- CN109004595A CN109004595A CN201810891850.3A CN201810891850A CN109004595A CN 109004595 A CN109004595 A CN 109004595A CN 201810891850 A CN201810891850 A CN 201810891850A CN 109004595 A CN109004595 A CN 109004595A
- Authority
- CN
- China
- Prior art keywords
- partition
- mounting post
- easy
- cable testing
- testing bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/04—Protective tubing or conduits, e.g. cable ladders or cable troughs
- H02G3/0437—Channels
- H02G3/045—Channels provided with perforations or slots permitting introduction or exit of wires
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/03—Cooling
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses a kind of cable testing bridges for being easy to radiate, including mounting post, mounting post is equipped with partition, partition is set as T-type structure, partition is equipped with four pieces and is evenly distributed in mounting post, and four pieces of partitions are respectively one piece of base spacer, two pieces of side partitions and one piece of roof spacer, originally it is easy to the cable testing bridge to radiate, by the partition of inside setting to which the cable of inside installation is split, to expand the contact area between cable and entirety, the heat that cable is generated leads to heat transfer and is quickly transferred on partition and mounting post, to the speed for the heat dissipation accelerated, again due to being equipped with intercommunicating pore in the inside of mounting post, link slot is equipped in the inside of partition, user can be by being attached with extraneous blast apparatus or air-extractor, so that the air-flow inside intercommunicating pore and link slot flows, so that The heat that mounting post and partition absorb can be quickly discharged, to ensure that the effect of heat dissipation.
Description
Technical field
The present invention relates to cable testing bridge technical field, specially a kind of cable testing bridge for being easy to radiate.
Background technique
Cable testing bridge is widely used in industries such as petroleum, chemical industry, electric power, light industry, telecommunications, is mainly used for empty electricity
Power cable, the laying for controlling cable, light conduits, telecommunication cable, cable testing bridge are divided into slot type, pellet type and ladder-type, grid
The structures such as formula, gantry can independently be set up in building, can also be attached on various buildings or structures and piping lane bracket, Ying Ti
The features such as existing structure is simple, handsome in appearance, configuration is flexible and easy to maintenance, but current most of gantries are U-shaped structure
Setting, so that spacing is smaller between the cable of internal installation, so that the contact between cable and gantry entirety is smaller, thus
So that internal cable heat dissipation is more slow, there is some potential safety problemss.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the existing defects, provides a kind of cable testing bridge for being easy to radiate, energy
It is enough that internal cable is split, to increase cable and whole contact area, the radiating rate of cable is accelerated, is protected
The safety for having demonstrate,proved operation, can effectively solve the problems in background technique.
To achieve the above object, the invention provides the following technical scheme: it is a kind of be easy to radiate cable testing bridge, including installation
Column, the mounting post are equipped with partition, and the partition is set as T-type structure, and the partition is equipped with four pieces and is evenly distributed in
In mounting post, and four pieces of partitions are respectively that one piece of base spacer, two pieces of side partitions and one piece of roof spacer, the inside of the mounting post are set
There is intercommunicating pore, the intercommunicating pore is evenly distributed in the inside of mounting post, and the inside of the partition is equipped with connectivity slot, the connection
The top of slot is equipped with connecting plate, and the connecting plate is set as V-structure, is equipped with sliding slot on the partition of the connecting plate two sides,
Baffle is slidably connected in the sliding slot, through-hole is equipped on the partition outside the baffle, and the both ends of the partition are equipped with
Side connecting plate, the side connecting plate are equipped with connecting hole, are rotatably connected to connecting column, the bottom of the base spacer in the connecting hole
End is equipped with bottom fixed plate, and the bottom fixed plate is equipped with the first fixation hole, and the intercommunicating pore is set with connectivity slot and extraneous air blast
Standby or air-extractor is attached.
As a preferred technical solution of the present invention, one end of the mounting post is equipped with support tube, the mounting post
The other end corresponds to support tube equipped with blocked hole, the outer wall of the support tube and the tangent setting of the inner wall of blocked hole.
As a preferred technical solution of the present invention, one end of the partition is equipped with support frame, support frame as described above it is outer
The tangent setting of the inner wall of wall and connectivity slot.
As a preferred technical solution of the present invention, the bottom end of the side partition is equipped with supporting block, and the supporting block is set
It is set to L-type structure.
As a preferred technical solution of the present invention, the bottom end of the supporting block is equipped with the second fixation hole, and described second
Fixed column is equipped in fixation hole and the first fixation hole.
As a preferred technical solution of the present invention, the top of the roof spacer is equipped with position-limited rack, the position-limited rack with
The side connecting plate top at roof spacer both ends connects.
As a preferred technical solution of the present invention, mounting hole, the mounting hole are equipped on the partition and baffle
Inside it is rotatably connected to mounting post.
As a preferred technical solution of the present invention, the partition includes the first preserving timber bed of material, first anti-corrosion
Material layer corresponds to connectivity slot and is thus arranged, and the other side of the first preserving timber bed of material is equipped with refractory material layer.
As a preferred technical solution of the present invention, the refractory material layer is connected with load-bearing material layer, the load-bearing
Material layer is connected with the first insulation material layer.
As a preferred technical solution of the present invention, the baffle includes being arranged in outermost second anti-corrosion material
Layer, the second preserving timber bed of material are internally connected with heat sink layer, and the heat sink layer is internally connected with second insulating layer.
Compared with prior art, the beneficial effects of the present invention are: the cable testing bridge for being originally easy to radiate, passes through inside setting
Partition is to be split the cable of inside installation, so that the contact area between cable and entirety is expanded, so that cable
The heat of generation can lead to heat transfer and quickly be transferred on partition and mounting post, thus the speed for the heat dissipation accelerated, and by
It is equipped with intercommunicating pore in the inside in mounting post, is equipped with link slot in the inside of partition, user can pass through the air blast with the external world
Equipment or air-extractor are attached so that the air-flow inside intercommunicating pore and link slot flows so that mounting post and every
The heat that plate absorbs can be quickly discharged, to ensure that the effect of heat dissipation.
Detailed description of the invention
Fig. 1 is schematic structural view of the invention;
Fig. 2 is side structure schematic view of the present invention;
Fig. 3 is diaphragm structure schematic diagram of the present invention;
Fig. 4 is baffle arrangement schematic diagram of the present invention.
In figure: 1 mounting post, 2 intercommunicating pores, 3 partitions, the 301 first preserving timber bed of materials, 302 refractory material layers, 303 load-bearing materials
The bed of material, 304 first insulation material layers, 4 connectivity slots, 5 connecting plates, 6 sliding slots, 7 baffles, 701 second insulating layers, 702 heat sink layers,
The 703 second preserving timber bed of materials, 8 through-holes, 9 side connecting plates, 10 connecting holes, 11 connecting columns, 12 bottom fixed plates, 13 first fixation holes,
14 support tubes, 15 support frames, 16 position-limited racks, 17 supporting blocks, 18 second fixation holes, 19 fixed columns, 20 mounting holes, 21 mounting posts,
22 base spacers, 23 side partitions, 24 roof spacers.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-4 is please referred to, the present invention provides a kind of technical solution: a kind of cable testing bridge for being easy to radiate, including mounting post
1, mounting post 1 is equipped with partition 3, and partition 3 is set as T-type structure, and partition 3 is equipped with four pieces and is evenly distributed in mounting post 1,
And four pieces of partitions 3 are respectively one piece of base spacer, 22, two pieces of side partitions 23 and one piece of roof spacer 24, the inside of mounting post 1, which is equipped with, to be connected
Through-hole 2, intercommunicating pore 2 are evenly distributed in the inside of mounting post 1, and one end of mounting post 1 is equipped with support tube 14, mounting post 1 it is another
One end corresponds to support tube 14 equipped with blocked hole, the outer wall of support tube 14 and the tangent setting of the inner wall of blocked hole, passes through support tube 14
Connection between blocked hole not only ensure that the connection between intercommunicating pore 2 and intercommunicating pore 2, but also can be to whole and whole
Between connection be supported, the inside of partition 3 is equipped with connectivity slot 4, and one end of partition 3 is equipped with support frame 15, support frame 15
The tangent setting of inner wall of outer wall and connectivity slot 4 also can play certain support operation to the connection between entirety and entirety, from
And ensure that the stability of connection, and the top of connectivity slot 4 is equipped with connecting plate 5, and connecting plate 5 is set as V-structure, and 5 liang of connecting plate
It is equipped with sliding slot 6 on the partition 3 of side, baffle 7 is slidably connected in sliding slot 6, is equipped with mounting hole 20 on partition 3 and baffle 7, is pacified
Dress is rotatably connected to mounting post 21 in hole 20, the connection between partition 3 and baffle 7 can be fixed, so as to prevent
Partition 3 is separated with the connection of baffle 7, and through-hole 8 is equipped on the partition 3 outside baffle 7, and the both ends of partition 3 are equipped with side connection
Plate 9, side connecting plate 9 are equipped with connecting hole 10, and connecting column 11 is rotatably connected in connecting hole 10, and the bottom end of base spacer 22 is equipped with bottom
Fixed plate 12, bottom fixed plate 12 are equipped with the first fixation hole 13, and the bottom end of side partition 23 is equipped with supporting block 17, and supporting block 17 is arranged
For L-type structure, the bottom end of supporting block 17 is equipped with the second fixation hole 18, is equipped in the second fixation hole 18 and the first fixation hole 13 solid
Fixed column 19, by what partition 3 was fixed, to install to whole, the top of roof spacer 24 is equipped with position-limited rack 16,
Position-limited rack 16 is connect with 9 top of side connecting plate at 24 both ends of roof spacer, ensure that the stability of roof spacer 24, can prevent top every
Plate 24 cracks, and partition 3 includes the first preserving timber bed of material 301, thus the corresponding connectivity slot 4 of the first preserving timber bed of material 301 is arranged, and first
The other side of the preserving timber bed of material 301 is equipped with refractory material layer 302, and refractory material layer 302 is connected with load-bearing material layer 303, load-bearing
Material layer 303 is connected with the first insulation material layer 304, so that partition 24 is whole not only with good fire protecting performance, but also
So that partition 24 has good insulating properties, baffle 7 includes being arranged in the outermost second preserving timber bed of material 703, the second anti-corrosion
Material layer 703 is internally connected with heat sink layer 702, and heat sink layer 702 is internally connected with second insulating layer 701, not only protects
Demonstrate,proved the anti-corrosion and insulating properties of baffle 7, and be also convenient for radiating, intercommunicating pore 2 and connectivity slot 4 and extraneous blast apparatus or
Person's air-extractor is attached.
When in use: cable being placed between partition 3 and partition 3, baffle 7 is then connected inside sliding slot 6, passes through peace
The connection between column 21 and mounting hole 20 is filled, to the connection between baffle 7 and partition 3 be fixed, then according to demand
It being attached between entirety and entirety, is attached by connecting column 11 and connecting hole 10, so that side connecting plate 9 and side are connected
Fishplate bar 9 is attached, to be attached fixation with whole to whole, is each passed through the first fixation hole finally by fixed column 19
13 and second fixation hole 18, thus base spacer 22 and side partition 23 are fixed, thus carry out installation fixation to whole, then
Intercommunicating pore 2 and connectivity slot 4 and extraneous blast apparatus or air-extractor are attached according to demand, to complete to install.
The present invention, the structure setting of partition 3, so that it is whole with good stability, and can be to required installation
Cable carries out subregional placement, so that the contact area between cable and partition 3 is expanded, while the structure setting of baffle 7,
Certain limit operation has been not only acted as, and has been also convenient for being rapidly performed by heat dissipation operation, the structure setting of through-hole 8, so that
Rainwater enters inside sliding slot 6 along baffle 7 when raining, and then flows out by through-hole 8, consequently facilitating being drained, connecting plate 5
Structure setting can effectively prevent extraneous sundries from entering the inside of connectivity slot 4, by intercommunicating pore 2 and connectivity slot 4 with
Extraneous blast apparatus or air-extractor is attached, and is thus accelerated the air-flow inside intercommunicating pore 2 and connectivity slot 4 and is flowed,
To ensure that the effect of heat dissipation.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (10)
1. a kind of cable testing bridge for being easy to radiate, including mounting post (1), it is characterised in that: the mounting post (1) is equipped with partition
(3), the partition (3) is set as T-type structure, and the partition (3) is equipped with four pieces and is evenly distributed on mounting post (1), and
Four pieces of partitions (3) are respectively one piece of base spacer (22), two pieces of side partitions (23) and one piece of roof spacer (24), the mounting post (1)
Inside be equipped with intercommunicating pore (2), the intercommunicating pore (2) is evenly distributed in the inside of mounting post (1), the partition (3) it is interior
Portion is equipped with connectivity slot (4), and the top of the connectivity slot (4) is equipped with connecting plate (5), and the connecting plate (5) is set as V-structure,
It is equipped with sliding slot (6) on the partition (3) of connecting plate (5) two sides, is slidably connected baffle (7) in the sliding slot (6), it is described
It is equipped with through-hole (8) on the external partition (3) of baffle (7), the both ends of the partition (3) are equipped with side connecting plate (9), the side
Connecting plate (9) is equipped with connecting hole (10), is rotatably connected to connecting column (11) in the connecting hole (10), the base spacer (22)
Bottom end be equipped with bottom fixed plate (12), the bottom fixed plate (12) be equipped with the first fixation hole (13), the intercommunicating pore (2) and even
Through slot (4) is attached with extraneous blast apparatus or air-extractor.
2. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the one of the mounting post (1)
End is equipped with support tube (14), and the other end of the mounting post (1) corresponds to support tube (14) equipped with blocked hole, the support tube (14)
Outer wall and blocked hole the tangent setting of inner wall.
3. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: one end of the partition (3)
Equipped with support frame (15), the outer wall of support frame as described above (15) and the tangent setting of inner wall of connectivity slot (4).
4. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the bottom of the side partition (23)
End is equipped with supporting block (17), and the supporting block (17) is set as L-type structure.
5. a kind of cable testing bridge for being easy to radiate according to claim 4, it is characterised in that: the bottom of the supporting block (17)
End is equipped with the second fixation hole (18), is equipped with fixed column (19) in second fixation hole (18) and the first fixation hole (13).
6. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the top of the roof spacer (24)
End is equipped with position-limited rack (16), and the position-limited rack (16) connect with side connecting plate (9) top at roof spacer (24) both ends.
7. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the partition (3) and baffle
(7) it is equipped on mounting hole (20), is rotatably connected to mounting post (21) in the mounting hole (20).
8. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the partition (3) includes the
The one preserving timber bed of material (301), the first preserving timber bed of material (301) corresponding connectivity slot (4) are thus arranged, first preserving timber
The other side of the bed of material (301) is equipped with refractory material layer (302).
9. a kind of cable testing bridge for being easy to radiate according to claim 8, it is characterised in that: the refractory material layer
(302) it is connected with load-bearing material layer (303), the load-bearing material layer (303) is connected with the first insulation material layer (304).
10. a kind of cable testing bridge for being easy to radiate according to claim 1, it is characterised in that: the baffle (7) includes setting
It sets in the outermost second preserving timber bed of material (703), the second preserving timber bed of material (703) is internally connected with heat sink layer
(702), the heat sink layer (702) is internally connected with second insulating layer (701).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810891850.3A CN109004595B (en) | 2018-08-07 | 2018-08-07 | Cable bridge easy to radiate heat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810891850.3A CN109004595B (en) | 2018-08-07 | 2018-08-07 | Cable bridge easy to radiate heat |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109004595A true CN109004595A (en) | 2018-12-14 |
CN109004595B CN109004595B (en) | 2020-04-21 |
Family
ID=64595570
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810891850.3A Active CN109004595B (en) | 2018-08-07 | 2018-08-07 | Cable bridge easy to radiate heat |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109004595B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203532960U (en) * | 2013-09-22 | 2014-04-09 | 天津市元皓机电设备有限公司 | High-efficiency cable bridge |
WO2017006051A1 (en) * | 2015-07-09 | 2017-01-12 | Legrand France | Chute |
CN207053091U (en) * | 2017-06-26 | 2018-02-27 | 天津市佰利德电缆桥架制造有限公司 | It is a kind of to be easy to manage line and the cable testing bridge with heat sinking function |
CN207339144U (en) * | 2017-10-17 | 2018-05-08 | 重庆航程电力设备有限公司 | A kind of cable testing bridge of good heat dissipation effect |
CN207339153U (en) * | 2017-10-29 | 2018-05-08 | 江苏鼎荣电气集团有限公司 | A kind of cable testing bridge easy to arrangement cable |
CN207638278U (en) * | 2017-12-26 | 2018-07-20 | 江苏浩华电缆桥架有限公司 | A kind of channel-type cable bridge |
-
2018
- 2018-08-07 CN CN201810891850.3A patent/CN109004595B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203532960U (en) * | 2013-09-22 | 2014-04-09 | 天津市元皓机电设备有限公司 | High-efficiency cable bridge |
WO2017006051A1 (en) * | 2015-07-09 | 2017-01-12 | Legrand France | Chute |
CN207053091U (en) * | 2017-06-26 | 2018-02-27 | 天津市佰利德电缆桥架制造有限公司 | It is a kind of to be easy to manage line and the cable testing bridge with heat sinking function |
CN207339144U (en) * | 2017-10-17 | 2018-05-08 | 重庆航程电力设备有限公司 | A kind of cable testing bridge of good heat dissipation effect |
CN207339153U (en) * | 2017-10-29 | 2018-05-08 | 江苏鼎荣电气集团有限公司 | A kind of cable testing bridge easy to arrangement cable |
CN207638278U (en) * | 2017-12-26 | 2018-07-20 | 江苏浩华电缆桥架有限公司 | A kind of channel-type cable bridge |
Also Published As
Publication number | Publication date |
---|---|
CN109004595B (en) | 2020-04-21 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103944356A (en) | Converter valve assembly and valve tower with converter valve assembly | |
CN210693315U (en) | Combined cable bridge | |
CN114336473B (en) | Bus duct based on surface coating protection | |
CN109004595A (en) | A kind of cable testing bridge for being easy to radiate | |
CN109707084B (en) | Flexible curtain wall elastic support and external ribbon system | |
CN110932571A (en) | Novel inversion power unit and power circuit thereof | |
CN215911872U (en) | Novel cable support is used in optical cable construction | |
CN202930882U (en) | Ice-melting bus bridge slipping telescoping fitting | |
CN210857581U (en) | Energy-saving building heat-insulating board | |
CN214497869U (en) | Shear wall structure with shock attenuation is thermal-insulated | |
CN211774722U (en) | Effectual heated board gives sound insulation | |
CN210562601U (en) | Assembled steel construction building | |
CN210380371U (en) | EPS fire emergency power switching device | |
CN203609773U (en) | Anti-dropping device for work high above ground | |
CN207453228U (en) | A kind of new steel structure roof | |
CN104158131B (en) | Fireproof bridge stand with draining structure | |
CN208310606U (en) | A kind of aluminium section connecting pieces | |
CN216042803U (en) | Safety device is used in construction in room | |
CN206859716U (en) | A kind of simple construction construction safety protection device | |
CN214696062U (en) | Platform frame modular structure of green steel construction | |
CN211081203U (en) | Building shock isolation device | |
CN109052144A (en) | A kind of plastic-steel door and window hanging apparatus | |
CN215622120U (en) | Air entrainment piece handling device for building engineering construction | |
CN213174242U (en) | Heat preservation heat insulating board with fixed knot constructs | |
CN217128653U (en) | Curtain wall with supporting device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |