CN108985637A - Study of Project Evaluation, device and computer readable storage medium - Google Patents
Study of Project Evaluation, device and computer readable storage medium Download PDFInfo
- Publication number
- CN108985637A CN108985637A CN201810815325.3A CN201810815325A CN108985637A CN 108985637 A CN108985637 A CN 108985637A CN 201810815325 A CN201810815325 A CN 201810815325A CN 108985637 A CN108985637 A CN 108985637A
- Authority
- CN
- China
- Prior art keywords
- project
- information
- ranking
- evaluation
- supplier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 78
- 238000012384 transportation and delivery Methods 0.000 claims description 31
- 238000000034 method Methods 0.000 claims description 23
- 238000012423 maintenance Methods 0.000 claims description 17
- 238000012360 testing method Methods 0.000 claims description 13
- 230000007547 defect Effects 0.000 claims description 10
- 238000005303 weighing Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 description 10
- 238000010586 diagram Methods 0.000 description 8
- 238000004891 communication Methods 0.000 description 6
- 238000012545 processing Methods 0.000 description 3
- 241000039077 Copula Species 0.000 description 2
- 208000034423 Delivery Diseases 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006870 function Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0639—Performance analysis of employees; Performance analysis of enterprise or organisation operations
- G06Q10/06393—Score-carding, benchmarking or key performance indicator [KPI] analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/16—Real estate
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- General Business, Economics & Management (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of Study of Project Evaluation, comprising the following steps: obtains the corresponding project information of each project, the project information includes delivering at least one of information, repairing information and calling information;The evaluation integral of each project is calculated according to the project information;Ranking is carried out to similar projects according to evaluation integral.The invention also discloses a kind of project appraisal device and a kind of computer readable storage mediums.The present invention is integrated by project information Calculation Estimation, and then integrates ranking of identifying project according to the evaluation, realizes the purpose of intelligence computation project ranking, solves the technical problem of project appraisal result inaccuracy.
Description
Technical field
The present invention relates to real estate domain more particularly to a kind of Study of Project Evaluation, device and computer-readable storage medium
Matter.
Background technique
With the development of society, the progress of science and technology, the purchase of property mode of the mankind is changed.Become from original self-built housing
Nowadays it is sold after building house property from developer to the masses.After house property sale, developer can usually collect appearance when house property is delivered
The problem of and house property deliver after report situation for repairment, then further according to delivery problem and report situation for repairment and further assess difference
The construction quality of project under construction.
In the prior art, it according to delivery problem and when reporting situation assessment item construction quality for repairment, needs that problem will be delivered
And report situation for repairment and first pass through manual sorting into report, project construction quality then is calculated further according to report and evaluates ranking, is led in this way
It causes the process of project appraisal operation cumbersome, and due to the comprehensive difference of report data, causes project appraisal result inaccurate.
Above content is only used to facilitate the understanding of the technical scheme, and is not represented and is recognized that above content is existing skill
Art.
Summary of the invention
The main purpose of the present invention is to provide a kind of Study of Project Evaluation, device and computer readable storage medium, purports
Simplify project appraisal operating process realizing, improves the accuracy of project appraisal result.
To achieve the above object, the present invention provides a kind of Study of Project Evaluation, and the Study of Project Evaluation includes following step
It is rapid:
The corresponding project information of each project is obtained, the project information includes delivering information, repairing information and complaint
At least one of information;
The evaluation integral of each project is calculated according to the project information;
Ranking is carried out to similar projects according to evaluation integral.
Preferably, the described the step of ranking of the destination item in similar projects is determined according to the evaluation integral it
Afterwards, further includes:
Obtain supplier information and the related information of the project and the ranking information of the project;
Described in ranking information determination according to the related information and the project of the supplier information and the project
The project ranking of supplier information and/or overall ranking.
Preferably, described according to the supplier information and the related information of the project and the ranking of the project
Information determines that the step of project ranking and/or overall ranking of the supplier information includes:
According to the related information and the ranking information, the row with the associated project of the supplier information is obtained
Name;
Calculate the ranking average value of the associated project;
The overall ranking of the supplier information is determined according to the ranking average value.
Preferably, described according to the supplier information and the related information of the project and the ranking of the project
Information determines that the step of project ranking and/or overall ranking of the supplier information includes:
Obtain the ranking of the affiliated supplier's information and the destination item of the destination item in similar projects;
The project ranking of affiliated supplier's information is determined according to the ranking of the destination item.
Preferably, before described the step of carrying out ranking to similar projects according to evaluation integral, further includes:
Batch information and/or Project Area are determined according to the project information;
According to the batch information and/or Project Area, by same batch and/or the delivery information of areal
And/or the associated project of repairing information is divided into similar projects.
Preferably, the delivery information includes at least and delivers information of exceeding the time limit, delivers and test room defect information and delivery satisfaction
Spend at least one single index in information;The repairing information includes reporting number, task handling duration and maintenance maintenance for repairment completely
At least one single index in meaning degree information.
Preferably, described according to the delivery information and/or repairing information, the step of calculating the evaluation integral of destination item
Include:
Obtaining for the single index of the destination item is determined according to the delivery information and/or the repairing information
Point;
The default weighted value for obtaining the single index score, according to the default weighted value to the single index score
It is weighted;
The evaluation integral is determined according to the weighing computation results.
In addition, to achieve the above object, the present invention also provides a kind of project appraisal devices, which is characterized in that described device
Include: memory, processor and is stored in the project appraisal program that can be run on the memory and on the processor, institute
State the step of realizing Study of Project Evaluation as described above when project appraisal program is executed by the processor.
In addition, to achieve the above object, the present invention also provides a kind of computer readable storage mediums, which is characterized in that institute
It states and is stored with project appraisal program on computer readable storage medium, realized such as when the project appraisal program is executed by processor
Above the step of Study of Project Evaluation.
A kind of Study of Project Evaluation, device and the computer readable storage medium that the embodiment of the present invention proposes, obtain first
The corresponding project information of each project, the project information include delivering in information, repairing information and calling information at least
It one, is then integrated according to the evaluation that the project information calculates each project, is finally integrated according to the evaluation to same
Intermediate item carries out ranking.By obtaining project information, then according to project information Calculation Estimation score, finally according to the evaluation
Score determines ranking information, to solve the technical problem of project appraisal inaccuracy.
Detailed description of the invention
Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to;
Fig. 2 is the flow diagram of Study of Project Evaluation first embodiment of the present invention;
Fig. 3 is the flow diagram of Study of Project Evaluation second embodiment of the present invention;
Fig. 4 is the flow diagram of Study of Project Evaluation 3rd embodiment of the present invention;
Fig. 5 is the flow diagram of Study of Project Evaluation fourth embodiment of the present invention;
Fig. 6 is the flow diagram of the 5th embodiment of Study of Project Evaluation of the present invention;
Fig. 7 is the flow diagram of Study of Project Evaluation sixth embodiment of the present invention.
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
It should be appreciated that described herein, specific examples are only used to explain the present invention, is not intended to limit the present invention.
The primary solutions of the embodiment of the present invention are:
The corresponding project information of each project is obtained, the project information includes delivering information, repairing information and complaint
At least one of information;
The evaluation integral of each project is calculated according to the project information;
Ranking is carried out to similar projects according to evaluation integral.
Due in the prior art, when according to delivery problem and reporting situation assessment item construction quality for repairment, needing to deliver and ask
It inscribes and reports for repairment situation and first pass through manual sorting into report, then calculate project construction quality further according to report and evaluate ranking, in this way
The process for causing project appraisal to operate is cumbersome, and due to the comprehensive difference of report data, causes project appraisal result inaccurate.
A kind of Study of Project Evaluation that the embodiment of the present invention proposes, by obtaining project information, then according to project information
Calculation Estimation score finally determines ranking information according to the evaluation score, solves the technical problem of project appraisal inaccuracy.
As shown in Figure 1, Fig. 1 is the terminal structure schematic diagram for the hardware running environment that the embodiment of the present invention is related to.
The terminal of that embodiment of the invention can be PC machine and/or intelligent mobile terminal etc..
As shown in Figure 1, the terminal may include: processor 1001, such as CPU, and communication bus 1002, display 1003,
Network interface 1004, memory 1005.Wherein, communication bus 1002 is for realizing the connection communication between these components.Storage
Device 1005 can be high speed RAM memory, be also possible to stable memory (non-volatile memory), such as disk
Memory.Memory 1005 optionally can also be the storage device independently of aforementioned processor 1001.
It will be understood by those skilled in the art that the restriction of the not structure paired terminal of terminal structure shown in Fig. 1, can wrap
It includes than illustrating more or fewer components, perhaps combines certain components or different component layouts.
As shown in Figure 1, as may include operating system, net in a kind of memory 1005 of computer readable storage medium
Network communication module, Subscriber Interface Module SIM and project appraisal program.
In terminal shown in Fig. 1, network interface 1004 is mainly used for connecting background server, carries out with background server
Data communication;User interface 1003 is mainly used for connecting client (user terminal), carries out data communication with client, and then realize
Pass through the purpose of client output data;And processor 1001 can be used for calling the project appraisal journey stored in memory 1005
Sequence, and execute following operation:
The corresponding project information of each project is obtained, the project information includes delivering information, repairing information and complaint
At least one of information;
The evaluation integral of each project is calculated according to the project information;
Ranking is carried out to similar projects according to evaluation integral.
Further, processor 1001 can call the annotation stored in memory 1005 more new procedures, also execute following
Operation:
Obtain supplier information and the related information of the project and the ranking information of the project;
Described in ranking information determination according to the related information and the project of the supplier information and the project
The project ranking of supplier information and/or overall ranking.
Further, processor 1001 can call the annotation stored in memory 1005 more new procedures, also execute following
Operation:
According to the related information and the ranking information, the row with the associated project of the supplier information is obtained
Name;
Calculate the ranking average value of the associated project;
The overall ranking of the supplier information is determined according to the ranking average value.
Further, processor 1001 can call the annotation stored in memory 1005 more new procedures, also execute following
Operation:
Obtain the ranking of the affiliated supplier's information and the destination item of the destination item in similar projects;
The project ranking of affiliated supplier's information is determined according to the ranking of the destination item.
Further, processor 1001 can call the annotation stored in memory 1005 more new procedures, also execute following
Operation:
Batch information and/or Project Area are determined according to the project information;
According to the batch information and/or Project Area, by same batch and/or the delivery information of areal
And/or the associated project of repairing information is divided into similar projects.
Further, processor 1001 can call the annotation stored in memory 1005 more new procedures, also execute following
Operation:
Obtaining for the single index of the destination item is determined according to the delivery information and/or the repairing information
Point;
The default weighted value for obtaining the single index score, according to the default weighted value to the single index score
It is weighted;
The evaluation integral is determined according to the weighing computation results.
Reference Fig. 2, Study of Project Evaluation first embodiment of the present invention, the Study of Project Evaluation include:
Step S10, the corresponding project information of each project is obtained, the project information includes delivering information, repairing information
And at least one of calling information;
In the present embodiment, when house property is delivered, after delivery information association project information collected in delivery process,
It uploads and saves to server, when receiving repairing information, uploaded simultaneously after the repairing information is associated with the project information
Save to server, after receiving calling information, after the calling information is associated with the project information, upload and save to
Server.
When receiving project appraisal instruction, the corresponding project information of each project is obtained.
Specifically, when receiving project appraisal instruction, the project letter of each item association saved in server is obtained
Breath, wherein the project information includes delivering information, repairing information, calling information, project batch and/or Project Area.
The delivery information includes at least and delivers information of exceeding the time limit, delivers and test room defect information and deliver in satisfaction information
At least one single index;The repairing information includes reporting number, task processing task handling duration and maintenance maintenance for repairment completely
At least one single index in meaning degree information.
Step S20, it is integrated according to the evaluation that the project information calculates each project;
In the present embodiment, when getting the project information, the single index that the project information includes first is obtained
Weighted value, then according to the weighted value calculate each project evaluation integrate.
Specifically, the delivery information include deliver exceed the time limit to count, it is described delivery test room defect information include deliver test room lack
It falls into item number (i.e. the project item number for testing room quality problems occurs in delivery process), the delivery satisfaction information includes handing over
Pay satisfaction.
Obtain deliver exceed the time limit information, deliver test room defect information, deliver satisfaction information, report for repairment number, task processing when
Long and maintenance satisfaction information weighted value Q1、Q2、Q3、Q4、Q5And Q6, and the evaluation of respective items purpose is calculated according to the following formula
Integral:
F=100 (Q3c+Q6g)-Q4d-Q5e-Q1a-Q2b
Wherein, F is evaluation integral, and a, b, c, d, e, g are respectively to deliver the number that exceeds the time limit, deliver and test room defect number, deliver satisfaction
It spends, report number, task handling duration and maintenance satisfaction for repairment.
The delivery satisfaction c can be calculated according to the following formula:
M in formula1、n1It respectively delivers and is satisfied with number and delivers total.
The maintenance satisfaction g can be calculated according to the following formula:
M in formula2、n2Respectively maintenance is satisfied with number and maintenance total degree.
Step S30, it is integrated according to the evaluation and ranking is carried out to similar projects.
In the present embodiment, batch information and/or the Project Area of each project are first determined according to the project information, so
Classified afterwards according to the batch information and/or the Project Area to each project, i.e., by same batch and/or same
The delivery information in area and/or the associated project of the repairing information are divided into similar projects.
The similar projects corresponding evaluation integral is obtained, and is determined according to the size relation of the evaluation integral described same
The rank order of intermediate item.
In the present embodiment, the project information of each item association is first obtained, it is then calculated according to the project information
The evaluation of associated project integrates, and is further integrated according to the evaluation to project progress ranking, be achieved automatically into
The purpose of row project appraisal, to solve the technical problem of project appraisal inaccuracy
Further, referring to Fig. 3, Study of Project Evaluation second embodiment of the present invention is based on above-mentioned first embodiment, described
After step S30, further includes:
Step S40, supplier information and the related information of the project and the ranking information of the project are obtained;
In the present embodiment, it when receiving supplier evaluation instruction, is instructed according to the supplier evaluation and obtains supply
Quotient's information.Then the related information for obtaining supplier information and the project, after getting the project information, described in acquisition
The corresponding ranking information of project information.
Step S50, according to the supplier information and the related information of the project and the ranking information of the project
Determine the project ranking and/or overall ranking of the supplier information.
In the present embodiment, the supplier can be determined according to the related information of the supplier information and the project
Project ranking and/or overall ranking.Wherein the project ranking of supplier information is directly believed according to project ranking and supplier
Breath and the related information of project determine.For example, the project ranking of A project is the 3rd, the affiliated supplier of A project is A1, then A1
Project ranking be the 3rd.
The overall ranking of supplier determines that the overall ranking P is according to pass according to the associated whole projects of the supplier
Copula purpose ranking average value determines, wherein the ranking average value p can be calculated according to the following formula:
Wherein, XiFor the ranking with the supplier associated project, i is associations mesh number.
After calculating ranking average value p, according to the size relation of the corresponding ranking average value of the supplier information, really
The overall ranking P of the fixed supplier information.
In the present embodiment, the project ranking and/or overall ranking of supplier are determined according to the ranking information of project, in this way
Realize the purpose that ranking is carried out to supplier's construction quality.
Further, referring to Fig. 4, Study of Project Evaluation 3rd embodiment of the present invention is based on above-mentioned second embodiment, described
Step S50 includes:
Step S51, it according to the related information and the ranking information, obtains associated described with the supplier information
The ranking information of project;
In the present embodiment, supplier information is first obtained, item associated with it is then obtained according to the supplier information
Purpose related information determines associated item according to the related information, and obtains the ranking information of the associated item.
Step S52, the ranking average value of the associated project is calculated;
Step S53, the overall ranking of the supplier information is determined according to the ranking average value.
In the present embodiment, in the ranking information for getting associated item, the associated item ranking information is calculated
Ranking average value, wherein the ranking average value can be calculated according to following formula:
Wherein, XiFor the ranking with the supplier associated project, i is associations mesh number.
For example, B corporate linkage has 3 project B1、B2And B3, wherein B1、B2And B3Ranking in similar projects is respectively
2,4,5, then the ranking average value of the project of B corporate linkage are as follows:
When calculating the corresponding ranking average value p of supplier information, is closed according to the size of p and determine the supplier information
Overall ranking.
It should be noted that p can be as accurate as 2 significant digits when p is unlimited decimal.
In the present embodiment, it first obtains for the ranking information with the associated project of supplier information, then calculates the pass
The ranking average value of copula purpose ranking information, and then determine according to the ranking draw value overall ranking of supplier.In this way
The overall ranking of supplier is determined, so that it is determined that the overall evaluation ranking of supplier's construction quality, it is whole to realize supplier
The assessment of body construction strength.
Further, referring to Fig. 5, Study of Project Evaluation fourth embodiment of the present invention is implemented based on above-mentioned first to third
Example, the step S50 include:
Step S54, the affiliated supplier's information for obtaining the destination item and the destination item are in similar projects
Ranking;
Step S55, the project ranking of affiliated supplier's information is determined according to the ranking of the destination item.
In the present embodiment, the associated supplier information of destination item is first obtained, in the confession for getting the destination item
While answering quotient's information, the ranking information of the destination item is obtained.The destination item is formed with supplier information corresponding
Relationship, using the ranking information of the project as the project ranking of the supplier information.
It should be noted that same supplier information can correspond to multiple project rankings.
In the present embodiment, according to being associated between project and supplier information, by the supplier information and project shape
At corresponding relationship, project ranking of the ranking of project as supplier information is then used, have thus determined suppliers single
Construction bear fruit grains in project.
Further, referring to Fig. 6, the 5th embodiment of Study of Project Evaluation of the present invention is implemented based on above-mentioned first to fourth
, before the step S30, further includes:
Step S60, batch information and/or Project Area are determined according to the project information;
Step S70, according to the batch information and/or Project Area, by the friendship of same batch and/or areal
It pays information and/or the associated project of the repairing information is divided into similar projects.
In the present embodiment, when getting the project information, batch of each project is determined according to the project information
The project of same batch and/or areal is classified as similar projects by secondary information and/or Project Area.
It should be noted that method provided by the present invention can also be divided according to the information that other project information include
Class, the present embodiment are not used in restriction class condition, this implementation is used only for explaining classification of the items process.
In the present embodiment, batch information and/or Project Area classify to the project, and being achieved will be different
Classification of the items evaluation, to make the ranking information more diversification of project.
Further, referring to Fig. 7, Study of Project Evaluation sixth embodiment of the present invention is implemented based on above-mentioned first to the 5th
Example, the step S20 include:
Step S21, determine that the individual event of the destination item refers to according to the delivery information and/or the repairing information
Target score;
In this implementation
Step S22, the default weighted value for obtaining the single index score, according to the default weighted value to the individual event
Index score is weighted;
Step S23, determine that the evaluation integrates according to the weighing computation results.
In the present embodiment,
In the present embodiment, when getting the project information, the single index that the project information includes first is obtained
Weighted value, then according to the weighted value calculate each project evaluation integrate.
Specifically, the delivery information include deliver exceed the time limit to count, it is described delivery test room defect information include deliver test room lack
Number (i.e. the project in delivery process, the number of failure) is fallen into, the deliverys satisfaction information includes delivery satisfaction.
Obtain deliver exceed the time limit information, deliver test room defect information, deliver satisfaction information, report for repairment number, task processing when
Long and maintenance satisfaction information weighted value Q1、Q2、Q3、Q4、Q5And Q6, and the evaluation of respective items purpose is calculated according to the following formula
Integral:
F=100 (Q3c+Q6g)-Q4d-Q5e-Q1a-Q2b
Wherein, F is evaluation integral, and a, b, c, d, e, g are respectively to deliver the number that exceeds the time limit, deliver and test room defect number, deliver satisfaction
It spends, report number, task handling duration and maintenance satisfaction for repairment.
The delivery satisfaction c can be calculated according to the following formula:
M in formula1、n1It respectively delivers and is satisfied with number and delivers total.
The maintenance satisfaction g can be calculated according to the following formula:
M in formula2、n2Respectively maintenance is satisfied with number and maintenance total degree.
For example, it is described delivery exceed the time limit number, deliver test room defect number, deliver satisfaction, report for repairment number, task handling duration and
Maintenance satisfaction is respectively equal to 22,15,90%, 32,9,80%, the Q1、Q2、Q3、Q4、Q5And Q6Respectively equal to 0.15,
0.15,0.2,0.15,0.15 and 0.2 when, the project evaluation integral
F=100 (0.2 × 90%+0.2 × 80%) -0.15 × 22+0.15 × 15+0.15 × 32+0.15 × 9=22.3
It should be noted that the weighted value is configured by administrator by backstage, the present embodiment does not limit the power
The occurrence of weight values.
In the present embodiment, the weighted value of single item evaluation is first obtained, is then integrated according to the weighted value Calculation Estimation, this
Sample realizes the purpose of automatic Calculation Estimation integral, improves the reliability of calculated result.
In addition, the embodiment of the present invention also proposes a kind of project appraisal device, which is characterized in that described device includes: storage
Device, processor and it is stored in the project appraisal program that can be run on the memory and on the processor, the project is commented
The step of valence program realizes Study of Project Evaluation as described above when being executed by the processor.
In addition, the embodiment of the present invention also proposes a kind of computer readable storage medium, which is characterized in that the computer can
It reads to be stored with project appraisal program on storage medium, such as above embodiments is realized when the project appraisal program is executed by processor
The step of described Study of Project Evaluation.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the system that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or system institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or system.
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in one as described above
In computer readable storage medium (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal device (can
To be mobile phone, computer, server or the network equipment etc.) execute method described in each embodiment of the present invention.
The above is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all to utilize this hair
Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills
Art field, is included within the scope of the present invention.
Claims (9)
1. a kind of Study of Project Evaluation, which is characterized in that the Study of Project Evaluation the following steps are included:
The corresponding project information of each project is obtained, the project information includes delivering information, repairing information and calling information
At least one of;
The evaluation integral of each project is calculated according to the project information;
Ranking is carried out to similar projects according to evaluation integral.
2. Study of Project Evaluation as described in claim 1, which is characterized in that described to determine the mesh according to evaluation integral
After the step of ranking of the mark project in similar projects, further includes:
Obtain supplier information and the related information of the project and the ranking information of the project;
The supply is determined according to the ranking information of the related information and the project of the supplier information and the project
The project ranking of quotient's information and/or overall ranking.
3. Study of Project Evaluation as claimed in claim 2, which is characterized in that described according to the supplier information and the item
Purpose related information and the ranking information of the project determine the project ranking and/or overall ranking of the supplier information
The step of include:
According to the related information and the ranking information, the ranking with the associated project of the supplier information is obtained;
Calculate the ranking average value of the associated project;
The overall ranking of the supplier information is determined according to the ranking average value.
4. Study of Project Evaluation as claimed in claim 2, which is characterized in that described according to the supplier information and the item
Purpose related information and the ranking information of the project determine the project ranking and/or overall ranking of the supplier information
The step of include:
Obtain the ranking of the affiliated supplier's information and the destination item of the destination item in similar projects;
The project ranking of affiliated supplier's information is determined according to the ranking of the destination item.
5. Study of Project Evaluation as described in claim 1, which is characterized in that described to be integrated according to the evaluation to similar projects
Before the step of carrying out ranking, further includes:
Batch information and/or Project Area are determined according to the project information;
According to the batch information and/or Project Area, by the delivery information of same batch and/or areal and/or
The associated project of repairing information is divided into similar projects.
6. Study of Project Evaluation as described in claim 1, which is characterized in that the delivery information, which includes at least, delivers the letter that exceeds the time limit
Breath delivers at least one single index testing room defect information and delivering in satisfaction information;The repairing information includes report
Repair at least one single index in number, task handling duration and maintenance maintenance satisfaction information.
7. Study of Project Evaluation as claimed in claim 6, which is characterized in that described according to the delivery information and/or to report for repairment
Information, calculate destination item evaluation integral the step of include:
The score of the single index of the destination item is determined according to the delivery information and/or the repairing information;
The default weighted value for obtaining the single index score carries out the single index score according to the default weighted value
Weighted calculation;
The evaluation integral is determined according to the weighing computation results.
8. a kind of project appraisal device, which is characterized in that the project appraisal device includes: memory, processor and is stored in
On the memory and the project appraisal program that can run on the processor, the project appraisal program is by the processor
The step of Study of Project Evaluation as described in any one of claims 1 to 7 is realized when execution.
9. a kind of computer readable storage medium, which is characterized in that be stored with project on the computer readable storage medium and comment
Valence program realizes the project appraisal as described in any one of claims 1 to 7 when the project appraisal program is executed by processor
The step of method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810815325.3A CN108985637A (en) | 2018-07-23 | 2018-07-23 | Study of Project Evaluation, device and computer readable storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810815325.3A CN108985637A (en) | 2018-07-23 | 2018-07-23 | Study of Project Evaluation, device and computer readable storage medium |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108985637A true CN108985637A (en) | 2018-12-11 |
Family
ID=64550006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810815325.3A Pending CN108985637A (en) | 2018-07-23 | 2018-07-23 | Study of Project Evaluation, device and computer readable storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108985637A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109377114A (en) * | 2018-12-14 | 2019-02-22 | 万翼科技有限公司 | Appraisal procedure, server and the storage medium of supplier |
-
2018
- 2018-07-23 CN CN201810815325.3A patent/CN108985637A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109377114A (en) * | 2018-12-14 | 2019-02-22 | 万翼科技有限公司 | Appraisal procedure, server and the storage medium of supplier |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107992401A (en) | Performance test evaluation method, device, terminal device and storage medium | |
CN109451532A (en) | A kind of check method and device of base station location | |
CN109242562A (en) | Ranking method, device and the storage medium of supplier | |
CN108537289A (en) | Training method, device and the storage medium of data identification model | |
CN108495329A (en) | A kind of evaluation method and device of base station reliability | |
CN109146271A (en) | Performance management method, apparatus, terminal and computer readable storage medium | |
CN108573355A (en) | The method, apparatus and service server of operation are replaced after model modification | |
CN107609711A (en) | A kind of offer method, apparatus, equipment and storage medium for entering oneself for the examination information | |
CN108073506A (en) | Test method and device | |
CN109102142A (en) | A kind of personnel evaluation methods and system based on evaluation criterion tree | |
CN106100883A (en) | A kind of cloud service evaluation method and device | |
CN112200459B (en) | Power distribution network data quality analysis and evaluation method and system | |
CN111782317A (en) | Page testing method and device, storage medium and electronic device | |
CN105487970A (en) | Interface display method and apparatus | |
CN110096430A (en) | Third party's SDK entry test method, apparatus, terminal and storage medium | |
CN110764999A (en) | Automatic testing method and device, computer device and storage medium | |
CN109408304A (en) | Block chain introduces test method, device, equipment and readable storage medium storing program for executing | |
CN108985637A (en) | Study of Project Evaluation, device and computer readable storage medium | |
CN109493958A (en) | A kind of follow-up ways to draw up the plan, device, server and medium | |
CN109034553A (en) | Method for pushing, device and the computer readable storage medium of engineer's ranking | |
CN108924369A (en) | NPS assessment method for running, systems and management platform based on telephone poll | |
CN104394039A (en) | Evaluation system and evaluation method for network performance maturity based on Sigmoid exponential model | |
CN107886180A (en) | Boat department creates single interface monitoring method, apparatus, electronic equipment, storage medium | |
CN111080364A (en) | Engineering cost data center management system and device | |
CN110516128A (en) | Information configuring methods, equipment, storage medium and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181211 |