CN108999182A - Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology - Google Patents

Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology Download PDF

Info

Publication number
CN108999182A
CN108999182A CN201810939228.5A CN201810939228A CN108999182A CN 108999182 A CN108999182 A CN 108999182A CN 201810939228 A CN201810939228 A CN 201810939228A CN 108999182 A CN108999182 A CN 108999182A
Authority
CN
China
Prior art keywords
spray
pile
friction pile
pea gravel
clear water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810939228.5A
Other languages
Chinese (zh)
Inventor
谭世勇
任勇
杨勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201810939228.5A priority Critical patent/CN108999182A/en
Publication of CN108999182A publication Critical patent/CN108999182A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technologies, friction pile is arranged in including pea gravel concreten time spray-up described in pea gravel concreten time spray-up to need on the artificial digging pile stake holes inner sidewall of exposed side, the surface that pea gravel concreten returns spray-up is provided with mortar and returns spray-up, the mortar, which returns tiling on the inner sidewall of spray-up, the thin template of plastics, several precast linings together with the binding of friction pile reinforcing bar are evenly distributed on the inner sidewall of the thin template of the plastics.The present invention uses unique multilayered structure, constructs fairly simple, reaches the good purpose of manually digging hole friction pile exposed face apparent mass of clear concrete.

Description

Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology
Technical field
The present invention relates to highway engineering construction fields, more particularly to side slope cutting manually digging hole friction pile exposed face clear water Formwork erecting structure and construction technology.
Background technique
Design often has the cutting of " wall between friction pile+stake " to protect in the cutting protection works of hills and mountain road, When the cutting protection works are constructed, to ensure construction safety, the construction technology that artificial digging pile is used to friction pile is often needed to, To pore-forming and steel reinforcement cage concrete perfusion pile is placed, and after pile body reaches design strength, then excavates the earthwork of road side, To guarantee that the construction subsequent prefabricated board wall of friction pile can support cutting side soil pressure.The friction pile pavement of road above section Front and two sides are exposed.Using conventional manual digging pile construction technique, corresponding measure, road to be excavated are not used Behind side cubic metre of earth, the concrete of the front of road surface above section and two sides is since artificial digging pile formwork is coarse, appearance effect Fruit will be very poor, and the acceptance requirement of clear-water concrete is not achieved, if carrying out plastering working process, also not meet " clear-water concrete Application technology regulation " requirement.
Existing Shimizu concrete template uses grain board as template, and it is existing cicada seam faulting of slab ends, pitted skin, abrasive band etc. easily occur As and the shortcomings that high production cost.
It is general to be realized using template surface smoothness is improved for these disadvantages, such as the method for customization steel form.It should Method is will to customize steel form after the molding of ground integral assembling, is integrally transferred in friction pile stake holes with crane, is then poured Antiskid pile concrete.The method solves the problems, such as sliding pile exposed face concrete appearance, but this side using the smoothness of steel form There are certain limitations for method: on the one hand need to expand the aperture of friction pile borehole because customization steel form has certain thickness, cause expense It is uneconomical with increase;On the other hand, it because customization steel form is cast in stake holes, can just be taken after road side cubic metre of earth need to be excavated Steel form is used in turn out, and customization steel form is used in turn by larger limitation, and cost is larger.
Or in template plate face after the reinforcing materials such as brushing composite polymer material and glass fibre, so that it may make steel form Pour apparent effect with steel frame plywood formwork promotion, however these methods for material and skills in the process of construction level requirement and its Height, construction cost of implementation is also relatively high, and popularization and application are extremely restricted.
Summary of the invention
Technical problem to be solved by the invention is to provide side slope cutting manually digging hole friction pile exposed face clear water formwork knots Structure and construction technology are constructed fairly simple using unique multilayered structure, are reached manually digging hole friction pile exposed face clear water coagulation The native good purpose of apparent mass.
The technical solution adopted by the present invention to solve the technical problems is: it is exposed to provide side slope cutting manually digging hole friction pile It is exposed in friction pile needs to return the setting of pea gravel concreten described in spray-up time spray-up including pea gravel concreten for face clear water formwork erecting structure On the artificial digging pile stake holes inner sidewall of side, the surface that pea gravel concreten returns spray-up is provided with mortar and returns spray-up, the sand Starching back on the inner sidewall of spray-up tiling has the thin template of plastics, is evenly distributed on the inner sidewall of the thin template of the plastics and antiskid Several precast linings of stake reinforcing bar binding together.
As supplement, it is provided on artificial digging pile stake holes inner sidewall in horn-like hole stake shield small, lower mouth is big suitable for reading Wall, the pea gravel concreten go back to the outside that spray-up is arranged in hole pile wall, and the most thin position of thickness is 25mm.
As supplement, the thin template thickness of the plastics is 5mm, and surface is smooth.
Preferably, size 50mm × 50mm × 25mm of the precast lining, using same pile concrete label Subtract stone concrete production.
The construction technology of specific side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, specific steps are such as Under:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and returns spray-up, It is preliminary it is levelling, look for it is vertical;
(b) spray-up surface spray furnace is returned in pea gravel concreten return spray-up, it is accurately levelling on vertical pea gravel concreten surface, With template flatness, the subsequent thin template of plastics easy to support;
(c) the thin template of plastics is sequentially placed into stake holes, is fixed on mortar with microcephaly's steel nail from bottom to top and goes back to spray-up surface;
(d) friction pile reinforcing bar after overall binding, binds precast lining in artificial digging pile stake holes, guarantees concrete Protective layer thickness;
(e) the last casting concrete in stake holes.
The utility model has the advantages that the present invention relates to side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction works Skill is constructed fairly simple using unique multilayered structure, is reached manually digging hole friction pile exposed face apparent mass of clear concrete Good purpose.
Detailed description of the invention
Fig. 1 is the vertical half-sectional structure chart of stake holes of the invention;
Fig. 2 is the half-sectional structure chart of level of stake holes of the invention.
Diagram: 1, pea gravel concreten returns spray-up;2, mortar returns spray-up;3, the thin template of plastics;4, precast lining;5, hole stake shield Wall.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
As shown in Figs. 1-2, embodiments of the present invention are related to side slope cutting manually digging hole friction pile exposed face clear water formwork Structure and construction technology return pea gravel concreten described in spray-up 1 including pea gravel concreten and return the setting of spray-up 1 outside friction pile needs On the artificial digging pile stake holes inner sidewall for revealing side, the surface that pea gravel concreten returns spray-up 1 is provided with mortar and returns spray-up 2, described Mortar return spray-up 2 inner sidewall on tiling have the thin template 3 of plastics, be uniformly distributed on the inner sidewall of the thin template 3 of the plastics There are several precast linings 4 together with the binding of friction pile reinforcing bar.
The construction technology of specific side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, specific steps are such as Under:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and returns spray-up 1, It is preliminary it is levelling, look for it is vertical, if be provided on artificial digging pile stake holes inner sidewall in horn-like hole stake small, lower mouth is big suitable for reading Retaining wall 5, the stone concrete go back to the outside that spray-up 1 is arranged in hole pile wall 5, and the most thin position of thickness is 25mm;
(b) 1 surface spray furnace of spray-up is returned in pea gravel concreten and return spray-up 2, accurately look on vertical pea gravel concreten surface It is flat, with template flatness, the subsequent thin template 3 of plastics easy to support;
(c) the thin template 3 of plastics being sequentially placed into stake holes, for the thin template 3 of the plastics with a thickness of 5mm, surface is smooth, from Mortar, which is fixed on, with microcephaly's steel nail on down goes back to 2 surface of spray-up;
(d) friction pile reinforcing bar after overall binding, binds precast lining 4 in artificial digging pile stake holes, guarantees coagulation Protective soil layer thickness, size 50mm × 50mm × 25mm of the precast lining 4 subtract stone using same pile concrete label Sub- concrete for making;
(e) the last casting concrete in stake holes.
It is of the invention using unique multilayered structure, construct fairly simple, reach manually digging hole friction pile exposed face clear water The good purpose of concrete apparent mass.

Claims (5)

1. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure, including pea gravel concreten go back to spray-up (1), feature It is, the pea gravel concreten goes back to spray-up (1) and the artificial digging pile stake holes inner sidewall that friction pile needs exposed side is arranged in On, the surface that pea gravel concreten goes back to spray-up (1) is provided with mortar and goes back to spray-up (2), and the mortar returns on the inner sidewall of spray-up (2) Tiling has the thin template of plastics (3), is evenly distributed on the inner sidewall of the thin template of the plastics (3) and exists with the binding of friction pile reinforcing bar Several precast linings (4) together.
2. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that: It is provided on artificial digging pile stake holes inner sidewall in horn-like hole pile wall (5) small, lower mouth is big suitable for reading, the microlith is mixed Solidifying soil goes back to the outside that spray-up (1) is arranged in hole pile wall (5), and the most thin position of thickness is 25mm.
3. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that: For the thin template of the plastics (3) with a thickness of 5mm, surface is smooth.
4. side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure according to claim 1, it is characterised in that: Size 50mm × 50mm × 25mm of the precast lining (4) subtracts stone concrete system using same pile concrete label Make.
5. a kind of construction work of side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure as described in claim 1 Skill, which is characterized in that specific step is as follows:
(a) pea gravel concreten is set first on the inside of the artificial digging pile stake holes that friction pile needs exposed side and goes back to spray-up (1), just Walk it is levelling, look for it is vertical;
(b) spray-up (1) surface spray furnace is returned in pea gravel concreten and go back to spray-up (2), accurately look on vertical pea gravel concreten surface It is flat, with template flatness, the subsequent thin template of plastics (3) easy to support;
(c) the thin template of plastics (3) is sequentially placed into stake holes, is fixed on mortar with microcephaly's steel nail from bottom to top and returns spray-up (2) table Face;
(d) friction pile reinforcing bar after overall binding, is bound precast lining (4) in artificial digging pile stake holes, guarantees concrete Protective layer thickness;
(e) the last casting concrete in stake holes.
CN201810939228.5A 2018-08-17 2018-08-17 Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology Pending CN108999182A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810939228.5A CN108999182A (en) 2018-08-17 2018-08-17 Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810939228.5A CN108999182A (en) 2018-08-17 2018-08-17 Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology

Publications (1)

Publication Number Publication Date
CN108999182A true CN108999182A (en) 2018-12-14

Family

ID=64592900

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810939228.5A Pending CN108999182A (en) 2018-08-17 2018-08-17 Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology

Country Status (1)

Country Link
CN (1) CN108999182A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile
CN105544533A (en) * 2014-10-29 2016-05-04 中铁十四局集团有限公司 Slab-pile wall digging pile retaining wall flitch plate

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013147933A (en) * 2013-05-08 2013-08-01 Ohbayashi Corp Earth retaining wall construction method, cast-in-place pile construction method, earth retaining wall, and cast-in-place pile
CN105544533A (en) * 2014-10-29 2016-05-04 中铁十四局集团有限公司 Slab-pile wall digging pile retaining wall flitch plate

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘勇: "《外墙外保温墙面裂缝成因及质量控制》", 31 May 2011, 西南交通大学出版社 *
李海峰等: "《钢筋工》", 31 March 2012, 中国环境科学出版社 *
袁影辉等: "《主体结构工程施工技巧与常见问题分析处理》", 31 May 2013, 湖南大学出版社 *

Similar Documents

Publication Publication Date Title
CN104594387B (en) Improved post-cast strip advance water stop construction method
CN100434598C (en) Retaining wall in lightweight, and construction method
CN106759126B (en) Construction method of side slope support drainage channel
CN102926398B (en) A kind of for Salt Lake Area iron tower of power transmission line bolts of inclined column type anti-corrosion foundation construction method
CN103321257A (en) Anti-cracking seepage-proof construction method for ultra-long mass concrete structure basement
CN107989032A (en) A kind of construction method of punching interlocking pile
CN102392549A (en) Construction working method for seamless prestressed-concrete self-waterproof clean water reservoir
CN206408655U (en) The top plate sidewall structure of covered back-digging construction
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN107447980A (en) A kind of building plastic formwork and its installation method for substituting brick fetal membrane
CN208056095U (en) I-shaped precast concrete and its compound soil-baffling structure of assembled cabin format
CN110056000A (en) A kind of construction method and structure of balance weight retaining wall
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN107142902B (en) High head and large flow tunneling boring damming method
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN108999182A (en) Side slope cutting manually digging hole friction pile exposed face clear water formwork erecting structure and construction technology
CN208293344U (en) Kerbstone, gutter and the molding pavement structure of top course one-time-concreting
CN205604287U (en) Highway tunnel portal wall
CN105888702B (en) Waterproofing Technology of Underground Works method
CN106801384A (en) Assembled steel reinforced concrete aliform type culvert opening and construction method
CN208280156U (en) The non-fully pile foundation cushion cap under precipitation state inside a kind of foundation pit
CN106351253A (en) Novel water conservancy project retaining wall
CN105735366B (en) Waterproof construction method based on concrete
CN105804123B (en) Waterproof construction construction method
CN206768879U (en) A kind of poured band of outer wall of basement structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination