CN108951882A - Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint - Google Patents

Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint Download PDF

Info

Publication number
CN108951882A
CN108951882A CN201710347059.1A CN201710347059A CN108951882A CN 108951882 A CN108951882 A CN 108951882A CN 201710347059 A CN201710347059 A CN 201710347059A CN 108951882 A CN108951882 A CN 108951882A
Authority
CN
China
Prior art keywords
reinforcing bar
bolt
nut
pinboard
timber structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710347059.1A
Other languages
Chinese (zh)
Other versions
CN108951882B (en
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710347059.1A priority Critical patent/CN108951882B/en
Publication of CN108951882A publication Critical patent/CN108951882A/en
Application granted granted Critical
Publication of CN108951882B publication Critical patent/CN108951882B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • E04B1/4114Elements with sockets
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings

Abstract

The invention discloses a kind of bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joints, belong to building engineering field, comprising: prefabricated wood structural column, basic built-in fitting, connection reinforcing bar, nut, end nut, pinboard;Prefabricated wood structure column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, and bolt board slot is reserved at the prominent step rear portion;The pinboard inserts in the bolt board slot;The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, opposite with the reserved steel bar hole;The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, and bottom thread is screwed into the threaded hole of the basic built-in fitting;The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the nut is close on the prominent step;The end nut is twisted in the connection reinforcing bar upper end, and abutting inserts on the pinboard.The present invention connect with nut using screw thread, when actual installation, only twists bolt and installation pinboard work, simple and efficient, high-efficient, while can be transmitted reinforcing bar and be drawn, press performance, and structural behaviour is good.

Description

Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint
Technical field
Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint.
Background technique
Prefabricated timber structure design, material regeneration, low-carbon, the comfort of inhabitation, energy conservation, in terms of, all reach The high levels of house, prefabricated wood structures are produced in the factory, and prefabricated component is then transported to construction, are carried out Assembling.This mode of construction can greatly improve mechanized construction level, reduce construction personnel, save the construction time, accelerate to apply Work progress reduces construction cost.Developing prefabricated timber structure structure is to realize the effective way of building industrialization, can be effectively save Resource reduces environmental pollution, is conducive to improve national construction industry modernization development level, has vast potential for future development.
The suspension column of prefabricated wood structural framing structure is the key that influence structural behaviour, and only prefabricated foot joint connection can It leans on, just can guarantee the safe and reliable of structure.Meanwhile prefabricated wood structure foot joint is also that influence prefabricated wood structural framing structure is fast The key factor of fast, convenient construction.Currently, conventional prefabricated timber structure connecting node mainly passes through metal connecting piece and bolt connects It connects.It is this to be connected under geological process, it is often destroyed at metal connecting piece position and the wooden component junction, anti-seismic performance is not enough managed Think.
Summary of the invention
It is an object of the invention to propose a kind of bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint, using nut and It is threadedly coupled, is convenient for Fast Installation, while using the drawing of reinforcing bar, pressure performance, guaranteeing the anti-seismic performance of foot joint.
To achieve the goals above, this invention takes following technical solutions.
Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint, comprising: prefabricated wood structural column, basic built-in fitting, connection Reinforcing bar, nut, end nut, pinboard.
Prefabricated wood structure column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, for across The connection reinforcing bar.
The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, with the reserved steel bar hole Relatively, to connect the connection reinforcing bar.
The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, it is pre-buried that bottom thread is screwed into the basis In the threaded hole of part.
The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the connection reinforcing bar is screwed into the basic built-in fitting Afterwards, the nut is close on the prominent step.
Bolt board slot is reserved at the prominent step rear portion, and the pinboard passes through the preformed hole in the connection reinforcing bar Afterwards, it is inserted into the part in the bolt board slot and smears epoxy glue, the reserved pinboard is inserted into, to withstand the end spiral shell It is female.
The prominent step and the bolt board slot of the prefabricated wood structural column adjacent side have certain height difference, avoid passing It passs internal force excessively to concentrate at same section, be mutated excessive.
The length of the end nut is three times of same specification plain nut, and there is the end plate slightly larger than the nut in one end, Before the pinboard is inserted into the latch groove, tightly twist on the thread segment of the connection reinforcing bar upper end, the pinboard is inserted into After the latch groove, the end nut moves back stubborn to the pinboard direction, is tightly attached to the pinboard and exists, described to transmit with this Connect the pressure of reinforcing bar.
The utility model has the advantages that
Compared with prior art, advantages of the present invention is as follows.
(1) present invention forms prefabrication and assembly construction timber structure foot joint using nut and threaded connection, and installation effectiveness is high, builds It is fast to make speed.
(2) whether present invention connection reinforcing bar or not when prefabricated post is not installed, and after prefabricated post is installed in place, connection reinforcing bar is worn Preformed hole is crossed, bolt and installation pinboard work are only twisted, it is simple and efficient, it is high-efficient.
(3) present invention connection reinforcing bar can effectively transmit drawing, pressure, form rigid connection, guarantee heel join node by Power performance, while reinforcing bar soap-free emulsion polymeization in duct is connected, deformability is good, and energy dissipation ability with higher can be protected effectively Demonstrate,prove structural behaviour of the foot joint under seismic loading.
Detailed description of the invention
Fig. 1 is component seperated schematic diagram of the invention.
Fig. 2 is foot joint assembling schematic diagram of the invention.
Specific embodiment
The present invention will be further described below with reference to the drawings.
As shown in Figs. 1-2: 1 bottom of the prefabricated wood structural column four sides is equipped with prominent step 2.
Bolt board slot 4 is reserved at the 2 reserved steel bar hole 3 of prominent step, prominent 2 rear portion of step.
The prominent step 2 of 1 adjacent side of prefabricated wood structural column and the bolt board slot 4 have certain height difference
Basis 5 center of built-in fitting is equipped with threaded hole, is embedded on the basis of suspension column position in advance, with 3 phase of reserved steel bar hole It is right.
6 both ends of connection reinforcing bar are equipped with thread segment, and the nut 7 and the end nut 8 are twisted in the connection reinforcing bar 6 Upper end.
To after subscribing position, the connection reinforcing bar 6 is inserted into the reserved steel bar hole 3, bottom for the lifting of prefabricated wood structural column 1 Portion is screwed into the threaded hole of the basic built-in fitting 5.
The pinboard 9 is inserted into the part in the bolt board slot 4 after the connection reinforcing bar 6 passes through the preformed hole 3 Epoxy glue is smeared, the pinboard 9 is inserted into.
The nut 7 is tightened, and the prominent step 2 is close to.
The length of the end nut 8 is three times of same specification plain nut, and there is the end plate slightly larger than the nut 7 in one end, Before the pinboard 9 is inserted into the latch groove 4, tightly twist in it is described connection 6 upper end of reinforcing bar thread segment on, the pinboard After the 9 insertion latch grooves 4, the end nut 8 moves back stubborn to 9 direction of pinboard, is tightly attached on the pinboard 9.
Embodiments of the present invention are described in detail in conjunction with attached drawing above, but the present invention is not limited to described reality Apply mode.For those of ordinary skill in the art, in the range of the principle of the present invention and technical idea, to these implementations Mode carries out a variety of variations of embodiment progress, modification, replacement and deformation and still falls in protection scope of the present invention.

Claims (6)

1. bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint, comprising: prefabricated wood structural column, basic built-in fitting, connection steel Muscle, nut, end nut, pinboard;
Prefabricated wood structure column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, the prominent step Reserve bolt board slot in rear portion;
The pinboard inserts in the bolt board slot;
The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, opposite with the reserved steel bar hole;
The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, and bottom thread is screwed into the basic built-in fitting In threaded hole;
The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the nut is close on the prominent step;
The end nut is twisted in the connection reinforcing bar upper end, and abutting inserts on the pinboard.
2. bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint according to claim 1, it is characterised in that: described pre- The prominent step and the bolt board slot of timber structure column adjacent side processed have certain height difference.
3. bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint according to claim 1, it is characterised in that: described pre- Before timber structure column lifting processed, the connection reinforcing bar and the pinboard are not installed.
4. bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint according to claim 1, it is characterised in that: described pre- Timber structure column processed is lifted to after subscribing position, installs the connection reinforcing bar and the pinboard, and the end nut is to the empty slot Move back stubborn, to be tightly attached in empty slot pinboard in direction.
5. pinboard according to claim 1, it is characterised in that: the pinboard is inserted into the part in the bolt board slot Smear epoxy glue.
6. end nut according to claim 1, it is characterised in that: the length of the end nut is same specification plain nut Three times, there is the end plate slightly larger than the nut in one end.
CN201710347059.1A 2017-05-17 2017-05-17 Bolt reinforcing bar bolt prefabricated assembly timber structure column base node Active CN108951882B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710347059.1A CN108951882B (en) 2017-05-17 2017-05-17 Bolt reinforcing bar bolt prefabricated assembly timber structure column base node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710347059.1A CN108951882B (en) 2017-05-17 2017-05-17 Bolt reinforcing bar bolt prefabricated assembly timber structure column base node

Publications (2)

Publication Number Publication Date
CN108951882A true CN108951882A (en) 2018-12-07
CN108951882B CN108951882B (en) 2021-05-11

Family

ID=64462510

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710347059.1A Active CN108951882B (en) 2017-05-17 2017-05-17 Bolt reinforcing bar bolt prefabricated assembly timber structure column base node

Country Status (1)

Country Link
CN (1) CN108951882B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175085A (en) * 2021-04-20 2021-07-27 同济大学 Glued wood column base node

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201679096U (en) * 2010-03-26 2010-12-22 昆明理工大学 Wooden pillar base shock-resistant quick assembly connector
CN201722789U (en) * 2010-01-27 2011-01-26 江苏省电力设计院 Prestressed steel bar-pressed flat joint cement joint pedestal
WO2013040585A2 (en) * 2011-09-15 2013-03-21 SR Systems, LLC Anchor bolt devices and operating methods for residential and commercial structures
CN203129337U (en) * 2013-01-22 2013-08-14 扬州工业职业技术学院 Column-foot two-way bolted connection of reconstructed bamboo frame structure
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure
CN204551760U (en) * 2015-04-27 2015-08-12 南京工业大学 A kind of ductility power consumption wooden construction node
CN205116401U (en) * 2015-11-06 2016-03-30 南京林业大学 Semi -rigid power consumption node of bamboo timber structure rapid Assembly formula

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201722789U (en) * 2010-01-27 2011-01-26 江苏省电力设计院 Prestressed steel bar-pressed flat joint cement joint pedestal
CN201679096U (en) * 2010-03-26 2010-12-22 昆明理工大学 Wooden pillar base shock-resistant quick assembly connector
WO2013040585A2 (en) * 2011-09-15 2013-03-21 SR Systems, LLC Anchor bolt devices and operating methods for residential and commercial structures
CN203129337U (en) * 2013-01-22 2013-08-14 扬州工业职业技术学院 Column-foot two-way bolted connection of reconstructed bamboo frame structure
CN103362210A (en) * 2013-07-08 2013-10-23 中国矿业大学 Prestress assembly frame structure
CN204551760U (en) * 2015-04-27 2015-08-12 南京工业大学 A kind of ductility power consumption wooden construction node
CN205116401U (en) * 2015-11-06 2016-03-30 南京林业大学 Semi -rigid power consumption node of bamboo timber structure rapid Assembly formula

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113175085A (en) * 2021-04-20 2021-07-27 同济大学 Glued wood column base node

Also Published As

Publication number Publication date
CN108951882B (en) 2021-05-11

Similar Documents

Publication Publication Date Title
CN207959515U (en) A kind of reparation of timber structure Tenon node and energy-consumption shock-absorption device
CN107605043A (en) A kind of inner ring ribbing assembling type node across timber structure greatly
CN206246140U (en) A kind of constant-resistance allows pressure assembled bolt
CN203066257U (en) Beam column rigid connection node of recombinant bamboo frame structure
CN108867886A (en) Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam column interior joint
CN104499579A (en) Insertion board type cross grain reinforced wooden structure tenon-mortise pitch point
CN206328893U (en) A kind of new vertical piece dry type connection shear wall
CN109505358A (en) A kind of assembling type node across timber structure greatly
CN108951882A (en) Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint
CN204703495U (en) Aluminum alloy pattern plate back cord system
CN202064454U (en) Connecting element for building and beam column building structure system adopting same
CN204174839U (en) Cellular junction steel plate-bis-limb steel pipe concrete combination column
CN203569696U (en) Assembly type wood-structure embedded-rebar node
CN108867873A (en) Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam-column joints
CN104763142A (en) Aluminum template back arris system
CN110130495A (en) A kind of bamboo-wood structure beam column energy consumption connection method
CN207003645U (en) A kind of connecting node of prefabricated post and precast beam
CN206337559U (en) A kind of prefabricated pile mechanical connecting structure
CN203066259U (en) Primary and secondary beam double angle iron node connection of recombinant bamboo frame structure
CN206815519U (en) A kind of connecting node of prefabricated post and precast beam
CN203066258U (en) Ridge beam column node connection of recombinant bamboo frame structure
CN109505357A (en) A kind of production method greatly across timber structure assembling type node
CN108867682A (en) Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint
CN204551806U (en) Graving piece matter shear wall structure in a kind of steel frame adopting bar planting to connect
CN203188378U (en) Main beam and secondary beam metal connecting piece node connection of recombined bamboo frame structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant