CN207003713U CN201720964785.3U CN201720964785U CN207003713U CN 207003713 U CN207003713 U CN 207003713U CN 201720964785 U CN201720964785 U CN 201720964785U CN 207003713 U CN207003713 U CN 207003713U
Authority
CN
China
Prior art keywords
wall
shear
shear wall
bar
partition wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720964785.3U
Other languages
Chinese (zh)
Inventor
李聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720964785.3U priority Critical patent/CN207003713U/en
Application granted granted Critical
Publication of CN207003713U publication Critical patent/CN207003713U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a kind of part cast-in-place shear wall, and comprising partition wall and shear wall, the shear wall is located at partition wall both sides of the edge, and shear wall and partition wall are common prefabricated and in the same plane;Some cavitys being linearly distributed are provided with the partition wall, are provided with partition wall reinforcing bar in partition wall, partition wall reinforcing bar links into an integrated entity with shear force wall reinforcing steel bar;The pouring hole through wall upper and lower end face is provided with the shear wall, protruding bar is provided with wall upper and lower end face, exposed steel bar is provided with shear wall outer ledge.During installation, positioning of being rule first on base surface or flooring, then shear wall is lifted, the reinforcing bar between shear wall bottom and shear wall uses live banding fixed, last pouring molding.Using the utility model, shear wall can according to demand combine with the common prefabricated and shear wall of partition wall and be mounted to Linear shear wall, L-type shear wall and T-shaped shear wall, have the advantages that applicability is wide, reduce wall seam, simplify construction method and improve operating efficiency.

Description

A kind of part cast-in-place shear wall
Technical field
Assembled architecture technical field is the utility model is related to, specifically a kind of part cast-in-place shear wall.
Background technology
Shear wall is also known as wind-resistant wall or seismic structural wall, earthquake resistant wall, structural wall, and wind load is primarily subjected in house or structures or earthquake is made With caused horizontal loading and the wall of vertical load, prevent structure shear from destroying.Partition wall is separation building interior space Wall.In assembled architecture, partition wall and shear wall are first prefabricated in the factory to be molded to transport to scene again and installed, and have and build speed Degree is fast, and climate conditionality is small, the advantages of saving labour and can improve construction quality.
Prior art mid-board and shear wall often separate the prefabricated scene of transporting again and carry out assembled, to be installed number of components Amount is more, not only needs to consume more manpower and materials, and increases wall seam, reduces wall integrity energy, has wall whole Body is poor, the cumbersome shortcoming such as low with operating efficiency of construction.
In shear wall installation, the quality of quality of connection directly affects construction quality between shear force wall reinforcing steel bar, determines work Cheng Jianshe success or failure.At present, vertical reinforcement connects mainly by grout sleeve between shear wall, and it installs connection simply, but connects matter Amount is difficult to ensure that, influences construction quality.
Utility model content
The utility model purpose is to provide a kind of part cast-in-place shear wall, it is possible to achieve shear wall is jointly pre- with partition wall System, wall installation seam and lifting number are reduced, is used manpower and material resources sparingly, improves wall integrity energy, simplify construction method, shearing Wall upper and lower end face is provided with protruding bar, it is possible to achieve wall vertical reinforcement is using existing reinforcing bars such as overlap joint, welding and mechanical connections Connected mode connects, and connection is safe and reliable, ensures construction quality.
The utility model solves above-mentioned technical problem with following technical scheme:
A kind of part cast-in-place shear wall, comprising partition wall and shear wall, the shear wall is located at partition wall both sides of the edge, shearing Wall and partition wall are common prefabricated and in the same plane;
Is provided with some cavitys being linearly distributed in the partition wall, cavity run through wall upper and lower end face, partition wall it is interior provided with every Wall reinforcing bar, partition wall reinforcing bar are two layers of reinforcing bar web frame, and partition wall reinforcing bar links into an integrated entity with shear force wall reinforcing steel bar;
The pouring hole through wall upper and lower end face is provided with the shear wall, protruding bar is provided with wall upper and lower end face, Protruding bar is that wall vertical reinforcement stretches out and its development length mutually staggers, and shear wall bottom protruding bar length does not surpass Cross partition wall bottom end face, be provided with exposed steel bar at shear wall outer ledge, exposed steel bar be wall transverse steel stretch out and Bending is connected to form enclosed construction two-by-two.
The shear force wall reinforcing steel bar is two layers of reinforcing bar web frame, and bar-mat reinforcement is provided with the drawing in blossom type arrangement or square type arrangement Tie muscle, tension rib hooks the vertical distributing reinforcement of two layers bar-mat reinforcement and horizontal distribution muscle and avoids wall pouring hole structure.
The partition wall can be provided with window opening OR gate hole according to building demand.
Compared with prior art, the utility model has the advantages that:
1) shear wall upper and lower end face is provided with protruding bar, during installation, it is possible to achieve wall vertical reinforcement is using overlap joint, welding Connected with existing bar connecting modes such as mechanical connections, quality of connection is more safe and reliable, ensures construction quality.
2) shear wall and common pre-formed transport again to scene of partition wall are installed, and reduce wall installation seam and lifting Number, have and use manpower and material resources sparingly, improve wall integrity energy, the advantages that simplifying construction method and improve operating efficiency.
3) partition wall reinforcing bar links into an integrated entity with shear force wall reinforcing steel bar, improves wall integrity energy, shear wall bottom protruding bar Of length no more than partition wall bottom end face, during installation, partition wall plays the effect of temporary support shear wall, only need to install wall bearing diagonal part , installation is simple, shortens the engineering time.
4) some cavitys being linearly distributed are provided with partition wall, there is heat preservation and soundproof, mitigate deadweight and be easy to the excellent of lifting Point;The size of shear wall and partition wall is determined by building demand, and partition wall can be provided with window opening OR gate hole according to building demand, applicable In a variety of situations, have the advantages that applicability is extensively and practical.
5) the utility model part cast-in-place shear wall can the shear wall according to building demand by polylith be assembled into yi word pattern Shear wall, L-type shear wall and T-shaped shear wall, only junction use cast-in-place connection between wall, reduces cast-in-place amount, improves and fills With rate, cast-in-place part is live assembling reinforcement pouring molding again between shear wall, and bar connecting quality is good, ensures construction quality.
Brief description of the drawings
Fig. 1 is the agent structure schematic diagram of the utility model part cast-in-place shear wall.
Fig. 2 is part cast-in-place shear wall inside bar construction distribution schematic diagram in Fig. 1.
Fig. 3 is the utility model part cast-in-place shear wall installation schematic diagram.
In figure:1. partition wall, 2. protruding bars, 3. exposed steel bars, 4. shear walls, 5. pouring holes, 6. cavitys, 7. shear wall steel Muscle, 8. partition wall reinforcing bars, 9. shear walls one, 10. shear walls two, 11. shear walls three, 12. wall bearing diagonal parts, 13. tension ribs, 14. wall stirrup, 15. cast-in-place shear wall reinforcing bars.
Embodiment
1 a kind of part cast-in-place shear wall of the utility model is further described to accompanying drawing 3 below in conjunction with the accompanying drawings:
As depicted in figs. 1 and 2, a kind of part cast-in-place shear wall of the utility model, it is described to cut comprising partition wall 1 and shear wall 4 Power wall 4 is located at the both sides of the edge of partition wall 1, and shear wall 4 and partition wall 1 are common prefabricated and in the same plane;
Some cavitys 6 being linearly distributed are provided with the partition wall 1, cavity 6 runs through wall upper and lower end face, set in partition wall 1 There is partition wall reinforcing bar 8, partition wall reinforcing bar 8 is two layers of reinforcing bar web frame, and partition wall reinforcing bar 8 links into an integrated entity with shear force wall reinforcing steel bar 7, wherein, Partition wall 1 can be provided with window opening OR gate hole according to building demand;
The pouring hole 5 through wall upper and lower end face is provided with the wall of the shear wall 4, is provided with wall upper and lower end face outer Reinforcing bar 2 is stretched, protruding bar 2 is that wall vertical reinforcement stretches out and its development length mutually staggers, the overhanging steel in the bottom of shear wall 4 The of length no more than bottom end face of partition wall 1 of muscle 2, exposed steel bar 3 is provided with the outer ledge of shear wall 4, and exposed steel bar 3 is that wall is horizontal Reinforcing bar, which stretches out and bent two-by-two, is connected to form enclosed construction, is provided with shear force wall reinforcing steel bar 7 in shear wall 4, shear force wall reinforcing steel bar 7 is Two layers of reinforcing bar web frame, bar-mat reinforcement are provided with the tension rib 13 in blossom type arrangement or square type arrangement, and tension rib 13 hooks two layers The vertical distributing reinforcement and horizontal distribution muscle of bar-mat reinforcement and avoid the structure of wall pouring hole 5.
Shear wall and partition wall are jointly pre-formed, raising wall integrity energy, reduction wall installation seam, between shear wall Using cast-in-place connection, cast-in-place amount is few, and assembly rate is high;Cloth muscle in the size and shear wall and partition wall of shear wall and partition wall all may be used Determine, and window opening OR gate hole can be provided with partition wall as needed have the advantages that applicability is extensively and practical by building demand.
The construction method of the utility model part cast-in-place shear wall, as shown in figure 3, its operating procedure is as follows:
1) it is inserted in wall stirrup 14:Rule and position first on base surface or flooring, then on base surface or flooring The wall stirrup 14 of closing is inserted at reserved steel bar;
2) shear wall is lifted:Mortar first is sat on the base surface or flooring of partition wall 1 to be installed, then shear wall is lifted into , certain installation seam is left between shear wall, adjusts the levelness and perpendicularity of shear wall, installation wall bearing diagonal part 12;
3) banding fixed shear force wall reinforcing steel bar:After shear wall whole rigging out, by shear wall body bottom protruding bar 2 It is connected with reserved steel bar, then moves up wall stirrup 14 to fix with Vertical bar connection to form space bar-mat reinforcement knot Structure, then the colligation cast-in-place shear wall reinforcing bar 15 and exposed steel bar 3 is connected into one between shear wall at shear wall seam Body;
4) pouring molding:The cast-in-place region installation wall combination die between shear wall body bottom position to be poured and shear wall Tool, finally pours completely whole face wall body by pouring hole 5 and shear wall seam above shear wall by concrete;
5) form removal:After the completion of to be onstructed, shear wall can be completed by pulling down wall bearing diagonal part 14 and wall assembling die Installation.
In aforesaid operations step, the shear wall can be assembled into according to building demand Linear shear wall, L-type shear wall and T-shaped shear wall, applicability are wide;It can increase tension rib in the space reinforcing bar web frame, make wall steel bar connection more stable, it is overall Performance is stronger, improves seismic performance of building.
In aforesaid operations step, base surface is provided with the reserved steel bar of shear wall installation connection, the length phase of reserved steel bar Mutually stagger, when shear wall is installed, the connecting end surface of shear wall protruding bar and reserved steel bar can be made mutually to stagger, improve shear wall Anti-shear performance, ensure construction quality.Shear wall body top protruding bar, the as reserved steel bar of last layer flooring, are easy to The connection installation of last layer shear wall.
Using the utility model part cast-in-place shear wall, cast-in-place connection, live colligation cast-in-place shear wall are used between shear wall Region reinforcing bar, quality of connection is safe and reliable between reinforcing bar, and can use and take between shear wall bottom protruding bar and reserved steel bar Connect, weld and mechanically connect etc. existing bar connecting mode connect, so being cut by its assembled Linear shear wall, L-type Bar connecting quality is firm inside power wall and T-shaped shear wall, improves wall integrity and shock resistance.

Claims (3)

1. a kind of part cast-in-place shear wall, it is characterised in that comprising partition wall and shear wall, the shear wall is located at the side of partition wall two At edge, shear wall and partition wall are common prefabricated and in the same plane;
Some cavitys being linearly distributed are provided with the partition wall, cavity runs through wall upper and lower end face, partition wall steel is provided with partition wall Muscle, partition wall reinforcing bar are two layers of reinforcing bar web frame, and partition wall reinforcing bar links into an integrated entity with shear force wall reinforcing steel bar;
The pouring hole through wall upper and lower end face is provided with the shear wall, protruding bar is provided with wall upper and lower end face, it is overhanging Reinforcing bar is that wall vertical reinforcement stretches out and its development length mutually staggers, shear wall bottom protruding bar it is of length no more than every Wall bottom end face, is provided with exposed steel bar at shear wall outer ledge, and exposed steel bar is that wall transverse steel stretches out and two-by-two Bending is connected to form enclosed construction.
2. part cast-in-place shear wall according to claim 1, it is characterised in that the shear force wall reinforcing steel bar is two layers of bar-mat reinforcement Structure, bar-mat reinforcement are provided with the tension rib in blossom type arrangement or square type arrangement, and tension rib hooks vertical point of two layers of bar-mat reinforcement Cloth muscle and horizontal distribution muscle and avoid wall pouring hole structure.
3. part cast-in-place shear wall according to claim 1, it is characterised in that the partition wall can be provided with according to building demand Window opening OR gate hole.
CN201720964785.3U 2017-08-04 2017-08-04 A kind of part cast-in-place shear wall Expired - Fee Related CN207003713U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720964785.3U CN207003713U (en) 2017-08-04 2017-08-04 A kind of part cast-in-place shear wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720964785.3U CN207003713U (en) 2017-08-04 2017-08-04 A kind of part cast-in-place shear wall

Publications (1)

Publication Number Publication Date
CN207003713U true CN207003713U (en) 2018-02-13

Family

ID=61458848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720964785.3U Expired - Fee Related CN207003713U (en) 2017-08-04 2017-08-04 A kind of part cast-in-place shear wall

Country Status (1)

Country Link
CN (1) CN207003713U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108589970A (en) * 2018-05-18 2018-09-28 中国二十二冶集团有限公司 The construction method of prefabricated window frame shear wall
CN108643381A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Assembly of shear wall structure is without support bottom bridging method
CN109386069A (en) * 2017-08-04 2019-02-26 李聪 A kind of part cast-in-place shear wall and its construction method
CN109680841A (en) * 2019-02-15 2019-04-26 姚攀峰 Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109386069A (en) * 2017-08-04 2019-02-26 李聪 A kind of part cast-in-place shear wall and its construction method
CN108589970A (en) * 2018-05-18 2018-09-28 中国二十二冶集团有限公司 The construction method of prefabricated window frame shear wall
CN108643381A (en) * 2018-05-18 2018-10-12 中国二十二冶集团有限公司 Assembly of shear wall structure is without support bottom bridging method
CN109680841A (en) * 2019-02-15 2019-04-26 姚攀峰 Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method

Similar Documents

Publication Publication Date Title
CN207003713U (en) A kind of part cast-in-place shear wall
US20200190799A1 (en) Prefabricated frame
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
KR101545649B1 (en) Construction method for coping using permanent form preventing interference of reinforcing bar
CN207700438U (en) A kind of fabricated shear wall cross connected structure
CN105926766A (en) Prefabricated shear wall toothed groove type connecting structure assembling construction method
CN113026993B (en) Assembly type combined connecting beam window opening component, structure and manufacturing and construction method
CN214739251U (en) Assembled combination tie-beam window opening component and connection structure thereof
KR101526889B1 (en) Permanent form and construction method for coping
CN101936074B (en) Fast building earthquake-resisting reinforcing method and device
CN105569222A (en) Vertical connection technology for precast assembled large panel shear walls with concealed supports
CN209799000U (en) High-strength bottom rib anchoring type prefabricated frame beam column joint
CN206956979U (en) A kind of Linear shear wall with fore-set
CN205617552U (en) Assembled integrated configuration
CN109610654A (en) Prefabricated assembled double steel plate concrete shear force wall connection component and its application method
CN207003673U (en) A kind of connecting node of beam and wallboard
CN206902987U (en) A kind of T-shaped shear wall with fore-set
CN112681514A (en) Assembly type node sleeve and installation method thereof
CN111576682A (en) Laminated wall prefabricated member and production method thereof
CN106592820A (en) Horizontal integral forming structure and method of shear steel-plates and one side reinforcement fabric
CN106592821A (en) Side-standing integral forming structure and method of shear steel plates and lateral reinforcement fabric
CN206987115U (en) A kind of partition wall for playing support floor effect
CN105952044B (en) A kind of full precast prestressed concrete floor construction and prestressing force assembly method
CN109386069A (en) A kind of part cast-in-place shear wall and its construction method
CN103835395A (en) Prestress oblique double-layer folded steel plate shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180213

Termination date: 20190804