CN109024674A - Underground pipe gallery passes through protection underground utilities construction method - Google Patents

Underground pipe gallery passes through protection underground utilities construction method Download PDF

Info

Publication number
CN109024674A
CN109024674A CN201810833564.1A CN201810833564A CN109024674A CN 109024674 A CN109024674 A CN 109024674A CN 201810833564 A CN201810833564 A CN 201810833564A CN 109024674 A CN109024674 A CN 109024674A
Authority
CN
China
Prior art keywords
underground
pipeline
pipe gallery
protection
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810833564.1A
Other languages
Chinese (zh)
Inventor
谭福生
郑宇�
乔风军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Original Assignee
China Huaye Group Co Ltd
North China Metallurgical Construction Engineering Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Huaye Group Co Ltd, North China Metallurgical Construction Engineering Construction Co Ltd filed Critical China Huaye Group Co Ltd
Priority to CN201810833564.1A priority Critical patent/CN109024674A/en
Publication of CN109024674A publication Critical patent/CN109024674A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The present invention provides a kind of underground pipe galleries to pass through protection underground utilities construction method, comprising the following steps: S1, according to the preset depth excavates artificial trial trench in underground pipe gallery excavation line two sides, to determine line distribution and depth;S2, according to line depth and distribution, excavated downwards in construction location, until close to pipeline subterranean depth position;S3, it is arranged protection pipe on underground utilities, and according to preset interval, protection pipe is bound;S4, anchor drawing device is set in the two sides of pipeline, then anchor drawing device is reinforced, is sling pipeline using pendant;S5, in pipeline side and lower section excavation pit, until underground pipe gallery designed elevation, then carries out underground pipe gallery construction;Backfilling of earthwork is carried out after the completion of S6, underground pipe gallery construction.It can effectively prevent the damage in underground pipe gallery work progress to pre-buried underground utilities, and construction cost and construction period can be effectively reduced, and avoid underground pipeline construction from relocating digging up and filling in repeatedly, influence construction area daily life.

Description

Underground pipe gallery passes through protection underground utilities construction method
Technical field
The present invention relates to underground pipe gallery technical field of construction, specifically, being related to a kind of underground pipe gallery passes through protection Underground pipeline construction method.
Background technique
Underground urban duct integrates corridor, i.e., builds a tunnel space in Urban Underground, by electric power, communication, combustion gas, confession The various utilities pipelines such as heat, plumbing are integrated in one, and are equipped with special access hole, hoisting port and monitoring system, implement unified rule It draws, Uniting, unified construction and management, is the important infrastructure and " lifeline " for ensureing city operations.Underground integrated pipe Corridor can effectively prevent " zipper road " phenomenon, allow technical staff without excavated pavement repeatedly, can be to all kinds of pipelines in piping lane It repaired, safeguarded, extending capacity reformation etc.;Reduce pipeline emergency repair time significantly simultaneously.
Under the prior art, in the work progress of Urban Underground piping lane, it can encounter and pre- be embedded in underground and pass perpendicularly through buried pipe Various pipelines of corridor construction area, and when piping lane excavates, can be related to also not can avoid the water pipe of underground, communication cable, The pipelines such as power high-tension cable, small-sized gas piping.It however under the prior art, inevitably can be right in the digging process of underground pipe gallery Above-mentioned pipeline, which impacts, even to be destroyed.
In order to solve the above-mentioned technical problem, detour of relocating usually is carried out before meeting large cross section excavation in the prior art, however Composite duct comprehensive corridor in underground is linear construction, and common construction distance is at several kilometers or more, and underground piping and pipeline are wrong Comprehensive complexity causes under the prior art, and can only first construct one section of piping lane, after the completion of piping lane is constructed and is backfilled, changes pipeline position It sets to piping lane construction location, then excavates the piping lane below pipeline, pipeline is moved into initial position again after to be onstructed.It is aobvious So, above-mentioned this construction method in the prior art, not only operating expenses is high, and construction period is longer, and process of relocating every time In all can inevitably cause serious influence to the daily life of construction area, it is generally the case that construction area can be caused interval Property is cut off the water supply or is powered off, and greatly affected the normal life of resident.
In view of this, should be improved to the prior art, to solve the above-mentioned technical problems in the prior art.
Summary of the invention
In order to solve the above-mentioned technical problem the present invention makes, the purpose is to provide one kind to effectively prevent underground To the damage of pre-buried underground utilities in piping lane work progress, construction cost and construction period can be effectively reduced, avoid buried pipe Line construction is relocated digging up and filling in repeatedly, and the underground pipe gallery for influencing construction area daily life passes through protection underground utilities construction party Method.
To achieve the goals above, the present invention provides a kind of underground pipe galleries to pass through protection underground utilities construction method, institute It states underground pipe gallery and passes through protection underground utilities construction method the following steps are included: S1, according to the preset depth, in buried pipe Nong Khai It digs line two sides and excavates artificial trial trench, to determine line distribution and line depth;S2, according to the line depth and line distribution, It is excavated downwards in construction location, until close to pipeline subterranean depth position;S3, it is arranged protection pipe on underground utilities, and according to Preset interval binds the protection pipe;S4, anchor drawing device is set in the two sides of the pipeline, then to anchor drawing device It is reinforced, is sling the pipeline using pendant;S5, in the pipeline side and lower section excavation pit, until underground pipe gallery Designed elevation then carries out underground pipe gallery construction;Backfilling of earthwork is carried out after the completion of S6, underground pipe gallery construction.
Preferably, in the step S1, width can be reserved in the two sides of the underground pipe gallery excavation line, it is described reserved Width can be in the range of 2 meters to 5 meters.
It preferably,, can be downward prior to construction location after determining line distribution and line depth in the step S2 Digging office groove, the trench depth should be less than the line depth, then can continue to excavate using hand digging mode, directly Extremely close to pipeline subterranean depth position.
Preferably, in the step S3, the length of the protection sleeve pipe can be 30 meters, and diameter can be 50 millimeters, The preset interval can be in the range of 15 centimetres to 25 centimetres, and the protection pipe can manage for PE.
Preferably, in the step S4, more fixing pipes can be squeezed into the pipeline both ends, it then can be using button Part is separately connected the fixing pipe of two sides, fixed cross beam is formed, and can connect the fixed cross beam of two sides, then at the fixation It is arranged on crossbeam multiple for slinging the pendant of the pipeline.
It is further preferred that the fixing pipe can be steel pipe, the fixed length of tube can be 1.5 meters, and diameter can be with It is 48 millimeters, the fixing pipe insertion subterranean depth can be 1 meter, and protruded length is 0.5 meter.
Further preferably, the fixed cross beam can be connected using wirerope, and the wirerope can pass through the gaily decorated basket Bolt is fixed.
Preferably, can be using true yellow soil and/or fine sand backfill at the pipeline in the step 6, backfill depth can In the range of 300 millimeters to 500 millimeters.
As described above with practice it is found that underground pipe gallery of the present invention passes through protection underground utilities construction method In, first by excavating artificial trial trench, accurately to determine distribution and the line depth of underground utilities, including trend, material, pressure Power, and be affected by it upstream and downstream user the case where;Then according to the line distribution of acquisition and line depth, ditch is excavated downwards Slot replaces mechanical excavation using hand digging, with further underground pipelines from the shadow of mining process when close to line depth It rings, improves construction accuracy and safety;When excavating to underground utilities, underground utilities are wrapped up using PE pipe, and according to Preset interval binds pipeline using thin nylon rope, can further protect to underground utilities;Then in buried pipe Multiple symmetrical fixing pipes are arranged in line both ends, and connect fixing pipe to form fixed cross beam, then symmetrical by wirerope connection two Fixing pipe, and fixed by flower basket bolt, then multiple pendants are arranged in interval on a steel cord, will be located at below wirerope Underground utilities sling, in this way, make underground utilities not by subsequent foundation pit excavation influenced;It is backfilled after the completion of construction, and Using true yellow soil and/or fine sand backfill near the pipeline after tamped, in this way, can in backfilling process further protecting field Underground pipelines consolidate.In conclusion underground pipe gallery of the present invention passes through in protection underground utilities construction method, using protection The mode of excavation replaces mechanical excavation using hand digging when excavating to underground utilities, wraps up and protecting on underground utilities Fixing pipe is arranged then at pipeline both ends in protecting pipe, and being bound, and by setting up fixed cross beam in fixing pipe, then passes through steel wire Rope is connected and fixed crossbeam, finally in interval setting many places pendant is on wirerope to sling underground utilities, in this way, multiple means pair Underground utilities are protected parallel, effectively prevent the damage in underground pipe gallery work progress to pre-buried underground utilities, reduce construction Cost and construction period avoid underground pipeline construction from relocating digging up and filling in repeatedly, influence construction area daily life.
Detailed description of the invention
Fig. 1 is flow chart, shows underground pipe gallery described in one embodiment of the present of invention and passes through protection underground utilities The process of construction method;
Fig. 2 is top view, shows underground pipe gallery shown in FIG. 1 and passes through in the step S4 of protection underground utilities construction method In the plan structure of pipeline two sides setting fixing pipe;
Fig. 3 is cross-sectional view, show underground pipe gallery shown in FIG. 1 pass through protection underground utilities construction method step S4 and In step S5, pipeline is sling in pendant is arranged on anchor drawing device, then the cross-section structure of excavation pit.
Specific embodiment
Below with reference to the accompanying drawings come describe underground pipe gallery of the present invention pass through protection underground utilities construction method reality Apply example.Those skilled in the art will recognize, without departing from the spirit and scope of the present invention, Ke Yiyong A variety of different modes are modified described embodiment.Therefore, attached drawing and description are regarded as illustrative in nature, without It is for limiting scope of protection of the claims.In addition, in the present specification, attached drawing is drawn not in scale, and identical attached Icon note indicates identical part.
Fig. 1 is flow chart, shows underground pipe gallery described in one embodiment of the present of invention and passes through protection underground utilities The process of construction method.It is applied as shown in Figure 1, the underground pipe gallery described in this embodiment of the invention passes through protection underground utilities Work method excavates artificial trial trench in underground pipe gallery excavation line two sides, with determination the following steps are included: S1, according to the preset depth Line distribution and line depth;S2, according to the line depth and line distribution, excavated downwards in construction location, until close Pipeline subterranean depth position;S3, it is arranged protection pipe on underground utilities, and according to preset interval, the protection pipe is tied up It pricks;S4, anchor drawing device is set in the two sides of the pipeline, then anchor drawing device is reinforced, using pendant by the pipeline It slings;S5, in the pipeline side and lower section excavation pit, until underground pipe gallery designed elevation, then carries out underground pipe gallery and applies Work;Backfilling of earthwork is carried out after the completion of S6, underground pipe gallery construction.
Specifically, in step sl, in the two sides of underground pipe gallery piping lane excavation line, reserved width is kept to be excavated, Reserved width is in the range of 2 meters to 5 meters, in this embodiment of the invention, in 3 meters of underground pipe gallery excavation line both ends distance Outside, artificial trial trench is excavated, obtaining pipeline buried depth is 1.6 meters, and pipeline diameter is 30 millimeters, and pipeline material is PE protective sheath.
In step s 2, after confirming line distribution and line depth, groove is excavated in such a way that machinery excavates, groove Depth should be less than the buried depth of pipeline, and in this embodiment of the invention, groove excavating depth is 1 meter, and width is 0.6 meter.Ditch Slot uses artificial tunneling method after the completion of excavating, and carries out digging office to groove to 600 mm depths between pipeline buried depth, works as excavation It when to apart from 100 millimeters of pipeline buried depth, uses hand digging mode instead and is excavated along pipeline, until reaching underground utilities position.
In step s3, use length for 30 meters, the PE material protection sleeve pipe that diameter is 50 millimeters is laterally cut along its surface It after cutting, is arranged from one end of pipeline, during being integrally arranged, the pipeline after the completion of being arranged is bound according to preset interval, Preset interval is in the range of 15 centimetres to 25 centimetres, and in this embodiment of the invention, preset interval setting encloses 20 centimetres, and And every 20 centimetres, bound using thin nylon rope.
Fig. 2 is top view, shows underground pipe gallery shown in FIG. 1 and passes through in the step S4 of protection underground utilities construction method In the plan structure of pipeline two sides setting fixing pipe.As shown in Fig. 2, the underground pipe gallery is worn in this embodiment of the invention More protect in underground utilities construction method, after the completion of pipeline protection casing is arranged, at pipeline both ends according to mode as shown in Figure 2, Nine fixing pipes 1 are set up respectively, and in this embodiment of the invention, fixing pipe uses length for 1.5 meters, DN48 millimeters of diameter Fixing pipe 1 is driven underground steel pipe, and keeping its subterranean depth is 1 meter, and protruded length is 0.5 meter, is then distinguished using fastener Three fixing pipes 1 are connected in the two sides of pipeline, form fixed cross beam 2, then connect the fixed cross beam 2 of two sides with wirerope 3, with shape At anchor drawing device.In this embodiment of the invention, wirerope 3 can also further be reinforced by flower basket bolt 4, and Keep its prestressing force.
Fig. 3 is cross-sectional view, show underground pipe gallery shown in FIG. 1 pass through protection underground utilities construction method step S4 and In step S5, pipeline is sling in pendant is arranged on anchor drawing device, then the cross-section structure of excavation pit.As shown in figure 3, in steel Every 1500 millimeters of one hanging points of setting in cord 3, zinc-plated pendant 5 is set at each hanging point, is sling pipeline 6 by pendant 5. Then in 6 side of pipeline and lower section excavation pit 7, until excavating to underground pipe gallery designed elevation, underground pipe gallery construction is completed.? In the embodiment of the present invention, slow soil digging is carried out from the position of 1 meter of pipeline lower part, until soil block does not stop and falls.
After the completion of construction, foundation pit is backfilled, and depth is backfilled using true yellow soil and/or fine sand backfill at pipeline Region between 300 millimeters to 500 millimeters carries out mechanical compacting, to complete integral construction after backfill.
As described above with practice it is found that underground pipe gallery of the present invention passes through protection underground utilities construction method In, first by excavating artificial trial trench, accurately to determine distribution and the line depth of underground utilities, including trend, material, pressure Power, and be affected by it upstream and downstream user the case where;Then according to the line distribution of acquisition and line depth, ditch is excavated downwards Slot replaces mechanical excavation using hand digging, with further underground pipelines from the shadow of mining process when close to line depth It rings, improves construction accuracy and safety;When excavating to underground utilities, underground utilities are wrapped up using PE pipe, and according to Preset interval binds pipeline using thin nylon rope, can further protect to underground utilities;Then in buried pipe Multiple symmetrical fixing pipes are arranged in line both ends, and connect fixing pipe to form fixed cross beam, then symmetrical by wirerope connection two Fixing pipe, and fixed by flower basket bolt, then multiple pendants are arranged in interval on a steel cord, will be located at below wirerope Underground utilities sling, in this way, make underground utilities not by subsequent foundation pit excavation influenced;It is backfilled after the completion of construction, and Using true yellow soil and/or fine sand backfill near the pipeline after tamped, in this way, can in backfilling process further protecting field Underground pipelines consolidate.In conclusion underground pipe gallery of the present invention passes through in protection underground utilities construction method, using protection The mode of excavation replaces mechanical excavation using hand digging when excavating to underground utilities, wraps up and protecting on underground utilities Fixing pipe is arranged then at pipeline both ends in protecting pipe, and being bound, and by setting up fixed cross beam in fixing pipe, then passes through steel wire Rope is connected and fixed crossbeam, finally in interval setting many places pendant is on wirerope to sling underground utilities, in this way, multiple means pair Underground utilities are protected parallel, effectively prevent the damage in underground pipe gallery work progress to pre-buried underground utilities, reduce construction Cost and construction period avoid underground pipeline construction from relocating digging up and filling in repeatedly, influence construction area daily life.
It describes underground pipe gallery according to the present invention in an illustrative manner above with reference to attached drawing and passes through protection buried pipe Line construction method.It will be understood by those skilled in the art, however, that the underground pipe gallery proposed for aforementioned present invention passes through protection Underground pipeline construction method can also make various improvement on the basis of not departing from the content of present invention.Therefore, guarantor of the invention Shield range should be determined by the content of appended claims.

Claims (8)

1. a kind of underground pipe gallery passes through protection underground utilities construction method, which is characterized in that the underground pipe gallery passes through protecting field Underground pipelines construction method the following steps are included:
S1, according to the preset depth excavates artificial trial trench in underground pipe gallery excavation line two sides, to determine that line distribution and pipeline are deep Degree;
S2, according to the line depth and line distribution, excavated downwards in construction location, until close to pipeline subterranean depth position It sets;
S3, it is arranged protection pipe on underground utilities, and according to preset interval, the protection pipe is bound;
S4, anchor drawing device is set in the two sides of the pipeline, then anchor drawing device is reinforced, using pendant by the pipeline It slings;
S5, in the pipeline side and lower section excavation pit, until underground pipe gallery designed elevation, then carries out underground pipe gallery and applies Work;
Backfilling of earthwork is carried out after the completion of S6, underground pipe gallery construction.
2. underground pipe gallery as described in claim 1 passes through protection underground utilities construction method, which is characterized in that in the step In S1, width is reserved in the two sides of the underground pipe gallery excavation line, the reserved width is in the range of 2 meters to 5 meters.
3. underground pipe gallery as described in claim 1 passes through protection underground utilities construction method, which is characterized in that in the step In S2, after determining line distribution and line depth, prior to construction location digging downwards office groove, the trench depth is less than described Line depth then continues to excavate using hand digging mode, until close to pipeline subterranean depth position.
4. underground pipe gallery as described in claim 1 passes through protection underground utilities construction method, which is characterized in that in the step In S3, the length of the protection sleeve pipe is 30 meters, and diameter is 50 millimeters, range of the preset interval at 15 centimetres to 25 centimetres Interior, the protection pipe is PE pipe.
5. underground pipe gallery as described in claim 1 passes through protection underground utilities construction method, which is characterized in that in the step In S4, more fixing pipes are squeezed into the pipeline both ends, the fixing pipe of two sides is then separately connected using fastener, are formed solid Determine crossbeam, and connect the fixed cross beam of two sides, is arranged on the fixed cross beam multiple for slinging the pendant of the pipeline.
6. underground pipe gallery as claimed in claim 5 passes through protection underground utilities construction method, which is characterized in that the fixing pipe For steel pipe, the fixed length of tube is 1.5 meters, and diameter is 48 millimeters, and the fixing pipe insertion subterranean depth is 1 meter, exposed length Degree is 0.5 meter.
7. underground pipe gallery as claimed in claim 5 passes through protection underground utilities construction method, which is characterized in that described fixed horizontal Beam is connected using wirerope, and the wirerope is fixed by flower basket bolt.
8. underground pipe gallery as described in claim 1 passes through protection underground utilities construction method, which is characterized in that in the step In 6, using true yellow soil and/or fine sand backfill at the pipeline, depth is backfilled in the range of 300 millimeters to 500 millimeters.
CN201810833564.1A 2018-07-26 2018-07-26 Underground pipe gallery passes through protection underground utilities construction method Pending CN109024674A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810833564.1A CN109024674A (en) 2018-07-26 2018-07-26 Underground pipe gallery passes through protection underground utilities construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810833564.1A CN109024674A (en) 2018-07-26 2018-07-26 Underground pipe gallery passes through protection underground utilities construction method

Publications (1)

Publication Number Publication Date
CN109024674A true CN109024674A (en) 2018-12-18

Family

ID=64645496

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810833564.1A Pending CN109024674A (en) 2018-07-26 2018-07-26 Underground pipe gallery passes through protection underground utilities construction method

Country Status (1)

Country Link
CN (1) CN109024674A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797776A (en) * 2019-01-10 2019-05-24 浙江交工集团股份有限公司 Underground pipe gallery based on cut and cover method meets the construction method of cross pipeline
CN110241854A (en) * 2019-06-24 2019-09-17 中冶赛迪工程技术股份有限公司 A kind of pipe gallery and its change cabin method convenient for across underground structure
CN110424517A (en) * 2019-07-31 2019-11-08 中国十七冶集团有限公司 A kind of underground pipe gallery construction rain sewage in urban core region is relocated construction method
CN110578343A (en) * 2019-09-26 2019-12-17 殷茜东 Suspension protection structure and method for high-voltage power pipeline at top of deep foundation pit
CN110593264A (en) * 2019-08-01 2019-12-20 中建五局土木工程有限公司 Excavation construction method for underground pipeline in-situ protection long and narrow deep foundation pit
CN110644799A (en) * 2019-09-26 2020-01-03 殷茜东 Pipeline suspension protection method and suspension structure thereof
CN111244832A (en) * 2020-01-16 2020-06-05 中国十七冶集团有限公司 Moving and modifying method for integrally lifting and protecting pipe-jacking type underground high-voltage cable in situ
CN111509649A (en) * 2019-01-30 2020-08-07 大唐东营发电有限公司 Temporary debugging power supply configuration scheme
CN112177006A (en) * 2020-09-27 2021-01-05 类维波 Construction method for protecting municipal pipeline
CN114576431A (en) * 2021-12-27 2022-06-03 华北冶建工程建设有限公司 Flexible natural gas pipeline reinforcing method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2316630C2 (en) * 2005-07-12 2008-02-10 Елена Борисовна Аль-Сайяль Method for pipeline protection against emergency state caused by doline
CN202500096U (en) * 2012-03-22 2012-10-24 深圳市兴班建筑工程有限公司 Rain water box culvert crossing underground pipeline protection device
CN105700039A (en) * 2016-01-20 2016-06-22 广州市城市规划勘测设计研究院 Method for detecting underground pipe in urban road exploration construction
CN106838465A (en) * 2017-02-24 2017-06-13 中冶建工集团有限公司 The existing pipe excavation protection construction method of underground pipe gallery

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2316630C2 (en) * 2005-07-12 2008-02-10 Елена Борисовна Аль-Сайяль Method for pipeline protection against emergency state caused by doline
CN202500096U (en) * 2012-03-22 2012-10-24 深圳市兴班建筑工程有限公司 Rain water box culvert crossing underground pipeline protection device
CN105700039A (en) * 2016-01-20 2016-06-22 广州市城市规划勘测设计研究院 Method for detecting underground pipe in urban road exploration construction
CN106838465A (en) * 2017-02-24 2017-06-13 中冶建工集团有限公司 The existing pipe excavation protection construction method of underground pipe gallery

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797776A (en) * 2019-01-10 2019-05-24 浙江交工集团股份有限公司 Underground pipe gallery based on cut and cover method meets the construction method of cross pipeline
CN109797776B (en) * 2019-01-10 2020-08-18 浙江交工集团股份有限公司 Construction method for underground pipe gallery to meet cross pipeline based on open cut method
CN111509649A (en) * 2019-01-30 2020-08-07 大唐东营发电有限公司 Temporary debugging power supply configuration scheme
CN110241854A (en) * 2019-06-24 2019-09-17 中冶赛迪工程技术股份有限公司 A kind of pipe gallery and its change cabin method convenient for across underground structure
CN110241854B (en) * 2019-06-24 2024-05-14 中冶赛迪工程技术股份有限公司 Utility tunnel convenient to span underground building and cabin changing method thereof
CN110424517A (en) * 2019-07-31 2019-11-08 中国十七冶集团有限公司 A kind of underground pipe gallery construction rain sewage in urban core region is relocated construction method
CN110593264B (en) * 2019-08-01 2021-02-26 中建五局土木工程有限公司 Excavation construction method for underground pipeline in-situ protection long and narrow deep foundation pit
CN110593264A (en) * 2019-08-01 2019-12-20 中建五局土木工程有限公司 Excavation construction method for underground pipeline in-situ protection long and narrow deep foundation pit
CN110578343A (en) * 2019-09-26 2019-12-17 殷茜东 Suspension protection structure and method for high-voltage power pipeline at top of deep foundation pit
CN110644799A (en) * 2019-09-26 2020-01-03 殷茜东 Pipeline suspension protection method and suspension structure thereof
CN111244832A (en) * 2020-01-16 2020-06-05 中国十七冶集团有限公司 Moving and modifying method for integrally lifting and protecting pipe-jacking type underground high-voltage cable in situ
CN112177006B (en) * 2020-09-27 2021-08-27 类维波 Construction method for protecting municipal pipeline
CN112177006A (en) * 2020-09-27 2021-01-05 类维波 Construction method for protecting municipal pipeline
CN114576431A (en) * 2021-12-27 2022-06-03 华北冶建工程建设有限公司 Flexible natural gas pipeline reinforcing method

Similar Documents

Publication Publication Date Title
CN109024674A (en) Underground pipe gallery passes through protection underground utilities construction method
CN106641440B (en) A kind of transverse crossing railway line underground piping jacking construction method
CN106436720B (en) The construction method of jacking construction small size deep foundation pit supporting structure
CN102261518B (en) Restoration construction method for in-service oil gas pipeline which encounters with collapse and destruction of worked-out section
CN106437798B (en) A kind of preprocess method of the anchor cable group across shield driving section
CN109056793A (en) Underground pipe gallery pre-reinforcement crossing pipeline construction method
CN108843333A (en) Collapsible Loess District tunneling double-arched tunnel passes through the construction method of existing railway
CN102878980B (en) Indirect testing method for underground pipeline settlement induced by subway tunnel construction
CN111156006A (en) Construction method for shield underpass of dangerous pipeline
CN109137998A (en) Cross the existing electric power piping lane protection structure and its construction method of tunnel foundation pit
CN111173027A (en) Construction method for reinforcing and protecting existing pipeline
CN105041322A (en) Method and system for reinforcing hole for push bench to go in and out
CN105544603A (en) Construction method for underground pipeline reinforcement
CN109356193A (en) Prefabricated piping lane propelling movement construction equipment
CN204099720U (en) The protective housing that under soil stone combination geological condition, artificial pipe jacking construction method is used
CN105387273A (en) Method for constructing natural gas pipelines in mountain environment
JP2009068213A (en) Construction method for underground structure using caisson, and caisson with cut-off device
CN109577337A (en) Deep foundation pit construction method for drainage pipeline
CN110512594A (en) The simple and easy method of churning driven opportunity cavity pore-forming
CN101141054A (en) Compaction grouting method for preventing land subsidence after non-digging horizontal drilling
CN110486531A (en) It a kind of artificial push pipe and rams and manages united pipeline construction method
CN105804203A (en) Plugging method of deep-buried large-diameter waste water pipeline
CN109137970A (en) Arterial highway underground pipe gallery construction method
CN109119943A (en) System of laying optimization method of the cable at push pipe both ends
CN209144866U (en) Prefabricated piping lane propelling movement construction equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218

RJ01 Rejection of invention patent application after publication