- Publication number
- CN108927411A CN108927411A CN201710389758.2A CN201710389758A CN108927411A CN 108927411 A CN108927411 A CN 108927411A CN 201710389758 A CN201710389758 A CN 201710389758A CN 108927411 A CN108927411 A CN 108927411A
- Authority
- CN
- China
- Prior art keywords
- milling train
- point
- line
- equipment placement
- measured
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Metal Rolling (AREA)
Abstract
本发明涉及轧机的安装。轧机安装控制测量网放设的方法,它包括:以连轧机到横向中心线以F4轧机为基础,分别测量轧机的横向中心,在轧机传动侧±0的位置,距轧制线5m处做一条平行于轧线的直线;将仪器安置在控制点1,以控制2为后视测量90°,沿90°度边放设5m,确定1′点,再将仪器安置在控制点2上,以1点为后视侧90°,沿90°度边放设2′点,通过1′、2′两点构成与轧线平行的辅助线;将仪器安置在辅助线和F4轧机交点处进行测量90°;确定F4轧机横向线后,在辅助线上用仪器定向,沿定向线测量出每台轧机横向中心线的测量点,再将仪器安置每个点上,依次将每台轧机横向线确定下来。本发明减少了劳动力的投入,提高工作效率,降低安全隐患。
Description
技术领域
本发明涉及轧机的安装,尤其涉及轧机安装控制测量网的放设。
背景技术
轧机作为冶金企业的主要生产设备之一,其安装质量是今后生产的轧钢质量的重要保证。通常一家冶金企业的轧机不止一台,五台以上成为常态。其安装质量尤其重要。以1780热轧机机为例,其横向中心线是5.8m,如有七台轧机,基础总长可达40m,要测量的轧机横向中心线长度有50多米,要测出七台轧机横向中心垂直于轧机纵向中心成为90°,必须要将仪器安置在纵向线和横向中心交点处,可是基础设计横向、纵向交点位置都是轧沟,根本无法安装仪器。以前遇到类似问题一般解决的方法是,用吊车和汽车将几块长3m的重钢坯吊运到轧机基础上,几块钢坯落在一起,将交点投在钢坯上,然后安装仪器进行测量,因为钢坯很重,人和仪器在上面工作有一定的稳定性。但是这样做既费工又费力,浪费很大,而且轧机之间的距离又不能在轧线直接丈量,不能达到理想的测量结果。
发明内容
本发明旨在克服现有技术的缺陷,提供一种轧机安装控制测量网放设的方法。本发明减少了劳动力的投入,提高了工作效率,降低了安全隐。
为了解决上述技术问题,本发明是这样实现的:轧机安装控制测量网放设的方法,它包括:
步骤一,以连轧机到横向中心线以F4轧机为基础,分别测量轧机的横向中心,在轧机传动侧±0的位置,距轧制线5m处做一条平行于轧线的直线;
步骤二,将仪器安置在控制点1,以控制2为后视测量90°,沿90°度边放设5m,确定1′点后,再将仪器安置在控制点2上,以1点为后视侧90°,沿90°度边放设2′点,这样有了1′、2′两点,通过这两点就构成与轧线平行的辅助线,这条直线平行于通过1、2两点的直线;
步骤三,将仪器安置在辅助线和F4轧机交点处进行测量90°;确定F4轧机横向线后,在辅助线上用仪器定向,沿定向线测量出每台轧机横向中心线的测量点,再将仪器安置每个点上,依次将每台轧机横向线确定下来。
所述的轧机安装控制测量网放设的方法,点1、点1′、点2和点2′在一个平面上。
本发明并根据现场基础特点,采用了辅助线的测量方式解决了这一难题。本发明测量精度高、准确可靠;本发明减少了劳动力的投入,提高了工作效率,降低了安全隐患。
附图说明
图1为本发明的示意图。
具体实施方式
如图1所示:本发明轧机安装控制测量网放设的方法,它包括:
步骤一,以连轧机到横向中心线以F4轧机为基础,分别测量轧机的横向中心,在轧机传动侧±0的位置,距轧制线5m处做一条平行于轧线的直线;
步骤二,将仪器安置在控制点1,以控制2为后视测量90°,沿90°度边放设5m,确定1′点后,再将仪器安置在控制点2上,以1点为后视侧90°,沿90°度边放设2′点,这样有了1′、2′两点,通过这两点就构成与轧线平行的辅助线,这条直线平行于通过1、2两点的直线;
步骤三,将仪器安置在辅助线和F4轧机交点处进行测量90°;确定F4轧机横向线后,在辅助线上用仪器定向,沿定向线测量出每台轧机横向中心线的测量点,再将仪器安置每个点上,依次将每台轧机横向线确定下来。
所述点1、点1′、点2和点2′在一个平面上。
Claims (2)
1.轧机安装控制测量网放设的方法,其特征在于,它包括:
步骤一,以连轧机到横向中心线以F4轧机为基础,分别测量轧机的横向中心,在轧机传动侧±0的位置,距轧制线5m处做一条平行于轧线的直线;
步骤二,将仪器安置在控制点1,以控制点2为后视测量90°,沿90°度边放设5m,确定1′点后,再将仪器安置在控制点2上,以1点为后视侧90°,沿90°度边放设2′点,这样有了1′、2′两点,通过这两点就构成与轧线平行的辅助线,这条直线平行于通过1、2两点的直线;
步骤三,将仪器安置在辅助线和F4轧机交点处进行测量90°;确定F4轧机横向线后,在辅助线上用仪器定向,沿定向线测量出每台轧机横向中心线的测量点,再将仪器安置每个点上,依次将每台轧机横向线确定下来。
2.根据权利要求1所述的轧机安装控制测量网放设的方法,其特征在于,点1、点1′、点2和点2′在一个平面上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710389758.2A CN108927411A (zh) | 2017-05-27 | 2017-05-27 | 轧机安装控制测量网放设的方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710389758.2A CN108927411A (zh) | 2017-05-27 | 2017-05-27 | 轧机安装控制测量网放设的方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108927411A true CN108927411A (zh) | 2018-12-04 |
Family
ID=64450661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710389758.2A Pending CN108927411A (zh) | 2017-05-27 | 2017-05-27 | 轧机安装控制测量网放设的方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108927411A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111790759A (zh) * | 2020-07-10 | 2020-10-20 | 中国十九冶集团有限公司 | 连续轧机安装测量的控制方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6983549B2 (en) * | 2003-06-02 | 2006-01-10 | Mark Vincent Loen | Method to accurately measure small angular differences between surfaces |
CN101209461A (zh) * | 2006-12-26 | 2008-07-02 | 上海宝钢工业检测公司 | 一种钢管穿孔机三辊定心装置中心准直度在线测量法 |
CN101275400A (zh) * | 2007-03-27 | 2008-10-01 | 鞍钢建设集团有限公司 | 大型轧机的安装方法 |
CN202049231U (zh) * | 2011-01-27 | 2011-11-23 | 宝山钢铁股份有限公司 | 一种适用于板坯吊车的热轧辊道板坯偏斜检测装置 |
CN102632494A (zh) * | 2012-03-28 | 2012-08-15 | 天津二十冶建设有限公司 | 轧机辊道地脚螺栓整体放样方法 |
-
2017
- 2017-05-27 CN CN201710389758.2A patent/CN108927411A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6983549B2 (en) * | 2003-06-02 | 2006-01-10 | Mark Vincent Loen | Method to accurately measure small angular differences between surfaces |
CN101209461A (zh) * | 2006-12-26 | 2008-07-02 | 上海宝钢工业检测公司 | 一种钢管穿孔机三辊定心装置中心准直度在线测量法 |
CN101275400A (zh) * | 2007-03-27 | 2008-10-01 | 鞍钢建设集团有限公司 | 大型轧机的安装方法 |
CN202049231U (zh) * | 2011-01-27 | 2011-11-23 | 宝山钢铁股份有限公司 | 一种适用于板坯吊车的热轧辊道板坯偏斜检测装置 |
CN102632494A (zh) * | 2012-03-28 | 2012-08-15 | 天津二十冶建设有限公司 | 轧机辊道地脚螺栓整体放样方法 |
Non-Patent Citations (2)
Title |
---|
崔雅红等: "轧机设备安装测量方案", 《百度文库HTTPS://WENKU.BAIDU.COM/VIEW/36B86AD549649B6648D74746.HTML》 * |
陈国基: "《钢铁联合企业的机械安装测量》", 31 August 1963, 中国工业出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111790759A (zh) * | 2020-07-10 | 2020-10-20 | 中国十九冶集团有限公司 | 连续轧机安装测量的控制方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100547345C (zh) | 一种在线测量板坯镰刀弯的方法 | |
CN102716913B (zh) | 铁素体热轧不锈钢楔形板坯宽度控制方法 | |
CN102322803B (zh) | 钢坯测长定位系统 | |
CN101507977A (zh) | 板带轧机板形检测设备系统误差综合补偿技术 | |
CN107532960B (zh) | 一种轮轨垂直力地面全连续测量方法和系统 | |
CN103191924B (zh) | 一种标定导尺中心线的方法 | |
CN104534989A (zh) | 高铁接触网线索空间几何状态参数检测方法 | |
CN108927411A (zh) | 轧机安装控制测量网放设的方法 | |
CN101871762A (zh) | 一种间隙测量工具 | |
CN103691744B (zh) | 一种带钢动态抛尾量预报方法 | |
CN201455008U (zh) | 测量精轧机轧辊轴轴向窜动量的专用工具 | |
CN204530480U (zh) | 错台调整装置 | |
CN105926387B (zh) | 一种cpⅲ平面网测量方法 | |
CN201227652Y (zh) | 一种轧机水平辊缝偏差的标定工具 | |
CN203373905U (zh) | 一种具有切分标识的钢筋 | |
CN204672699U (zh) | 检验高速线材精轧机大底座的安装精度的工装 | |
CN103033174A (zh) | 隧道仰拱衬砌钢筋标距尺及用标距尺进行的施工方法 | |
CN103334544A (zh) | 一种具有切分标识的钢筋 | |
CN202661017U (zh) | 测量螺栓孔距离的装置 | |
ATE298639T1 (de) | Verfahren zum stranggiessen eines stahlvorblocks | |
CN104483173A (zh) | 一种检测h型钢侧向弯曲残余应力切割方法 | |
CN210603127U (zh) | 一种直条钢筋端部剪切弯曲度的测量工具 | |
Liu et al. | Influence analysis of irregularities on vehicle dynamic response on curved track of speed-up railway | |
CN205482689U (zh) | 定宽压力机模块开口度标定工具 | |
CN110659840B (zh) | 一种既有轨道交通结构安全状况的动态评估系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181204 |