CN109024884A - Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint - Google Patents
Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint Download PDFInfo
- Publication number
- CN109024884A CN109024884A CN201710429938.9A CN201710429938A CN109024884A CN 109024884 A CN109024884 A CN 109024884A CN 201710429938 A CN201710429938 A CN 201710429938A CN 109024884 A CN109024884 A CN 109024884A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- bolt
- nut
- pinboard
- empty slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joints, belong to building engineering field, comprising: precast concrete column, precast concrete beam, connection reinforcing bar, nut, end nut, pinboard;Empty slot is reserved on the precast concrete beam both ends top at a certain distance from apart from end cross-sectional, forms sinking step, and precast beam both ends lower part is equipped with prominent step;When the precast beam does not lift, the connection reinforcing bar is placed in the reserved empty slot, and after the precast beam lifting in place, the connection reinforcing bar passes through reinforcing bar preformed hole;The pinboard inserts in the bolt board slot of the precast concrete beam;The nut is twisted on the thread segment at the connection reinforcing bar both ends, and the sinking step and the prominent step are close to;The end nut is close on the pinboard.Simple installation of the present invention is quick, high-efficient, while can transmit reinforcing bar and draw, press performance, and structural behaviour is good.
Description
Technical field
The present invention relates to a kind of bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joints, belong to building engineering field.
Background technique
Component in precast concrete is produced in the factory, and prefabricated component is then transported to construction, into
Row assembling.This mode of construction can greatly improve mechanized construction level, reduce construction personnel, save the construction time, accelerate
Construction speed reduces construction cost.Developing precast concrete is the effective way for realizing building industrialization, can effectively be saved
About resource, reduction environmental pollution are conducive to improve national construction industry modernization development level, have vast potential for future development.
The key of Precast Concrete Frame performance is that bean column node connects, and only prefabricated bean column node connection can
It leans on, just can guarantee the safe and reliable of structure.Meanwhile precast concrete concrete frame joint is also to influence precast concrete frame knot
The key factor of quick, the convenient construction of structure.Currently, conventional prefabricated connecting node pours " wet " connecting node, bolt after mainly having
Connecting node, welding connection node etc..After pour " wet " connecting node often prefabricated beam-ends there are stretch out reinforcing bar, seriously affect pre-
Beam processed, column lifting efficiency;For bolt connection node at the scene there is inconvenient situation, conventional stud often can only be by
It draws, and generally requires pre-buried auxiliary profile steel joint, influence joint efficiency and performance;Welding connection node narrow model at the scene
In enclosing, manual operation is inconvenient, and welding quality is difficult to ensure, inefficiency.
Summary of the invention
It is an object of the invention to propose a kind of bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint, using " dry
Fast Installation is convenient in formula " connection, while using the drawing of reinforcing bar, pressure performance, guaranteeing the anti-seismic performance of beam-to-column joint interior joint.
To achieve the goals above, this invention takes following technical solutions.
Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint, comprising: precast concrete column, precast concrete beam,
Connect reinforcing bar, nut, end nut, pinboard.
The precast concrete column is in node region reserved steel bar hole, for across the connection reinforcing bar.
Empty slot is reserved on the precast concrete beam both ends top at a certain distance from apart from end cross-sectional, so that prefabricated beam-ends
Sinking step is formed at top, and long empty slot is reserved in one end, and short empty slot is reserved in one end, and the length of the long empty slot is slightly larger than the connection
Difference at a distance from reinforcing bar length and the long empty slot to beam-ends section, the long empty slot are not connected with described prefabricated in the precast beam
When column, to store the connection reinforcing bar, avoids the connection reinforcing bar from stretching out beam-ends, influence to lift efficiency.
Precast beam both ends lower part is equipped with prominent step, the sinking step and the prominent step reserved steel bar hole,
The erection of precast beams is corresponded to each other in the prefabricated post both ends, the preformed hole, to pass through the connection reinforcing bar.
Bolt board slot is reserved at the sinking step and the prominent step rear portion, and the pinboard is worn in the connection reinforcing bar
After crossing the preformed hole, it is inserted into the part in the bolt board slot and smears epoxy glue, be inserted into the reserved pinboard, to
Withstand the connection reinforcing bar or the end nut.
The connection reinforcing bar both ends are equipped with thread segment and are placed in the long empty slot when the precast beam does not lift in place,
After precast beam lifting in place, the preformed hole is passed through, the pinboard in the short empty slot is held out against.
The nut is twisted in due course after the connection reinforcing bar passes through the preformed hole in the screw thread at the connection reinforcing bar both ends
Duan Shang, the connection reinforcing bar in place after, the nut is further tightened, and the sinking step and the prominent step are tightly attached to
On, to transmit the pulling force of the connection reinforcing bar.
The length of the end nut is three times of same specification plain nut, and there is the end plate slightly larger than the nut in one end,
Before the pinboard is inserted into the latch groove, tightly twists and is located in the threaded one end section of the long empty slot in the connection reinforcing bar,
After the pinboard is inserted into the latch groove, the end nut moves back stubborn to the long empty slot direction, is tightly attached in the long empty slot
Pinboard, with this come transmit it is described connection reinforcing bar pressure.
Beneficial effect
Compared with prior art, advantages of the present invention is as follows:
(1) present invention is connected using " dry type " to form prefabrication and assembly construction concrete frame bean column node, live wet-less operation, installation
High-efficient, construction speed is fast.
(2) present invention connection reinforcing bar does not stretch out precast beam end face when precast beam is not installed, and there is no conventional prefabricated beam-ends
The problem of stretching out reinforcing bar mutual " fighting ", after precast beam is installed in place, connection reinforcing bar passes through preformed hole, is suitable for multicolumn entirety
Prefabricated in-site installation, it is simple and efficient, it is high-efficient.
(3) present invention connection reinforcing bar can effectively transmit drawing, pressure, form rigid connection, guarantee beam-column connection by
Power performance, while reinforcing bar soap-free emulsion polymeization in duct is connected, deformability is good, and energy dissipation ability with higher can be protected effectively
Demonstrate,prove structural behaviour of the connecting node under seismic loading.
Detailed description of the invention
Fig. 1 is component seperated schematic diagram of the invention.
Fig. 2 is precast concrete beam schematic diagram of the invention.
Fig. 3 is connection interior joint assembling schematic diagram of the invention.
Specific embodiment
The present invention will be further described below with reference to the drawings.
As shown in Figs. 1-3: the precast concrete column 1 is in node region reserved steel bar hole 2.
Empty slot is reserved on the 3 both ends top of precast concrete beam at a certain distance from apart from end cross-sectional, so that precast beam
Top is held to form sinking step 4, long empty slot 5 is reserved in one end, and short empty slot 6 is reserved in one end, and the length of the long empty slot 6 is slightly larger than institute
State the difference at a distance from connection 7 length of reinforcing bar and the long empty slot 5 to beam-ends section.
The 3 both ends lower part of precast beam is equipped with prominent step 8, the sinking step 4 and 8 reserved steel bar of prominent step
Hole 2.
Bolt board slot 9 is reserved at the sinking step 4 and 8 rear portion of prominent step.
7 both ends of connection reinforcing bar are equipped with thread segment, and when the precast beam 3 does not lift in place, the connection reinforcing bar 7 is set
In in the long empty slot 5, the nut 10 and the end nut 11 are twisted in one end of the connection reinforcing bar 7.
When the precast beam 3 is lifted into the node area both sides of the prefabricated post 1, the connection reinforcing bar 7 passes through 1 He of prefabricated post
The reserved steel bar hole 2 of precast beam 3,12 lower part of pinboard are smeared epoxy glue, are inserted in the latch groove 9.
The nut 13, which is twisted, is located at the thread segment in short 6 direction of empty slot, the connection reinforcing bar 7 in the connection reinforcing bar 7
The pinboard 12 positioned at short 6 direction of empty slot is held out against, the nut 10 and 13 is tightened, and 4 He of sinking step is close to
The prominent step 8.
The length of the end nut 11 is three times of same specification plain nut, and there is the end slightly larger than the nut 10 in one end
Plate, after the pinboard 12 is inserted into the latch groove 9, the end nut 11 moves back stubborn to long 6 direction of empty slot, is tightly attached to institute
It states on the pinboard 12 in long empty slot.
Embodiments of the present invention are described in detail in conjunction with attached drawing above, but the present invention is not limited to described reality
Apply mode.For those of ordinary skill in the art, in the range of the principle of the present invention and technical idea, to these implementations
Mode carries out a variety of variations of embodiment progress, modification, replacement and deformation and still falls in protection scope of the present invention.
Claims (5)
1. bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint, comprising: precast concrete column, precast concrete beam, company
Connect reinforcing bar, nut, end nut, pinboard;
The precast concrete column is in node region reserved steel bar hole;
Empty slot is reserved on the precast concrete beam both ends top at a certain distance from apart from end cross-sectional, so that prefabricated beam-ends top
Sinking step is formed, long empty slot is reserved in one end, and short empty slot is reserved in one end, and the length of the long empty slot is slightly larger than the connection reinforcing bar
Difference at a distance from length and the long empty slot to beam-ends section, precast beam both ends lower part are equipped with prominent step, the sinking
Bolt board slot is reserved at step and the prominent step reserved steel bar hole, the sinking step and the prominent step rear portion, described
Erection of precast beams is corresponded to each other in the prefabricated post both ends, the preformed hole;
The pinboard inserts in the bolt board slot;
The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole;
The nut is twisted on the thread segment at the connection reinforcing bar both ends, and is close to the sinking step and the prominent step;
The end nut, which is twisted, is located at one end of the long empty slot in the connection reinforcing bar, and abutting inserts on the pinboard.
2. bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint according to claim 1, it is characterised in that: described
When precast concrete beam is not mounted to predetermined position, the pinboard is inserted in the bolt board slot of the short empty slot, the connection
Reinforcing bar is placed in the long empty slot.
3. bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint according to claim 1, it is characterised in that: described
After precast concrete beam is lifted into predetermined position, the connection reinforcing bar passes through the reserved steel bar hole, and the short sky is close in end
Pinboard in slot, the nut are tightened, and the end nut moves back stubborn to the long empty slot direction, are tightly attached in the long empty slot
Pinboard.
4. pinboard according to claim 1, it is characterised in that: the pinboard is inserted into the part in the bolt board slot
Smear epoxy glue.
5. end nut according to claim 1, it is characterised in that: the length of the end nut is same specification plain nut
Three times, there is the end plate slightly larger than the nut in one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710429938.9A CN109024884B (en) | 2017-06-09 | 2017-06-09 | Node in bolt reinforcing bar bolt prefabricated assembly concrete beam column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710429938.9A CN109024884B (en) | 2017-06-09 | 2017-06-09 | Node in bolt reinforcing bar bolt prefabricated assembly concrete beam column |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109024884A true CN109024884A (en) | 2018-12-18 |
CN109024884B CN109024884B (en) | 2021-05-11 |
Family
ID=64629674
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710429938.9A Active CN109024884B (en) | 2017-06-09 | 2017-06-09 | Node in bolt reinforcing bar bolt prefabricated assembly concrete beam column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109024884B (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2797476Y (en) * | 2005-04-22 | 2006-07-19 | 北京工业大学 | Mixed jointing node of assembled concrete frame structure beam column |
KR20060093889A (en) * | 2005-02-23 | 2006-08-28 | 유승룡 | Dry joint structure of precast concrete beam and column unit |
CN103195170A (en) * | 2013-04-03 | 2013-07-10 | 中铁建设集团有限公司 | Prefabricated reinforced concrete frame structure system |
CN103362210A (en) * | 2013-07-08 | 2013-10-23 | 中国矿业大学 | Prestress assembly frame structure |
CN203866982U (en) * | 2014-05-28 | 2014-10-08 | 江苏尚昇建设集团有限公司 | Prefabricated beam end joint structure |
CN105839775A (en) * | 2016-05-24 | 2016-08-10 | 东南大学 | Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node |
CN205875395U (en) * | 2016-08-02 | 2017-01-11 | 北京市建筑工程研究院有限责任公司 | Prestressing force is from restoring to throne assembled concrete frame beam column node |
CN104727439B (en) * | 2015-03-09 | 2017-01-18 | 沈阳建筑大学 | Assembly concrete pillar and beam structure and assembly connecting method |
-
2017
- 2017-06-09 CN CN201710429938.9A patent/CN109024884B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20060093889A (en) * | 2005-02-23 | 2006-08-28 | 유승룡 | Dry joint structure of precast concrete beam and column unit |
CN2797476Y (en) * | 2005-04-22 | 2006-07-19 | 北京工业大学 | Mixed jointing node of assembled concrete frame structure beam column |
CN103195170A (en) * | 2013-04-03 | 2013-07-10 | 中铁建设集团有限公司 | Prefabricated reinforced concrete frame structure system |
CN103362210A (en) * | 2013-07-08 | 2013-10-23 | 中国矿业大学 | Prestress assembly frame structure |
CN203866982U (en) * | 2014-05-28 | 2014-10-08 | 江苏尚昇建设集团有限公司 | Prefabricated beam end joint structure |
CN104727439B (en) * | 2015-03-09 | 2017-01-18 | 沈阳建筑大学 | Assembly concrete pillar and beam structure and assembly connecting method |
CN105839775A (en) * | 2016-05-24 | 2016-08-10 | 东南大学 | Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node |
CN205875395U (en) * | 2016-08-02 | 2017-01-11 | 北京市建筑工程研究院有限责任公司 | Prestressing force is from restoring to throne assembled concrete frame beam column node |
Also Published As
Publication number | Publication date |
---|---|
CN109024884B (en) | 2021-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733486B (en) | High-efficiency ductile node for prefabrication assembly concrete frame | |
CN103195188A (en) | I-shaped double-plate assembling steel structure prestressed buckling preventing support | |
CN208441231U (en) | A kind of beam column built from concrete dry method connecting node | |
CN205329526U (en) | Pier is assembled to precast concrete | |
CN104032956A (en) | Construction method for connecting reinforced concrete beams with steel reinforced concrete columns | |
CN108867886A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam column interior joint | |
CN207003713U (en) | A kind of part cast-in-place shear wall | |
CN210086553U (en) | Dry-type connected precast concrete wall and foundation connection node | |
CN213358962U (en) | Novel assembled power consumption type dry-type connecting beam column node | |
CN108867861A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete mid-side node | |
CN108867873A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam-column joints | |
CN109024884A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete interior joint | |
CN112095811A (en) | Adopt bolted connection's assembled concrete frame roof beam post trunk formula connected node | |
CN208518137U (en) | A kind of closed-section steel deck combined concrete shear wall connecting node | |
CN218622790U (en) | Antidetonation coincide wall | |
CN106436969A (en) | Intersecting reinforcement profiled steel plate shear wall with broadside slotting | |
CN204266378U (en) | A kind of steel structural embedded parts that can bear larger pulling force | |
CN204326301U (en) | A kind of bottom punches containing the fabricated assembly overall concrete shear wallboard of many coupling beams | |
CN218060703U (en) | Assembled concrete beam column node | |
CN207419695U (en) | One kind assembles the prefabricated whole beam column construction of concrete frame structure for " dry type " | |
CN109098277A (en) | A kind of bolt reinforcing bar bolt assembly concrete concrete frame joint | |
CN108951882A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint | |
CN208472942U (en) | A kind of Self-resetting frame structure | |
CN108867682A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint | |
CN216713926U (en) | Precast concrete elevator structure of dry type connecting node of post-cast-free embedded steel box |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |