CN206815544U CN201720339718.2U CN201720339718U CN206815544U CN 206815544 U CN206815544 U CN 206815544U CN 201720339718 U CN201720339718 U CN 201720339718U CN 206815544 U CN206815544 U CN 206815544U
Authority
CN
China
Prior art keywords
metal bracket
dry type
prefabricated post
connecting plate
column node
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720339718.2U
Other languages
Chinese (zh)
Inventor
陈定球
刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuyou Zhizao Technology Investment Co., Ltd
Original Assignee
China Mingsheng Drawin Technology Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mingsheng Drawin Technology Investment Co Ltd filed Critical China Mingsheng Drawin Technology Investment Co Ltd
Priority to CN201720339718.2U priority Critical patent/CN206815544U/en
Application granted granted Critical
Publication of CN206815544U publication Critical patent/CN206815544U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model belongs to building engineering field, specifically disclose a kind of dry type bean column node, including prefabricated post and an at least precast beam, connector is embedded with the prefabricated post, the at least side of the prefabricated post is fixedly connected with metal bracket by the connector, and the precast beam is overlapped on the metal bracket;The connector includes connecting plate and the anchoring supporting leg being arranged on connecting plate, the connecting plate offer jack hole, and the connecting plate is bolted with metal bracket.Prefabricated post forms effective dry type by bracket with precast beam and is connected in bean column node of the present utility model, wet-less operation, the two forms overall common stress, add prefabricated component and be coupled tension ability, be advantageous to the conduction of power between prefabricated component, meet the construction quality and technical performance of building, simultaneously without cast-in-place concrete in assembling process, cost savings, speed of application is fast, short construction period.

Description

A kind of dry type node of column and beam
Technical field
The utility model belongs to building engineering field, more particularly to a kind of dry type bean column node.
Background technology
Assembling frame structure can greatly improve construction ability and construction speed, be ensured while saving a large amount of labours Build guality.Connected mode is the key problem of the structure in assembling frame structural system, while is also the weakness of the structure Link, as long as there is reliable connection the junction of prefabricated components, it just can guarantee that the safe and reliable of structure.Conventional beam column at present It is connected with two kinds, it is a kind of by the way of composite beam, although such a mode can ensure that the globality of node and connection can well By property, but substantial amounts of cast-in-place work be present, node is mostly situ wet operation, and cloth muscle is complicated, not easy to operate, construction period Slowly.Another kind is to penetrate reserving hole channel in whole precast beam using prestress wire, but presstressed reinforcing steel perforation workload is big, Longer duct grouting construction inconvenience, and be not easy to install, flexibility and speed of application must be built by reducing assembling frame structure.
For the bean column node of assembling frame structure, especially low layer assembling frame structure (such as villa), in order to the greatest extent Amount simplifies connecting structure and construction technology, improves the efficiency of construction of bean column node connection, needs badly and develops new frame beam column connection Node, in it can simplify site operation on the premise of meeting strength performance, facilitate execute-in-place, simplify construction technology, reduce Assembling duration.
Utility model content
The purpose of this utility model is to provide a kind of simple structure, easy construction, can effectively improve the dry type of efficiency of assembling Bean column node.
Above-mentioned purpose is to be achieved through the following technical solutions:A kind of dry type bean column node, including prefabricated post and at least one Precast beam, connector is embedded with the prefabricated post, at least side of the prefabricated post is fixedly connected with by the connector Metal bracket, the precast beam are overlapped on the metal bracket;The connector includes connecting plate and is arranged on connecting plate On anchoring supporting leg, the connecting plate offers jack hole, and the connecting plate is bolted with metal bracket.This practicality is new Type built-in connection in prefabricated post, in assembling process, according to installation needs, metal bracket can be connected to by connector The side wall of prefabricated post, hoisting prefabricated post, after prefabricated post is stood well, then hoisting prefabricated beam so that precast beam is overlapped on the bracket, It is preferred that and formed and be reliably connected with bracket, prefabricated post and precast beam form effective dry type by bracket in above-mentioned bean column node Connection, wet-less operation, is advantageous to the conduction of power between prefabricated component, meets the construction quality and technical performance of building, while is filling Without cast-in-place concrete during matching somebody with somebody, cost savings, speed of application is fast, short construction period.
, then need to be pre- when needing to be all connected with metal bracket in the one side or the multi-lateral of prefabricated post in actual mechanical process Pre-buried multiple connectors, metal bracket is connected by connector respectively in post processed, is then connected by bracket with more precast beams, Such as prefabricated post only side connection precast beam, the relative two sides connection precast beam of prefabricated post, two adjacent sides of prefabricated post connect Precast beam is connect, the three sides connection precast beam of prefabricated post or four sides of prefabricated post are all connected with precast beam.
Further, gathering hole is offered at the prefabricated post built-in connection.The setting of gathering hole is easy in prefabricated component In assembling process, using bolt prefabricated post connect with metal bracket by gathering hole it is integral, the two formed integrally jointly by Power.
Further, slurry is filled with the gathering hole.It is arranged such, on the one hand can solves caused by reservation operations mouth Unsightly problem, on the other hand, after the slurry in gathering hole solidifies, fixing bolt can be played a part of, avoid using year Limit long or external force under the influence of bolt looseness.Now filling paste has no effect on construction speed, is carried out again without waiting for slurry hardening The installation of next prefabricated component node.
Further, the connecting plate is fixedly connected with the branch sleeve being used cooperatively with the bolt, the branch sleeve An end closure, the other end is fixedly connected on connecting plate and opens up medial surface at jack hole, after the bolt connection metal bracket Inserted through the jack hole in the branch sleeve.Connector is connected with metal bracket by branch sleeve, precast beam without Gathering hole need to be opened up, when metal bracket is installed, it is only necessary to through described in jack hole insertion after by bolt connection metal bracket In branch sleeve, then tighten and connection can be achieved, it is easy to operate.It should be noted that medial surface described herein refers to connect The side of the fishplate bar into prefabricated post.
Further, the branch sleeve is the lengthening nut of an end closure.Lengthening nut bolt is used cooperatively, sealed It is welded on connecting plate, so without processing sleeve in addition, reduces production cost.
Further, the branch sleeve, which includes setting, is connected to the nut at jack hole and the set being socketed on nut Cylinder.It is preferred that the nut is for plastic manufacturing and with being interference fitted with sleeve.
Further, one end that the precast beam is overlapped on the metal bracket is provided with patchhole, the metal bracket top Portion is provided with insertion muscle, is inserted in the hole described in the insertion muscle insertion.In this way, in assembling process, it is only necessary in the lifting of precast beam During the lapping ends of precast beam being caused while on the bracket being arranged in prefabricated post to, insert insertion is described prefabricated Inserting in the hole in beam, said structure are advantageous to the conduction of power between prefabricated post and precast beam, while greatly improve scene The efficiency of installation, improves construction speed.The mode of the patchhole in insert insertion precast beam on bracket can not only be realized Prefabricated post and precast beam are reliably connected, at the same can operative constraint precast beam end, it is ensured that beam-ends destroys under geological process It is smaller not destroy even.
Further, described insert in the hole is perfused with grouting material.In this way, anchoring piece can be connected with precast beam by grouting material It is integral, and then increase the globality of bracket and precast beam, connection is more reliable, and the grouting material is preferably mortar.
Further, the metal bracket is can, and the side wall of reinforcement or the can is provided with the can Provided with ribs.It is arranged such, increases the rigidity and stretching resistance of metal bracket side wall, improves the energy of the bearing load of metal bracket Power.It is preferred that the both ends of the reinforcement connect two side walls of the can respectively.It is preferred that can one side is open, so Without opening up gathering hole in addition.It should be appreciated that in the case of as gathering hole, the opening surface outside bracket with connecting.
Further, the top surface of the metal bracket is equipped with seat pulp layer.It is arranged such, is on the one hand advantageous to the tune of precast beam It is flat, certain cushioning effect on the other hand is played in precast beam dropping place, avoids precast beam dropping place process from causing to damage to component, Simultaneously in the case where setting seat pulp layer, the caking property of bracket and precast beam Mosaic face can be increased, improve the globality of the two.
Further, at least two precast beams and the two sides of the prefabricated post are spliced, and are at least embedded with the prefabricated post Provided with two connectors, the anchoring supporting leg of described two connectors shifts to install.In this way, it is easy in multiple sides of prefabricated post point Not Lian Jie metal bracket, be then connected by metal bracket with precast beam.
Brief description of the drawings
Form a part of accompanying drawing of the present utility model to be used for providing further understanding to of the present utility model, this practicality is new The schematic description and description of type is used to explain the utility model, does not form to improper restriction of the present utility model.
Fig. 1 is the front section view of the dry type bean column node involved by a kind of embodiment of the utility model;
Fig. 2 is the A-A faces sectional view of dry type bean column node involved in Fig. 1;
Fig. 3 is the structural representation of connector involved in Fig. 1;
Fig. 4 is the front section view of the dry type bean column node involved by the utility model another embodiment.
In figure:
The connector of 1 prefabricated post, 2 precast beam, 3 metal bracket 4
The connecting plate of 5 bolt, 6 nut, 7 sleeve 8
The patchhole 12 of 9 10 jack hole of anchoring supporting leg 11 inserts muscle
13 grouting materials
Embodiment
The utility model is described in detail below in conjunction with the accompanying drawings, the description of this part be only it is exemplary and explanatory, There should not be any restriction effect to the scope of protection of the utility model.In addition, those skilled in the art's retouching according to this document State, respective combination can be carried out to the feature in embodiment in this document and in different embodiments.
The utility model embodiment is as follows, reference picture 1~3, a kind of dry type bean column node, including prefabricated post 1 and at least one Root precast beam 2, connector 4 is embedded with the prefabricated post 1, at least side of the prefabricated post 1 is fixed by the connector 4 Metal bracket 3 is connected with, the precast beam 2 is overlapped on the metal bracket 3;The connector 4 includes connecting plate 8 and set The anchoring supporting leg 9 on connecting plate 8 is put, the connecting plate 8 offers jack hole 10, and the connecting plate 8 passes through with metal bracket 3 Bolt 5 connects.The utility model built-in connection 4 in prefabricated post 1, in assembling process, according to installation needs, company can be passed through Metal bracket 3 is connected to the side wall of prefabricated post 1 by fitting 4, hoisting prefabricated post 1, prefabricated post 1 it is vertical it is good after, then hoisting prefabricated beam 2, So that precast beam 2 is overlapped on the bracket, is formed preferably and with bracket and be reliably connected, prefabricated post 1 in above-mentioned bean column node Effective dry type is formed by bracket with precast beam 2 to be connected, wet-less operation, be advantageous to the conduction of power between prefabricated component, meet to build The construction quality and technical performance built, while without cast-in-place concrete in assembling process, cost savings, speed of application is fast, applies The work cycle is short.
In actual mechanical process, such as Fig. 1 and Fig. 4, metal bracket is all connected with when needing the one side or the multi-lateral in prefabricated post 1 When 3, then need in prefabricated post 1 pre-buried multiple connectors 4, metal bracket 3 is connected by connector 4 respectively, then passes through bracket It is connected with more precast beams 2, such as the only side connection precast beam 2 of prefabricated post 1, the relative two sides connection precast beam of prefabricated post 1 2, two adjacent sides of prefabricated post 1 connection precast beam 2, the three sides connection precast beam 2 of prefabricated post 1 or prefabricated post 1 Four sides are all connected with precast beam 2.
On the basis of above-described embodiment, in another embodiment of the utility model, opened at the built-in connection 4 of prefabricated post 1 Provided with gathering hole.The setting of gathering hole is easy in the assembling process of prefabricated component, and bolt 5 is used by prefabricated post 1 by gathering hole Integral, the overall common stress of the two formation is connected with metal bracket 3.
On the basis of above-described embodiment, in another embodiment of the utility model, slurry is filled with the gathering hole.So Set, on the one hand can solve caused by reservation operations mouth unsightly problem, on the other hand, when the slurry solidification in gathering hole Afterwards, fixing bolt 5 can be played a part of, avoiding service life, bolt 5 loosens long or under the influence of external force.Now filling paste is simultaneously Construction speed is not influenceed, carries out the installation of next prefabricated component node again without waiting for slurry hardening.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the connecting plate 8 is fixedly connected with The branch sleeve being used cooperatively with the bolt 5, an end closure of the branch sleeve, the other end are fixedly connected on connecting plate 8 Open up the medial surface at jack hole 10, the bolt 5 connects and inserts the adapter sleeve through the jack hole 10 after metal bracket 3 In cylinder.Connector 4 is connected with metal bracket 3 by branch sleeve, precast beam 2 need not open up gathering hole, installation metal bracket 3 When, it is only necessary to insert in the branch sleeve, then tighten i.e. through the jack hole 10 after bolt 5 to be connected to metal bracket 3 Connection can be achieved, it is easy to operate.It should be noted that medial surface described herein refers to that into prefabricated post 1 of connecting plate 8 Face.
On the basis of above-described embodiment, in another embodiment of the utility model, the branch sleeve adds for an end closure Long nut 6.The lengthening nut 6 bolt 5 is used cooperatively, sealed is welded on connecting plate 8, so without processing set in addition Cylinder 7, reduce production cost.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, the branch sleeve includes setting The nut 6 being connected at jack hole 10 and the sleeve 7 being socketed on nut 6.It is preferred that the nut 6 is interference fitted with sleeve 7.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1 and Fig. 2, the precast beam 2 overlaps One end on the metal bracket 3 is provided with patchhole 11, and the top of metal bracket 3 is provided with insertion muscle 12, the insertion muscle In the 12 insertion patchholes 11.In this way, in assembling process, it is only necessary to by the end of precast beam 2 in the hoisting process of precast beam 2 Portion, which is overlapped on, causes insert to insert in the patchhole 11 in the precast beam 2 while on the bracket being arranged in prefabricated post 1 , said structure is advantageous to the conduction of power between prefabricated post 1 and precast beam 2, while greatly improves field erected efficiency, carries High construction speed.The mode of the patchhole 11 in insert insertion precast beam 2 on bracket can not only realize prefabricated post 1 with it is pre- Beam 2 processed is reliably connected, at the same can operative constraint precast beam 2 end, it is ensured that beam-ends destroys smaller even under geological process Do not destroy.
On the basis of above-described embodiment, in another embodiment of the utility model, such as Fig. 1, it is perfused with the patchhole 11 Grouting material 13.In this way, can be connected with precast beam 2 anchoring piece by grouting material 13 integral, and then increase bracket and precast beam 2 Globality, connection it is more reliable, the grouting material 13 be preferably mortar.
On the basis of above-described embodiment, in another embodiment of the utility model, the metal bracket 3 is can, described Side wall provided with reinforcement or the can in can is provided with ribs.It is arranged such, increases the firm of the side wall of metal bracket 3 Degree and stretching resistance, improve the ability of the bearing load of metal bracket 3.It is preferred that the both ends of the reinforcement connect the gold respectively Belong to two side walls of box.It is preferred that can one side is open, so without opening up gathering hole in addition.It should be appreciated that as gathering hole In the case of, the opening surface outside bracket with connecting.
On the basis of above-described embodiment, in another embodiment of the utility model, the top surface of the metal bracket 3 is equipped with seat Pulp layer.It is arranged such, is on the one hand advantageous to the leveling of precast beam 2, on the other hand plays certain buffering in 2 dropping place of precast beam Effect, avoid the dropping place process of precast beam 2 from causing to damage to component, while set sit pulp layer in the case of, can increase bracket with The caking property of the Mosaic face of precast beam 2, improves the globality of the two.
On the basis of above-described embodiment, in another embodiment of the utility model, at least two precast beams 2 and the prefabricated post 1 two sides are spliced, and are at least embedded with provided with two connectors 4, the anchoring branch of described two connectors 4 in the prefabricated post 1 Leg 9 shifts to install.In this way, be easy to connect metal bracket 3 respectively in multiple sides of prefabricated post 1, then by metal bracket 3 with Precast beam 2 is connected.
Described above is only preferred embodiment of the present utility model, it is noted that for the common skill of the art For art personnel, on the premise of the utility model principle is not departed from, some improvements and modifications can also be made, these improve and Retouching also should be regarded as the scope of protection of the utility model.

Claims (10)

1. a kind of dry type bean column node, including prefabricated post and an at least precast beam, it is characterised in that pre-buried in the prefabricated post There is connector, at least side of the prefabricated post is fixedly connected with metal bracket, the precast beam overlap joint by the connector On the metal bracket;The connector includes connecting plate and the anchoring supporting leg being arranged on connecting plate, the connecting plate Jack hole is offered, the connecting plate is bolted with metal bracket.
2. dry type bean column node according to claim 1, it is characterised in that offered at the prefabricated post built-in connection Gathering hole.
3. dry type bean column node according to claim 2, it is characterised in that slurry is filled with the gathering hole.
4. dry type bean column node according to claim 1, it is characterised in that the connecting plate is fixedly connected with and the spiral shell The branch sleeve that bolt is used cooperatively, an end closure of the branch sleeve, the other end are fixedly connected on connecting plate and open up jack hole The medial surface at place, inserted through the jack hole in the branch sleeve after the bolt connection metal bracket.
5. dry type bean column node according to claim 4, it is characterised in that the branch sleeve is the lengthening of an end closure Nut;Or the branch sleeve includes setting and is connected to the nut at jack hole and the sleeve being socketed on nut.
6. the dry type bean column node according to Claims 1 to 5 any one, it is characterised in that the precast beam is overlapped on One end on the metal bracket is provided with patchhole, and insertion muscle is provided with the top of the metal bracket, described to insert described in muscle insertion Insert in the hole.
7. dry type bean column node according to claim 6, it is characterised in that described insert in the hole is perfused with grouting material.
8. dry type bean column node according to claim 7, it is characterised in that the metal bracket is can, the gold The side wall provided with reinforcement or the can is provided with ribs in category box.
9. dry type bean column node according to claim 7, it is characterised in that the top surface of the metal bracket is equipped with seat slurry Layer.
10. the dry type bean column node according to Claims 1 to 5 any one, it is characterised in that at least two precast beams with The two sides of the prefabricated post are spliced, and are at least embedded with provided with two connectors in the prefabricated post, described two connectors Anchoring supporting leg shifts to install.
CN201720339718.2U 2017-03-31 2017-03-31 A kind of dry type node of column and beam Active CN206815544U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720339718.2U CN206815544U (en) 2017-03-31 2017-03-31 A kind of dry type node of column and beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720339718.2U CN206815544U (en) 2017-03-31 2017-03-31 A kind of dry type node of column and beam

Publications (1)

Publication Number Publication Date
CN206815544U true CN206815544U (en) 2017-12-29

Family

ID=60753075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720339718.2U Active CN206815544U (en) 2017-03-31 2017-03-31 A kind of dry type node of column and beam

Country Status (1)

Country Link
CN (1) CN206815544U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104281A (en) * 2018-01-12 2018-06-01 上海城乡建筑设计院有限公司 It is a kind of to be used for side form way of the fabricated construction exterior wall without tongue and groove composite beam
CN112177153A (en) * 2020-08-10 2021-01-05 锦萧建筑科技有限公司 Connecting mechanism and connecting method of frame nodes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108104281A (en) * 2018-01-12 2018-06-01 上海城乡建筑设计院有限公司 It is a kind of to be used for side form way of the fabricated construction exterior wall without tongue and groove composite beam
CN112177153A (en) * 2020-08-10 2021-01-05 锦萧建筑科技有限公司 Connecting mechanism and connecting method of frame nodes

Similar Documents

Publication Publication Date Title
CN207003643U (en) A kind of assembled beam-column node
CN206815520U (en) A kind of connecting node of prefabricated post and precast beam
CN206815547U (en) A kind of frame-type bean column node
CN105756202A (en) Tooth groove type connection structure of assembled shear wall in combination with superimposed floor slab
CN105926766B (en) Fabricated shear wall Alveolus type attachment structure assembly engineering method
CN107023121A (en) A kind of reinforcing bar grout sleeve connected for prefabricated concrete structure ductility
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN206034631U (en) Connected node of wallboard and floor
CN206815666U (en) A kind of connecting node of multilayer wallboard and wallboard and floor
CN209179247U (en) A kind of novel precast reinforced concrete shearing force wall connection structure
CN206873767U (en) A kind of reinforcing bar grout sleeve for the connection of prefabricated concrete structure ductility
CN109339344A (en) A kind of high level assembly concrete shear wall structure boxlike connection structure and method
CN207003634U (en) A kind of balcony slab installs node
CN206815544U (en) A kind of dry type node of column and beam
CN207003644U (en) A kind of low layer assembled beam-column node
CN108505647A (en) A kind of prefabricated assembled profiled sheet concrete shear force wall and its construction method
CN105350641B (en) Suitable for the framework column connected node and its construction technology of prefabrication and assembly construction building
CN207003713U (en) A kind of part cast-in-place shear wall
CN206815521U (en) A kind of assembling frame bean column node
CN206815539U (en) A kind of connecting node of wallboard and beam
CN207003673U (en) A kind of connecting node of beam and wallboard
CN206815519U (en) A kind of connecting node of prefabricated post and precast beam
CN110107023A (en) A kind of rigid connection prefabricated frame for assembled architecture is set a roof beam in place
CN207003645U (en) A kind of connecting node of prefabricated post and precast beam
CN212836854U (en) House building reinforcing wall structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: China Civil Architecture Friends Technology (Jiaozhou) Co., Ltd.

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: 2018430000023

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20190102

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanning Zhongmin zhuyou Intelligent Manufacturing Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2019430000004

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20191105

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Xiangxi Zhongmin zhuyou Technology Co., Ltd

Assignor: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT CO., LTD.

Contract record no.: X2020430000002

Denomination of utility model: Dry -type post girder segment point

Granted publication date: 20171229

License type: Common License

Record date: 20200305

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 5 / F, office building 2, Zhongmin zhuyou Co., Ltd., No. 10, Zhongshi Road, shaping street, Kaifu District, Changsha City, Hunan Province, 410000

Patentee after: Zhuyou Zhizao Technology Investment Co., Ltd

Address before: 410205 comprehensive building in Hunan province Changsha Kaifu District, No. 30 Xingang Road, Changsha Jinxia bonded logistics center room 2005

Patentee before: CHINA MINGSHENG DRAWIN TECHNOLOGY INVESTMENT Ltd.

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nantong Zhongmin zhuyou Zhizao Technology Co., Ltd

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2020980007488

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20201105

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Yuanfeng Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980000884

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210203

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Hailong Construction Engineering Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001039

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210207

EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan YingYuan Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001160

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210218

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Henan guochi Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001282

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210225

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hongen Construction Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980001340

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210302

EE01 Entry into force of recordation of patent licensing contract
EE01 Entry into force of recordation of patent licensing contract

Assignee: Linzhou Hantai Construction Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980009995

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20210929

EE01 Entry into force of recordation of patent licensing contract

Assignee: Hunan Shangyi Engineering Labor Service Co.,Ltd.

Assignor: Zhuyou Zhizao Technology Investment Co., Ltd

Contract record no.: X2021980010464

Denomination of utility model: A dry column beam joint

Granted publication date: 20171229

License type: Common License

Record date: 20211011

EE01 Entry into force of recordation of patent licensing contract