CN108867682A - Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint - Google Patents
Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint Download PDFInfo
- Publication number
- CN108867682A CN108867682A CN201710342481.8A CN201710342481A CN108867682A CN 108867682 A CN108867682 A CN 108867682A CN 201710342481 A CN201710342481 A CN 201710342481A CN 108867682 A CN108867682 A CN 108867682A
- Authority
- CN
- China
- Prior art keywords
- reinforcing bar
- bolt
- nut
- pinboard
- connection reinforcing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/42—Foundations for poles, masts or chimneys
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C3/00—Structural elongated elements designed for load-supporting
- E04C3/30—Columns; Pillars; Struts
- E04C3/34—Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/021—Bearing, supporting or connecting constructions specially adapted for such buildings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H9/00—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
- E04H9/02—Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
- E04H9/025—Structures with concrete columns
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
The invention discloses a kind of bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joints, belong to building engineering field, including:Precast concrete column, basic built-in fitting, connection reinforcing bar, nut, end nut, pinboard;The precast concrete column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, and bolt board slot is reserved at the prominent step rear portion;The pinboard inserts in the bolt board slot;The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, opposite with the reserved steel bar hole;The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, and bottom thread is screwed into the threaded hole of the basic built-in fitting;The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the nut is close on the prominent step;The end nut is twisted in the connection reinforcing bar upper end, and abutting inserts on the pinboard.The present invention is connected using " dry type ", when actual installation, only twists bolt and installation pinboard work, simple and efficient, high-efficient, at the same can transmit reinforcing bar draw, pressure performance, structural behaviour is good.
Description
Technical field
The present invention relates to a kind of bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joints, belong to building engineering field.
Background technique
Component in precast concrete is produced in the factory, and prefabricated component is then transported to construction, into
Row assembling.This mode of construction can greatly improve mechanized construction level, reduce construction personnel, save the construction time, accelerate
Construction speed reduces construction cost.Developing precast concrete is the effective way for realizing building industrialization, can effectively be saved
About resource, reduction environmental pollution are conducive to improve national construction industry modernization development level, have vast potential for future development.
The suspension column of Precast Concrete Frame is the key that influence structural behaviour, and only prefabricated foot joint connection can
It leans on, just can guarantee the safe and reliable of structure.Meanwhile precast concrete suspension column node is also that influence Precast Concrete Frame is fast
The key factor of fast, convenient construction.Currently, conventional prefabricated foot joint mainly has grout sleeve connection suspension column, is bolted
Suspension column, welded connecting suspension column etc..Grout sleeve connects foot joint often on prefabricated foundation there are reinforcing bar is stretched out, and prefabricated post is pre-
Sleeve is buried, then grouting connection, step is more, low efficiency;Being bolted suspension column, there is inconvenient situations at the scene, conventional
Bolt often can only tension, and generally require pre-buried auxiliary steel part, influence joint efficiency and performance;Suspension column is welded to connect to exist
In the narrow range in scene, manual operation is inconvenient, and welding quality is difficult to ensure, inefficiency.
Summary of the invention
It is an object of the invention to propose a kind of bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint, using " dry type "
Fast Installation is convenient in connection, while using the drawing of reinforcing bar, pressure performance, guaranteeing the anti-seismic performance of foot joint.
To achieve the goals above, this invention takes following technical solutions.
Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint, including:Precast concrete column, basic built-in fitting, connection
Reinforcing bar, nut, end nut, pinboard.
Precast concrete column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, for across
The connection reinforcing bar.
The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, with the reserved steel bar hole
Relatively, to connect the connection reinforcing bar.
The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, it is pre-buried that bottom thread is screwed into the basis
In the threaded hole of part.
The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the connection reinforcing bar is screwed into the basic built-in fitting
Afterwards, the nut is close on the prominent step.
Bolt board slot is reserved at the prominent step rear portion, and the pinboard passes through the preformed hole in the connection reinforcing bar
Afterwards, it is inserted into the part in the bolt board slot and smears epoxy glue, the reserved pinboard is inserted into, to withstand the end spiral shell
It is female.
The prominent step and the bolt board slot of the precast concrete column adjacent side have certain height difference, avoid passing
It passs internal force excessively to concentrate at same section, be mutated excessive.
The length of the end nut is three times of same specification plain nut, and there is the end plate slightly larger than the nut in one end,
Before the pinboard is inserted into the latch groove, tightly twist on the thread segment of the connection reinforcing bar upper end, the pinboard is inserted into
After the latch groove, the end nut moves back stubborn to the pinboard direction, is tightly attached to the pinboard and exists, described to transmit with this
Connect the pressure of reinforcing bar.
Beneficial effect
Compared with prior art, advantages of the present invention is as follows.
(1)The present invention connects to form prefabrication and assembly construction concrete foot joint, live wet-less operation, installation using " dry type "
High-efficient, construction speed is fast.
(2)The present invention connects reinforcing bar when prefabricated post is not installed, does not install, and after prefabricated post is installed in place, connection reinforcing bar is worn
Preformed hole is crossed, bolt and installation pinboard work are only twisted, it is simple and efficient, it is high-efficient.
(3)The present invention, which connects reinforcing bar, can effectively transmit drawing, pressure, form rigid connection, guarantee heel join node by
Power performance, while reinforcing bar soap-free emulsion polymeization in duct is connected, deformability is good, and energy dissipation ability with higher can be protected effectively
Demonstrate,prove structural behaviour of the foot joint under seismic loading.
Detailed description of the invention
Fig. 1 is component seperated schematic diagram of the invention.
Fig. 2 is foot joint assembling schematic diagram of the invention.
Specific embodiment
The present invention will be further described below with reference to the drawings.
As shown in Figs. 1-2:1 bottom of the precast concrete column four sides is equipped with prominent step 2.
Bolt board slot 4 is reserved at the 2 reserved steel bar hole 3 of prominent step, prominent 2 rear portion of step.
The prominent step 2 of 1 adjacent side of precast concrete column and the bolt board slot 4 have certain height difference.
Basis 5 center of built-in fitting is equipped with threaded hole, is embedded on the basis of suspension column position in advance, with the reserved steel bar hole
3 is opposite.
6 both ends of connection reinforcing bar are equipped with thread segment, and the nut 7 and the end nut 8 are twisted in the connection reinforcing bar 6
Upper end.
To after subscribing position, the connection reinforcing bar 6 is inserted into the reserved steel bar hole 3, bottom for the lifting of precast concrete column 1
Portion is screwed into the threaded hole of the basic built-in fitting 5.
The pinboard 9 is inserted into the part in the bolt board slot 4 after the connection reinforcing bar 6 passes through the preformed hole 3
Epoxy glue is smeared, the pinboard 9 is inserted into.
The nut 7 is tightened, and the prominent step 2 is close to.
The length of the end nut 8 is three times of same specification plain nut, and there is the end plate slightly larger than the nut 7 in one end,
Before the pinboard 9 is inserted into the latch groove 4, tightly twist in it is described connection 6 upper end of reinforcing bar thread segment on, the pinboard
After the 9 insertion latch grooves 4, the end nut 8 moves back stubborn to 9 direction of pinboard, is tightly attached on the pinboard 9.
Embodiments of the present invention are described in detail in conjunction with attached drawing above, but the present invention is not limited to described reality
Apply mode.For those of ordinary skill in the art, in the range of the principle of the present invention and technical idea, to these implementations
Mode carries out a variety of variations of embodiment progress, modification, replacement and deformation and still falls in protection scope of the present invention.
Claims (6)
1. bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint, including:Precast concrete column, basic built-in fitting, connection steel
Muscle, nut, end nut, pinboard;
The precast concrete column bottom four sides is equipped with prominent step, the prominent step reserved steel bar hole, the prominent step
Reserve bolt board slot in rear portion;
The pinboard inserts in the bolt board slot;
The basis built-in fitting center is equipped with threaded hole, is embedded on the basis of suspension column position in advance, opposite with the reserved steel bar hole;
The connection reinforcing bar both ends are equipped with thread segment, insert in the preformed hole, and bottom thread is screwed into the basic built-in fitting
In threaded hole;
The nut is twisted on the thread segment of the connection reinforcing bar upper end, and the nut is close on the prominent step;
The end nut is twisted in the connection reinforcing bar upper end, and abutting inserts on the pinboard.
2. bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint according to claim 1, it is characterised in that:It is described pre-
The prominent step and the bolt board slot of concrete column adjacent side processed have certain height difference.
3. bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint according to claim 1, it is characterised in that:It is described pre-
Before concrete column lifting processed, the connection reinforcing bar and the pinboard are not installed.
4. bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint according to claim 1, it is characterised in that:It is described pre-
Concrete column processed is lifted to after subscribing position, installs the connection reinforcing bar and the pinboard, and the end nut is to the empty slot
Move back stubborn, to be tightly attached in empty slot pinboard in direction.
5. pinboard according to claim 1, it is characterised in that:The pinboard is inserted into the part in the bolt board slot
Smear epoxy glue.
6. end nut according to claim 1, it is characterised in that:The length of the end nut is same specification plain nut
Three times, there is the end plate slightly larger than the nut in one end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710342481.8A CN108867682B (en) | 2017-05-16 | 2017-05-16 | Bolt reinforcing bar bolt prefabricated assembly concrete column base node |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710342481.8A CN108867682B (en) | 2017-05-16 | 2017-05-16 | Bolt reinforcing bar bolt prefabricated assembly concrete column base node |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108867682A true CN108867682A (en) | 2018-11-23 |
CN108867682B CN108867682B (en) | 2021-05-11 |
Family
ID=64320467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710342481.8A Active CN108867682B (en) | 2017-05-16 | 2017-05-16 | Bolt reinforcing bar bolt prefabricated assembly concrete column base node |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867682B (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101925713A (en) * | 2008-01-24 | 2010-12-22 | 新日本制铁株式会社 | Connection metal fitting and building with the same |
KR101155229B1 (en) * | 2011-11-01 | 2012-06-13 | 류동수 | Concrete Foundation Block Assembly |
CN206090867U (en) * | 2016-09-19 | 2017-04-12 | 广州容柏生建筑结构设计事务所 | Steel construction wall column base quick connect structure |
-
2017
- 2017-05-16 CN CN201710342481.8A patent/CN108867682B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101925713A (en) * | 2008-01-24 | 2010-12-22 | 新日本制铁株式会社 | Connection metal fitting and building with the same |
KR101155229B1 (en) * | 2011-11-01 | 2012-06-13 | 류동수 | Concrete Foundation Block Assembly |
CN206090867U (en) * | 2016-09-19 | 2017-04-12 | 广州容柏生建筑结构设计事务所 | Steel construction wall column base quick connect structure |
Also Published As
Publication number | Publication date |
---|---|
CN108867682B (en) | 2021-05-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207749895U (en) | Splice angle steel reinforced device outside the old steel tower of transmission line of electricity | |
CN206495362U (en) | A kind of assembly concrete shear wall structure sleeve grouting cabin sealing device | |
CN203113627U (en) | Nodular cast iron grout sleeve for connecting longitudinal steel bars | |
CN208441231U (en) | A kind of beam column built from concrete dry method connecting node | |
CN207003643U (en) | A kind of assembled beam-column node | |
CN205242848U (en) | Adopt prefabricated assembled steel - concrete combination beam of high strength bolt connection | |
CN205329526U (en) | Pier is assembled to precast concrete | |
CN206815520U (en) | A kind of connecting node of prefabricated post and precast beam | |
CN206328893U (en) | A kind of new vertical piece dry type connection shear wall | |
CN210887565U (en) | Assembled bolted connection roof beam-post node | |
CN206815547U (en) | A kind of frame-type bean column node | |
CN108867886A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam column interior joint | |
CN207582727U (en) | Double steel plate-concrete shear force wall side column inner lining pipe type connecting joint structure | |
CN218622790U (en) | Antidetonation coincide wall | |
CN108867873A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure beam-column joints | |
CN108867682A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction concrete foot joint | |
CN207003645U (en) | A kind of connecting node of prefabricated post and precast beam | |
CN206815544U (en) | A kind of dry type node of column and beam | |
CN108951882A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction timber structure foot joint | |
CN111335468A (en) | Slidable self-resetting node connecting structure for assembled concrete beam column and assembling method | |
CN206815519U (en) | A kind of connecting node of prefabricated post and precast beam | |
CN218060703U (en) | Assembled concrete beam column node | |
CN207003644U (en) | A kind of low layer assembled beam-column node | |
CN216475700U (en) | Connecting piece based on assembled composite wall | |
CN108867861A (en) | Bolt reinforcing bar bolt prefabrication and assembly construction beam column built from concrete mid-side node |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |