CN202930882U CN 201220644484 CN201220644484U CN202930882U CN 202930882 U CN202930882 U CN 202930882U CN 201220644484 CN201220644484 CN 201220644484 CN 201220644484 U CN201220644484 U CN 201220644484U CN 202930882 U CN202930882 U CN 202930882U
Authority
CN
China
Prior art keywords
bus
ice
melt
bracing frame
telescoping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220644484
Other languages
Chinese (zh)
Inventor
卢泓治
周云斌
陈旭玫
郭拾崇
吴东高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NANJING TERUI POWER MATERIAL CO Ltd
Original Assignee
NANJING TERUI POWER MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NANJING TERUI POWER MATERIAL CO Ltd filed Critical NANJING TERUI POWER MATERIAL CO Ltd
Priority to CN 201220644484 priority Critical patent/CN202930882U/en
Application granted granted Critical
Publication of CN202930882U publication Critical patent/CN202930882U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

Disclosed is an ice-melting bus bridge slipping telescoping fitting, comprising a fixed bracing frame, a bus clamp body, a bus clamp cover plate, a bus telescoping clamp, a bracing frame connector, and a bus sealing end cap, wherein the fixed bracing frame is fixed upon a support insulator of the ice-melting bus bridge apparatus via a locking connecting piece; the bus clamp body employs a locking member to connect to the fixed bracing frame; the bus clamp cover plate is fastened after an ice-melting bus is installed upon the bus clamp body; the bus telescoping clamp utilizes the locking member to fix the ice-melting bus; the bus sealing end cap is installed to the end portion of the ice-melting bus; and the bracing frame connector is finally installed. The bracing frame connector connects and fixes the vertically superimposed insulation type supports, thereby realizing the insulation transition connection of the ice-melting bus and the telescoping slipping function. Compared to the conventional products, the ice-melting bus bridge slipping telescoping fitting of the utility model saves 20% of the raw material and is capable of automatically adjusting the horizontal moving distance, thereby being flexible and convenient.

Description

A kind of ice-melt bus bridge slippage gold utensil that stretches
Technical field
The utility model relates to built on stilts power transmission and transformation line field, is specifically related to the flexible gold utensil of a kind of more convenient ice-melt bus bridge slippage.
Background technology
Overhead transmission line icing in winter is one of great natural calamity of electric power system, because of the power failure that icing causes, causes that the power grid accident consequence is extremely serious, and up to the present generation is nearly all arranged every year.Bring very large difficulty for simultaneously electrical network reparation in winter, add that domestic existing ice-melt electric armour clamp servicing unit is not bery desirable, and volume be large and heavy, to construction and installation bring difficulty, labour intensity is large, efficient is low.The flexible gold utensil of ice-melt bus bridge of the present utility model slippage plays fixedly ice-melt bus and Level tune in DC ice melting bus bridge device, play again fixedly multilayer ice-melt bus of support insulator, vertical stack simultaneously, realizes the purpose of auxiliary ice-melt.The flexible gold utensil of ice-melt bus bridge of the present utility model slippage is also not discovery technique problem and defective in engineering is used at present, estimates that this device can also be more succinct, light in the future.
The utility model content
Goal of the invention: for solving the deficiencies in the prior art, the utility model provides the more flexible gold utensil of ice-melt bus bridge slippage of advantages of simple of a kind of structure.
Technical scheme: for achieving the above object, the ice-melt bus bridge of the present utility model slippage gold utensil that stretches comprises fixing support rack, bus wire clip body, bus wire clamp cover plate, bus telescoping wire clamp, bracing frame connector and bus end-blocking lid; Described fixing support rack is fixed on the support insulator of ice-melt bus bridge device by the locking connector, and described bus wire clip body uses locking member to be connected on fixing support rack, and is after on the bus wire clip body, the ice-melt bus being installed, that bus wire clamp cover plate is fastening; Described bus telescoping wire clamp is by the fixing ice-melt bus of locking member; Described bus end-blocking lid is arranged on the ice-melt end of bus bars, and the bracing frame connector is installed at last.
As preferably, described bus telescoping wire clamp is connected with the ice-melt bus transition.
As preferably, be symmetrically distributed in the two ends of bracing frame connector on described bus wire clip body, bus wire clamp cover plate, bus telescoping wire clamp and bus end-blocking lid horizontal direction.
Beneficial effect: the ice-melt bus bridge of the present utility model slippage gold utensil that stretches, play fixedly ice-melt bus and Level tune effect in DC ice melting bus bridge device, solved the problem of bus because expanding with heat and contract with cold and producing, support insulator and the fixedly effect of multilayer ice-melt bus of vertical stack, the auxiliary purpose that has realized ice-melt.The flexible gold utensil of ice-melt bus bridge of the present utility model slippage is realized the effect of adjusting displacement automatically when transcient short circuit time produces displacement of ice-melt bus by adjustable apparatus; reach the purpose of protecting the ice-melt gold utensil, bus end-blocking lid prevents that the immersion of ice-melt bus from freezing or foreign material enter the impact use.Simple in structure, the utilization scope is wide, floor space is little, save the space, and is easy for installation, be easy to construction, compares with original product and saves 20% raw material; Can automatically regulate and move horizontally distance, flexible.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the utility model is further described.
As shown in Figure 1, the ice-melt bus bridge of the present utility model slippage gold utensil that stretches comprises fixing support rack 1, bus wire clip body 2, bus wire clamp cover plate 3, bus telescoping wire clamp 4, bracing frame connector 5 and bus end-blocking lid 6; Described fixing support rack 1 is fixed on the support insulator of ice-melt bus bridge device by the locking connector, described bus wire clip body 2 uses locking member to be connected on fixing support rack 1, after on bus wire clip body 2, the ice-melt bus being installed, that bus wire clamp cover plate 3 is fastening; Described bus telescoping wire clamp 4 is by the fixing ice-melt bus of locking member; Described bus end-blocking lid 6 is arranged on the ice-melt end of bus bars, and bracing frame connector 5 is installed at last.
In the present embodiment, described bus telescoping wire clamp 4 is connected with the ice-melt bus transition; Be symmetrically distributed in the two ends of bracing frame connector 5 on described bus wire clip body 2, bus wire clamp cover plate 3, bus telescoping wire clamp 4 and bus end-blocking lid 6 horizontal directions.
The ice-melt bus bridge of the present utility model slippage gold utensil that stretches, play fixedly ice-melt bus and Level tune effect in DC ice melting bus bridge device, solved the problem of bus because expanding with heat and contract with cold and producing, support insulator and the fixedly effect of multilayer ice-melt bus of vertical stack, the auxiliary purpose that has realized ice-melt.The flexible gold utensil of ice-melt bus bridge of the present utility model slippage is realized the effect of adjusting displacement automatically when transcient short circuit time produces displacement of ice-melt bus by adjustable apparatus; reach the purpose of protecting the ice-melt gold utensil, bus end-blocking lid 6 prevents that the immersion of ice-melt bus from freezing or foreign material enter the impact use.Simple in structure, the utilization scope is wide, floor space is little, save the space, and is easy for installation, be easy to construction, compares with original product and saves 20% raw material; Can automatically regulate and move horizontally distance, flexible.
The above is only preferred implementation of the present utility model; be noted that for those skilled in the art; under the prerequisite that does not break away from the utility model principle; can also make some improvements and modifications, these improvements and modifications also should be considered as protection range of the present utility model.

Claims (3)

1. the flexible gold utensil of ice-melt bus bridge slippage, is characterized in that: comprise fixing support rack (1), bus wire clip body (2), bus wire clamp cover plate (3), bus telescoping wire clamp (4), bracing frame connector (5) and bus end-blocking lid (6); Described fixing support rack (1) is fixed on the support insulator of ice-melt bus bridge device by the locking connector, described bus wire clip body (2) uses locking member to be connected on fixing support rack (1), after the upper installation of bus wire clip body (2) ice-melt bus, that bus wire clamp cover plate (3) is fastening; Described bus telescoping wire clamp (4) is by the fixing ice-melt bus of locking member; Described bus end-blocking lid (6) is arranged on the ice-melt end of bus bars, and bracing frame connector (5) is installed at last.
2. the flexible gold utensil of ice-melt bus bridge according to claim 1 slippage, it is characterized in that: described bus telescoping wire clamp (4) is connected with the ice-melt bus transition.
3. the flexible gold utensil of ice-melt bus bridge according to claim 1 slippage, is characterized in that: the two ends that are symmetrically distributed in bracing frame connector (5) on described bus wire clip body (2), bus wire clamp cover plate (3), bus telescoping wire clamp (4) and bus end-blocking lid (6) horizontal direction.
CN 201220644484 2012-11-29 2012-11-29 Ice-melting bus bridge slipping telescoping fitting Expired - Fee Related CN202930882U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220644484 CN202930882U (en) 2012-11-29 2012-11-29 Ice-melting bus bridge slipping telescoping fitting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220644484 CN202930882U (en) 2012-11-29 2012-11-29 Ice-melting bus bridge slipping telescoping fitting

Publications (1)

Publication Number Publication Date
CN202930882U true CN202930882U (en) 2013-05-08

Family

ID=48220792

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220644484 Expired - Fee Related CN202930882U (en) 2012-11-29 2012-11-29 Ice-melting bus bridge slipping telescoping fitting

Country Status (1)

Country Link
CN (1) CN202930882U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269792A (en) * 2014-09-25 2015-01-07 湖北兴和电力新材料股份有限公司 Vertical arrangement tubular busbar hardware in power grid ice melting system
CN104377560A (en) * 2014-11-10 2015-02-25 国家电网公司 Bus bridge used for 10 kV switch cabinet
CN107959272A (en) * 2016-10-17 2018-04-24 国家电网公司 Current conversion station is with sliding/be fixedly connected overcurrent gold utensil

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104269792A (en) * 2014-09-25 2015-01-07 湖北兴和电力新材料股份有限公司 Vertical arrangement tubular busbar hardware in power grid ice melting system
CN104377560A (en) * 2014-11-10 2015-02-25 国家电网公司 Bus bridge used for 10 kV switch cabinet
CN104377560B (en) * 2014-11-10 2016-08-24 国家电网公司 A kind of bus bridge for 10kV switch cubicle
CN107959272A (en) * 2016-10-17 2018-04-24 国家电网公司 Current conversion station is with sliding/be fixedly connected overcurrent gold utensil
CN107959272B (en) * 2016-10-17 2023-05-30 国家电网公司 Sliding/fixed connection overcurrent fitting for convertor station

Similar Documents

Publication Publication Date Title
CN101689757A (en) Ice-melting device for bundle conductor transmission line and thereof method
CN202930882U (en) Ice-melting bus bridge slipping telescoping fitting
CN202930884U (en) Ice-melting short circuit fitting
CN202978166U (en) Deicing bus bridge closo fixed fitting
CN103022949A (en) Transmission and transformation line deicing trolley
CN204315931U (en) Low voltage switchgear and bus clip thereof
CN205224790U (en) Do intelligent transmission line iron tower of style of calligraphy based on improve structure
CN204668305U (en) A kind of assembly of high-pressure thyristor series connection
CN104141403A (en) Bird-repellent telegraph pole
CN204145263U (en) Based on the water-cooled power cell of IGBT
CN202583570U (en) Installation wire clamp of OPGW optical cable downlead
CN204045750U (en) For the earthing device of electric railway system
CN207398597U (en) Bus adaption device
CN203445424U (en) Insulator support
CN202050213U (en) Strain clamp and jumper wire combining device for overhead power transmission line
CN202759171U (en) Tubular bus disconnected lead insulated operation platform
CN204215955U (en) Contact connecting structure and circuit breaker under a kind of circuit breaker
CN204517175U (en) High-tension switch cabinet horizontal bus linkage unit
CN202678883U (en) Special-purpose fitting capable of being connected with ice melting device pipe bus
CN202997475U (en) Short circuit ice melting device used for three-phase power supply lines
CN204558906U (en) A kind of novel fixing power distribution equipment
CN204046100U (en) Short-circuit grounding wire suspension arrangement
CN203911326U (en) Armored centrally-positioned metal-enclosed switchgear
CN211127036U (en) Frame body for fixing electric power transmission line
CN201230142Y (en) 12kV switch station construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130508

Termination date: 20211129

CF01 Termination of patent right due to non-payment of annual fee