CN108960553A - A kind of visualizing monitor method of drillng operation information and risk - Google Patents
A kind of visualizing monitor method of drillng operation information and risk Download PDFInfo
- Publication number
- CN108960553A CN108960553A CN201711163761.9A CN201711163761A CN108960553A CN 108960553 A CN108960553 A CN 108960553A CN 201711163761 A CN201711163761 A CN 201711163761A CN 108960553 A CN108960553 A CN 108960553A
- Authority
- CN
- China
- Prior art keywords
- drillng operation
- risk
- well site
- operation information
- drilling well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/002—Survey of boreholes or wells by visual inspection
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B44/00—Automatic control systems specially adapted for drilling operations, i.e. self-operating systems which function to carry out or modify a drilling operation without intervention of a human operator, e.g. computer-controlled drilling systems; Systems specially adapted for monitoring a plurality of drilling variables or conditions
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21B—EARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
The present invention provides a kind of drillng operation information and the visualizing monitor methods of risk, belong to oil gas well drilling field.This method acquires drillng operation information data at drilling well site end, and collected drillng operation information data is sent to remote base end in real time;The drillng operation information data received is stored at remote base end, and risk profile information is calculated, establishes drilling well site three-dimensional sand table, drillng operation information and risk profile information are shown on the drilling well site three-dimensional sand table.The sense of reality, intuitive, validity of drillng operation information and Risk Monitoring are greatly improved and improved using the present invention, plays an important role and is of great significance to drillng operation risk is reduced or avoided.
Description
Technical field
The invention belongs to oil gas well drilling fields, and in particular to the visualizing monitor side of a kind of drillng operation information and risk
Method.
Background technique
It is special that there are operating environments in drillng operation lifecycle process is complicated, technical difficulty is big and managing risk is high etc.
Point, it may be said that drillng operation is the highest field of oil and gas industry risk.Once accident occurs, it will give well site and periphery
Area causes damages, and gently then damages drillng operation equipment, heavy then casualties, surrounding enviroment is caused to deteriorate etc..And drilling well is made
Potential risks and the accident (failure) that may occur carry out remote real time monitoring and visualizing monitor and analysis during industry, right
Part drillng operation risk is reduced or avoided to play an important role and be of great significance.
Related patents " a kind of drillng operation risk management and control system and method " (application number 201510612316.0), devise
A kind of drillng operation risk management and control system, the system comprises well site server-side and mobile terminals, wherein the well site server-side
Store risky array and work flow array;The drillng operation risk management and control method of offer is based on identification label, mobile terminal
Risk real time monitoring is carried out to the drillng operation on well site in conjunction with risk assessment quantization method with technologies such as well site server-sides.It should
Patent relates only to the drillng operation Risk Monitoring at situ of drilling well end, is not involved in relation to the long-range of drillng operation information data
It transmits the long-range monitoring with drillng operation risk, well site three-dimensional sand table and drilling well is realized based on well site three-dimensional sand table
The technology contents such as the visualizing monitor of job information and drillng operation risk.
" willow is superfine in document " virtual electronic sand table realizes technology analysis " (Chongqing Higher INdustry Training School for pertinent literature
Journal, 2002,17 (2)) " in, the virtual electronic sand table essentially described for operational deployment makes the three-dimensional modeling being related to
The related realization details of technology.The document is not involved with reading and the database number of virtual electronic sand table and database data
According to visualization display of the display, Risk-warning information on virtual electronic sand table on virtual electronic sand table and related it is directed to
The technology contents such as the three-dimensional sand table production of drilling well site.
In short, the prior art resolves the long-range monitoring in relation to drillng operation information and drillng operation risk not yet and can
Depending on changing the technical problems such as monitoring, sense of reality, intuitive, validity in relation to drillng operation information and Risk Monitoring etc. are also
To be modified and raising.
Summary of the invention
It is an object of the invention to solve above-mentioned problem existing in the prior art, a kind of drillng operation information and wind are provided
The visualizing monitor method of danger, based on well site three-dimensional sand table come really, intuitively displaying drillng operation information and its risk
Position occurs for information, risk, with generation that is timely, being effectively prevented from drillng operation risk, it is ensured that drillng operation is gone on smoothly.
The present invention is achieved by the following technical solutions:
A kind of visualizing monitor method of drillng operation information and risk acquires drillng operation Information Number at drilling well site end
According to, and collected drillng operation information data is sent to remote base end in real time;At remote base end to the brill received
Well operations information data is stored, and risk profile information is calculated, and drilling well site three-dimensional sand table is established, by drilling well
Job information and risk profile information are shown on the drilling well site three-dimensional sand table.
The described method includes:
(1) drillng operation information data is acquired at drilling well site end using hand-held acquisition terminal, and sent it to long-range
Base end;
(2) drillng operation information database is established at remote base end, the drillng operation information database is for receiving
With the drillng operation information data of storage situ of drilling well;
(3) data acquisition components and remote transmission serviced component are established, the collected drillng operation in drilling well site end is believed
Breath data are sent to the drillng operation information database at remote base end in real time;
(4) drilling well site three-dimensional sand table is established, is the visualizing monitor of drillng operation information and drillng operation risk
Drilling well site three-dimensional artificial environment true to nature is provided;
(5) remote service end is established at remote base end, after remote service termination receives the data that drilling well site end is sent,
It is deposited into drillng operation information database, while data are subjected to serializing and form a string of character strings, and are led to using between process
Character string is pushed to drilling well site three-dimensional sand table by letter technology;
(6) drillng operation information and risk display component based on well site three-dimensional simulation sand table are established;
(7) drillng operation Risk Calculation and evaluation component are established, carry out drillng operation risk sentences knowledge, obtains risk profile
Information;
(8) drillng operation Risk-warning component, and the relevant device position on drilling well site three-dimensional sand table are established
The risk profile information that step (7) is calculated is shown.Exhibition method includes bubble prompts, physical profiles are highlighted etc..
The step (3) is achieved in that
Collection point is arranged at drilling well site end using wireless radio-frequency, on the hand-held acquisition terminal top at drilling well site end
Data acquisition components are affixed one's name to, data can be obtained using corresponding agreement from the collection point;Control terminal at drilling well site end
Upper deployment remote transmission serviced component can receive the data that hand-held acquisition terminal is sent by wireless transmission method, and
Remote base end is sent the data to by internet (such as 4G mobile network, cable network) etc., remote base termination receives
After data, it is deposited into drillng operation information database.
The wireless radio-frequency includes NFC, RFID.
The step (4) is achieved in that
First main well site entity is modeled to obtain well site three-dimensional entity model using 3 d modeling software, and is made
Drilling well site three-dimensional sand table is built with three-dimensional software development technique;
The well site three-dimensional entity model include: rig floor area equipment, dynamical system equipment, borehole fluid system, drilling tool,
Well control system, grease can system, safety devices, auxiliary system and equipment, mud logging equipment and drillng operation personnel.
The step (6) is achieved in that
The position of well site personnel and job information are directly presented on drilling well site three-dimensional sand table, i.e., according to reception
The position of the well site personnel at the drilling well site end the arrived drilling well site three-dimensional sand table that personnel's entity render is live to correspondence
Position on, job information is shown by drillng operation information and risk display component;
The drillng operation information and risk display component include virtual instrument, liquidometer, digital dial plate.
The step (7) is achieved in that
Drillng operation Risk Calculation and evaluation component are established, carries out drillng operation according to the data that drilling well site end is sent
Risk Calculation obtains risk profile information;
The risk profile information includes: the risk category predicted, rank.
The drillng operation information and risk display component, drillng operation Risk Calculation and evaluation component are drilling well sites three
The a part for tieing up virtual sand table is floated on drilling well site three-dimensional sand table in a manner of 2 dimension display panels, or each
Component corresponds to an independent application program, and the independent application program directly can obtain corresponding number from remote service end
According to, and data are handled, drilling well site three-dimensional sand table is sent result to after being disposed.
Compared with prior art, the beneficial effects of the present invention are: using this method, the drillng operation information of situ of drilling well
Be real-time transmitted to the drillng operation information bank of remote base, based on well site three-dimensional sand table and drillng operation Risk Calculation with comment
Valence component etc. realizes long-range monitoring and the visualizing monitor of drillng operation information and drillng operation risk, greatly improves and mention
The high sense of reality, intuitive, the validity of drillng operation information and Risk Monitoring, are played to drillng operation risk is reduced or avoided
Important function is simultaneously of great significance.
Detailed description of the invention
The step block diagram of Fig. 1 the method for the present invention.
Specific embodiment
Present invention is further described in detail with reference to the accompanying drawing:
Step of the invention is as shown in Figure 1, comprising:
(1) drillng operation information data is acquired at drilling well site end, and sends it to remote base end: in drilling well site
End carries out the acquisition of drillng operation information using hand-held acquisition terminal.Wherein, drillng operation information collection content is existing according to drilling well
Field operation HSE risk management relevant criterion, which requires, and situ of drilling well job management is practical determines.
The specific standards in each well site are slightly different, although these requirements all meet the standard of industry, but still have some numbers
It is different according to, information, it is therefore desirable to according to the specific requirement at scene come.Drillng operation personnel can be acquired using hand-held acquisition terminal
Which kind of operation when time on duty wherein carried out, even if well site management is different, standard some differences, as long as these information
Well site personnel carry out operation, all have, only information frequency, it is rich might have difference, but virtual sand can be met
The building of disk needs.
(2) drillng operation information database is established at remote base end, the drillng operation information database is for receiving
With the drillng operation information data of storage situ of drilling well;
(3) data acquisition components and remote transmission serviced component are established, the drillng operation Information Number that situ of drilling well is acquired
The drillng operation information database at remote base end is sent to when factually.
It is specific as follows: to arrange collection point at the scene using technologies such as NFC, RFID, the hand-held acquisition at drilling well site end is whole
Data acquisition components (data can be obtained using corresponding agreement from collection point) is disposed on end, hand-held acquisition terminal calling passes through
Wireless transmission (such as WIFI etc.) is transferred to the control terminal (PC machine or professional server) at well site end using modes such as WEB, TCP,
Remote transmission serviced component (receiving the data that hand-held acquisition terminal is sent using corresponded manner) is disposed in the control terminal of well site, far
Journey transmission serviced component passes through the long-range clothes that internet (such as 4G mobile network, cable network) etc. sends back remote base end again
Business end is stored in drillng operation information database after remote service termination receives data.
(4) drilling well site three-dimensional sand table is established, is the visualizing monitor of drillng operation information and drillng operation risk
Drilling well site three-dimensional artificial environment true to nature is provided.
Specifically, well site three-dimensional sand table first using 3 d modeling software to main well site solid modelling, make
It is built into virtual sand table with the three-dimensional softwares development technique such as Unity3D, the basis of building can be scene photograph or layout,
This sand table is it is important that mark the relative position of each entity in well site.Main well site three-dimensional entity model includes but unlimited
In: rig floor area equipment, dynamical system equipment, borehole fluid system, drilling tool, well control system, grease can system, safety devices,
Auxiliary system and equipment, mud logging equipment and drillng operation personnel.
(5) remote service termination receives after the data that send back to of front while storage, and data sequence is also turned to one
String character string, and it is pushed to well site three-dimensional electronic sand table, the inter-process communication techniques such as name pipeline, Socket can be used herein.
The case where including forward operation in this information, (different according to the demand in front well site, data field may have difference
Not): such as the position of all personnel, the ongoing operation of owner, each major project parameter (bit pressure, drilling speed, discharge capacity, hook
Height etc.).
(6) drillng operation information and risk display component based on well site three-dimensional simulation sand table are established:
The position of well site personnel and job information will be directly presented to above 3 D sand table, according to the personnel positions received
It will be on the specific location of the 3 D sand table of personnel's entity render to corresponding scene with job information.By virtual instrument, liquidometer,
The display components such as digital dial plate show other engineering informations.A part that these display components can be sand table (is appointed
What three-dimension developing technology has the component for realizing such function, such as the component that can be carried using Unity3D software), with 2 dimensions
The mode of display panel floats on three-dimensional scenic, is also possible to another or several application programs.As journey is used alone
When sequence, it is also desirable to realize the data receiver function similar with 3 D sand table, directly obtain corresponding data from server-side, handled
Simulation sand table is sent to after finishing.
(7) drillng operation Risk Calculation and evaluation component are established, carry out drillng operation risk sentences knowledge: is fed back according to scene
Data back carry out drillng operation Risk Calculation and obtain risk profile information.This component can be three as display component
The a part (such as Unity3D included component) for tieing up sand table, is also possible to a single program, directly receives from server-side
Data are calculated, and the component of 3 D sand table is sent to after being disposed.Drilling risk calculates, evaluation method uses existing wind
Danger prediction, evaluation method.
(8) drillng operation Risk-warning component is established, and the relevant device position on the three-dimensional sand table of well site carries out
Risk-warning prompt: it according to the risk profile information (predict risk category, rank) being calculated, will be mentioned by bubble
Show, the display modes (these display modes are all that these three-dimensional softwares of Unity3D are included) such as physical profiles are highlighted are on sand table
It shows.
It is tested in certain oil field prospecting block emphasis well drillng operation remotely monitoring project using the method for the present invention
With implementation, the drillng operation risk of block X well is monitored.At drilling well site end, using hand-held acquisition terminal to brill
Well operations information data is acquired, and by Data Remote Transmission Process System component, acquisition data are sent to far in real time
The drillng operation information database in journey base;At remote base end, drilling well site three-dimensional sand table, the three-dimensional void in well site are established
It is husky that reading data interface, drillng operation information and the risk of quasi- sand table and drillng operation information database are based on well site three-dimensional simulation
Display component, drillng operation Risk Calculation and the evaluation component of disk, drillng operation Risk-warning component etc., realize drillng operation
The long-range monitoring of information and risk and visualizing monitor greatly improve and improve the true of drillng operation information and Risk Monitoring
Sense, intuitive, validity play important function and are of great significance to drillng operation risk is reduced or avoided.
The present invention is the key that realize drillng operation information and the monitoring of risk remote visualization and basis, is drillng operation wind
The key technology that danger control needs to carry out.It is increasingly deep with land exploration and development and offshore drilling, how safely and effectively
Manage and control key problem and main hardly possible that the risk in drilling operation course has become oil company and drilling contractor
One of topic.The application of the invention can greatly improve and improve the true of drillng operation information and drillng operation Risk Monitoring
Sense, intuitive, validity play important function and are of great significance to drillng operation risk is reduced or avoided, and have wide
General application prospect.
Above-mentioned technical proposal is one embodiment of the present invention, for those skilled in the art, at this
On the basis of disclosure of the invention application method and principle, it is easy to make various types of improvement or deformation, be not limited solely to this
Invent method described in above-mentioned specific embodiment, therefore previously described mode is only preferred, and and do not have limitation
The meaning of property.
Claims (8)
1. a kind of visualizing monitor method of drillng operation information and risk, it is characterised in that: the method is at drilling well site end
Drillng operation information data is acquired, and collected drillng operation information data is sent to remote base end in real time;Long-range
Base end stores the drillng operation information data received, and risk profile information is calculated, and establishes drilling well site
Three-dimensional sand table shows drillng operation information and risk profile information on the drilling well site three-dimensional sand table.
2. the visualizing monitor method of drillng operation information according to claim 1 and risk, it is characterised in that: the side
Method includes:
(1) drillng operation information data is acquired at drilling well site end using hand-held acquisition terminal, and sends it to remote base
End;
(2) drillng operation information database is established at remote base end, the drillng operation information database is for receiving and depositing
Store up the drillng operation information data of situ of drilling well;
(3) data acquisition components and remote transmission serviced component are established, by the collected drillng operation Information Number in drilling well site end
The drillng operation information database at remote base end is sent to when factually;
(4) drilling well site three-dimensional sand table is established, the visualizing monitor for drillng operation information and drillng operation risk provides
Drilling well site three-dimensional artificial environment true to nature;
(5) remote service end is established at remote base end, after remote service termination receives the data that drilling well site end is sent, by it
It is stored in drillng operation information database, while data are subjected to serializing and form a string of character strings, and use interprocess communication skill
Character string is pushed to drilling well site three-dimensional sand table by art;
(6) drillng operation information and risk display component based on well site three-dimensional simulation sand table are established;
(7) drillng operation Risk Calculation and evaluation component are established, carry out drillng operation risk sentences knowledge, obtains risk profile letter
Breath;
(8) drillng operation Risk-warning component is established, and the relevant device position on drilling well site three-dimensional sand table will walk
Suddenly the risk profile information that (7) are calculated is shown.
3. the visualizing monitor method of drillng operation information according to claim 2 and risk, it is characterised in that: the step
Suddenly (3) are achieved in that
Collection point is arranged at drilling well site end using wireless radio-frequency, disposes number on the hand-held acquisition terminal at drilling well site end
According to acquisition component, data can be obtained using corresponding agreement from the collection point;On the control terminal top at drilling well site end
Remote transmission serviced component is affixed one's name to, the data that hand-held acquisition terminal is sent can be received by wireless transmission method, and pass through
Internet sends the data to remote base end and is deposited into drillng operation information data after remote base termination receives data
Library.
4. the visualizing monitor method of drillng operation information according to claim 3 and risk, it is characterised in that the nothing
Line radio-frequency technique includes NFC, RFID.
5. the visualizing monitor method of drillng operation information according to claim 4 and risk, it is characterised in that: the step
Suddenly (4) are achieved in that
Main well site entity is modeled using 3 d modeling software first to obtain well site three-dimensional entity model, and uses three
Dimension software development technique builds drilling well site three-dimensional sand table;
The well site three-dimensional entity model includes: rig floor area equipment, dynamical system equipment, borehole fluid system, drilling tool, well control
System, grease can system, safety devices, auxiliary system and equipment, mud logging equipment and drillng operation personnel.
6. the visualizing monitor method of drillng operation information according to claim 5 and risk, it is characterised in that: the step
Suddenly (6) are achieved in that
The position of well site personnel and job information are directly presented on drilling well site three-dimensional sand table, i.e., basis receives
The position of the well site personnel at drilling well site end is by the position of the drilling well site three-dimensional sand table of personnel's entity render to corresponding scene
It sets, is shown job information by drillng operation information and risk display component;
The drillng operation information and risk display component include virtual instrument, liquidometer, digital dial plate.
7. the visualizing monitor method of drillng operation information according to claim 6 and risk, it is characterised in that: the step
Suddenly (7) are achieved in that
Drillng operation Risk Calculation and evaluation component are established, carries out drillng operation risk according to the data that drilling well site end is sent
Risk profile information is calculated;
The risk profile information includes: the risk category predicted, rank.
8. the visualizing monitor method of drillng operation information according to claim 7 and risk, it is characterised in that: the brill
Well operations information and risk display component, drillng operation Risk Calculation and evaluation component are the one of drilling well site three-dimensional sand table
Part, is floated on drilling well site three-dimensional sand table in a manner of 2 dimension display panels or each component corresponding one only
Vertical application program, the independent application program directly can obtain corresponding data from remote service end, and to data into
Row processing, sends result to drilling well site three-dimensional sand table after being disposed.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710388436 | 2017-05-27 | ||
CN2017103884366 | 2017-05-27 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108960553A true CN108960553A (en) | 2018-12-07 |
Family
ID=64495364
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711163761.9A Pending CN108960553A (en) | 2017-05-27 | 2017-11-21 | A kind of visualizing monitor method of drillng operation information and risk |
CN201711163264.9A Pending CN108952681A (en) | 2017-05-27 | 2017-11-21 | A kind of visualizing monitor system for drillng operation |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711163264.9A Pending CN108952681A (en) | 2017-05-27 | 2017-11-21 | A kind of visualizing monitor system for drillng operation |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN108960553A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113738343B (en) * | 2021-09-16 | 2023-11-07 | 零空间(北京)科技有限公司 | VR underground drilling machine state detection method, system, device and equipment |
US20230131106A1 (en) * | 2021-10-27 | 2023-04-27 | Halliburton Energy Services, Inc. | Design of service improvements using adaptive models derived from classified vibration mechanisms |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102354326A (en) * | 2011-10-26 | 2012-02-15 | 大连伟岸纵横科技发展有限公司 | Three-dimensional emulation method of petroleum drilling |
CN105117982A (en) * | 2015-08-27 | 2015-12-02 | 云南电网有限责任公司楚雄供电局 | Visual display method of business data on the basis of tower entity |
US20160145994A1 (en) * | 2014-11-20 | 2016-05-26 | Petrochina Company Limited | Evaluation Method and Evaluation Device for Water Breakthrough Risk of Production Wells in Aquifer Drive Gas Reservoirs |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN203257406U (en) * | 2013-04-09 | 2013-10-30 | 常州大学 | Underground drill column fault diagnosis system |
US10323499B2 (en) * | 2013-12-06 | 2019-06-18 | Halliburton Energy Services, Inc. | Managing wellbore operations using uncertainty calculations |
CN105917073A (en) * | 2014-01-30 | 2016-08-31 | 兰德马克绘图国际公司 | Depth range manager for drill string analysis |
CN105484725A (en) * | 2014-09-18 | 2016-04-13 | 中国石油化工股份有限公司 | Drilling downhole anomaly monitoring device |
CN104806226B (en) * | 2015-04-30 | 2018-08-17 | 北京四利通控制技术股份有限公司 | intelligent drilling expert system |
-
2017
- 2017-11-21 CN CN201711163761.9A patent/CN108960553A/en active Pending
- 2017-11-21 CN CN201711163264.9A patent/CN108952681A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102354326A (en) * | 2011-10-26 | 2012-02-15 | 大连伟岸纵横科技发展有限公司 | Three-dimensional emulation method of petroleum drilling |
US20160145994A1 (en) * | 2014-11-20 | 2016-05-26 | Petrochina Company Limited | Evaluation Method and Evaluation Device for Water Breakthrough Risk of Production Wells in Aquifer Drive Gas Reservoirs |
CN105117982A (en) * | 2015-08-27 | 2015-12-02 | 云南电网有限责任公司楚雄供电局 | Visual display method of business data on the basis of tower entity |
Also Published As
Publication number | Publication date |
---|---|
CN108952681A (en) | 2018-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20190325642A1 (en) | Computer platform for pooling and viewing digital data | |
CA2715451C (en) | Data aggregation for drilling operations | |
KR100866830B1 (en) | System and method for managing river using 3d based moving picture | |
CN103632509B (en) | Based on the numeral of generalized information system, intelligent mine alarm linkage method and platform thereof | |
EP2575089A1 (en) | Customizable user interface for real-time oilfield data visualization | |
CN109274737B (en) | C/S technical architecture system for oil field exploration, development and production | |
US20140204121A1 (en) | Augmented reality for oilfield | |
CN113869680A (en) | Intelligent pile foundation construction management and control method and system | |
CN114037097A (en) | BIM model-based equipment operation and maintenance management method | |
CN104680588A (en) | BIM-based event marking method and system | |
CN112712300A (en) | BIM + GIS construction project management system based on B/S information system | |
CN108960553A (en) | A kind of visualizing monitor method of drillng operation information and risk | |
US11151762B2 (en) | Systems and methods for shared visualization and display of drilling information | |
CN112199750A (en) | Multi-format integration method for rail transit construction management and GIS platform | |
CN111459289A (en) | BIM information visualization system and method based on mobile augmented reality | |
WO2012162736A1 (en) | Construction management system and method | |
CN110069552A (en) | A kind of data processing system and method | |
Bo et al. | Research on the data validity of a coal mine solid backfill working face sensing system based on an improved transformer | |
US20170122095A1 (en) | Automated geo-target and geo-hazard notifications for drilling systems | |
Zhang et al. | WebGIS-based collaborative construction quality control of RCC gravity dam using sensing devices | |
Le et al. | A novel mobile information system for risk management of adjacent buildings in urban underground construction | |
CN108491530A (en) | A kind of Spatial GIS | |
Feng et al. | Bimil: automatic generation of bim-based indoor localization user interface for emergency response | |
Papadopoulou et al. | Mobilizing the Semantic Interpreter Pythia–Teaching Engineering Students to Integrate GIS and Soil Data During In Situ Measurements | |
RU2703576C1 (en) | Adaptive control system for wells drilling based on a single digital platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181207 |