B (en) A kind of bus platform lamp box being conveniently replaceable
CN108518528A (en) The petroleum pipeline stringer of adjusting is convenient in a kind of lifting
CN205637511U (en) Can freely come in and go out white washed wall machine in construction hole
CN208378292U (en) A kind of electric appliances service support device
CN209628202U (en) A kind of small-sized pepper breeding greenhouse
CN107143940A (en) A kind of erecting device for air-conditioner outdoor unit
CN208365756U (en) A kind of Intelligent control cabinet for water pump of central air conditioner
CN209384230U (en) A kind of broken pile treatment device
CN208706051U (en) A kind of traffic lights lamp stand good convenient for the highly protective performance of adjusting
CN205162395U (en) Multilayer wardrobe convenient to get clothing
CN216556021U (en) Movable electric lift TV frame
CN207921667U (en) A kind of projecting apparatus support device applied to career planing teaching
CN215874142U (en) Product design model display stand with placing chamber

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20161012

Effective date of abandoning: 20180629