CN110499854B - Assembled building curtain wall and mounting method - Google Patents

Assembled building curtain wall and mounting method Download PDF

Info

Publication number
CN110499854B
CN110499854B CN201910827794.1A CN201910827794A CN110499854B CN 110499854 B CN110499854 B CN 110499854B CN 201910827794 A CN201910827794 A CN 201910827794A CN 110499854 B CN110499854 B CN 110499854B
Authority
CN
China
Prior art keywords
curtain wall
groove
plate
frame
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910827794.1A
Other languages
Chinese (zh)
Other versions
CN110499854A (en
Inventor
何淑敏
李晨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG XIONGSHI ARCHITECTURE DECORATION Co.,Ltd.
Original Assignee
SHANDONG XIONGSHI ARCHITECTURE DECORATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG XIONGSHI ARCHITECTURE DECORATION CO Ltd filed Critical SHANDONG XIONGSHI ARCHITECTURE DECORATION CO Ltd
Priority to CN201910827794.1A priority Critical patent/CN110499854B/en
Publication of CN110499854A publication Critical patent/CN110499854A/en
Application granted granted Critical
Publication of CN110499854B publication Critical patent/CN110499854B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B1/6108Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together
    • E04B1/612Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces
    • E04B1/6125Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface
    • E04B1/6129Connections for building structures in general of slab-shaped building elements with each other the frontal surfaces of the slabs connected together by means between frontal surfaces with protrusions on the one frontal surface co-operating with recesses in the other frontal surface the connection made by expansion
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)
  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The invention relates to an assembly type building curtain wall and an installation method thereof. The invention can solve the problems that the prior building curtain wall is usually designed in an integrated manner, but the integrated curtain wall is usually large in volume, difficult to transport, high in use cost and poor in mounting and dismounting effects of the curtain wall, and the prior building curtain wall can not adjust the distance between the curtain walls during mounting, so that a large gap is easy to exist between the assembled curtain walls, the attractiveness of integral assembly is influenced, meanwhile, the assembled curtain wall has poor sealing effect, rainwater is easy to permeate into the interior of the curtain wall, the service life of the curtain wall is reduced, and the like.

Description

Assembled building curtain wall and mounting method
Technical Field
The invention relates to the technical field of building curtain walls, in particular to an assembled building curtain wall and an installation method.
Background
The building curtain wall is a light wall with decorative effect commonly used in modern large and high-rise buildings. The building curtain wall is composed of a panel and a supporting structure system, can have certain displacement capacity or certain deformation capacity relative to a main structure, does not bear the external protective structure or the decorative structure of a building acted by the main structure, and has the advantages of attractive appearance, energy conservation, easy maintenance and the like.
At present, the following defects of the existing building curtain wall are usually existed when the existing building curtain wall is installed and used: 1. the existing building curtain wall is usually designed in an integrated manner, however, the integrated curtain wall is usually large in size, difficult to transport and high in use cost, and the installation and disassembly effects of the curtain wall are poor; 2. when the existing building curtain wall is installed, the distance between the curtain walls cannot be adjusted normally, so that a large gap is easy to exist between the assembled curtain walls, the attractiveness of the whole assembly is influenced, meanwhile, the assembled curtain wall is poor in sealing effect, rainwater is easy to permeate into the interior of the curtain wall, and the service life of the curtain wall is shortened.
Disclosure of Invention
Technical problem to be solved
The invention can solve the problems that the prior building curtain wall is usually designed in an integrated manner, but the integrated curtain wall is usually large in volume, difficult to transport, high in use cost and poor in mounting and dismounting effects of the curtain wall, and the prior building curtain wall can not adjust the distance between the curtain walls during mounting, so that a large gap is easy to exist between the assembled curtain walls, the attractiveness of integral assembly is influenced, meanwhile, the assembled curtain wall has poor sealing effect, rainwater is easy to permeate into the interior of the curtain wall, the service life of the curtain wall is reduced, and the like.
(II) technical scheme
In order to achieve the purpose, the invention adopts the following technical scheme that the assembly type building curtain wall comprises two curtain wall bodies, mounting frames and connecting devices, wherein the mounting frames are mounted in the middle of the lower ends of the curtain wall bodies, through grooves are formed between the curtain wall bodies, and the two curtain wall bodies are connected through the connecting devices.
Connecting device include the fixed plate, the connecting plate, grafting mechanism, adjustment mechanism, coupling mechanism and spacing, curtain body lower extreme install the fixed plate, install the connecting plate on the fixed plate, the connecting plate is located logical inslot, connecting plate internally mounted has grafting mechanism, lower extreme mid-mounting has adjustment mechanism between two fixed plates, coupling mechanism is installed to lower extreme outside symmetry between two fixed plates, be located the left curtain body of coupling device and go up the symmetry and install spacing, concrete during operation, at first, separate folding curtain body from spacing, the manual work rotates adjustment mechanism through the spanner, adjustment mechanism drives two curtain body syntropy motions, grafting mechanism can be to curtain body zonulae occludens, can guarantee the leakproofness of connecting simultaneously, prevent that rainwater infiltration from influencing the life of curtain.
The splicing mechanism comprises a splicing column, a sealing groove, a piston plate, an air bag, a sliding plate and a telescopic spring, wherein the splicing column is arranged on the inner side of a connecting plate on the left side in the through groove, the sealing groove is arranged on the inner side of a connecting plate on the right side in the through groove, the piston plate is arranged in the sealing groove and is in sealing connection with the sealing groove, a groove is arranged below the sealing groove and is positioned on the connecting plate, the sliding plate is connected in the groove in a sliding fit manner, the telescopic spring is arranged at the right end of the sliding plate, the air bag is arranged on the left side of the sliding plate and is communicated with the sealing groove, the left end of the sliding plate is connected with the air bag through an elastic band, when the splicing column is inserted into the sealing groove, the splicing column can fix the curtain wall body, meanwhile, the piston plate in the sealing, and then the sealing effect of curtain wall connection can be guaranteed.
As a preferred technical scheme of the invention, the adjusting mechanism comprises an adjusting rod, a driving gear, a driven gear, a U-shaped frame and a clamping frame, the connecting plate is internally provided with an adjusting rod through a bearing, the lower end of the adjusting rod is provided with a driving gear which is meshed with a driven gear, the driven gear is arranged on a fixed plate on the right side of the through groove, a clamping frame is also arranged on the fixed plate on the right side of the through groove, the inside of the clamping frame is connected with a U-shaped frame in a sliding fit mode, the U-shaped frame is of a foldable structure, the left side of the U-shaped frame is arranged on a fixed plate on the left side of the through groove, a rack matched with the driven gear, the adjusting rod is rotated manually through a wrench, the adjusting rod drives the U-shaped frame to move through the driven gear, and then can adjust the gap between the curtain body, adjust effectual, convenient to use.
As a preferred technical scheme, the mounting frame comprises fixing columns, connecting frames and mounting plates, the fixing columns are mounted in the middle of the lower end of the curtain wall body, the connecting frames are uniformly mounted on the fixing columns, the mounting plates are mounted at the upper ends of the connecting frames, mounting holes are uniformly formed in the mounting plates, and when the mounting frame works in detail, the curtain wall body is mounted on the keel frame through the mounting plates.
As a preferred technical scheme of the invention, the connecting mechanism comprises a slot frame and a plug board, the plug board is installed at the lower end of the fixing plate positioned at the left side of the through slot, the plug board is of a foldable structure, the slot frame is installed at the lower end of the fixing plate positioned at the right side of the through slot, the plug board is connected with the slot frame in a plug-in fit manner, and the plug board can support the side edge of the curtain wall body, so that the stability of the curtain wall after installation is ensured.
As a preferred technical scheme of the invention, the limiting frame comprises a fixed seat, a sliding sleeve, a connecting spring and a sucker, the fixed seat is installed on the curtain wall body, the sliding sleeve is connected to the fixed seat in a sliding fit manner, the connecting spring is installed between the sliding sleeve and the fixed seat, an annular groove is formed in the upper end of the sliding sleeve, the sucker is installed inside the annular groove, and when the curtain wall body works in a specific working state and is in a folded state, the sucker can tightly suck and fix the curtain wall body, so that the size of the curtain wall can be reduced, and the transportation of the curtain wall body is facilitated.
According to the preferable technical scheme, the upper end of the inserting column is provided with the clamping groove, the clamping plate is arranged in the clamping groove and made of elastic metal materials, the decorating plate is arranged between the two clamping grooves, the decorating plate is inserted into the clamping groove during specific work, the decorating plate can decorate and plug a gap between the two curtain wall bodies, and the attractiveness of curtain wall connection is guaranteed.
As a preferred technical scheme of the invention, the decorative plate comprises clamping columns and transverse plates, the transverse plates are positioned at the upper ends of the two connecting plates, the clamping columns are symmetrically arranged at the lower ends of the transverse plates, and notches are formed in the middle of the clamping columns.
In addition, the invention also provides an installation method of the assembled building curtain wall, which comprises the following steps:
s1: installing the keel frame on the outer surface of the wall body;
s2: unfolding the two folded curtain wall bodies to enable the two curtain wall bodies to be vertically arranged, and wiping the surfaces of the curtain walls clean;
s3: firstly, manually rotating an adjusting mechanism, wherein the adjusting mechanism drives two curtain wall bodies to move in the same direction, so that an inserting column on the inserting mechanism is inserted into a sealing groove, then a piston plate in the sealing groove extrudes an air bag to expand, the air bag realizes the function of sealing a through groove between the adjacent curtain wall bodies, external rainwater is prevented from permeating into the curtain wall, and finally a decorative plate is inserted into a clamping groove on a connecting plate, so that a gap between the two curtain wall bodies can be decorated and filled, and the attractiveness of curtain wall connection is ensured;
s4: the curtain wall body is uniformly arranged on the keel frame outside the wall body through the mounting frame.
(III) advantageous effects
1. The assembled building curtain wall provided by the invention adopts a foldable design, is convenient for transportation of the curtain wall, is convenient for installation and disassembly of the curtain wall, and avoids the problems of difficult transportation and inconvenient installation caused by an integrally designed curtain wall;
2. according to the assembled building curtain wall provided by the invention, the adjusting mechanism can accurately adjust the distance between the curtain walls, so that a large gap is avoided easily existing between the assembled curtain walls, meanwhile, the assembled curtain wall has a good sealing effect, rainwater is prevented from permeating into the curtain wall, and the service life of the curtain wall can be effectively ensured.
Drawings
The invention is further illustrated with reference to the following figures and examples.
FIG. 1 is a schematic perspective view of the present invention;
FIG. 2 is a bottom view of the present invention;
FIG. 3 is a schematic cross-sectional view taken along line A-A of FIG. 2 in accordance with the present invention;
FIG. 4 is a schematic cross-sectional view taken along line B-B of FIG. 2 in accordance with the present invention;
fig. 5 is an enlarged view of the structure at I in fig. 4 according to the present invention.
Detailed Description
The embodiments of the invention will be described in detail below with reference to the drawings, but the invention can be implemented in many different ways as defined and covered by the claims.
As shown in fig. 1 to 5, an assembly type building curtain wall comprises curtain wall bodies 1, mounting frames 2 and connecting devices 3, wherein the number of the curtain wall bodies 1 is two, the mounting frames 2 are mounted in the middle of the lower end of each curtain wall body 1, through grooves are formed between the curtain wall bodies 1, and the two curtain wall bodies 1 are connected through the connecting devices 3.
Mounting bracket 2 include fixed column 21, link 22 and mounting panel 23, fixed column 21 install at 1 lower extreme middle part of curtain body, evenly install link 22 on the fixed column 21, mounting panel 23 is installed to link 22 upper end, evenly is provided with the mounting hole on the mounting panel 23, during concrete work, link 22 passes through mounting panel 23 and installs curtain body 1 on the keel frame.
The connecting device 3 comprises a fixing plate 31, a connecting plate 32, a plugging mechanism 33, an adjusting mechanism 34, a connecting mechanism 35 and a limiting frame 36, wherein the fixing plate 31 is installed at the lower end of the curtain wall body 1, the connecting plate 32 is installed on the fixing plate 31, the connecting plate 32 is positioned in the through groove, the plugging mechanism 33 is installed inside the connecting plate 32, the adjusting mechanism 34 is installed in the middle of the lower end between the two fixing plates 31, the connecting mechanism 35 is symmetrically installed at the outer side of the lower end between the two fixing plates 31, and the limiting frame 36 is symmetrically installed on the curtain wall body 1 positioned on the left side of the connecting device 3, during the specific work, firstly, the folded curtain wall body 1 is separated from the limiting frame 36, the adjusting mechanism 34 is manually rotated through a wrench, the adjusting mechanism 34 drives the two curtain wall bodies 1 to move in the same direction, the, the service life of the curtain wall is prevented from being influenced by rainwater infiltration.
The plugging mechanism 33 comprises a plugging column 331, a sealing groove 332, a piston plate 333, an airbag 334, a sliding plate 335 and a telescopic spring 336, the plugging column 331 is installed on the inner side of the connecting plate 32 on the left side inside the through groove, the sealing groove 332 is installed on the inner side of the connecting plate 32 on the right side inside the through groove, the piston plate 333 is arranged inside the sealing groove 332 and is hermetically connected with the sealing groove 332, a groove is arranged below the sealing groove 332 and is positioned on the connecting plate 32, the sliding plate 335 is connected inside the groove in a sliding fit manner, the telescopic spring 336 is installed at the right end of the sliding plate 335, the airbag 334 is arranged on the left side of the sliding plate 335, the airbag 334 is communicated with the sealing groove 332, the left end of the sliding plate 335 is connected with the airbag 334 through an elastic belt, and during specific work, when the plugging, meanwhile, the piston plate 333 inside the sealing groove 332 inflates the air bag 334, the air bag 334 expands outwards to seal the through groove between the two curtain wall bodies 1, and the sealing effect of curtain wall connection can be further ensured.
The post 331 upper end of pegging graft be provided with joint groove 3311, joint groove 3311 is inside to be provided with cardboard 3312, cardboard 3312 makes for elastic metal material, installs decorative board 330 between two joint grooves 3311, decorative board 330 including card post 3301 and diaphragm 3302, diaphragm 3302 be located two connecting plates 32 upper ends, the card post 3301 is installed to diaphragm 3302 lower extreme symmetry, is provided with the incision in the middle part of card post 3301, during specific work, insert inside joint groove 3311 with decorative board 330, decorative board 330 can decorate the gap between two curtain bodies 1 and fill, guarantees the aesthetic property that the curtain is connected.
The adjusting mechanism 34 comprises an adjusting rod 341, a driving gear 342, a driven gear 343, a U-shaped frame 344 and a clamping frame 345, the adjusting rod 341 is installed inside the connecting plate 32 through a bearing, the driving gear 342 is installed at the lower end of the adjusting rod 341, the driving gear 342 is meshed with the driven gear 343, the driven gear 343 is installed on the fixing plate 31 at the right side of the through groove, the clamping frame 345 is further arranged on the fixing plate 31 at the right side of the through groove, the U-shaped frame 344 is connected inside the clamping frame 345 in a sliding fit manner, the U-shaped frame 344 is of a foldable structure, the left side of the U-shaped frame 344 is installed on the fixing plate 31 at the left side of the through groove, a rack matched with the driven gear 343 is arranged on the U-shaped frame 344, when the curtain wall adjusting mechanism works, the adjusting rod 341 is manually rotated through a, good adjusting effect and convenient use.
Coupling mechanism 35 include slot frame 351 and picture peg 352, be located picture peg 352 is installed to the left fixed plate 31 lower extreme that leads to the groove, picture peg 352 is beta structure, is located slot frame 351 is installed to the fixed plate 31 lower extreme that leads to the groove right side, picture peg 352 is connected with slot frame 351 through grafting complex mode, picture peg 352 can support 1 side of curtain body, guarantees the stability of curtain after the installation.
Spacing 36 include fixing base 361, sliding sleeve 362, coupling spring 363 and sucking disc 364, fixing base 361 install on curtain body 1, be connected with sliding sleeve 362 through sliding fit's mode on fixing base 361, install coupling spring 363 between sliding sleeve 362 and the fixing base 361, the sliding sleeve 362 upper end is provided with the ring channel, ring channel internally mounted has sucking disc 364, during specific work, when curtain body 1 is fold condition, sucking disc 364 can suck curtain body 1 tightly fixedly, can reduce the volume of curtain, be convenient for the transportation of curtain body 1.
In addition, the invention also provides an installation method of the assembled building curtain wall, which comprises the following steps:
s1: installing the keel frame on the outer surface of the wall body;
s2: unfolding the two folded curtain wall bodies 1 to enable the two curtain wall bodies 1 to be vertically arranged, and wiping the surfaces of the curtain walls clean;
s3: firstly, manually rotating the adjusting mechanism 34, wherein the adjusting mechanism 34 drives the two curtain wall bodies 1 to move in the same direction, so that the plug-in column 331 on the plug-in mechanism 33 is inserted into the sealing groove 332, then the piston plate 333 in the sealing groove 332 extrudes the air bag 334 to expand, the air bag 334 realizes the function of sealing the through groove between the adjacent curtain wall bodies 1, external rainwater is prevented from permeating into the interior of the curtain wall, and finally the decorative plate 330 is inserted into the clamping groove 3311 on the connecting plate 32, so that the gap between the two curtain wall bodies 1 can be decorated and filled, and the attractiveness of curtain wall connection is ensured;
s4: the curtain wall body 1 is uniformly arranged on the keel frame outside the wall body through the mounting frame 2.
The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention, and various modifications and changes may be made by those skilled in the art. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (8)

1. The utility model provides an assembly type building curtain wall, includes curtain wall body (1), mounting bracket (2) and connecting device (3), its characterized in that: the curtain wall comprises two curtain wall bodies (1), wherein the middle part of the lower end of each curtain wall body (1) is provided with a mounting frame (2), a through groove is formed between the curtain wall bodies (1), and the two curtain wall bodies (1) are connected through a connecting device (3); wherein:
the connecting device (3) comprises fixing plates (31), connecting plates (32), inserting mechanisms (33), adjusting mechanisms (34), connecting mechanisms (35) and limiting frames (36), wherein the fixing plates (31) are installed at the lower ends of the curtain wall bodies (1), the connecting plates (32) are installed on the fixing plates (31), the connecting plates (32) are located in the through grooves, the inserting mechanisms (33) are installed inside the connecting plates (32), the adjusting mechanisms (34) are installed in the middle of the lower ends between the two fixing plates (31), the connecting mechanisms (35) are symmetrically installed on the outer sides of the lower ends between the two fixing plates (31), and the limiting frames (36) are symmetrically installed on the curtain wall bodies (1) on the left side of the connecting device (3);
the inserting mechanism (33) comprises an inserting column (331), a sealing groove (332), a piston plate (333), an air bag (334), a sliding plate (335) and a telescopic spring (336), the inner side of the connecting plate (32) at the left side in the through groove is provided with an inserting column (331), seal groove (332) are installed to connecting plate (32) inboard on logical groove inside right side, seal groove (332) inside is provided with piston board (333), piston board (333) and seal groove (332) sealing connection, seal groove (332) below is provided with the recess, the recess is located connecting plate (32), the recess is inside to be connected with sliding plate (335) through sliding fit's mode, expanding spring (336) are installed to sliding plate (335) right-hand member, sliding plate (335) left side is provided with gasbag (334), gasbag (334) are linked together with seal groove (332), sliding plate (335) left end is connected with gasbag (334) through the elastic webbing.
2. An assembled building curtain wall as claimed in claim 1, wherein: adjustment mechanism (34) including adjusting pole (341), driving gear (342), driven gear (343), U type frame (344) and joint frame (345), connecting plate (32) inside install through the bearing and adjust pole (341), driving gear (342) are installed to adjusting pole (341) lower extreme, driving gear (342) meshing has driven gear (343), driven gear (343) are installed on fixed plate (31) of logical groove right side, still be provided with joint frame (345) on fixed plate (31) of logical groove right side, joint frame (345) is inside to be connected with U type frame (344) through sliding fit's mode, U type frame (344) are beta structure, install on leading to left fixed plate (31) of groove on U type frame (344) left side, be provided with on U type frame (344) with driven gear (343) complex rack.
3. An assembled building curtain wall as claimed in claim 1, wherein: mounting bracket (2) include fixed column (21), link (22) and mounting panel (23), fixed column (21) install in curtain body (1) lower extreme middle part, evenly install link (22) on fixed column (21), mounting panel (23) are installed to link (22) upper end, evenly be provided with the mounting hole on mounting panel (23).
4. An assembled building curtain wall as claimed in claim 1, wherein: coupling mechanism (35) include slot frame (351) and picture peg (352), be located picture peg (352) are installed to lead to left fixed plate (31) lower extreme of groove, picture peg (352) are beta structure, are located slot frame (351) are installed to fixed plate (31) lower extreme that leads to the groove right side, picture peg (352) are connected with slot frame (351) through grafting complex mode.
5. An assembled building curtain wall as claimed in claim 1, wherein: spacing (36) include fixing base (361), sliding sleeve (362), coupling spring (363) and sucking disc (364), fixing base (361) install on curtain body (1), be connected with sliding sleeve (362) through sliding fit's mode on fixing base (361), install coupling spring (363) between sliding sleeve (362) and fixing base (361), sliding sleeve (362) upper end is provided with the ring channel, ring channel internally mounted has sucking disc (364).
6. An assembled building curtain wall as claimed in claim 1, wherein: the upper end of the inserting column (331) is provided with a clamping groove (3311), a clamping plate (3312) is arranged in the clamping groove (3311), the clamping plate (3312) is made of elastic metal materials, and a decorative plate (330) is arranged between the two clamping grooves (3311).
7. An assembled building curtain wall as claimed in claim 6, wherein: decorative board (330) including card post (3301) and diaphragm (3302), diaphragm (3302) be located two connecting plate (32) upper ends, card post (3301) are installed to diaphragm (3302) lower extreme symmetry, card post (3301) middle part is provided with the incision.
8. The mounting method of the assembly type building curtain wall is characterized by comprising the following steps: further comprising the steps of:
s1: installing the keel frame on the outer surface of the wall body;
s2: unfolding the two folded curtain wall bodies (1) to enable the two curtain wall bodies (1) to be mutually and vertically arranged, and wiping the surfaces of the curtain walls clean;
s3: firstly, manually rotating an adjusting mechanism (34), wherein the adjusting mechanism (34) drives two curtain wall bodies (1) to move in the same direction, so that an inserting column (331) on an inserting mechanism (33) is inserted into a sealing groove (332), then a piston plate (333) in the sealing groove (332) extrudes an air bag (334) to expand, the air bag (334) realizes the function of sealing a through groove between adjacent curtain wall bodies (1), external rainwater is prevented from permeating into the interior of a curtain wall, and finally a decorative plate (330) is inserted into a clamping groove (3311) on a connecting plate (32), so that a gap between the two curtain wall bodies (1) can be decorated and filled, and the attractiveness of curtain wall connection is ensured;
s4: the curtain wall body (1) is uniformly arranged on the keel frame outside the wall body through the mounting frame (2).
CN201910827794.1A 2019-09-03 2019-09-03 Assembled building curtain wall and mounting method Active CN110499854B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910827794.1A CN110499854B (en) 2019-09-03 2019-09-03 Assembled building curtain wall and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910827794.1A CN110499854B (en) 2019-09-03 2019-09-03 Assembled building curtain wall and mounting method

Publications (2)

Publication Number Publication Date
CN110499854A CN110499854A (en) 2019-11-26
CN110499854B true CN110499854B (en) 2020-06-26

Family

ID=68591001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910827794.1A Active CN110499854B (en) 2019-09-03 2019-09-03 Assembled building curtain wall and mounting method

Country Status (1)

Country Link
CN (1) CN110499854B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111379432A (en) * 2020-04-20 2020-07-07 向文焦 Building curtain wall
CN111719793B (en) * 2020-07-13 2021-02-26 深圳市中筑营造建设工程有限公司 Environment-friendly building outer wall decorative plate and installation method thereof
CN111851812B (en) * 2020-07-25 2021-07-27 山东永胜建设集团有限公司 Assembled building curtain wall and mounting method thereof
CN111877619B (en) * 2020-08-10 2021-09-28 大潮建设集团有限公司 Combined curtain wall system
CN111852040B (en) * 2020-08-18 2022-03-11 安徽雷辰建工集团有限公司 Assembling method of high-stability and convenient-to-disassemble temporary building
CN111851749B (en) * 2020-08-18 2022-01-11 常熟雅致模块化建筑有限公司 High-stability temporary building convenient to disassemble
CN112196133A (en) * 2020-10-13 2021-01-08 衡阳远大建筑工业有限公司 Air-permeable assembly type wall body assembly
CN112282188A (en) * 2020-10-21 2021-01-29 郭文坤 Desulfurized gypsum sound-absorbing partition wall brick
CN113622618B (en) * 2021-09-06 2022-08-05 冠恒建设集团有限公司 Mounting member for architectural decoration
CN114250978B (en) * 2021-12-31 2022-10-04 浙江大地钢结构有限公司 Assembled curtain wall tandem type installation method
CN114718267B (en) * 2022-05-26 2023-08-15 航天建设集团深圳有限公司 Photovoltaic power generation type building outer elevation
CN116624742B (en) * 2023-07-11 2023-10-17 中哲创建科技股份有限公司 Equipment mounting bracket for frame type glass curtain wall
CN117127742B (en) * 2023-10-23 2024-01-26 上海骊港幕墙科技有限公司 Combined curtain wall

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3835712A1 (en) * 1987-10-29 1989-05-11 Standard Products Co COLORED SEALING ARRANGEMENT FOR A CURTAIN WALL
CN206205341U (en) * 2016-11-18 2017-05-31 闫向阳 A kind of easy to disassemble and assembling decorative panel for building
CN206418714U (en) * 2017-01-12 2017-08-18 东莞市力佳辉玻璃有限公司 A kind of paint glass plate
CN207073243U (en) * 2017-06-13 2018-03-06 高续鑫 A kind of assemble type decorative panel for building
CN109024895A (en) * 2018-07-26 2018-12-18 赣州市兴顺辉科技有限公司 It is a kind of to assemble the ash wall body plate for building being easily installed
CN208486385U (en) * 2018-07-04 2019-02-12 安徽省浦菲尔建材有限公司 A kind of curtain wall panel with heat preservation energy-saving function
CN110185171A (en) * 2019-06-27 2019-08-30 安徽劲帆建设有限公司 A kind of prefabricated wall construction of assembled architecture and its installation method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3835712A1 (en) * 1987-10-29 1989-05-11 Standard Products Co COLORED SEALING ARRANGEMENT FOR A CURTAIN WALL
CN206205341U (en) * 2016-11-18 2017-05-31 闫向阳 A kind of easy to disassemble and assembling decorative panel for building
CN206418714U (en) * 2017-01-12 2017-08-18 东莞市力佳辉玻璃有限公司 A kind of paint glass plate
CN207073243U (en) * 2017-06-13 2018-03-06 高续鑫 A kind of assemble type decorative panel for building
CN208486385U (en) * 2018-07-04 2019-02-12 安徽省浦菲尔建材有限公司 A kind of curtain wall panel with heat preservation energy-saving function
CN109024895A (en) * 2018-07-26 2018-12-18 赣州市兴顺辉科技有限公司 It is a kind of to assemble the ash wall body plate for building being easily installed
CN110185171A (en) * 2019-06-27 2019-08-30 安徽劲帆建设有限公司 A kind of prefabricated wall construction of assembled architecture and its installation method

Also Published As

Publication number Publication date
CN110499854A (en) 2019-11-26

Similar Documents

Publication Publication Date Title
CN110499854B (en) Assembled building curtain wall and mounting method
WO2015081790A1 (en) Integrated roll-up window
US6460805B1 (en) Double convex aircraft window
CN210659326U (en) Prevent glass curtain wall from gluing strutting arrangement
CN116641565B (en) Installation clamping device suitable for assembled decoration and heat preservation integrated wallboard
CN110756406B (en) Device is paintd to eminence glass window frame glass cement
CN211114237U (en) Integral partition wall
CN204084025U (en) A kind of embedded LED panel lamp case
CN108272289B (en) Architectural decoration screen
CN109594906B (en) Double-layer glass with shutter device inside
CN114718188B (en) Green building surface system for public venues
CN110805184A (en) Angle-adjustable unit type glass curtain wall connecting structure and glass curtain wall mounting method
CN216048302U (en) Filter screen structure for air conditioner
CN114319668B (en) Glass-aluminum plate double-layer curtain wall
CN215829723U (en) Architectural decoration curtain wall
CN210399227U (en) Saddle formula window machine auxiliary erection device
CN212866419U (en) Portable sound insulation and wind shielding device
CN111445805B (en) Building wall advertisement screen
CN112761499A (en) Intelligent door and window with automatic sound insulation and noise reduction functions
CN211774819U (en) Wall surface
CN206902991U (en) Separate in building
CN2757325Y (en) Novel overhead bulb mounting device
CN216007451U (en) Lower opening switching cross beam of unit curtain wall
CN219710687U (en) Window side upright post section bar of unitized curtain wall
JPH11504090A (en) Walk-in shower door

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200601

Address after: 277599 No. 699, Tengfei Road, Tengzhou Economic Development Zone, Zaozhuang City, Shandong Province

Applicant after: SHANDONG XIONGSHI ARCHITECTURE DECORATION Co.,Ltd.

Address before: 430014 Wuhan Guanhua Steel Structure Co., Ltd.

Applicant before: He Shumin

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A prefabricated building curtain wall and its installation method

Effective date of registration: 20211116

Granted publication date: 20200626

Pledgee: Shandong Tengzhou rural commercial bank Limited by Share Ltd. SME branch

Pledgor: SHANDONG XIONGSHI ARCHITECTURE DECORATION Co.,Ltd.

Registration number: Y2021980012493

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221130

Granted publication date: 20200626

Pledgee: Shandong Tengzhou rural commercial bank Limited by Share Ltd. SME branch

Pledgor: SHANDONG XIONGSHI ARCHITECTURE DECORATION Co.,Ltd.

Registration number: Y2021980012493

PC01 Cancellation of the registration of the contract for pledge of patent right