CN108951699A - A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method - Google Patents

A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method Download PDF

Info

Publication number
CN108951699A
CN108951699A CN201810615241.5A CN201810615241A CN108951699A CN 108951699 A CN108951699 A CN 108951699A CN 201810615241 A CN201810615241 A CN 201810615241A CN 108951699 A CN108951699 A CN 108951699A
Authority
CN
China
Prior art keywords
piping lane
bracket
internal model
mobile
sectional type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810615241.5A
Other languages
Chinese (zh)
Other versions
CN108951699B (en
Inventor
王瑜
王鹏
方涛
范忠磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201810615241.5A priority Critical patent/CN108951699B/en
Publication of CN108951699A publication Critical patent/CN108951699A/en
Application granted granted Critical
Publication of CN108951699B publication Critical patent/CN108951699B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0007Production methods using a mold

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The present invention relates to a kind of mobile internal model of the sectional type of pipe gallery and bracket and its application methods, including frame support and inner template, the frame support is spliced by square steel tube in " well " according to the sectional dimension of piping lane, the surrounding of the frame support is arranged by inner template, the disposed inboard of the inner template, which has, to be spliced back cord by square steel tube in " well ", the back cord is connected by the steel pipe scaffolding spiral jackscrew being evenly arranged on frame support with frame support, the lower end installation of the frame support is by several rollers of walking, the walking roller is erected on bracket walking track, the track foundation column that the bracket walking track is embedded in concrete by lower end is fixed.The present invention has process structure simple, production easy to process, can effectively reduce the labor intensity of construction personnel, reduces process, has and is easy to guarantee construction quality, improves construction efficiency, saves the advantages of construction cost.

Description

A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method
Technical field
The present invention relates to construction engineering technical fields, more particularly to the mobile internal model of sectional type and branch of a kind of pipe gallery Frame and its application method.
Background technique
In underground pipe gallery standard paragraphs cast-in-place construction, existing template support is still used conventional methods, that is, is adopted It is often set up using steel pipe scaffolding with wooden splint, other steel membranes or plastic formwork, flitch or steel pipe scaffolding supporting, internal mould supporter, Baseplate reinforcing bar, concrete construction are first carried out, then carries out side wall and baseplate reinforcing bar, concrete construction again.The construction method process More, long in time limit, work efficiency is low, and steel plate for sealing water need to be arranged in indwelling construction joint, and piping lane builds up rear construction joint and percolating water phenomenon easily occurs, It is unfavorable for accelerating construction progress, improves construction quality, reduces construction cost.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of mobile internal model of the sectional type of pipe gallery and bracket and its Application method has process structure simple, and production easy to process can effectively reduce the labor intensity of construction personnel, reduces process, With being easy to guarantee construction quality, improves construction efficiency, saves the advantages of construction cost.
The technical solution adopted by the present invention to solve the technical problems is: in the sectional type movement for providing a kind of pipe gallery Mould and bracket, including frame support and inner template, the frame support are in " well " by square steel tube according to the sectional dimension of piping lane It is spliced, the surrounding of the frame support arranges that the disposed inboard of the inner template has is in by square steel tube by inner template " well " is spliced back cord, and the back cord passes through the steel pipe scaffolding spiral jackscrew and frame support phase that are evenly arranged on frame support Even, by several rollers of walking, the walking roller is erected at bracket walking track for the lower end installation of the frame support On, the track foundation column that the bracket walking track is embedded in concrete by lower end is fixed.
As a supplement to the technical solution of the present invention, the lower end of the frame support passes through high-intensitive spiral shell Bolt is connected with walking roller, and the bracket walking track is erected on the rest track bracket of track foundation column side, described Bracket walking track be connected and fixed by the side side wall of high-strength bolt and track foundation column.
The steel pipe scaffolding spiral jackscrew includes adjusting jackscrew and one end handler connected vertically with adjusting jackscrew, Adjusting jackscrew corresponding square steel tube from frame support passes through and one end is connected with the connecting plate being welded on back cord.
Further, rectangle is provided in the inner template of bottom to vibrate hole, which vibrates setting above hole There is stopend, the upper end of the stopend is equipped with several short steel pipes, the U-iron that the short steel pipes pass through outside Ring is connected with stopend.
Further, internal model and bracket are moved along several sectional types of bracket walking track length direction arranged Frame support between pass through rack connecting plate.
Further, the side of the inner template is mounted on edge-protecting angle iron.
A kind of application method of the mobile internal mould supporter of the sectional type of pipe gallery, the specific steps are as follows:
(a) first carry out bracket walk track installation, it is desirable that track is straight, strict control rail level absolute altitude, and in piping lane Bottom elevation is consistent, and first segment piping lane track should be longer than quasi- construction piping lane 5-6m, so as to the mobile piping lane internal model of sectional type and bracket point Section is interim in place;
(b) the mobile piping lane internal model of sectional type and bracket are hung in into foundation pit section by section, are pushed into predetermined position in time, dispose car stop, Triangle iron block is placed under walking roller, connects frame support with bolt and rack connecting plate, keeps multiple sectional types mobile Piping lane internal model and bracket connection are integral;
(c) spiral jackscrew is adjusted, template is stretched out, is connected with two section templates of locking, keeps the connection of piping lane internal model integral, Specific template stretching sequence are as follows: side wall template → roof plate template → upper armpit Angle formwork → bottom plate → lower armpit Angle formwork → bottom Stopend on plate;
(d) after the mobile piping lane internal model of single cabin piping lane sectional type and bracket are linked to be entirety in place, in piping lane side before closing template Three connector split bolts are installed on the external mold of wall;The installation of three connector split bolts is also installed between double cabin piping lanes, it should be wherein After the mobile piping lane internal model of one cabin sectional type and bracket are linked to be entirety in place, the mobile piping lane internal model of another cabin sectional type and bracket are installed In the process, three connector split bolts are coupled section by section with internal model and frame support;
(e) single cabin or the mobile piping lane internal model of double cabin sectional types and bracket after the installation is completed, close external mold in due course, in fastening, Three connector split bolts on external mold, while adjusting internal model clear distance and make its rule side, it blocks in time later, installation end head formwork;
(f) after the inside and outside template support of piping lane, fastening, examination, timely casting concrete is torn open in due course after maintenance 3-5 days Removing template, demoulding carry out in the following order: stopend → lower armpit Angle formwork → bottom plate → upper armpit Angle formwork on bottom plate → roof plate template → side wall template;
(g) the mobile piping lane internal model of sectional type and bracket are pushed into section by section in time after demoulding next wait hand over a section piping lane.In segment After the mobile piping lane internal model of formula and bracket removal have poured piping lane, in order to ensure Pipe rack is stablized, foot hand is provided with using top The steel pipe scaffolding of steel pipe spiral jackscrew supports piping lane top plate, comes support top piping lane top plate, jackscrew and pipe by vertical, horizontal spacing 1.0m Laterally usually setting scaffolding pole plate protects piping lane top surface to corridor top surface contact surface, continues to conserve piping lane until intensity meets design and rule Model requirement.
Piping lane, which pours, in step (f) must be layered progress, vibrate in time, and bottom slab concreting is in piping lane by pre- in template The rectangle stayed hole of vibrating is vibrated, and after underplate concrete is completely poured, vibrated, with wooden splint, from piping lane downstream, (absolute altitude is relatively one by one Lower) mouth that vibrates securely is blocked, side wall and top plate, which pour, answers uniform distribution, sufficiently vibrates, forbids owed to shake, leakage, due to piping lane Bottom plate is there are track foundation column, and template is not easy tight-closed, and spillage brings unnecessary defect, bottom to piping lane entity in order to prevent After board concrete completely pours, necessary technology intermission is preferably carried out, interval preferably terminates before concrete initial set.
First three connector split bolt both ends are laid down when removing side wall template in step (f), later steel pipe scaffolding spiral top Silk, makes template progressively disengage wall 5-10cm, the mobile internal model of sectional type and bracket slowly, paragraph by paragraph can be removed piping lane later.
The utility model has the advantages that the present invention relates to a kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method, tool There are technique, structure simple, it is easily operated, the labor intensity of construction personnel is effectively reduced, and construction joint indwelling can be cancelled, reduce work Sequence improves work efficiency, saves construction cost, the advantages of can be safeguarded at any time, be maintained in use.
Detailed description of the invention
Fig. 1 is the cross section structure figure of the mobile piping lane internal model of double cabin sectional types of the invention and bracket;
Fig. 2 is the mobile piping lane internal model of sectional type of the invention and side face structure chart;
Fig. 3 is the main view installation schematic configuration diagram of walking roller of the invention;
Fig. 4 is the side view installation schematic configuration diagram of walking roller of the invention;
Fig. 5 is the structural schematic diagram of steel pipe scaffolding spiral jackscrew of the invention;
Fig. 6 is the scheme of installation of stopend of the invention;
Fig. 7 is the interim position schematic diagram of lifting of the mobile piping lane internal model of sectional type of the invention and bracket;
Fig. 8 is the mobile piping lane internal model of sectional type of the invention and the status diagram that bracket is arranged according to predetermined position;
Fig. 9 is the mobile piping lane internal model of sectional type of the invention and bracket collapses the state for entering next segment piping lane after template Schematic diagram.
Diagram: 1, inner template;2, steel pipe scaffolding spiral jackscrew;3, frame support;4, three connector split bolt;5, external mold; 6, walking roller;7, track foundation column;8, rectangle is vibrated hole;10, bracket walking track;11, rest track bracket;13, high Strength bolts;14, handler;15, jackscrew is adjusted;16, connecting plate;18, stopend;19, U-iron ring;20, short steel pipes;22, Back cord;23, edge-protecting angle iron.
Specific embodiment
Present invention will be further explained below with reference to specific examples.It should be understood that these embodiments are merely to illustrate the present invention Rather than it limits the scope of the invention.In addition, it should also be understood that, after reading the content taught by the present invention, those skilled in the art Member can make various changes or modifications the present invention, and such equivalent forms equally fall within the application the appended claims and limited Range.
As shown in figs 1-9, embodiments of the present invention are related to the mobile internal model of sectional type and bracket of a kind of pipe gallery, packet Frame support 3 and inner template 1 are included, the frame support 3 is spliced by square steel tube in " well " according to the sectional dimension of piping lane, The surrounding of the frame support 3 arranges that by inner template 1, the disposed inboard of the inner template 1, which has, is spelled by square steel tube in " well " It connects into back cord 22, the back cord 22 passes through the steel pipe scaffolding spiral jackscrew 2 and frame support 3 that are evenly arranged on frame support 3 It is connected, by several rollers 6 of walking, the walking roller 6 is erected at bracket walking for the lower end installation of the frame support 3 On track 10, the bracket walking track 10 is embedded in the track foundation column 7 in concrete by lower end and fixes.
The lower end of the frame support 3 is connected by high-strength bolt 13 with walking roller 6, the bracket walking rail Road 10 is erected on the rest track bracket 11 of 7 side of track foundation column, and the bracket walking track 10 passes through high-intensitive spiral shell Bolt 13 and the side side wall of track foundation column 7 are connected and fixed.
The steel pipe scaffolding spiral jackscrew 2 includes adjusting jackscrew 15 and connected vertically turn of one end with adjusting jackscrew 15 Dynamic handle 14, the adjustings jackscrew 15 corresponding square steel tube from frame support 3 pass through and one end be welded on back cord 22 Connecting plate 16 is connected.
It is provided with rectangle in the inner template 1 of bottom to vibrate hole 8, which, which vibrates, is provided with closure above hole 8 Template 18, the upper end of the stopend 18 are equipped with several short steel pipes 20, the U-shaped that the short steel pipes 20 pass through outside Iron hoop 19 is connected with stopend 18.
The frame shape of internal model and bracket is moved along several sectional types of bracket walking 10 length direction arranged of track Pass through rack connecting plate 24 between bracket 3.
The side of the inner template 1 is mounted on edge-protecting angle iron 23.
In the construction of piping lane main body standard paragraphs, no matter the structural shape of piping lane is single cabin, double cabins or three cabins, can be according to The cross dimensions of piping lane design, the mobile piping lane internal model of the sectional type of merogenesis processing in advance and bracket, framework of steel reinforcement implement overall binding Afterwards, the mobile piping lane internal model of the sectional type of processing and bracket are hung to foundation pit section by section, is manually pushed into predetermined position, connection branch Frame adjusts jackscrew and stretches out internal model, locks template, block the end head formwork of deformation joint, later continuous one-piece casting from the bottom to top Piping lane.
It is poured for the track foundation of trapped orbit foundation columns 7 using C30 armored concrete in this patent, pattern preferably reference Attached drawing 1, attached drawing 2 are arranged, and the parameters such as arrangement of reinforcement, spacing, buried depth, outer dimension should be according to foundation bearing capacity, construction loads, segment The mobile piping lane internal model of formula and the piping lane top plate of bracket self weight and its carrying are determined from re-computation.
Track foundation column 7 is replaced using 10# or 12# channel steel, can also be calculated and be determined according to upper load, track foundation column 7 In corresponding position using 10mm thickness general steel plate welding setting rest track bracket 11,11 size of rest track bracket is held according to it The upper load received, which calculates, to be determined, the installation of track foundation column 7 controls position using hanging steel wire, it is desirable that 7 position of track foundation column Accurately, 11 elevation of top surface of rest track bracket is consistent with bottom elevation in piping lane, is detailed in shown in attached drawing 3.
Track 10 of walking uses 10mm thickness general steel plate welding processing, and every section track length is arranged by 6m, track width 40mm, the high 200mm of track, in walking 10 side of track and basic spaced set mounting hole, walk track 10 and track foundation The installation of 7 column of column, until its infall is fastenedly connected with 4 10.9 grades of Φ, 10 high-strength bolts 13, rest is preferably arranged in rail joint At 11 face of track bracket, walking track structure pattern is detailed in shown in attached drawing 3.
Roller 6 of walking is processed using roller bearing, bearing outside diameter 200mm, internal diameter 95mm, thickness 45mm, the weldering of bearing two sides It connects 5mm thick and circular baffle, processes roller bearing with 0.2m long diameter 95mm round steel among bearing, both ends processing screw thread penetrates bearing, row After walking the processing assembling of roller 6, it is mounted on frame support 3 by bracket, idler wheel connector and high-strength bolt.
The mobile internal model of the sectional type of pipe gallery described in this patent and holder device consist of two parts, respectively frame shape Bracket 3 and piping lane internal model, wherein frame support 3 uses wall thickness for the processing of 100 × 100 square steel tube of 4.5mm, and piping lane internal model is by painting Face wooden splint, wall thickness are that 50 × 50 square steel tube of 3.5mm and steel pipe scaffolding spiral jackscrew form.
Wherein frame support 3 uses wall thickness for 4.5mm, 100 × 100 square steel tube, according to 3 place piping lane of frame support Chamber size processing, every section stent length about 3.0m are welded by horizon bar and upright bar, horizontal at the angle Liang Ye of middle and upper part Bar adjusts armpit Angle formwork and needs, and horizon bar need to rotate 45 °, be detailed in attached drawing 1.
Inner template 1 is processed with the high-quality lacquer painting wooden splint of thickness 18mm, and back cord 22 uses wall thickness for 50 × 50 side of 3.5mm Steel pipe is in " well " font cross weld, and wooden splint is connected and fixed by self-tapping screw and back cord, inner mold edge setting 45 × 45 etc. Corner angle as edge-protecting angle iron 23, fixed by self-tapping screw and Bolted angle connection by wooden splint, is detailed in attached drawing 1.
Using derusting, brushing twice antirust paint anti-corrosion, steel pipe scaffolding spiral jackscrew 2 is adopted for frame support 3 and template back arris 22 With yellow glycerine lubrication.
As a kind of specific embodiment of the invention, the specific steps are as follows:
(a) it carries out bracket walking track 10 first to install, it is desirable that track is straight, strict control rail level absolute altitude, and and piping lane Interior bottom elevation is consistent, and first segment piping lane track should be longer than quasi- construction piping lane 5-6m, so as to the mobile piping lane internal model of sectional type and bracket Merogenesis is temporarily in place;
(b) the mobile piping lane internal model of sectional type and bracket are hung in into foundation pit section by section, are pushed into predetermined position in time, dispose car stop, Triangle iron block is placed under walking roller 6, frame support 3 is connected with bolt and rack connecting plate 24, makes multiple sectional types Mobile piping lane internal model and bracket connection are integral;
(c) spiral jackscrew is adjusted, template is stretched out, is connected with two section templates of locking, keeps the connection of piping lane internal model integral, Specific template stretching sequence are as follows: side wall template → roof plate template → upper armpit Angle formwork → bottom plate → lower armpit Angle formwork → bottom Stopend on plate;
(d) after the mobile piping lane internal model of single cabin piping lane sectional type and bracket are linked to be entirety in place, in piping lane side before closing template Three connector split bolts 4 are installed on the external mold 5 of wall;The installation of three connector split bolts 4 is also installed between double cabin piping lanes, it should be wherein The mobile piping lane internal model of a cabin sectional type and after bracket is linked to be entirety in place, the mobile piping lane internal model of another cabin sectional type and branch are installed During frame, it is coupled three connector split bolts 4 section by section with internal model and frame support 3;
(e) single cabin or the mobile piping lane internal model of double cabin sectional types and bracket after the installation is completed, close external mold in due course, in fastening, Three connector split bolts 4 on external mold, while adjusting internal model clear distance and make its rule side, it blocks in time later, installation end head formwork;
(f) it is provided with rectangle in bottom plate to vibrate hole 8, aperture longitudinal direction is vertical with piping lane longitudinal center, pours Underplate concrete blocks hole of vibrating after hole spill-over of vibrating, with stopend 18;
(g) after the inside and outside template support of piping lane, fastening, examination, timely casting concrete is torn open in due course after maintenance 3-5 days Removing template, demoulding carry out in the following order: stopend → lower armpit Angle formwork → bottom plate → upper armpit Angle formwork on bottom plate → roof plate template → side wall template;
(h) the mobile piping lane internal model of sectional type and bracket are pushed into section by section in time after demoulding next wait hand over a section piping lane.In segment After the mobile piping lane internal model of formula and bracket removal have poured piping lane, in order to ensure Pipe rack is stablized, foot hand is provided with using top The steel pipe scaffolding of steel pipe spiral jackscrew supports piping lane top plate, comes support top piping lane top plate, jackscrew and pipe by vertical, horizontal spacing 1.0m Laterally usually setting scaffolding pole plate protects piping lane top surface to corridor top surface contact surface, continues to conserve piping lane until intensity meets design and rule Model requirement.
Piping lane, which pours, in step (f) must be layered progress, vibrate in time, and bottom slab concreting is in piping lane by pre- in template The rectangle stayed hole 8 of vibrating is vibrated, and after underplate concrete is completely poured, vibrated, with wooden splint, from piping lane downstream, (absolute altitude is relatively one by one Lower) mouth that vibrates securely is blocked, side wall and top plate, which pour, answers uniform distribution, sufficiently vibrates, forbids owed to shake, leakage, due to piping lane Bottom plate is there are track foundation column, and template is not easy tight-closed, and spillage brings unnecessary defect, bottom to piping lane entity in order to prevent After board concrete completely pours, necessary technology intermission is preferably carried out, interval preferably terminates before concrete initial set.
First three connector split bolts, 4 both ends are laid down when removing side wall template in step (f), later steel pipe scaffolding spiral top Silk 2, makes template progressively disengage wall 5-10cm, the mobile internal model of sectional type and bracket slowly, paragraph by paragraph can be removed piping lane later.
The present invention has technique, structure simple, easily operated, the labor intensity of construction personnel is effectively reduced, and can cancel Construction joint indwelling, reduce process, improve work efficiency, save construction cost, can be safeguarded at any time in use, maintain it is excellent Point.

Claims (10)

1. a kind of mobile internal model of the sectional type of pipe gallery and bracket, which is characterized in that including frame support (3) and inner template (1), which is characterized in that the frame support (3) is spliced by square steel tube in " well " according to the sectional dimension of piping lane, described The surrounding of frame support (3) arrange that, by inner template (1), the disposed inboard of the inner template (1) has by square steel tube in " well " Be spliced back cord (22), the back cord (22) by the steel pipe scaffolding spiral jackscrew (2) that is evenly arranged on frame support (3) with Frame support (3) is connected, and the lower end installation of the frame support (3) is walked roller (6) by several, the walking roller (6) it is erected in bracket walking track (10), bracket walking track (10) is embedded in the rail in concrete by lower end Road foundation columns (7) are fixed.
2. the mobile internal model of the sectional type of pipe gallery according to claim 1 and bracket, it is characterised in that: the frame shape The lower end of bracket (3) is connected by high-strength bolt (13) with walking roller (6), and bracket walking track (10) is erected at On the rest track bracket (11) of track foundation column (7) side, bracket walking track (10) passes through high-strength bolt (13) the side side wall with track foundation column (7) is connected and fixed.
3. the mobile internal model of the sectional type of pipe gallery according to claim 1 and bracket, it is characterised in that: the foot hand Steel pipe spiral jackscrew (2) includes adjusting jackscrew (15) and one end handler connected vertically (14) with adjusting jackscrew (15), institute The adjusting jackscrew (15) stated is passed through from corresponding square steel tube on frame support (3) and one end and the connection that is welded on back cord (22) Plate (16) is connected.
4. the mobile internal model of the sectional type of pipe gallery according to claim 1 and bracket, it is characterised in that: positioned at bottom It is provided with rectangle in inner template (1) to vibrate hole (8), which, which vibrates, is provided with stopend (18) above hole (8), described The upper end of stopend (18) several short steel pipes (20) are installed, the short steel pipes (20) pass through the U-iron ring in outside (19) it is connected with stopend (18).
5. the mobile internal mould supporter of the sectional type of pipe gallery according to claim 1, it is characterised in that: walk along bracket Pass through bracket between the mobile internal model of several sectional types of track (10) length direction arranged and the frame support (3) of bracket Connecting plate (24).
6. the mobile internal model of the sectional type of pipe gallery according to claim 1 and bracket, it is characterised in that: the internal model The side of plate (1) is mounted on edge-protecting angle iron (23).
7. a kind of application method of the mobile internal mould supporter of the sectional type of pipe gallery as described in claim 1, specific steps are such as Under:
(a) first carry out bracket walking track (10) installation, it is desirable that track is straight, strict control rail level absolute altitude, and in piping lane Bottom elevation is consistent, and first segment piping lane track should be longer than quasi- construction piping lane 5-6m, so as to the mobile piping lane internal model of sectional type and bracket point Section is interim in place;
(b) the mobile piping lane internal model of sectional type and bracket are hung in into foundation pit section by section, is pushed into predetermined position in time, car stop is disposed, by three Angular iron block is placed under walking roller (6), with bolt and rack connecting plate (24) connection frame support (3), makes multiple segments The mobile piping lane internal model of formula and bracket connection are integral;
(c) spiral jackscrew is adjusted, template is stretched out, is connected with two section templates of locking, keeps the connection of piping lane internal model integral, specifically Template stretching sequence are as follows: on side wall template → roof plate template → upper armpit Angle formwork → bottom plate → lower armpit Angle formwork → bottom plate Stopend;
(d) after the mobile piping lane internal model of single cabin piping lane sectional type and bracket are linked to be entirety in place, in piping lane side wall before closing template Three connector split bolts (4) are installed on external mold (5);The installation of three connector split bolts (4), Ying Qi are also installed between double cabin piping lanes In the mobile piping lane internal model of a cabin sectional type and bracket be linked to be entirety in place after, install the mobile piping lane internal model of another cabin sectional type and In stent procedures, it is coupled three connector split bolts (4) section by section with internal model and frame support (3);
(e) single cabin or the mobile piping lane internal model of double cabin sectional types and bracket after the installation is completed, close external mold in due course, fasten inside and outside mould On three connector split bolts (4), while adjusting internal model clear distance and make its rule side, block in time later, installation end head formwork;
(f) after the inside and outside template support of piping lane, fastening, examination, timely casting concrete removes mould after maintenance 3-5 days in due course Plate, demoulding carry out in the following order: stopend → lower armpit Angle formwork → bottom plate → upper armpit Angle formwork → top on bottom plate Template die plate → side wall template;
(g) the mobile piping lane internal model of sectional type and bracket are pushed into section by section in time after demoulding next wait hand over a section piping lane.
8. the application method of the mobile internal mould supporter of the sectional type of pipe gallery according to claim 7, it is characterised in that: After the mobile piping lane internal model of sectional type and bracket removal have poured piping lane, in order to ensure Pipe rack is stablized, it is provided with using top The steel pipe scaffolding of steel pipe scaffolding spiral jackscrew (2) supports piping lane top plate, by vertical, horizontal spacing 1.0m carrys out support top piping lane top plate, Laterally usually setting scaffolding pole plate protects piping lane top surface for jackscrew and piping lane top surface contact surface, continues to conserve piping lane until intensity meets Design and code requirement.
9. the application method of the mobile internal mould supporter of the sectional type of pipe gallery according to claim 7, it is characterised in that: step Suddenly piping lane pours and must be layered progress in (f), vibrates in time, rectangle of the bottom slab concreting in piping lane by reserving in template Hole (8) of vibrating is vibrated, after underplate concrete is completely poured, vibrated, one by one with wooden splint from piping lane downstream (absolute altitude relatively lower) jail The stifled mouth that vibrates of sealing, side wall and top plate, which pour, answers uniform distribution, sufficiently vibrates, forbids owed to shake, leakage, due to piping lane bottom plate there are Track foundation column, template are not easy tight-closed, and spillage brings unnecessary defect, underplate concrete to piping lane entity in order to prevent After completely pouring, necessary technology intermission is preferably carried out, interval preferably terminates before concrete initial set.
10. the application method of the mobile internal mould supporter of the sectional type of pipe gallery according to claim 7, it is characterised in that: First three connector split bolt (4) both ends are laid down when removing side wall template in step (f), later steel pipe scaffolding spiral jackscrew (2), So that template is progressively disengaged wall 5-10cm, the mobile internal model of sectional type and bracket slowly, paragraph by paragraph can be removed into piping lane later.
CN201810615241.5A 2018-06-14 2018-06-14 Festival segmentation removal centre form and support of utility tunnel Active CN108951699B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810615241.5A CN108951699B (en) 2018-06-14 2018-06-14 Festival segmentation removal centre form and support of utility tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810615241.5A CN108951699B (en) 2018-06-14 2018-06-14 Festival segmentation removal centre form and support of utility tunnel

Publications (2)

Publication Number Publication Date
CN108951699A true CN108951699A (en) 2018-12-07
CN108951699B CN108951699B (en) 2021-09-21

Family

ID=64489135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810615241.5A Active CN108951699B (en) 2018-06-14 2018-06-14 Festival segmentation removal centre form and support of utility tunnel

Country Status (1)

Country Link
CN (1) CN108951699B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914476A (en) * 2019-03-27 2019-06-21 中建五局第三建设有限公司 Construction process of cast-in-place urban comprehensive pipe gallery
CN115419108A (en) * 2022-09-20 2022-12-02 中交第三航务工程局有限公司 Assembling method of assembled type superposed pipe gallery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696439A (en) * 2013-11-29 2014-04-02 中交第二航务工程局有限公司 Immersed tube pouring method
CN105908777A (en) * 2016-05-04 2016-08-31 东北大学 Comprehensive pipe gallery sliding mold and application method thereof
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method
CN107142960A (en) * 2017-05-16 2017-09-08 中国建筑第六工程局有限公司 A kind of city piping lane construction method
CN107460889A (en) * 2017-09-20 2017-12-12 中铁四局集团有限公司 Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103696439A (en) * 2013-11-29 2014-04-02 中交第二航务工程局有限公司 Immersed tube pouring method
CN105908777A (en) * 2016-05-04 2016-08-31 东北大学 Comprehensive pipe gallery sliding mold and application method thereof
CN107119715A (en) * 2017-04-28 2017-09-01 东北大学 A kind of overall mould bases of pipe gallery and its application method
CN107142960A (en) * 2017-05-16 2017-09-08 中国建筑第六工程局有限公司 A kind of city piping lane construction method
CN107460889A (en) * 2017-09-20 2017-12-12 中铁四局集团有限公司 Integral movable support formwork in underground comprehensive pipe gallery construction and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
焦欣欣等: "《建筑识图与构造》", 28 February 2018 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109914476A (en) * 2019-03-27 2019-06-21 中建五局第三建设有限公司 Construction process of cast-in-place urban comprehensive pipe gallery
CN115419108A (en) * 2022-09-20 2022-12-02 中交第三航务工程局有限公司 Assembling method of assembled type superposed pipe gallery
CN115419108B (en) * 2022-09-20 2024-02-02 中交第三航务工程局有限公司 Assembling method of assembled superposed pipe gallery

Also Published As

Publication number Publication date
CN108951699B (en) 2021-09-21

Similar Documents

Publication Publication Date Title
CN207143755U (en) A kind of adjustable bracket for No. 0 block of bridge pier
CN207109856U (en) Piping lane, culvert construction hydraulic steel formwork jumbo
CN108019076B (en) Construction method of large-diameter reinforced concrete silo and device for conical shell construction
CN206607863U (en) A kind of post-cast strip temporary support structure
CN101481944A (en) Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN208415968U (en) Hydraulic climbing formwork/slding form operation shaft of high pier intelligence curing system
CN103526929A (en) Super high-rise steel pipe column interior concrete pouring construction method
CN108265623A (en) A kind of prefabricated superposed type anti-collision wall and its construction method for urban viaduct
CN110552502A (en) Construction method of C-shaped stock yard intermediate retaining wall overhanging platform
CN102251481B (en) Railway pier layered construction method and construction device
CN108951699A (en) A kind of mobile internal model of the sectional type of pipe gallery and bracket and its application method
CN103306463A (en) Metal liner concrete air channel construction method
CN205894670U (en) Template structure for concrete joint construction between floors
CN103510466B (en) Wet joint construction method for T-shaped beam bridge deck system
CN204875558U (en) Shaped steel runs through inside and outside compound support formula bracket system of encorbelmenting
CN106894345A (en) Continuous beam end bay closing device and method
CN104895108A (en) Bailey piece assembled movable-type truss unilateral framework system construction method
CN211341789U (en) Wall form reinforcing tool
CN204691259U (en) The assembled portable truss single side formwork system of beret truss
CN106284989A (en) The sliding form bracing system of double track and complete construction method
CN203498850U (en) Raft foundation reinforcement support of super high-rising building
CN105350719A (en) Large span post-pouring belt early-dismantled mould additionally installed temporary constructional column construction method
CN108930406A (en) Construction method for large-formwork narrow-space wall based on integral assembly
CN205296821U (en) Oblique roofing formwork system of heavy grade cast in situ concrete

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant