CN108949201A - The coke dry quenching furnace and its working method of room are prestored with water cooling hanger and annular - Google Patents

The coke dry quenching furnace and its working method of room are prestored with water cooling hanger and annular Download PDF

Info

Publication number
CN108949201A
CN108949201A CN201811052309.XA CN201811052309A CN108949201A CN 108949201 A CN108949201 A CN 108949201A CN 201811052309 A CN201811052309 A CN 201811052309A CN 108949201 A CN108949201 A CN 108949201A
Authority
CN
China
Prior art keywords
annular
room
outer ring
ring wall
inner ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811052309.XA
Other languages
Chinese (zh)
Other versions
CN108949201B (en
Inventor
白银石
魏振东
李旭东
王满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Acre Coking and Refractory Engineering Consulting Corp MCC
Original Assignee
Acre Coking and Refractory Engineering Consulting Corp MCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Acre Coking and Refractory Engineering Consulting Corp MCC filed Critical Acre Coking and Refractory Engineering Consulting Corp MCC
Priority to CN201811052309.XA priority Critical patent/CN108949201B/en
Publication of CN108949201A publication Critical patent/CN108949201A/en
Application granted granted Critical
Publication of CN108949201B publication Critical patent/CN108949201B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C10PETROLEUM, GAS OR COKE INDUSTRIES; TECHNICAL GASES CONTAINING CARBON MONOXIDE; FUELS; LUBRICANTS; PEAT
    • C10BDESTRUCTIVE DISTILLATION OF CARBONACEOUS MATERIALS FOR PRODUCTION OF GAS, COKE, TAR, OR SIMILAR MATERIALS
    • C10B39/00Cooling or quenching coke
    • C10B39/02Dry cooling outside the oven

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Organic Chemistry (AREA)
  • Coke Industry (AREA)
  • Furnace Details (AREA)

Abstract

The present invention relates to a kind of coke dry quenching furnaces and its working method that room is prestored with water cooling hanger and annular, and the room of prestoring of the coke dry quenching furnace is that the annular collectively constituted by upper inner ring wall, upper outer ring wall and lower inner ring wall, lower outer ring wall prestores room;Annular passage side sets partition wall, and the other side sets recyclegas outlet;Multiple levels prestore airflow channel and are connected to central tube with annular passage across lower inner ring wall and lower outer ring wall;Water cooling hanger is made of multiple hollow beams, and the outer end of hollow beam is connected to by desalination water inlet with outer ring sink, and the other end of hollow beam is connected to by desalination water out with inner ring sink;Ball-cock assembly is set in outer ring sink, long shaft submerged pump is set in inner ring sink, and the water outlet of long shaft submerged pump connects external oxygen-eliminating device by pipeline.The present invention can overcome the shortcomings that conventional coke dry quenching furnace structure, reduce cloth segregation, reduce and prestore room top high-voltage caused by the big material of unit materialbeds comminution, reduce the drag losses of recyclegas.

Description

The coke dry quenching furnace and its working method of room are prestored with water cooling hanger and annular
Technical field
The present invention relates to coke dry quenching furnace technical field more particularly to a kind of coke dry quenching furnaces that room is prestored with water cooling hanger and annular And its working method.
Background technique
Coke dry quenching furnace is an important energy conservation and environmental protection facility of coking production, and the incandescent coke that released from coke oven can exist A large amount of thermal energy that coke carries are recycled while cooling, also avoid wet quenching water caused by environment, gas pollution, because This is widely applied in coking field.Coke oven production have it is periodically and intermittent, and coke furnace system need to carry out it is daily Regularly maintenance (maximum repair time coke over machinery day reaches 2h), therefore coke is packed into coke dry quenching furnace and carries out cooling time and the frequency It is influenced and restriction by coke oven production;On the other hand, the supply of cooling chamber coke needs continuous-stable in coke dry quenching furnace, with Just heat energy recycling system continuous and steady operation is ensured.In order to achieve the above objectives, usually on the top of coke dry quenching furnace, cooling chamber Top be arranged one prestore room, be used for a certain amount of coke of temporary storage, adapt to the daily periodic inspection of coke oven production requirement.
Conventional coke dry quenching furnace to prestore room generally cylindrical cross section (as shown in Figure 1), material is from prestoring the room top opening 1-1 period Ground is packed into, and freely falls into prestore room 1-2 under the effect of gravity, and natural packing forms top in the cylindrical space for prestoring room 1-2 Portion has the material bed 1-3 at annular peak, prestores the material accumulation cylindrical of the room lower part 1-2 and progresses into cooling chamber 1-4.? Prestore the room lower part 1-2, the annular passage 1-5 equipped with export for the recyclegas cooling with red-hot material, annular passage 1-5 by Interior ringwall 1-6 and outer ring wall 1-7 are surrounded.Interior ringwall 1-6 and the lower part outer ring wall 1-7 by the top cooling chamber 1-4 bracket 1-8 into Row support, is arranged chute 1-9 between the lower part interior ringwall 1-6 and bracket 1-8, for exporting the recyclegas for obtaining material thermal energy. The above-mentioned conventional cylindrical room of prestoring has the disadvantage in that
1) be relatively large in diameter due to prestoring room 1-2, material after bell 1-10 cloth in upper lower leaf and inside and outside not Controlled oblique throwing curvilinear motion state, when especially prestoring that level of filler material is lower in the 1-2 of room, material whereabouts height difference is larger, under The enormous impact fallen exacerbates the segregation of cloth, i.e. the biggish material of granularity tends to the two sides for being distributed in material peak, and granularity Lesser material is then distributed in the middle part of material peak.The segregation of cloth also leads to the segregation of cooling air-flow, causes the cooling degree of material not Uniformly, thermal energy can not be effectively recovered, to seriously reduce the cooling efficiency of coke dry quenching furnace.When material is nature difference When biggish mixture, above-mentioned operating condition is more unfavorable.
2) when coke dry quenching furnace prestore have material in the 1-2 of room when, internal is solid " caecum " structure, and air-flow can only pass through It is exported positioned at the chute mouth 1-9 for prestoring mouth bed of material periphery under the 1-2 of room, since the area of chute mouth 1-9 is limited, leads to air velocity Comparatively fast.Material biggish for unit materialbeds comminution, this increases not only the conveying energy consumptions of recyclegas, also change in the bed of material Pressure distribution, cause that prestore positive pressure at the top of the 1-2 of room larger, dust escapes when charging, seriously pollutes environment.
In addition, there is also following disadvantages for the corbels support structure of the conventional coke dry quenching furnace room of prestoring use:
1) bracket 1-8 is successively overhang by brick setting in chute section and is constituted, since its needs is in the operating condition of temperature frequent fluctuation The lower loading for bearing top masonry, the impact grinding of side material undermines cooling air-flow and the fierceness of material dust is washed away, therefore non- It is often easily damaged, the bracket structure strength reduction of damage influences the structural stability of interior ringwall 1-6.
2) structure successively overhang also causes the length of bracket 1-8 and height to be restricted, so as to cause annular passage 1-5 It is restricted with the circulation section of chute mouth 1-9 recyclegas.
3) while the presence of bracket 1-8 reduces chute mouth 1-9 circulation area, chute mouth 1-9 recyclegas is increased Flow velocity increases the recyclegas drag losses flowed through and prestores positive pressure at the top of the 1-2 of room, chute mouth 1-9 is also made to be easier to send out Biology material floats phenomenon, causes chute mouth 1-9 Severe blockage, further increases the operation energy consumption of the circulatory system.
Summary of the invention
The present invention provides a kind of coke dry quenching furnaces and its working method that room is prestored with water cooling hanger and annular, can overcome The shortcomings that conventional coke dry quenching furnace structure, reduces cloth segregation, reduces and prestores ceiling portion height caused by the big material of unit materialbeds comminution Pressure, reduces the drag losses of recyclegas;It can avoid existing many adverse effects when conventional coke dry quenching furnace setting bracket simultaneously, subtract Few material floats the generation of phenomenon.
In order to achieve the above object, the present invention is implemented with the following technical solutions:
The coke dry quenching furnace that room is prestored with water cooling hanger and annular, prestores room and cooling chamber including what is be connected to up and down;It is described pre- Depositing room is that the annular collectively constituted by upper inner ring wall, upper outer ring wall and lower inner ring wall, lower outer ring wall prestores room;Cooling chamber exterior wall Top sets top plate, and water cooling hanger is set above top plate, and upper inner ring wall and upper outer ring wall are built on water cooling hanger;Water cooling hanger Set interior ringwall and lower outer ring wall, lower inner ring wall, the circular passage of lower outer ring wall composition and upper inner ring wall, upper outer ring wall group in lower section At circular passage be aligned and be connected to;The lower section that annular prestores room is cooling chamber;Cooling chamber exterior wall, top plate, lower outer ring wall and cold Indoor material surrounds annular passage, and partition wall, annular wind are set between the cooling chamber exterior wall of annular passage side and lower outer ring wall The road side opposite with partition wall sets training wall and recyclegas outlet;Lower inner ring wall and its top plate of top form lower central Cylinder, along coke dry quenching furnace circumferential direction, multiple levels prestore airflow channel across lower inner ring wall and lower outer ring wall, by lower central cylinder and annular Air duct connection;For water cooling hanger by forming along multiple hollow beams that coke dry quenching furnace is circumferentially arranged, the middle part of water cooling hanger passes through suspention machine Structure is connect with the framework above coke dry quenching furnace;Upper outer ring wall exterior bottom sets outer ring sink, and side bottom sets inner ring water to upper inner ring within the walls Slot, the outer end of hollow beam extend respectively into except furnace shell and are connected to by desalination water inlet with outer ring sink, and hollow beam is close to dry The one end for putting out furnace center sets desalination water out respectively and is connected to inner ring sink;Ball-cock assembly is set in outer ring sink, is set in inner ring sink The water outlet of long shaft submerged pump, long shaft submerged pump connects external oxygen-eliminating device by pipeline.
The water cooling hanger is made of metal material, and its annular across upper inner ring wall, upper outer ring wall prestores room Part outer lining is wear-resisting and heat-barrier material.
The bottom of the water cooling hanger sets the cage skeleton of 2 annulars, and lower inner ring wall and lower outer ring wall are built respectively right Including around the cage skeleton answered and going along with sb. to guard him cage skeleton, cage skeleton is made of refractory metal material.
The cage skeleton is by along more circumferentially distributed vertical sunpenders of coke dry quenching furnace and being vertically arranged on vertical sunpender Multilayer brick plate composition, the height of brick plate is adjustable.
The level prestores airflow channel and is made of heat-resistant and wear-resistant material, and level, which prestores, sets recyclegas stream in airflow channel Quantity regulating device.
The outer ring sink, inner ring sink are located above top plate, the water cooling hanger across outer ring sink, inner ring sump area Top offers multiple exhaust outlets.
The working method of the coke dry quenching furnace that room is prestored with water cooling hanger and annular, comprising:
1) red-hot material is packed by distributing device from the material loading port that annular prestores ceiling portion, and prestoring interior in annular is in Annular crest accumulation, and move down under the effect of gravity;Since annular prestores room limited width, caused by material natural packing Radial segregation degree it is small;Material, can be successively by water cooling hanger and level during loading annular prestores room and moves down The blocking of airflow channel is prestored, generated relative motion is equivalent to whipping process, can further destroy the cloth generated Expect segregation status, cloth is made to tend to uniform;
2) after material prestores the outflow of room bottom from annular, the natural packing in cooling chamber forms the material heap with annular peak, Material bed entrance cooling chamber upper space is passed through after sufficiently exchanging heat from the recyclegas and material that cooling chamber bottom is fed, wherein one The inclination charge level that part recyclegas passes through on the inside of annular peak enters lower central cylinder, then prestores airflow channel by level and enter In annular passage, converge with another part recyclegas that inclination charge level enters annular passage on the outside of annular peak, uniformly distributed water It is flat to prestore airflow channel and mix the air-flow in lower central cylinder and annular passage uniformly, it is more advantageous to the steady of output gas flow temperature Fixed, last recyclegas exports discharge by being located at the recyclegas of annular passage side;
3) outer ring sink is entered by the demineralized water that boiler feedwater pumps out, is controlled by ball-cock assembly and realizes automatic water supplement and tie up Hold the liquid level of setting;Demineralized water is entered from the desalination water inlet for being set to hollow beam sides and is flowed to desalination water out side It is dynamic, it is heated in flow process, is sent by the long shaft submerged pump extraction being located in inner ring sink to external oxygen-eliminating device;Corresponding inner ring Sink, outer ring sink water cooling hanger top area be equipped with exhaust outlet, for export desalination it is water after steam.
Compared with prior art, the beneficial effects of the present invention are:
1) room is prestored using annular, material is circumferentially uniformly packed into annular and prestores interior, material is in relatively narrow space Degree of segregation greatly reduces, and material is during being packed into annular and prestoring room and move down, and successively by circumferentially uniformly distributed water cooling Hanger hollow beam and the horizontal blocking for prestoring airflow channel, generated relative motion are similar to whipping process, can further break The bad cloth segregation status generated makes cloth tend to uniform;
2) material forms annular material peak, medial and lateral charge level in cooling chamber upper space in the case where annular prestores the constraint of room The gross area increases, and inside recyclegas can prestore airflow channel by level and quickly export to external annular passage, more have Conducive to the uniform export of recyclegas, and reduce the resistance of recyclegas and the operation energy consumption of system;
3) it after prestoring room using annular, is equivalent to and prestores the material loading port in ceiling portion in cooling chamber upper space and annular Between be provided with enough height material seal, gas-circulating system and material loading port are effectively completely cut off, cooling chamber top is eliminated Influence of the space pressure to material charging apparatus;
4) the part recyclegas passed through out of the bed of material enters lower central cylinder and to prestore airflow channel laggard by level Entering in annular passage, uniformly distributed level prestores airflow channel and the air-flow of lower central tubular and annular passage is uniformly mixed, It is more advantageous to the stabilization of output gas flow temperature;
5) main body that annular prestores room is fixed by water cooling hanger and suspension gear, is significantly reduced and is built to lower part cooling chamber The load of body, while conventional bracket structure is eliminated, keep the structure of coke dry quenching furnace more stable, Maintenance and Repair cost significantly drops Low, service life can significantly extend;
6) water cooling hanger is cooling using demineralized water, not only ensure that the structural strength of water cooling hanger itself, but also recycled dry put out The heat of material in furnace, while saving the low-pressure steam dosage of oxygen-eliminating device.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of conventional coke dry quenching furnace.
Fig. 2 is the main view of the coke dry quenching furnace of the present invention that room is prestored with water cooling hanger and annular.
Fig. 3 is the A-A view in Fig. 2.
Fig. 4 is the B-B view in Fig. 2.
In figure: 1-1., which prestores room top opening 1-2. and prestores, has the material bed 1-4. at annular peak cold at the top of the 1-3. of room But ringwall 1-7. outer ring wall 1-8. bracket 1-9. chute 1-10. bell in room 1-5. annular passage 1-6.
1. 3. annular of outer ring wall prestores 4. lower central cylinder of room, 5. level and prestores airflow channel 6. on upper inner ring wall 2. The lower outer ring wall 13. of 10. water cooling hanger of annular passage 7. partition wall, 8. training wall, 9. cage skeleton, 11. lower inner ring wall 12. is cold But 14. material loading port of room exterior wall, 15. recyclegas exports 16. top plate, 17. suspension gear, 18. recyclegas flow tune Under 23. exhaust outlet of regulating device 19. outer ring sink, 20. inner ring sink, 21. ball-cock assembly, 22. desalination water inlet, 24. long-shaft liquid Pump 25. desalination water outs
Specific embodiment
Specific embodiments of the present invention will be further explained with reference to the accompanying drawing:
As shown in figs 2-4, of the present invention that there is water cooling hanger and annular to prestore the coke dry quenching furnace of room, including be connected to up and down Prestore room and cooling chamber;The room of prestoring is common by upper inner ring wall 1, upper outer ring wall 2 and lower inner ring wall 11, lower outer ring wall 12 The annular of composition prestores room;The top of cooling chamber exterior wall 13 sets top plate 16, and the top of top plate 16 sets water cooling hanger 10, upper inner ring wall 1 and upper outer ring wall 2 build on water cooling hanger 10;Interior ringwall 11 and lower outer ring wall 12 are set below water cooling hanger 10, it is lower interior The circular passage that ringwall 11, lower outer ring wall 12 form is aligned and is connected to the circular passage that upper inner ring wall 1, upper outer ring wall 2 form; The lower section that annular prestores room 3 is cooling chamber;Cooling chamber exterior wall 13, top plate 16, lower outer ring wall 12 and cooling indoor material surround Annular passage 6 sets partition wall 7, annular passage 6 and partition wall 7 between the cooling chamber exterior wall 13 of 6 side of annular passage and lower outer ring wall 12 Opposite side sets training wall 8 and recyclegas outlet 15;Lower inner ring wall 12 and its top plate of top 16 form lower central cylinder 4, along coke dry quenching furnace circumferential direction, multiple levels prestore airflow channel 5 across lower inner ring wall 11 and lower outer ring wall 12, by lower central cylinder 4 It is connected to annular passage 6;Water cooling hanger 10 along multiple hollow beams that coke dry quenching furnace is circumferentially arranged by forming, the middle part of water cooling hanger 10 It is connect by suspension gear 17 with the framework above coke dry quenching furnace;Upper 2 exterior bottom of outer ring wall sets outer ring sink 19, upper inner ring wall 1 Inside bottom sets inner ring sink 20, and the outer end of hollow beam extends respectively into except furnace shell and by desalination water inlet 22 and outer ring water Slot 19 is connected to, and hollow beam sets desalination water out close to the one end at coke dry quenching furnace center respectively and is connected to inner ring sink 20;Outer ring sink Ball-cock assembly 21 is set in 19, long shaft submerged pump 24 is set in inner ring sink 20, and the water outlet of long shaft submerged pump 24 is connected outer by pipeline Portion's oxygen-eliminating device.
The water cooling hanger 10 is made of metal material, and its annular across upper inner ring wall 1, upper outer ring wall 2 prestores The part outer lining of room 3 is wear-resisting and heat-barrier material.
The bottom of the water cooling hanger 10 sets the cage skeleton 9 of 2 annulars, and lower inner ring wall 11 and lower outer ring wall 12 are built respectively Including building around corresponding cage skeleton 9 and going along with sb. to guard him cage skeleton 9, cage skeleton 9 is made of refractory metal material.
The cage skeleton 9 is by along more circumferentially distributed vertical sunpenders of coke dry quenching furnace and being vertically arranged on vertical sunpender Multilayer brick plate composition, the height of brick plate is adjustable.
The level prestores airflow channel 5 and is made of heat-resistant and wear-resistant material, and level prestores in airflow channel 5 and sets recyclegas Flow regulator 18.
The outer ring sink 19, inner ring sink 20 are located at 16 top of top plate, pass through outer ring sink 19,20 region of inner ring sink Water cooling hanger 10 at the top of offer multiple exhaust outlets 23.
The working method of the coke dry quenching furnace that room is prestored with water cooling hanger and annular, comprising:
1) red-hot material is packed by distributing device from the material loading port 14 that annular prestores 3 top of room, prestores room 3 in annular Inside crest is accumulated in a ring, and is moved down under the effect of gravity;Since annular prestores 3 limited width of room, material natural packing Caused radial segregation degree is small;Material, can be successively by water cooling hanger during loading annular prestores room 3 and moves down 10 and the horizontal blocking for prestoring airflow channel 5, generated relative motion be equivalent to whipping process, can further destroy The cloth segregation status of generation makes cloth tend to uniform;
2) after material prestores the outflow of 3 bottom of room from annular, the natural packing in cooling chamber forms the material with annular peak Heap passes through material bed entrance cooling chamber upper space after sufficiently exchanging heat from the recyclegas and material that cooling chamber bottom is fed, The inclination charge level that middle a part of recyclegas passes through on the inside of annular peak enters lower central cylinder 4, then prestores air-flow by level and lead to Road 5 enters in annular passage 6, converges with another part recyclegas that inclination charge level enters annular passage 6 on the outside of annular peak, Uniformly distributed level, which prestores airflow channel 5, mixes the air-flow in lower central cylinder 4 and annular passage 6 uniformly, is more advantageous to output The stabilization of gas flow temperature, last recyclegas are discharged by being located at the recyclegas outlet 15 of 6 side of annular passage;
3) outer ring sink 19 is entered by the demineralized water that boiler feedwater pumps out, is controlled by ball-cock assembly 21 and realizes automatic water supplement And maintain the liquid level of setting;Demineralized water is entered and from the desalination water inlet 22 for being set to hollow beam sides to desalination water out one Side flowing, is heated in flow process, is sent by the extraction of long shaft submerged pump 24 being located in inner ring sink 20 to external oxygen-eliminating device; Corresponding inner ring sink 20, outer ring sink 19 10 top area of water cooling hanger be equipped with exhaust outlet 23, for exporting desalination aqueous vapor Steam after change.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (7)

1. prestoring the coke dry quenching furnace of room with water cooling hanger and annular, room and cooling chamber are prestored including what is be connected to up and down;Its feature exists In the room of prestoring is that the annular collectively constituted by upper inner ring wall, upper outer ring wall and lower inner ring wall, lower outer ring wall prestores room;It is cold Outdoor coping sets top plate, sets water cooling hanger above top plate, upper inner ring wall and upper outer ring wall build water cooling hanger it On;Interior ringwall and lower outer ring wall, lower inner ring wall, the circular passage of lower outer ring wall composition and upper inner ring are set below water cooling hanger The circular passage that wall, upper outer ring wall form is aligned and is connected to;The lower section that annular prestores room is cooling chamber;Cooling chamber exterior wall, top plate, Lower outer ring wall and cooling indoor material surround annular passage, set between the cooling chamber exterior wall of annular passage side and lower outer ring wall Partition wall, the annular passage side opposite with partition wall set training wall and recyclegas outlet;The top plate group of lower inner ring wall and its top At lower central cylinder, along coke dry quenching furnace circumferential direction, multiple levels prestore airflow channel and pass through lower inner ring wall and lower outer ring wall, will be in lower part Heart cylinder is connected to annular passage;Water cooling hanger along multiple hollow beams that coke dry quenching furnace is circumferentially arranged by forming, the middle part of water cooling hanger It is connect by suspension gear with the framework above coke dry quenching furnace;Upper outer ring wall exterior bottom sets outer ring sink, upper inner ring side bottom within the walls Portion sets inner ring sink, and the outer end of hollow beam extends respectively into except furnace shell and is connected to by desalination water inlet with outer ring sink, empty Heart beam sets desalination water out close to the one end at coke dry quenching furnace center respectively and is connected to inner ring sink;Ball-cock assembly is set in outer ring sink, it is interior Long shaft submerged pump is set in ring sink, the water outlet of long shaft submerged pump connects external oxygen-eliminating device by pipeline.
2. the coke dry quenching furnace according to claim 1 for prestoring room with water cooling hanger and annular, which is characterized in that the water cooling Hanger is made of metal material, and its across upper inner ring wall, upper outer ring wall annular prestore room part outer lining it is wear-resisting and every Hot material.
3. the coke dry quenching furnace according to claim 1 or 2 for prestoring room with water cooling hanger and annular, which is characterized in that described The bottom of water cooling hanger sets the cage skeleton of 2 annulars, and lower inner ring wall and lower outer ring wall are built respectively in corresponding cage skeleton Including around and going along with sb. to guard him cage skeleton, cage skeleton is made of refractory metal material.
4. the coke dry quenching furnace according to claim 1 for prestoring room with water cooling hanger and annular, which is characterized in that the cage Skeleton is made of the multilayer brick plate along more circumferentially distributed vertical sunpenders of coke dry quenching furnace and being vertically arranged on vertical sunpender, The height of brick plate is adjustable.
5. the coke dry quenching furnace according to claim 1 for prestoring room with water cooling hanger and annular, which is characterized in that the level It prestores airflow channel to be made of heat-resistant and wear-resistant material, level, which prestores, sets recyclegas flow regulator in airflow channel.
6. the coke dry quenching furnace according to claim 1 for prestoring room with water cooling hanger and annular, which is characterized in that the outer ring Sink, inner ring sink are located above top plate, offer multiple rows at the top of the water cooling hanger of outer ring sink, inner ring sump area Port.
7. the working method of the coke dry quenching furnace of room is prestored with water cooling hanger and annular as described in claim 1, which is characterized in that Include:
1) red-hot material is packed by distributing device from the material loading port that annular prestores ceiling portion, prestores interior in a ring in annular Crest accumulation, and move down under the effect of gravity;Since annular prestores room limited width, diameter caused by material natural packing It is small to degree of segregation;Material can be prestored successively by water cooling hanger and level during loading annular prestores room and moves down The blocking of airflow channel, generated relative motion are equivalent to whipping process, and it is inclined can further to destroy the cloth generated Analysis state makes cloth tend to uniform;
2) after material prestores the outflow of room bottom from annular, the natural packing in cooling chamber forms the material heap with annular peak, from cold But the recyclegas and material that room bottom is fed pass through material bed into cooling chamber upper space, a portion after sufficiently exchanging heat The inclination charge level that recyclegas passes through on the inside of annular peak enters lower central cylinder, then prestores airflow channel by level and enter annular In air duct, converge with another part recyclegas that inclination charge level enters annular passage on the outside of annular peak, uniformly distributed level is pre- Depositing airflow channel mixes the air-flow in lower central cylinder and annular passage uniformly, is more advantageous to the stabilization of output gas flow temperature, Last recyclegas exports discharge by being located at the recyclegas of annular passage side;
3) outer ring sink is entered by the demineralized water that boiler feedwater pumps out, is controlled by ball-cock assembly and realizes automatic water supplement and maintain to set Fixed liquid level;Demineralized water is entered from the desalination water inlet for being set to hollow beam sides and is flowed to desalination water out side, It is heated in flow process, is sent by the long shaft submerged pump extraction being located in inner ring sink to external oxygen-eliminating device;Corresponding inner ring sink, The water cooling hanger top area of outer ring sink is equipped with exhaust outlet, for export desalination it is water after steam.
CN201811052309.XA 2018-09-10 2018-09-10 Dry quenching furnace with water-cooling hanging frame and annular pre-chamber and working method thereof Active CN108949201B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811052309.XA CN108949201B (en) 2018-09-10 2018-09-10 Dry quenching furnace with water-cooling hanging frame and annular pre-chamber and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811052309.XA CN108949201B (en) 2018-09-10 2018-09-10 Dry quenching furnace with water-cooling hanging frame and annular pre-chamber and working method thereof

Publications (2)

Publication Number Publication Date
CN108949201A true CN108949201A (en) 2018-12-07
CN108949201B CN108949201B (en) 2024-01-30

Family

ID=64476396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811052309.XA Active CN108949201B (en) 2018-09-10 2018-09-10 Dry quenching furnace with water-cooling hanging frame and annular pre-chamber and working method thereof

Country Status (1)

Country Link
CN (1) CN108949201B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200981856Y (en) * 2006-12-19 2007-11-28 惠建明 Dry coke quenching boiler
CN101709222A (en) * 2009-11-16 2010-05-19 中冶焦耐(大连)工程技术有限公司 Dry quenching furnace shell with novel structure
CN201883068U (en) * 2010-12-17 2011-06-29 攀钢集团钢铁钒钛股份有限公司 Coke-dry-quenching furnace
RU2468063C1 (en) * 2011-06-23 2012-11-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кузбасский государственный технический университет имени Т.Ф. Горбачева" (КузГТУ) Coal char discharge device
CN209161944U (en) * 2018-09-10 2019-07-26 中冶焦耐(大连)工程技术有限公司 The coke dry quenching furnace of room is prestored with water cooling hanger and annular

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN200981856Y (en) * 2006-12-19 2007-11-28 惠建明 Dry coke quenching boiler
CN101709222A (en) * 2009-11-16 2010-05-19 中冶焦耐(大连)工程技术有限公司 Dry quenching furnace shell with novel structure
CN201883068U (en) * 2010-12-17 2011-06-29 攀钢集团钢铁钒钛股份有限公司 Coke-dry-quenching furnace
RU2468063C1 (en) * 2011-06-23 2012-11-27 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Кузбасский государственный технический университет имени Т.Ф. Горбачева" (КузГТУ) Coal char discharge device
CN209161944U (en) * 2018-09-10 2019-07-26 中冶焦耐(大连)工程技术有限公司 The coke dry quenching furnace of room is prestored with water cooling hanger and annular

Also Published As

Publication number Publication date
CN108949201B (en) 2024-01-30

Similar Documents

Publication Publication Date Title
CN108359756B (en) Dry centrifugal granulation and waste heat recycling system for liquid slag
CN204434565U (en) With the vapourizing furnace of radiation waste pot
CN102410715B (en) Parallel-flow heating vertical static dryer
CN104048516A (en) Vertical-type spiral particle waste heat recycling device and method for sintering waste heat power generation system
CN209161944U (en) The coke dry quenching furnace of room is prestored with water cooling hanger and annular
CN207180340U (en) A kind of Active Lime Rotary Kiln secondary cooling energy saver
CN208980642U (en) Airflow channel is prestored with inclination and annular prestores the coke dry quenching furnace of room
CN106905988B (en) Dry quenching furnace with new exhaust structure
CN208980645U (en) The coke dry quenching furnace of room is prestored with air-cooled hanger and annular
CN108675269B (en) Full-automatic sulfur dioxide device by directly burning sulfur particles
CN208980646U (en) The coke dry quenching furnace of room is prestored with water cooling support frame and annular
CN108949201A (en) The coke dry quenching furnace and its working method of room are prestored with water cooling hanger and annular
CN208776655U (en) The coke dry quenching furnace of room is prestored with air-cooled support frame and annular
CN201803581U (en) Concurrent heating vertical static drying machine
CN108913169A (en) The coke dry quenching furnace and its working method of room are prestored with water cooling support frame and annular
CN204629539U (en) Burning boiler flue accumulation prevention structure
CN108949202A (en) The coke dry quenching furnace and its working method of room are prestored with air-cooled hanger and annular
CN108865191A (en) Airflow channel is prestored with inclination and annular prestores the coke dry quenching furnace and working method of room
CN107308803B (en) Circulating fluidized bed desulfurizing tower and control method
CN202973073U (en) Air-cooled slag discharging pipe for small and medium-sized circulating fluidized bed boiler
CN203162933U (en) High-sulfur coal circulating fluidized bed boiler
CN216784478U (en) Cooling storage bin and treatment furnace
CN104100968A (en) Circulating fluidized bedboiler cyclone separator provided with entirely inclined center cylinder
CN204824950U (en) Converter high temperature flue gas dry process is removed dust and cascaded recovery plant of process waste heat
CN211170602U (en) Biomass carbonization material production device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant