CN109024646A CN201810851765.4A CN201810851765A CN109024646A CN 109024646 A CN109024646 A CN 109024646A CN 201810851765 A CN201810851765 A CN 201810851765A CN 109024646 A CN109024646 A CN 109024646A
Authority
CN
China
Prior art keywords
bottom plate
prefabricated
hydraulic cylinder
prefabricated part
steel plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810851765.4A
Other languages
English (en)
Inventor
林威
周健
伊帝业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wing Aircraft Technology (tianjin) Co Ltd
Original Assignee
Wing Aircraft Technology (tianjin) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wing Aircraft Technology (tianjin) Co Ltd filed Critical Wing Aircraft Technology (tianjin) Co Ltd
Priority to CN201810851765.4A priority Critical patent/CN109024646A/zh
Publication of CN109024646A publication Critical patent/CN109024646A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

本发明涉及沉井技术领域,尤其涉及一种装配式沉箱(井),包括带有刃脚的底板、钢板套、装配式预制件、混凝土沉井以及液压缸;所述钢板套套接在所述底板的外部并与其固定连接,所述装配式预制件由若干块半圆形预制件组成,半圆形预制件放置在所述底板的上部其外壁与所述钢板套配合,每个半圆形预制件的内侧壁上分别固定有挡块,所述液压缸固定在所述底板内,液压缸的活塞杆与所述挡块配合,所述混凝土沉井装在所述装配式预制件的上部。本发明通过将装配式预制件与液压缸相结合的方式,增加装配式预制件,可以达到增加沉井深度的目的,有效防止沉井发生偏移的问题,使沉井能够始终平稳,在平衡状态下的整体下降施工。

Description

装配式沉箱(井)及其工艺
技术领域
本发明涉及沉井技术领域,尤其涉及一种装配式沉箱(井)及其工艺。
背景技术
目前,沉井在下沉过程中,随着下沉深度增加,地面的握裹力增大,为了使地下室顺利下沉,需要在沉井的上部增加一些配重,从而使沉井的自身重量增大,才能顺利的下沉,但在实际使用过程中,增加配重的方式并不理想,比较容易导致沉井发生倾斜偏移的情况,需要不断的修正,这样就增加了施工难度。
发明内容
本发明的目的在于克服上述技术的不足,而提供一种装配式沉箱(井)及其工艺,使沉井能够顺利下沉。
本发明为实现上述目的,采用以下技术方案:一种装配式沉箱(井),其特征在于:包括带有刃脚的底板、钢板套、装配式预制件、混凝土沉井以及液压缸;所述钢板套套接在所述底板的外部并与其固定连接,所述装配式预制件由若干块半圆形预制件组成,半圆形预制件放置在所述底板的上部其外壁与所述钢板套配合,半圆形预制件的高度低于钢板套的位于底板以上部分的高度,每个半圆形预制件的内侧壁上分别固定有挡块,所述液压缸固定在所述底板内,液压缸的活塞杆与所述挡块配合,所述混凝土沉井装在所述装配式预制件的上部。
优选地,钢板套与装配式预制件之间设有阻水胶。
一种装配式沉箱(井)工艺,其特征在于:包括以下步骤:
1)清理地面杂填土直至露出原土;
2)在原土上将底板整体预制完成,并将钢板套固定在底板的周围;
3)逐一或分组或同时将底板下方的泥土掏出;
4)当底板将要下沉到地面以下时,将装配式预制件放在底板上的台阶上;
5)当钢板套的上部将要下沉到地面以下时,将混凝土沉井装在装配式预制件的上部;
6)当混凝土沉井下降到一定程度由于周围泥土的握裹力增大,无法继续下沉时,启动液压缸,液压缸的活塞杆顶住装配式预制件上的挡块上;
7)在装配式预制件的反作用下,液压缸推动底板继续下沉,当下沉深度在一个装配式预制件的高度时,液压缸收回,在原有的装配式预制件位置再放置一套装配式预制件;
8)重复步骤7),直到下沉到设计深度。
本发明的有益效果是:相对于现有技术,本发明在传统的沉井底部增加底板和装配式预制件,当沉井难以向下继续下沉的情况下,通过将装配式预制件与液压缸相结合的方式,增加装配式预制件,可以达到增加沉井深度的目的,有效防止沉井发生偏移的问题,使沉井能够始终平稳,在平衡状态下的整体下降施工。
附图说明
图1为本发明的结构示意图;
图2为本发明中增加一块装配式预制件的结构示意图。
具体实施方式
下面结合附图及较佳实施例详细说明本发明的具体实施方式。如图1和2所示,一种装配式沉箱(井),包括带有刃脚的底板1、钢板套2、装配式预制件3、混凝土沉井4以及液压缸5;所述钢板套套接在所述底板的外部并与其固定连接,所述装配式预制件由若干块半圆形预制件组成,在本发明中可以是三块也可以是四块,具体结构申请人已经申请过专利,半圆形预制件放置在所述底板的上部其外壁与所述钢板套配合,也就是说,半圆形预制件的背面与钢板套紧密配合的,为了防止水进入,提高密封性,钢板套与装配式预制件之间设有阻水胶。为了使钢板套始终能够紧密贴紧半圆形预制件,防止在下沉过程中有水进入,所述半圆形预制件的高度低于钢板套的位于底板以上部分的高度,这样半圆形预制件始终能够包裹住装配式预制件,为了能够使半圆形预制件产生反作用力,每个半圆形预制件的内侧壁上分别固定有挡块6,所述液压缸固定在所述底板内,液压缸的活塞杆与所述挡块配合,所述混凝土沉井装在所述装配式预制件的上部。当液压缸启动时,活塞杆推动挡块时,由于上部的混凝土沉井已经无法继续下沉,所以液压缸向下移动,从而推动下部的底板向下移动,使底板继续下沉,下沉到一套装配式预制件的距离后,再放入一套装配式预制件。
工作原理:
1)清理地面杂填土直至露出原土;
2)在原土上将底板整体预制完成,并将钢板套固定在底板的周围;
3)逐一或分组或同时将底板下方的泥土掏出;
4)当底板将要下沉到地面以下时,将装配式预制件放在底板上的台阶上;
5)当钢板套的上部将要下沉到地面以下时,将混凝土沉井装在装配式预制件的上部;
6)当混凝土沉井下降到一定程度由于周围泥土的握裹力增大,无法继续下沉时,启动液压缸,液压缸的活塞杆顶住装配式预制件上的挡块上;
7)在装配式预制件的反作用下,液压缸推动底板继续下沉,当下沉深度在一个装配式预制件的高度时,液压缸收回,在原有的装配式预制件位置再放置一套装配式预制件;
8)重复步骤7),直到下沉到设计深度。
本发明在传统的沉井底部增加底板和装配式预制件,当沉井难以向下继续下沉的情况下,通过将装配式预制件与液压缸相结合的方式,增加装配式预制件,可以达到增加沉井深度的目的,有效防止沉井发生偏移的问题,使沉井能够始终平稳,在平衡状态下的整体下降施工。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。

Claims (3)

1.一种装配式沉箱(井),其特征在于:包括带有刃脚的底板、钢板套、装配式预制件、混凝土沉井以及液压缸;所述钢板套套接在所述底板的外部并与其固定连接,所述装配式预制件由若干块半圆形预制件组成,半圆形预制件放置在所述底板的上部其外壁与所述钢板套配合,半圆形预制件的高度低于钢板套的位于底板以上部分的高度,每个半圆形预制件的内侧壁上分别固定有挡块,所述液压缸固定在所述底板内,液压缸的活塞杆与所述挡块配合,所述混凝土沉井装在所述装配式预制件的上部。
2.根据其权利要求1所述的装配式沉箱(井),其特征在于:所述钢板套与装配式预制件之间设有阻水胶。
3.一种如权利要求1和2任意一项所述的装配式沉箱(井)工艺,其特征在于:包括以下步骤:
1)清理地面杂填土直至露出原土;
2)在原土上将底板整体预制完成,并将钢板套固定在底板的周围;
3)逐一或分组或同时将底板下方的泥土掏出;
4)当底板将要下沉到地面以下时,将装配式预制件放在底板上的台阶上;
5)当钢板套的上部将要下沉到地面以下时,将混凝土沉井装在装配式预制件的上部;
6)当混凝土沉井下降到一定程度由于周围泥土的握裹力增大,无法继续下沉时,启动液压缸,液压缸的活塞杆顶住装配式预制件上的挡块上;
7)在装配式预制件的反作用下,液压缸推动底板继续下沉,当下沉深度在一个装配式预制件的高度时,液压缸收回,在原有的装配式预制件位置再放置一套装配式预制件;
8)重复步骤7),直到下沉到设计深度。
CN201810851765.4A 2018-07-30 2018-07-30 装配式沉箱(井)及其工艺 Pending CN109024646A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810851765.4A CN109024646A (zh) 2018-07-30 2018-07-30 装配式沉箱(井)及其工艺

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810851765.4A CN109024646A (zh) 2018-07-30 2018-07-30 装配式沉箱(井)及其工艺

Publications (1)

Publication Number Publication Date
CN109024646A true CN109024646A (zh) 2018-12-18

Family

ID=64647751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810851765.4A Pending CN109024646A (zh) 2018-07-30 2018-07-30 装配式沉箱(井)及其工艺

Country Status (1)

Country Link
CN (1) CN109024646A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914621A (zh) * 2019-03-18 2019-06-21 天津建岩岩土工程有限公司 地下室外防水结构及其铺设方法
CN110952581A (zh) * 2019-12-13 2020-04-03 广州市市政集团有限公司 一种预制装配式沉井及其施工方法
CN113309129A (zh) * 2021-05-18 2021-08-27 天津建岩岩土工程有限公司 针对塑体状土的地区整体施工式地下室的施工方法

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61142231A (ja) * 1984-12-13 1986-06-30 Nitsusaku:Kk 井筒沈設法
JPS61216931A (ja) * 1985-03-19 1986-09-26 Nitsusaku:Kk 井筒沈設工法
JPH02108728A (ja) * 1988-10-18 1990-04-20 Taisei Corp ケーソンの沈設方法
JPH03295929A (ja) * 1990-04-12 1991-12-26 East Japan Railway Co オープンケーソン沈埋工法
JPH08296237A (ja) * 1995-04-24 1996-11-12 Daiho Constr Co Ltd 立坑または構造物基礎杭の築造方法および築造装置
JPH10115174A (ja) * 1996-10-11 1998-05-06 Yoshiji Matsumoto 立坑掘削方法及び立坑掘削装置
JP2008019679A (ja) * 2006-07-14 2008-01-31 Ishikawajima Constr Materials Co Ltd 穴の掘削方法及び集水井の施工方法
CN101736744A (zh) * 2009-12-25 2010-06-16 张子良 自平衡下沉大直径管桩及其施工方法
CN107083771A (zh) * 2017-06-15 2017-08-22 中铁六局集团天津铁路建设有限公司 一种人工挖孔桩的成孔施工方法
KR20170106150A (ko) * 2016-03-11 2017-09-20 한국과학기술원 수직구 굴착시스템 및 이를 이용한 수직구 시공방법
CN208884553U (zh) * 2018-07-30 2019-05-21 神翼航空器科技(天津)有限公司 装配式沉箱或沉井

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61142231A (ja) * 1984-12-13 1986-06-30 Nitsusaku:Kk 井筒沈設法
JPS61216931A (ja) * 1985-03-19 1986-09-26 Nitsusaku:Kk 井筒沈設工法
JPH02108728A (ja) * 1988-10-18 1990-04-20 Taisei Corp ケーソンの沈設方法
JPH03295929A (ja) * 1990-04-12 1991-12-26 East Japan Railway Co オープンケーソン沈埋工法
JPH08296237A (ja) * 1995-04-24 1996-11-12 Daiho Constr Co Ltd 立坑または構造物基礎杭の築造方法および築造装置
JPH10115174A (ja) * 1996-10-11 1998-05-06 Yoshiji Matsumoto 立坑掘削方法及び立坑掘削装置
JP2008019679A (ja) * 2006-07-14 2008-01-31 Ishikawajima Constr Materials Co Ltd 穴の掘削方法及び集水井の施工方法
CN101736744A (zh) * 2009-12-25 2010-06-16 张子良 自平衡下沉大直径管桩及其施工方法
KR20170106150A (ko) * 2016-03-11 2017-09-20 한국과학기술원 수직구 굴착시스템 및 이를 이용한 수직구 시공방법
CN107083771A (zh) * 2017-06-15 2017-08-22 中铁六局集团天津铁路建设有限公司 一种人工挖孔桩的成孔施工方法
CN208884553U (zh) * 2018-07-30 2019-05-21 神翼航空器科技(天津)有限公司 装配式沉箱或沉井

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914621A (zh) * 2019-03-18 2019-06-21 天津建岩岩土工程有限公司 地下室外防水结构及其铺设方法
CN110952581A (zh) * 2019-12-13 2020-04-03 广州市市政集团有限公司 一种预制装配式沉井及其施工方法
CN110952581B (zh) * 2019-12-13 2021-06-25 广州市市政集团有限公司 一种预制装配式沉井及其施工方法
CN113309129A (zh) * 2021-05-18 2021-08-27 天津建岩岩土工程有限公司 针对塑体状土的地区整体施工式地下室的施工方法

Similar Documents

Publication Publication Date Title
CN109024646A (zh) 装配式沉箱(井)及其工艺
US8535017B2 (en) Hydraulic gravity ramp pump
CN105350525A (zh) 一种桩的施工方法
CN103912134B (zh) 既有建筑原位地下空间结构及施工方法
CN104831720B (zh) 一种桩靴及其使用方法
CN102444122A (zh) 一种桩的施工方法
CN101831908A (zh) 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备
CN106013132A (zh) 一种变径组合桩
CN108755731A (zh) 一种沉井基础及构建方法
CN208884553U (zh) 装配式沉箱或沉井
CN107794952A (zh) 垃圾池及其建造方法
CN106049392A (zh) 套筒桁架桩腿桩靴基础
CN105386462A (zh) 整体施工式中小型地下室及其施工方法
CN106013093B (zh) 一种桩施工方法
CN100420798C (zh) 一种静力挤压混凝土桩的施工方法
CN101979777B (zh) 一种现浇空芯方桩的组合型地下连续墙板的施工方法
JP2002364006A (ja) 水中基礎の構築工法
CN106400814A (zh) 一种基坑支护方法
CN106958309A (zh) 一种集成机电管线的装配式墙体及其施工方法
CN109853565A (zh) 沉管桩的施工方法
CN105672354B (zh) 现浇地连墙与现浇地铁车站施工一体化方法
CN106088085B (zh) 桩施工方法
CN104895058B (zh) 全液压静压双管复合扩底桩机及其施工方法
CN1970888A (zh) 半圆体防波堤
CN102061695A (zh) 一种排水管桩复合地基处理方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181218