CN108999182A - Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology - Google Patents
Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology Download PDFInfo
- Publication number
- CN108999182A CN108999182A CN201810939228.5A CN201810939228A CN108999182A CN 108999182 A CN108999182 A CN 108999182A CN 201810939228 A CN201810939228 A CN 201810939228A CN 108999182 A CN108999182 A CN 108999182A
- Authority
- CN
- China
- Prior art keywords
- spray
- pile
- friction pile
- pea gravel
- clear water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/66—Mould-pipes or other moulds
- E02D5/665—Mould-pipes or other moulds for making piles
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The present invention relates to side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technologies, friction pile is arranged in including pea gravel concreten time spray-up described in pea gravel concreten time spray-up to need on the artificial digging pile stake holes inner sidewall of exposed side, the surface that pea gravel concreten returns spray-up is provided with mortar and returns spray-up, the mortar, which returns tiling on the inner sidewall of spray-up, the thin template of plastics, several precast linings together with the binding of friction pile reinforcing bar are evenly distributed on the inner sidewall of the thin template of the plastics.The present invention uses unique multilayered structure, constructs fairly simple, reaches the good purpose of manually digging hole friction pile exposed face apparent mass of clear concrete.
Description
Technical field
The present invention relates to highway engineering construction fields, more particularly to side slope cutting manually digging hole friction pile exposed face clear water
Formwork erecting structure and construction technology.
Background technique
Design often has the cutting of " wall between friction pile+stake " to protect in the cutting protection works of hills and mountain road,
When the cutting protection works are constructed, to ensure construction safety, the construction technology that artificial digging pile is used to friction pile is often needed to,
To pore-forming and steel reinforcement cage concrete perfusion pile is placed, and after pile body reaches design strength, then excavates the earthwork of road side,
To guarantee that the construction subsequent prefabricated board wall of friction pile can support cutting side soil pressure.The friction pile pavement of road above section
Front and two sides are exposed.Using conventional manual digging pile construction technique, corresponding measure, road to be excavated are not used
Behind side cubic metre of earth, the concrete of the front of road surface above section and two sides is since artificial digging pile formwork is coarse, appearance effect
Fruit will be very poor, and the acceptance requirement of clear-water concrete is not achieved, if carrying out plastering working process, also not meet " clear-water concrete
Application technology regulation " requirement.
Existing Shimizu concrete template uses grain board as template, and it is existing cicada seam faulting of slab ends, pitted skin, abrasive band etc. easily occur
As and the shortcomings that high production cost.
It is general to be realized using template surface smoothness is improved for these disadvantages, such as the method for customization steel form.It should
Method is will to customize steel form after the molding of ground integral assembling, is integrally transferred in friction pile stake holes with crane, is then poured
Antiskid pile concrete.The method solves the problems, such as sliding pile exposed face concrete appearance, but this side using the smoothness of steel form
There are certain limitations for method: on the one hand need to expand the aperture of friction pile borehole because customization steel form has certain thickness, cause expense
It is uneconomical with increase;On the other hand, it because customization steel form is cast in stake holes, can just be taken after road side cubic metre of earth need to be excavated
Steel form is used in turn out, and customization steel form is used in turn by larger limitation, and cost is larger.
Or in template plate face after the reinforcing materials such as brushing composite polymer material and glass fibre, so that it may make steel form
Pour apparent effect with steel frame plywood formwork promotion, however these methods for material and skills in the process of construction level requirement and its
Height, construction cost of implementation is also relatively high, and popularization and application are extremely restricted.
Summary of the invention
Technical problem to be solved by the invention is to provide side slope cutting manually digging hole friction pile exposed face clear water formwork knots
Structure and construction technology are constructed fairly simple using unique multilayered structure, are reached manually digging hole friction pile exposed face clear water coagulation
The native good purpose of apparent mass.
The technical solution adopted by the present invention to solve the technical problems is: it is exposed to provide side slope cutting manually digging hole friction pile
It is exposed in friction pile needs to return the setting of pea gravel concreten described in spray-up time spray-up including pea gravel concreten for face clear water formwork erecting structure
On the artificial digging pile stake holes inner sidewall of side, the surface that pea gravel concreten returns spray-up is provided with mortar and returns spray-up, the sand
Starching back on the inner sidewall of spray-up tiling has the thin template of plastics, is evenly distributed on the inner sidewall of the thin template of the plastics and antiskid
Several precast linings of stake reinforcing bar binding together.
As supplement, it is provided on artificial digging pile stake holes inner sidewall in horn-like hole stake shield small, lower mouth is big suitable for reading
Wall, the pea gravel concreten go back to the outside that spray-up is arranged in hole pile wall, and the most thin position of thickness is 25mm.
As supplement, the thin template thickness of the plastics is 5mm, and surface is smooth.
Preferably, size 50mm × 50mm × 25mm of the precast lining, using same pile concrete label
Subtract stone concrete production.
The construction technology of specific side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, specific steps are such as
Under:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and returns spray-up,
It is preliminary it is levelling, look for it is vertical;
(b) spray-up surface spray furnace is returned in pea gravel concreten return spray-up, it is accurately levelling on vertical pea gravel concreten surface,
With template flatness, the subsequent thin template of plastics easy to support;
(c) the thin template of plastics is sequentially placed into stake holes, is fixed on mortar with microcephaly's steel nail from bottom to top and goes back to spray-up surface;
(d) friction pile reinforcing bar after overall binding, binds precast lining in artificial digging pile stake holes, guarantees concrete
Protective layer thickness;
(e) the last casting concrete in stake holes.
The utility model has the advantages that the present invention relates to side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction works
Skill is constructed fairly simple using unique multilayered structure, is reached manually digging hole friction pile exposed face apparent mass of clear concrete
Good purpose.
Detailed description of the invention
Fig. 1 is the vertical half-sectional structure chart of stake holes of the invention;
Fig. 2 is the half-sectional structure chart of level of stake holes of the invention.
Diagram: 1, pea gravel concreten returns spray-up;2, mortar returns spray-up;3, the thin template of plastics;4, precast lining;5, hole stake shield
Wall.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention
Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art
Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited
Range.
As shown in Figs. 1-2, embodiments of the present invention are related to side slope cutting manually digging hole friction pile exposed face clear water formwork
Structure and construction technology return pea gravel concreten described in spray-up 1 including pea gravel concreten and return the setting of spray-up 1 outside friction pile needs
On the artificial digging pile stake holes inner sidewall for revealing side, the surface that pea gravel concreten returns spray-up 1 is provided with mortar and returns spray-up 2, described
Mortar return spray-up 2 inner sidewall on tiling have the thin template 3 of plastics, be uniformly distributed on the inner sidewall of the thin template 3 of the plastics
There are several precast linings 4 together with the binding of friction pile reinforcing bar.
The construction technology of specific side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, specific steps are such as
Under:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and returns spray-up 1,
It is preliminary it is levelling, look for it is vertical, if be provided on artificial digging pile stake holes inner sidewall in horn-like hole stake small, lower mouth is big suitable for reading
Retaining wall 5, the stone concrete go back to the outside that spray-up 1 is arranged in hole pile wall 5, and the most thin position of thickness is 25mm;
(b) 1 surface spray furnace of spray-up is returned in pea gravel concreten and return spray-up 2, accurately look on vertical pea gravel concreten surface
It is flat, with template flatness, the subsequent thin template 3 of plastics easy to support;
(c) the thin template 3 of plastics being sequentially placed into stake holes, for the thin template 3 of the plastics with a thickness of 5mm, surface is smooth, from
Mortar, which is fixed on, with microcephaly's steel nail on down goes back to 2 surface of spray-up;
(d) friction pile reinforcing bar after overall binding, binds precast lining 4 in artificial digging pile stake holes, guarantees coagulation
Protective soil layer thickness, size 50mm × 50mm × 25mm of the precast lining 4 subtract stone using same pile concrete label
Sub- concrete for making;
(e) the last casting concrete in stake holes.
It is of the invention using unique multilayered structure, construct fairly simple, reach manually digging hole friction pile exposed face clear water
The good purpose of concrete apparent mass.
Claims (5)
1. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, including pea gravel concreten go back to spray-up (1), feature
It is, the pea gravel concreten goes back to spray-up (1) and the artificial digging pile stake holes inner sidewall that friction pile needs exposed side is arranged in
On, the surface that pea gravel concreten goes back to spray-up (1) is provided with mortar and goes back to spray-up (2), and the mortar returns on the inner sidewall of spray-up (2)
Tiling has the thin template of plastics (3), is evenly distributed on the inner sidewall of the thin template of the plastics (3) and exists with the binding of friction pile reinforcing bar
Several precast linings (4) together.
2. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that:
It is provided on artificial digging pile stake holes inner sidewall in horn-like hole pile wall (5) small, lower mouth is big suitable for reading, the microlith is mixed
Solidifying soil goes back to the outside that spray-up (1) is arranged in hole pile wall (5), and the most thin position of thickness is 25mm.
3. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that:
For the thin template of the plastics (3) with a thickness of 5mm, surface is smooth.
4. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that:
Size 50mm × 50mm × 25mm of the precast lining (4) subtracts stone concrete system using same pile concrete label
Make.
5. a kind of construction work of side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure as described in claim 1
Skill, which is characterized in that specific step is as follows:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and goes back to spray-up (1), just
Walk it is levelling, look for it is vertical;
(b) spray-up (1) surface spray furnace is returned in pea gravel concreten and go back to spray-up (2), accurately look on vertical pea gravel concreten surface
It is flat, with template flatness, the subsequent thin template of plastics (3) easy to support;
(c) the thin template of plastics (3) is sequentially placed into stake holes, is fixed on mortar with microcephaly's steel nail from bottom to top and returns spray-up (2) table
Face;
(d) friction pile reinforcing bar after overall binding, is bound precast lining (4) in artificial digging pile stake holes, guarantees concrete
Protective layer thickness;
(e) the last casting concrete in stake holes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810939228.5A CN108999182A (en) | 2018-08-17 | 2018-08-17 | Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810939228.5A CN108999182A (en) | 2018-08-17 | 2018-08-17 | Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108999182A true CN108999182A (en) | 2018-12-14 |
Family
ID=64592900
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810939228.5A Pending CN108999182A (en) | 2018-08-17 | 2018-08-17 | Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108999182A (en) |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013147933A (en) * | 2013-05-08 | 2013-08-01 | Ohbayashi Corp | Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile |
CN105544533A (en) * | 2014-10-29 | 2016-05-04 | 中铁十四局集团有限公司 | Slab-pile wall digging pile retaining wall flitch plate |
-
2018
- 2018-08-17 CN CN201810939228.5A patent/CN108999182A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2013147933A (en) * | 2013-05-08 | 2013-08-01 | Ohbayashi Corp | Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile |
CN105544533A (en) * | 2014-10-29 | 2016-05-04 | 中铁十四局集团有限公司 | Slab-pile wall digging pile retaining wall flitch plate |
Non-Patent Citations (3)
Title |
---|
刘勇: "《外墙外保温墙面裂缝成因及质量控制》", 31 May 2011, 西南交通大学出版社 * |
李海峰等: "《钢筋工》", 31 March 2012, 中国环境科学出版社 * |
袁影辉等: "《主体结构工程施工技巧与常见问题分析处理》", 31 May 2013, 湖南大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104594387B (en) | Improved post-cast strip advance water stop construction method | |
CN100434598C (en) | Retaining wall in lightweight, and construction method | |
CN106759126B (en) | Construction method of side slope support drainage channel | |
CN102926398B (en) | A kind of for Salt Lake Area iron tower of power transmission line bolts of inclined column type anti-corrosion foundation construction method | |
CN103321257A (en) | Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement | |
CN107989032A (en) | A kind of construction method of punching interlocking pile | |
CN102392549A (en) | Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir | |
CN206408655U (en) | The top plate sidewall structure of covered back-digging construction | |
CN111676987A (en) | Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method | |
CN107447980A (en) | A kind of building plastic formwork and its installation method for substituting brick fetal membrane | |
CN208056095U (en) | I-shaped precast concrete and its compound soil-baffling structure of assembled cabin format | |
CN110056000A (en) | A kind of construction method and structure of balance weight retaining wall | |
CN204456058U (en) | A kind of constructing structure reducing building base subsidence speed | |
CN107142902B (en) | High head and large flow tunneling boring damming method | |
CN106012971A (en) | Vegetation concrete protection slope and construction method thereof | |
CN108999182A (en) | Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology | |
CN208293344U (en) | Kerbstone, gutter and the molding pavement structure of top course one-time-concreting | |
CN205604287U (en) | Highway tunnel portal wall | |
CN105888702B (en) | Waterproofing Technology of Underground Works method | |
CN106801384A (en) | Assembled steel reinforced concrete aliform type culvert opening and construction method | |
CN208280156U (en) | The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit | |
CN106351253A (en) | Novel water conservancy project retaining wall | |
CN105735366B (en) | Waterproof construction method based on concrete | |
CN105804123B (en) | Waterproof construction construction method | |
CN206768879U (en) | A kind of poured band of outer wall of basement structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |