CN108876281A - A kind of project management system and device - Google Patents
A kind of project management system and device Download PDFInfo
- Publication number
- CN108876281A CN108876281A CN201810379447.2A CN201810379447A CN108876281A CN 108876281 A CN108876281 A CN 108876281A CN 201810379447 A CN201810379447 A CN 201810379447A CN 108876281 A CN108876281 A CN 108876281A
- Authority
- CN
- China
- Prior art keywords
- project
- information
- log
- program member
- responsibility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Engineering & Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of project management system and devices.The project management system includes:Member management module, for obtaining the power and responsibility mark and program member's title of the program member of project in the project;Authority management module, for establishing the corresponding relationship of program member's title with corresponding power and responsibility information;Member links up module, based on the corresponding relationship that the authority management module is established, to meet the communicative channel that program member's foundation of default communication condition is used for synchronizing project information;Project information management module, for storing the project information of the project;Project process update module, for updating the progress of the project;Log management module, for obtaining and recording the log corresponding to the project label;Talent's retrieval module, for carrying out talent's retrieval;Knowledge Sharing module, for sharing and obtaining professional knowledge relevant to the project.
Description
Technical field
The present invention relates to Internet technical field more particularly to a kind of project management system and devices.
Background technique
Project can be a series of unique, complicated and activities that are mutually related, these activities have one it is specific
Target or purpose, and these movable targets or purpose will often be limited in specific period, budget and limited resource
It is interior, it is completed according to certain specification.Common project such as include but is not limited to construction project, New Product Development Item,
Large-scale activity scheme programs, etc..
By taking construction project as an example, when a project is only complete by a company, the participant of project (i.e. project at
Member, sometimes referred as personal) often multiple departments from the said firm, such as the Planning Department from the said firm, prospecting portion, design
Portion, purchasing department, construction portion and examination portion etc.;If this project is cooperated completion by multiple companies, then, program member
Being also possible to can be from different company, for example, adopting respectively from the Planning Department of company A, prospecting portion and design portion and B company
Purchase portion and construction portion, there are also the examination portions of C company.
As it can be seen that the participant of project is often diversified, they may be from the different departments of same company, or even can
It can be from the different departments of different company.It is completed since project generally requires multiple participant collaborations, different participant even can
It can be distributed in all over the world, therefore, it is necessary to be managed to information such as progress, the member's power and responsibility of project of project, to promote
Project smoothly completes.
Existing project information management mode is the system software of program member's operation management project, in limited resource
Constraint under, project information involved in the project task of respective self-responsibility is managed.Wherein, program member is respectively right
Project information involved in oneself responsible project task is managed, and is primarily referred to as program member and is remembered using the system software
Record the relevant information for the project task being responsible for.Until Items in order member confirms that project process, project encounter various jointly
When the various project information such as difficulty, project funds service condition, projects member is using hold a meeting (such as videoconference or view
Frequency meeting etc.) mode carry out reporting in meeting to reaching project according to the relevant information of the project task of oneself record
Synchronization of the information between disparity items member.Such Information Administration Mode, there is synchronizing projects between program member to believe
The relatively low problem of the efficiency of breath.
In addition, according to above-mentioned existing project management mode, energy when program member in development of projects in order to encounter problems
It relates to related personnel to solve the problems, such as, program member needs in the address list of oneself, carries out the power and responsibility of sundry item member
It indicates, when to encounter problems in development of projects, address list can be recalled, and look into according to the power and responsibility information recorded in address list
Related personnel is looked for solve the problems, such as.Such mode also causes the efficiency of synchronizing project information between program member relatively low.
Summary of the invention
The embodiment of the present invention provides a kind of project management system and device, is led in a manner of existing project information management by solving
The relatively low problem of project information synchronous efficiency between the program member of cause.
In order to solve the above-mentioned technical problem, the invention is realized in this way:In a first aspect, the embodiment of the invention provides one
Kind project management system, including:
Member management module, for obtaining the power and responsibility mark and program member's title of the program member of project in the project;
Authority management module, power and responsibility mark and program member's name for being obtained according to the member management module
Claim, establishes the corresponding relationship of program member's title with corresponding power and responsibility information;
Member links up module, based on the corresponding relationship that the authority management module is established, to meet default ditch poker
The program member of part establishes the communicative channel for being used for synchronizing project information;
Project information management module, for storing the project information of the project, the project information includes at least project
The information of mark and the predicted duration for characterizing the project;The duration, including duration and/or hold
The continuous period;
Project process update module, for according to the practical progress time of the project and project information management module
The information of the predicted duration of storage, updates the progress of the project;The practical progress time, including practical progress
Duration and/or practical progress period;
Log management module, for obtaining the log for corresponding to the project label, the log recording that will acquire is arrived
In the file of the project label name of project information management module storage.
Second aspect, the embodiment of the present invention also provide a kind of project management device, including:
Member management unit, for obtaining the power and responsibility mark and program member's title of the program member of project in the project;
Rights management unit, power and responsibility mark and program member's name for being obtained according to the member management module
Claim, establishes the corresponding relationship of program member's title with corresponding power and responsibility information;
Member links up unit, based on the corresponding relationship that the authority management module is established, to meet default ditch poker
The program member of part establishes the communicative channel for being used for synchronizing project information;
Project information management unit, for storing the project information of the project, the project information includes at least project
The information of mark and the predicted duration for characterizing the project;The duration, including duration and/or hold
The continuous period;
Project process updating unit, for according to the practical progress time of the project and project information management module
The information of the predicted duration of storage, updates the progress of the project;The practical progress time, including practical progress
Duration and/or practical progress period;
Log management unit, for obtaining the log for corresponding to the project label, the log recording that will acquire is arrived
In the file of the project label name of project information management module storage.
In embodiments of the present invention, a kind of project management system, including member management module, rights management mould are capable of providing
Block, member link up module, project information management module, project process monitoring module and log management module, wherein first at
Member's management module can obtain the power and responsibility mark and program member's title of program member in the project, then authority management module energy
Enough power and responsibility marks and program member's title obtained according to member management module, establish program member's title and believe with corresponding power and responsibility
The corresponding relationship of breath, so as to the power and responsibility information of clear projects member, member, which links up module, can be based on rights management mould
The corresponding relationship that block is established, to meet the communicative channel that program member's foundation of default communication condition is used for synchronizing project information,
The relatively low problem of project information synchronous efficiency being able to solve between program member caused by existing project information management mode.
In addition, project information management module is capable of the project information of stored items, including at least project label and it is used for
The information of the predicted duration section of characterization project, project process update module can be according to the practical carry out durations and item of project
The information of the predicted duration of mesh information management module storage, the progress of renewal item, this enables program member timely
The progress of grasp project, last log management module can obtain the log corresponding to project label, and the log note that can be will acquire
In the file for recording the project label name stored with log management module, convenient for determining that projects member completes in the project
Work, be also convenient for finding and search.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below by institute in the description to the embodiment of the present invention
Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention
Example, for those of ordinary skill in the art, without any creative labor, can also be according to these attached drawings
Obtain other attached drawings.
Fig. 1 is a kind of structural schematic diagram of project management system provided in an embodiment of the present invention;
Fig. 2 is the structural representation of the power and responsibility rank of program member in a project management system provided in an embodiment of the present invention
Figure;
Fig. 3 a is program member's structural schematic diagram in a project provided in an embodiment of the present invention;
Fig. 3 b invites the schematic diagram of a scenario of program member's addition project between disparity items provided in an embodiment of the present invention;
Fig. 4 is the interface schematic diagram of the project examination progress in project management system provided in an embodiment of the present invention;
Fig. 5 is the interface schematic diagram of the first project group chat in project management system provided in an embodiment of the present invention;
Fig. 6 is the interface schematic diagram of second of project group chat in project management system provided in an embodiment of the present invention;
Fig. 7 is the interface signal that project group chat carries out Video chat in project management system provided in an embodiment of the present invention
Figure;
Fig. 8 is the personal progress in project management system provided in an embodiment of the present invention comprising project process and program member
" project summary page " interface schematic diagram;
Fig. 9 is the schematic diagram of schedule planning in project management system provided in an embodiment of the present invention;
Figure 10 is the schematic diagram of log in project management system provided in an embodiment of the present invention;
Figure 11 is " I that program member has generated after having edited log in project management system provided in an embodiment of the present invention
Log " interface schematic diagram;
Figure 12 is talent's retrieval module interface schematic diagram in project management system provided in an embodiment of the present invention;
Figure 13 is Knowledge Sharing module interfaces schematic diagram in project management system provided in an embodiment of the present invention;
Figure 14 is a kind of structural schematic diagram of project management device provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
The technical solution provided below in conjunction with attached drawing, each embodiment that the present invention will be described in detail.
Permission to solve program member in existing project management system is indefinite, between program member without convenient and fast ditch
The problem of logical channel, the present invention provides a kind of project management system.
Below with reference to the structural schematic diagram of project management system shown in FIG. 1, it is situated between in detail to the project management system
It continues, including:
Member management module 101, for obtaining the power and responsibility mark of the program member of project in the project and program member's name
Claim;
Authority management module 102, power and responsibility mark and program member's title for being obtained according to member management module, is established
The corresponding relationship of program member's title and corresponding power and responsibility information;
Member links up module 103, based on the corresponding relationship that authority management module is established, to meet default communication condition
Program member establish be used for synchronizing project information communicative channel;
Project information management module 104, for the project information of stored items, which includes at least project label
And the information of the predicted duration for characterizing project;The duration, including duration and/or duration;
Project process update module 105, for according to the practical progress time of project and project information management module
The information of the predicted duration of 104 storages, the progress of renewal item;The time carries out the time, including it is practical carry out duration and/
Or the practical progress period;
Log management module 106, for obtaining the log for corresponding to project label, the log that will acquire is recorded with item
In the file of the project label name of mesh information management module storage.
Optionally, member links up module 106, is specifically used for:When applicant sends to recipient links up request, firstly,
Can determine whether applicant has and recipient according to the corresponding power and responsibility information of applicant power and responsibility information corresponding with recipient
The permission of communication;Wherein apply for a program member in artificial project, receives the project in artificial project in addition to applicant
Member, then, however, it is determined that applicant has the permission linked up with recipient, then establishes the communication canal between applicant and recipient
Road so that can directly be linked up between applicant and recipient, communication mentioned here, can be, but not limited to it is following extremely
Few one kind:Examination & approval, communication, log are shared.Specifically, however, it is determined that the power and responsibility of applicant is greater than or equal to the power and responsibility of recipient,
Or the corresponding power and responsibility of applicant be less than recipient power and responsibility and the corresponding power and responsibility of applicant in the corresponding power and responsibility range of recipient
It is interior, that is, apply artificial recipient directly under junior, then can establish between applicant and recipient for synchronizing project information
Communicative channel.
If it is determined that applicant does not have the permission linked up with recipient, then can determine between applicant and recipient first
Intermediate auditor, then will link up request and be sent to intermediate auditor, and finally determine that intermediate auditor agree to that the communication is asked
When asking, then it can establish the communicative channel between applicant and recipient, so that can be direct between applicant and recipient
It is linked up.Specifically, however, it is determined that the power and responsibility of applicant is less than the power and responsibility of recipient, and the corresponding power and responsibility of applicant is receiving
I.e. applicant is not recipient directly under junior within the scope of the corresponding power and responsibility of people, then can determine between applicant and recipient
Intermediate auditor, the intermediate auditor include applicant directly under higher level.
By taking program member's structure chart of a project as shown in Figure 2 as an example, embodiment that the present invention will be described in detail is provided
Authority management module workflow.As shown in Fig. 2, the power and responsibility of the program member of the project includes three ranks:First power
Limit rank, the second Permission Levels and third Permission Levels.Wherein the corresponding program member of the first Permission Levels includes level-one leader;
The corresponding program member of second Permission Levels includes department head a~department head e, wherein department head a~department head e
It is level-one leader C directly under junior;The corresponding program member of third Permission Levels include department employee a11, b21, c31, d41,
D42, e51 and e52, wherein department employee a11 is department head a directly under junior, and department employee b21 is the straight of department head b
Subordinate's grade, department employee c31 are department head c directly under junior, and department employee d41 and d42 are department head d directly under under
Grade, department employee e51 and e52 are department head e directly under junior.
When a certain program member (i.e. applicant) sends to another program member (i.e. recipient) links up request, permission
Management module judged first according to the rank of the rank of the corresponding power and responsibility of applicant power and responsibility corresponding with recipient applicant with
Whether the permission of communication is had between recipient.If it is determined that the rank of the power and responsibility of applicant is greater than or equal to the power and responsibility of recipient
Rank, or the artificial recipient of application directly under junior, then can establish and believe between applicant and recipient for synchronizing project
The communicative channel of breath.For example, the corresponding program member of the first Permission Levels, that is, level-one leader has and other two Permission Levels
The permission that corresponding program member links up, the corresponding program member of the second Permission Levels such as department head a not only has and portion
Door leader's b~department head e communication permission, is also equipped with program member corresponding with third Permission Levels and the first Permission Levels
Communication permission.
Again by taking department employee a11 wants to link up with level-one leader as an example, department employee a11 can send a communication and ask
It asks, the mark comprising applicant department employee a11 and the mark of recipient's level-one leader, server receive in communication request
This communication request, the mark that can be led according to the mark and recipient's level-one of applicant department employee a11 are corresponding
Permission, judges whether department employee a11 has the permission linked up with level-one leader.
Obviously, the structure chart of the power and responsibility rank of program member according to Fig.2, is it is found that the power and responsibility of department employee a11
Rank is less than the rank of the power and responsibility of level-one leader, and department employee a11 is not level-one leader directly under junior, that is to say, that department
Employee a11 does not have the permission linked up with level-one leader.The embodiment of the present invention is wanted to lead with level-one to meet department employee a11
Lead communication request, can determine department head a11 and level-one leader B between intermediate auditor, department employee a11 directly under
Leader is department head a, it is clear that department head a is one of intermediate auditor, when department head a agrees to communication request, the portion
Door employee a11 can just lead with level-one and directly be linked up.
Again shown in Fig. 3 a for program member's structure chart, rights management that embodiment of coming that the present invention will be described in detail provides
The workflow of module.As shown in Figure 3a, " item " shown in the project i.e. Fig. 3 a is total to by company A, company B and company C
With undertaking, wherein company A is participated in by department A and department B jointly again, and the program member of department A includes people A and people B, department
The program member of B includes people C and people D, and company B is participated in jointly by department C and department D, and the program member of department C includes people E
With people F, the program member of department D includes people G and people H, and company C is participated in jointly by department E and department F, and the project of department E at
Member includes people I and people J, and the program member of department F includes people K and people L.
When program member people A (i.e. applicant) wants with any program member in program member people B~people L (i.e.
Recipient) when linking up, it can be sent to the program member for wanting to be linked up and link up request, authority management module is first
Judge to be between applicant and recipient according to the rank of the rank of the corresponding power and responsibility of applicant power and responsibility corresponding with recipient
The no permission for having communication, by Fig. 3 a it is found that the rank of the rank of the corresponding power and responsibility of the applicant power and responsibility corresponding with recipient
Identical, therefore, program member people A (i.e. applicant) has with any program member in program member people B~people L (i.e.
Recipient) permission directly linked up.
And it is led when program member people A (i.e. applicant) wants with the department in any department in department B~department F
Lead or the company of company A be responsible for lead (i.e. recipient) link up when, authority management module is first according to the corresponding power of applicant
The rank of the rank of duty power and responsibility corresponding with recipient judges the permission for whether having communication between applicant and recipient, by
Fig. 3 a it is found that the rank of the corresponding power and responsibility of the applicant is less than the rank of the corresponding power and responsibility of recipient, then may be used by authority management module
Communication request is sent to the intermediate auditor of program member people A, that is, program member people A directly under leader, i.e. portion
The department head of door A audits, and when determining that the department head of department A agrees to communication request, establishes applicant and connect
Receive the communicative channel between people.
When program member A (i.e. applicant) wants it is responsible for that (i.e. recipient) is led to link up with the company of company B or company C
When, authority management module judges Shen according to the rank of the rank of the corresponding power and responsibility of applicant power and responsibility corresponding with recipient first
It asks someone the permission for whether having communication between recipient, by Fig. 3 a it is found that the rank of the corresponding power and responsibility of the applicant is less than connects
The rank of the corresponding power and responsibility of people is received, which then can be requested the centre for being sent to program member people A to be examined by authority management module
Core people, that is, the company directly under leader, that is, department A department head and company A of program member people A are responsible for leader and examine
Core, and the company of the department head and company A that determine department A be responsible for leader agree to the communication request when, establish applicant
Communicative channel between recipient.
As shown in Figure 3b, invite program member that the schematic diagram of a scenario of project, in fig 3b, project is added between disparity items
Program member's structure in A includes level-one leader a, department head a1, department head a2, department employee a11 and department employee
Program member's structure in a21, project B includes level-one leader b, department head b1, department head b2, department employee b11 and portion
Door employee b21, if the level-one leader a in project A wants the level-one leader b in invitation project B and participates in project A, if level-one
Leader b agrees to this invitation, then level-one leader b just joined in project A, and if the level-one leader a in project A wants to invite
Department head b1 in project B is participated in project A, then the level-one leader b agreement in Items in order B and department head b1
Also it after agreeing to, can just be added in project A.
Communicative channel described above including but not limited to checked by phone, short message, wechat, mailbox, log, etc.
Etc. modes realize the communication between applicant and recipient.By taking short message as an example, when applicant wants one short message of hair to reception
When people, member links up module 106, then can be according to the corresponding power and responsibility information of applicant power and responsibility information corresponding with recipient, really
Determine whether applicant has the permission directly sent short messages with recipient, however, it is determined that applicant, which has, directly to send short messages with recipient
Permission then establishes the communicative channel between applicant and recipient, so that can directly carry out between applicant and recipient
Messaging communication, and if applicant does not have the permission directly sent short messages with recipient, request that this is sent short messages can be sent
To the intermediate auditor between applicant and recipient, and after intermediate auditor agrees to the request sent short messages, Shen is established
The communicative channel asked someone between recipient, can directly to carry out messaging communication between applicant and recipient.
Module 106 is linked up since the project management system in the embodiment of the present invention is added to member, it can between program member
With power and responsibility information of its clear people in a project, the foundation of module 106 can be linked up by the member and has different power and responsibility
Communicative channel between the program member of information greatly facilitates the communication between program member.
As shown in figure 4, for the interface signal of the project examination progress in project management system provided in an embodiment of the present invention
Figure, in Fig. 4, when the program member Li Si of-xx department of xx company applies for the examination & approval of a certain contract signing, can enter should
The examination & approval progress of the contract signing is checked at interface, and program member Li Si can be to view current conjunction in interface shown in Fig. 4
Any degree is proceeded to the examination & approval progress signed, including is examined by which approver, each approver examines the contract signing institute
The examination & approval duration of consuming and next approver, corresponding approver in the examination & approval task for receiving the contract signing,
The suggestions made after examination of other approvers can be viewed, and can determine whether to agree to the contract signing in the examination & approval interface, if
Agree to that then the approval process is by automatic flow to next approver.
For the ease of communicating with each other, discussing between projects member in the same project and negotiation problem, the present invention
The project management system that embodiment provides can also provide the function of project group chat, if Fig. 5, Fig. 6 and Fig. 7 are the embodiment of the present invention
Three kinds of interface schematic diagrams of the project group chat of offer.To check that oneself is closed convenient for the program member of the local log-on project system
The message that the program member of note sends and the message oneself sent, project group chat shown in fig. 5 interface may include three pieces and chat
Its content:The chat content of all items member, interface right side top program member " I " are closed in the project group chat A of interface left side
The chat content of the program member of note and the chat content of program member " I ".It should be understood that in the interface in this three pieces chats
The position of appearance can be adjusted according to actual needs, and can be according to actual needs to all items member in project group chat A
Chat content zoom in and out displaying.The present invention is not specifically limited the position of this three pieces of chat contents.
In addition, the program member in project group chat can also carry out Video chat, Fig. 7 is item provided in an embodiment of the present invention
Mesh group chat carries out the interface schematic diagram of Video chat, and in Fig. 7, displaying has three pieces of chat contents:On the left of interface in project group chat A
The video image of all items member and the video image of the amplified a certain program member of selection, interface right side top project
The video image of member " I " program member of interest and the video image of program member " I ".
The message that oneself program member of interest sends is checked for the program member convenient for the local log-on project system,
Project group chat shown in fig. 6 interface then may include two pieces of chat contents:Program member " I " project of interest above interface
Below the chat content of member and interface in project group chat A all items member chat content.It should be understood that this two pieces chats
The position of content can be adjusted according to actual needs, for example, the interface top show project group chat A in all items at
The chat content of member, and the chat content of program member " I " program member of interest is shown in the lower section at the interface.This hair
The bright position to this two pieces of chat contents is not specifically limited.
It should be understood that project process update module 105, connect with project information management module 104, available project information
Project information in management module 104, including the information for characterizing Item duration, such as can be project starting when
Between, project terminate the time, come current target advance of identifying project.Optionally, project process update module 105, can also be with
Log management module 106 connects, it can and divided stages are carried out to project, and each phased mission of project is associated with log,
According to log associated with the phased mission of project in log management module 106, the actual progress identified project.It is specific next
It says, the phased mission of project can be obtained from project information management module 106, then from the acquisition of log management module 106 and item
The associated log of purpose phased mission, finally can be according to log associated with the phased mission of project and the rank of project
Section task, carrys out the practical duration of renewal item.
In addition, being also provided in project process update module 105 to preferably promote the progress of entire project to develop
The material time node of project, then project process update module 105 can be in the timing node and material time section identified project
When point is identical, program member is prompted.
Project information in project information management module 104 further includes responsible in the project for characterizing projects member
The information of the duration of project task, then project process update module 105, can also be responsible in the project according to program member
Project task the practical progress time and the program member that stores of project information management module 104 it is responsible in the project
The information of the predicted duration of project task, the progress for the project task that renewal item member is responsible in the project.Optionally,
It can also include the information for characterizing the project task that projects member is responsible in the project in project information, such as some small
Task or the information such as target, then project process update module can also be according to the program member stored in project management system
The item being responsible in the project in the information and log management module 106 of responsible project task with program member in the project
The associated log of mesh task is come the actual progress for the member that identifies project.
Optionally, as described in the background art, most program member's target is unknown in existing project management system
Really, various this of the item being responsible for just makes projects member in the progradation of project, then may ignore or forget certain
A little items and the propulsion for influencing entire project, in order to solve this problem, project process update module 105 can for the embodiment of the present invention
To be connect with project information management module 104, at the beginning of determining projects member, end time and current time, really
Determine the target advance of projects member.Project process update module 105 can also be connect with log management module 106, be determined each
The task or item be responsible in the project of program member, further according to projects member submit log, determine projects at
The actual progress of member.
As shown in figure 8, for the " project of the personal progress provided in an embodiment of the present invention comprising project process and program member
Summarize page " interface schematic diagram, in fig. 8, the round progress bar in left side is the schematic diagram of project process, the round progress bar on right side
For the schematic diagram of the personal progress of program member in project.Wherein, the project process in Fig. 8 and the personal progress of program member be all
Be according to project at the beginning of, propulsion time of end time and project determine, and the project process and project at
The personal progress of member mainly includes time started, remaining time and promotion of item time account for total Item duration section hundred
Divide ratio.
Optionally, log management module 106 can record the log of program member first, then determine to have and check respectively
The program member of log permission, that is, the visible people of log described below, finally by log be sent to it is corresponding have look into
See the program member of the log permission, wherein the log in the embodiment of the present invention can also include schedule planning.The project of should be understood that
Member can in project management system recoding daily log and schedule planning, when having recorded work log and schedule planning,
Since certain tasks often will be cooperated to complete with sundry item member, will also in time into project leader report project propulsion
Situation, therefore, the embodiment of the present invention work log and schedule planning can also be arranged by setting presentable mode can
See people, after being provided with visible people, work log that program member issues in the project management system and schedule planning are just
The visible people that can be set views the working day of program member's publication in the entrance for checking the work log and schedule planning
Will and schedule planning.
It is illustrated in figure 9 the schematic diagram of schedule planning provided in an embodiment of the present invention, the schedule planning is by calendar, schedule meter
Composition is drawn, program member can click a certain date in calendar, can show program member's sheet corresponding with the date
The schedule planning list of people i.e. " my schedule planning " shown in Fig. 9, and sundry item member corresponding with the date
It is shared with the schedule planning of the program member i.e. " other people schedule plannings " shown in Fig. 9.Program member can edit the day
Interim schedule planning, and schedule planning is submitted after editor completes, schedule planning may include the following contents:In project
The schedule planning that sundry item member is shared with the schedule planning of the program member and the program member submits.Wherein, project
In sundry item member be shared with the schedule planning of the program member can be with xx company-xx department-xx program member-schedule
The name form of plan is shown.
The schedule planning that the program member submits then may be displayed under the date corresponding with the schedule planning, when the project
The visible people of the schedule planning can be set in member when submitting schedule planning, when being set as that only oneself is visible, the schedule planning
Then only have this talent as it can be seen that and when specifying certain people visible, these specified visible people then can with the schedule planning pair
The schedule planning of other people sharings is viewed below the date answered, and after having checked the schedule planning that other people share, it can also be anti-
Feed participator, for example can feed back to participator in a manner of having read or not read, can to show that the schedule planning is appointed
See that people checked or do not checked.
Program member can also edit log in project management system provided in an embodiment of the present invention, be as shown in Figure 10
Editor's log schematic diagram in project management system provided in an embodiment of the present invention, the content of the log include but is not limited to text
Word, picture, video, voice, file upload, position etc..After log editor completes, visible people can be set, i.e., it will editor
Good log is set as that only oneself is visible or specified portions people is visible.Wherein, only oneself visible log, can also share
To other people.The log of the visible type of groups of people, once upload, it is seen that list can increase visible people newly, and be shared with visible people
Aim at day be deleted after, which still can be checked by visible people.After editor completes log, for point convenient for log
Class storage and search, the title of the log can be defined as:Project abbreviation+company abbreviation+department name+name.Program member
It can be in the information searches logs relevant to these information such as cuit abbreviation, department's abbreviation, department name and/or name
Hold.
As shown in figure 11, raw after having edited log for program member in project management system provided in an embodiment of the present invention
At " my log " interface schematic diagram, including the log of text class, picture, video, voice, position class log and files classes day
Will.In Figure 11, program member can view the state that the visible people that all kinds of logs are arranged by the program member checks, wherein
It can be seen that people checks that the state of log includes read states and unread state, when determining that visible people A checked that the program member shares
Log after, the program member can be viewed below the log the visible people A name the upper right corner occur " " printed words
Label, show that the visible people A has read the log;And when the log for determining that visible people B checks that the program member shares not yet
Afterwards, there is the label of " not " printed words in the upper right corner which can view the visible people B name below the log,
Show that the visible people B does not read the log.
The log of program member can show that program member can delete submitted day according to time flashback
Will, however it is shared with presentable log, even if the program member for being submitted the log deletes, the visible people of the log is still
It can check forever.Sundry item member in project is shared with the log of a certain program member, can also issue according to resource
Time flashback arrangement.
Optionally, after log is sent to visible people, operation record module is also used to record to have and checks that log is weighed
The program member of limit checks the record of log;It will be provided with checking that the program member of log permission checks that the record of log is fed back to and mentions
Hand over the program member of the log.Specifically, have the program member for checking log permission i.e. day log to be sent to
After the visible people of will, when visible people does not also check the log, then feeds back to and submit the program member of the log visible people
The log is not read, submits the program member of the log visible people to read when visible people has checked the log, then feeding back to
The log.
Optionally, in order to preferably be managed to project implementation, project management system further includes document management module,
This document management module is for managing file relevant to project.The embodiment of the present invention provides a kind of preferred scheme, in project
Creation module can add 9 files relevant to the project created when creating project, wherein the file of system default
Can there are three, including charter, project material and material time node file, alternative document folder can be according to establishment of item people
Demand come customized addition.As shown in figure 8, the Fig. 8 also includes 9 files related with the project, wherein charter, item
Mesh material and key node file are the file of system default, and it is what item creator added according to demand that item, which chats file,
To save the chat record of project group chat.
Optionally, for the ease of the record queries in later period and evidence obtaining, the loss of the important information in project, Yi Jixiang are avoided
In mesh after program member's change, the loss that these program members before changing record in the project is provided in an embodiment of the present invention
Project management system further includes operation record module, for recording the operation note of program member in systems, the operation note
Including but not limited to following at least one:The system login record of program member, program member invite record, log to delete note
Record, log submit record to share record with log.
Optionally, the project information in project information management module, including but not limited to following at least one:The mark of project
Inscribe one's name title, the prompt of item destination node, project full name, project abbreviation, project initial time, project termination time, scale of the project, item
Mesh cost, item address, item description etc..After having added item related information, editor can be clicked and completed, into creation
Department of project entity information page.It should be noted that in the embodiment of the present invention in addition to project is referred to as required item, other data
Default value is filled out by system side, but all properties cannot be sky when submission data.Timing node is all defaulted as current time, and item
It is unlimited that mesh describes number of words.
Optionally, for the ease of checking and/or adding personnel nearby, project management system provided in an embodiment of the present invention is also
It is shown including neighbouring personnel and search module is displayed for and searches for personal information nearby, neighbouring personal information is including near
Affiliated company, title, contact method and the position of personnel.Program member, can basis after seeing personal information nearby
The certain personnel nearby of demands of individuals selection addition mask certain personnel nearby.Further, it is also possible to be shown by neighbouring personnel
And search module, personnel nearby are searched for, specifically, the information such as input Skills tab, Business Name, position title can be passed through
It is shown to carry out screening to neighbouring personnel.
Wherein, the company's information for including in the project information in project information management module include but is not limited to it is following at least
It is a kind of:Title, company's full name, company referred to as, positioning of the company in this project, founder's name (or pet name), wound
The contact method such as phone number of people is built, department's information of addition includes department name.Company's information of addition includes but not
It is limited to following at least one:Title, company's full name, company referred to as, positioning of the company in this project, founder's name
The contact method such as phone number of (or pet name), founder, department's information of addition includes department name.
After having added company's information and department's information, " editor completes, in next step " can be clicked, is being worked as into individual
Preceding paragraph purpose essential information edit page.Wherein, the personal essential information in the project of editor include but is not limited to it is following at least
It is a kind of:Account, name or the pet name, gender, contact method, mailbox, company, department academic title, Skills tab, personal common ground
Location, personal real-time address update.It is completed clicking individual information editing, the project overview page can be entered, show that project is general
Condition information.Wherein, project overview page can show project essential information, project picture etc., wherein project picture may include to
One few, when including one or more project picture, project overview page can be to these project pictures according to the upload of picture
Sequence is polled displaying.
Wherein, it can be arranged only that oneself is visible and allow him in above-mentioned essential information according to the demands of individuals of program member
People checks that two kinds of situations, such as name or the pet name, Ministry Function, Skills tab etc. facilitate other people to quickly understand the basic of oneself
The information of situation can be set to allow other people as it can be seen that and information that gender, personal common address etc. are related to individual privacy then may be used
To be set as only, oneself is visible.The program member for being added to the project can edit its personal information, personal information editable
Xiang Ze may include at least one of following:Name or the pet name, gender, place company, contact method, Skills tab, mailbox with
And personal common address.The privacy options of these personal informations can be arranged in program member according to personal and/or project demands,
Can set certain personal informations to only oneself as it can be seen that or specifying certain people visible.
In some cases, for the ease of data collection and archive, project management system provided in an embodiment of the present invention is also
Time record and printout can be provided for program member, specifically, the data information of some project can be printed,
In, data type includes:Full content, approval process, log, the chat record of program member, schedule planning.Time screens item
Part is:Initial time terminates the time.Data form format:Time, plate, content.
It should be understood that when an establishment of item people creates two or more projects, and the two or two with
There are certain intersections in the propulsion of project by the program member of upper project, for the ease of managing the two or more than two items
Mesh, two or more projects that project management system provided in an embodiment of the present invention can also create establishment of item people
Merge processing.Specifically, invited party, which can be initiated to invite, merges item request, includes in the request:What application merged
The information such as project abbreviation A and cell-phone number, the pet name of the people that receive merging project.After being received the request by invited party, Ke Yitong
Meaning or refusal this time merge item request;If being agreed to merging project by invited party, combined project can be needed by current
Abbreviation B, it returns to and invites people;Finally, after reaffirming merging, success can be merged after inviting people to receive message, generate
New project, wherein new project information can carry out adaptability more to the information of project using the essential information of project A as foundation
Change.
Program member can also exit project during promotion of item, for example the task of the program member in the project is
It is completed, or needs to exit some project currently participated in due to personal, can also proposed to exit application, need to illustrate
, only program member in the project not directly under junior when, just can directly exit the project, sundry item member is such as
When establishment of item people wants to exit out some project of its creation, then need to transfer the role of its founder some of the project
Program member can just exit the project.When some project is completed, the people for deleting project can only be program member role,
If his Role Membership need to delete project, needs to go out current character transfer or the permission of the program member of current operation is minimum,
Next rank of namely its permission does not have sundry item member.
Optionally, project management system provided in an embodiment of the present invention can also include talent's retrieval module 107, such as Figure 12
It is shown, it is the interface schematic diagram of talent's retrieval module provided in an embodiment of the present invention, when the project leader in a certain project is
The project identify project member when, in addition to can the intra-company locating for the project leader identify project member, can be with
Talents recruitment information is issued in talent's retrieval module 107 in the project management system, can wrap in the talents recruitment information
Include the information such as professional skill, the working experience of the talent for wanting recruitment.
When the talents recruitment information is distributed in the project management system, project management system can be somebody's turn to do based on using
The personal label (keyword, be engaged in job category) in terms of including professional skill of the user of project management system and user
The information such as the position being presently in are the user that the project leader recommends the talents recruitment information issued with it to match, this
Mesh responsible person can also input the profession for wanting the personnel of recruitment in talent's retrieval module 107 in the project management system
The demand informations such as keyword, length of service in terms of technical ability retrieve the personnel that the demand inputted with it matches, it can
Keyword is inputted in interface shown in Figure 12, search and the personnel of Keywords matching can also look at when showing search result
With the location information of the personnel of Keywords matching.
Optionally, it is presently in these users in project to be easy to use the user of the project management system that can obtain
Information, the project management systems provided in an embodiment of the present invention such as associated professional knowledge, related consultancy can also include knowledge
Sharing module 108, the Knowledge Sharing module 108 can collect the project phase participated in the user in the project management system in advance
The information such as professional knowledge, the information of pass, and it is distributed to user.It as shown in figure 13, is project management provided in an embodiment of the present invention
The interface schematic diagram of Knowledge Sharing module in system can be on the boundary when user enters in Knowledge Sharing interface shown in Figure 13
It is new that the relevant some newest consultancy (intelligent recommendation shown in namely Figure 13) of project participated in user, industry are viewed in face
News, professional skill, standard criterion and professional tool.
For example these information can be obtained with some related media cooperations, or obtain by some professional persons of tissue
These information, and classification is distinguished according to locating technical field, technique direction etc. to these information, it is based on project management system
Some professional knowledges for being related to of the participated in project of user, provide the knowledge base to match with these professional knowledges for user,
User can inquire relevant professional knowledge and related consultancy in the knowledge base, which can also periodically recommend for user special
Industry knowledge and related consultancy, user can also share some professional knowledges and related consultancy in the Knowledge Sharing module 108,
His user can check the professional knowledge that the user shares and related consultancy.
Optionally, the project management system in the embodiment of the present invention further includes demand release module, user's (demand for services
Side) some demands can be issued in the demand release module, for example unlock, demand release module after obtaining this demand,
Due to will record the keyword of the professional skill of each user in the project management system, then demand release module can be by this
One demand is sent to the user's (service provider) for having this unlocking technical ability, when demand release module determines service provider energy
Enough meet the needs of service publisher, it can be to provide the contact method of demand for services side for service provider, so that service mentions
Supplier can contact the demand for services side demand for services Fang Bingwei and provide service, to meet the needs of demand for services side.
Optionally, the project management system in the embodiment of the present invention further includes service transacting module, to be related to the item of transaction
There is the cooperation between project between mesh, such as company A and company B, treasury trade, such as company are often had in cooperative process
A purchases some materials to company B, then company A will then converge the fund of these materials to company B, the service transacting module
To be that company A and company B provide transaction platform.
In embodiments of the present invention, a kind of project management system, including member management module, rights management mould are capable of providing
Block, member link up module, project information management module, project process monitoring module and log management module, wherein first at
Member's management module can obtain the power and responsibility mark and program member's title of program member in the project, then authority management module energy
Enough power and responsibility marks and program member's title obtained according to member management module, establish program member's title and believe with corresponding power and responsibility
The corresponding relationship of breath, so as to the power and responsibility information of clear projects member, member, which links up module, can be based on rights management mould
The corresponding relationship that block is established, to meet the communicative channel that program member's foundation of default communication condition is used for synchronizing project information,
The relatively low problem of project information synchronous efficiency being able to solve between program member caused by existing project information management mode.
In addition, project information management module is capable of the project information of stored items, including at least project label and it is used for
The information of the predicted duration section of characterization project, project process update module can be according to the practical carry out durations and item of project
The information of the predicted duration of mesh information management module storage, the progress of renewal item, this enables program member timely
The progress of grasp project, last log management module can obtain the log corresponding to project label, and the log note that can be will acquire
In the file for recording the project label name stored with log management module, convenient for determining that projects member completes in the project
Work, be also convenient for finding and search.
The embodiment of the present invention also provides a kind of project management device 200, as shown in figure 14, including:
Member management unit 201, for obtaining the power and responsibility mark of the program member of project in the project and program member's name
Claim;
Rights management unit 202, power and responsibility mark and the program member for being obtained according to the member management module
Title establishes the corresponding relationship of program member's title with corresponding power and responsibility information;
Member links up unit 203, based on the corresponding relationship that the authority management module is established, to meet default communication
The program member of condition establishes the communicative channel for being used for synchronizing project information;
Project information management unit 204, for storing the project information of the project, the project information includes at least item
Target knows and the information of the predicted duration for characterizing the project;The duration, including duration and/or
Duration;
Project process updating unit 205, for according to the practical progress time of the project and project information management mould
The information of the predicted duration of block storage, updates the progress of the project;It is described it is practical carry out the time, including reality into
Row duration and/or practical progress period;
Log management unit 206, for obtaining the log for corresponding to the project label, the log recording that will acquire
Into the file of the project label name stored with project information management module.
In one embodiment, the member links up unit 203, is specifically used for:
When applicant sends to recipient links up request, according to the corresponding power and responsibility information of the applicant and described connect
The corresponding power and responsibility information of people is received, determines whether the applicant has the permission linked up with the recipient;The application is artificial
A program member in the project, the program member received in the artificial project in addition to the applicant, then,
If it is determined that the applicant has the permission linked up with the recipient, then the applicant and the reception are established
The communicative channel of synchronizing project information is used between people;
If it is determined that the applicant does not have the permission linked up with the recipient, it is determined that the applicant connects with described
Receive the intermediate auditor between people;
Communication request is sent to the intermediate auditor;
If it is determined that the intermediate auditor agrees to the communication request, then establish between the applicant and the recipient
Communicative channel for synchronizing project information.
In one embodiment, the member links up unit 203, is specifically used for:
If it is determined that the corresponding power and responsibility of the applicant is greater than or equal to the corresponding power and responsibility of the recipient or the application
The corresponding power and responsibility of people is less than the power and responsibility of the recipient and the corresponding power and responsibility of the applicant in the corresponding power and responsibility of the recipient
In range, then establishes between the applicant and the recipient and be used for the communicative channel of synchronizing project information.
In one embodiment, the member links up unit 203, is specifically used for:
If it is determined that the corresponding power and responsibility of the applicant is less than the corresponding power and responsibility of the recipient, and the applicant is corresponding
Power and responsibility is not within the scope of the corresponding power and responsibility of the recipient, it is determined that the intermediate audit between the applicant and the recipient
People, the corresponding power and responsibility of the maximum intermediate auditor of power and responsibility power and responsibility corresponding with the recipient is identical in the intermediate auditor.
In one embodiment, for the ease of the operation note of record program member, described device further includes:
Operation note unit 207, for recording the operation note of the program member in the system, the operation note
Record includes following at least one:The system login record of program member, program member invite record, log deletion record, log
Share record.
In one embodiment, the timing node of the project is equipped in the project process module, then the project
Progress updating unit 205, is specifically used for:
When the timing node for determining the project is identical as the material time node, the program member is prompted.
In one embodiment, the project information further includes the phased mission of the project, then the project process
Update module 205, is specifically used for:
The phased mission of the project is obtained from the project information management module;
Log associated with the phased mission of the project is obtained from the log management module;
According to log associated with the phased mission of the project and the project stage task, the project is updated
Actual progress.
In one embodiment, the project information further includes bearing in the project for characterizing the program member
The information of the predicted duration of the project task of duty, then the project process updating unit 205, is also used to:
According to the practical progress time of program member project task responsible in the project and project information
The information of the predicted duration for the project task that the program member of management module storage is responsible in the project, updates
The progress for the project task that the program member is responsible in the project.
In one embodiment, the log management unit 206, is specifically used for:
Obtain the log of program member's input;
Determination has the program member for checking the log permission;
The log is sent to and described has the program member for checking the log permission.
In one embodiment, after the log is sent to the visible people, the operation note unit
207, it is also used to:
Has the record for checking that the program member of the log permission checks the log described in record;
By it is described have check that the program member of the log permission checks that the record of the log is fed back to described in record
The program member of log.
In one embodiment, further include for the ease of finding and search nearby personnel, described device:
Neighbouring personnel's display module 208, for showing personal information nearby, the personal information nearby includes neighbouring personnel
Affiliated company, title contact method and position.
Project management device provided in an embodiment of the present invention can be realized project management in the embodiment of the method for Fig. 1~Figure 13
Each process that system is realized.
Optionally, project management device 200 provided in an embodiment of the present invention can also include talent's retrieval unit 207, when
Project leader in a certain project be the project identify project member when, in addition to can the company locating for the project leader
Identify project member for inside, and personnel recruitment letter can also be issued in talent's retrieval unit 207 in the project management device 200
It ceases, may include the information such as professional skill, the working experience of the talent for wanting recruitment in the talents recruitment information.
When the talents recruitment information is distributed in the project management system, project management device 200 can be based on making
With the personal label of the user of the project management device (keyword, be engaged in job category) in terms of including professional skill, and
The information such as the position that user is presently in are the user that the project leader recommends the talents recruitment information issued with it to match,
The project leader can also input the personnel's for wanting recruitment in talent's retrieval unit 207 in the project management system
The demand informations such as keyword, length of service in terms of professional skill retrieve the personnel that the demand inputted with it matches.
Optionally, the user to be easy to use the project management device 200 can obtain with these users be presently in
Information, the project management systems provided in an embodiment of the present invention such as the associated professional knowledge of project, related consultancy can also include
Knowledge Sharing unit 208, the Knowledge Sharing unit 208 can collect the item participated in the user in the project management system in advance
The information such as the relevant professional knowledge of mesh, information, and it is distributed to user.
For example these information can be obtained with some related media cooperations, or obtain by some professional persons of tissue
These information, and classification is distinguished according to locating technical field, technique direction etc. to these information, it is based on project management system
Some professional knowledges for being related to of the participated in project of user, provide the knowledge base to match with these professional knowledges for user,
User can inquire relevant professional knowledge and related consultancy in the knowledge base, which can also periodically recommend for user special
Industry knowledge and related consultancy, user can also share some professional knowledges and related consultancy in the Knowledge Sharing unit 208,
His user can check the professional knowledge that the user shares and related consultancy.
In embodiments of the present invention, a kind of project management device, including member management unit, rights management list are capable of providing
Member, member link up unit, project information management unit, project process monitoring unit and log management unit, wherein first at
Member's administrative unit can obtain the power and responsibility mark and program member's title of program member in the project, then rights management unit energy
Enough power and responsibility marks and program member's title obtained according to member management unit, establish program member's title and believe with corresponding power and responsibility
The corresponding relationship of breath, so as to the power and responsibility information of clear projects member, member, which links up unit, can be based on rights management list
The corresponding relationship that member is established, to meet the communicative channel that program member's foundation of default communication condition is used for synchronizing project information,
The relatively low problem of project information synchronous efficiency being able to solve between program member caused by existing project information management mode.
In addition, project information management unit is capable of the project information of stored items, including at least project label and it is used for
The information of the predicted duration section of characterization project, project process updating unit can be according to the practical carry out durations and item of project
The information of the predicted duration of mesh administrative unit storage, the progress of renewal item, this enables program member to grasp in time
The progress of project, last log management unit can obtain the log corresponding to project label, and the log recording that can be will acquire arrives
With the work in the file of the project label name of log management unit storage, completed in the project convenient for determining projects member
Make, is also convenient for finding and search.
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row
His property includes, so that the process, method, article or the device that include a series of elements not only include those elements, and
And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic
Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do
There is also other identical elements in the process, method of element, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side
Method can be realized by means of software and necessary general hardware platform, naturally it is also possible to by hardware, but in many cases
The former is more preferably embodiment.Based on this understanding, technical solution of the present invention substantially in other words does the prior art
The part contributed out can be embodied in the form of software products, which is stored in a storage medium
In (such as ROM/RAM, magnetic disk, CD), including some instructions are used so that a terminal (can be mobile phone, computer, service
Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form belongs within protection of the invention.
Claims (12)
1. a kind of project management system, which is characterized in that including:
Member management module, for obtaining the power and responsibility mark and program member's title of the program member of project in the project;
Authority management module, power and responsibility mark and program member's title for being obtained according to the member management module, builds
Found the corresponding relationship of program member's title with corresponding power and responsibility information;
Member links up module, based on the corresponding relationship that the authority management module is established, to meet default communication condition
Program member establishes the communicative channel for being used for synchronizing project information;
Project information management module, for storing the project information of the project, the project information includes at least project label
And the information of the predicted duration for characterizing the project;The duration, including duration and/or it is lasting when
Between section;
Project process update module, for according to the practical progress time of the project and the storage of project information management module
The predicted duration information, update the progress of the project;The practical progress time, including practical progress duration
And/or the practical progress period;
Log management module, for obtaining the log for corresponding to the project label, the log recording that will acquire is to item
In the file of the project label name of mesh information management module storage.
2. the system as claimed in claim 1, which is characterized in that the member links up module, is specifically used for:
When applicant sends to recipient links up request, according to the corresponding power and responsibility information of the applicant and the recipient
Corresponding power and responsibility information, determines whether the applicant has the permission linked up with the recipient;The application is artificial described
A program member in project, the program member received in the artificial project in addition to the applicant, then,
If it is determined that the applicant has the permission linked up with the recipient, then establish the applicant and the recipient it
Between be used for synchronizing project information communicative channel;
If it is determined that the applicant does not have the permission linked up with the recipient, it is determined that the applicant and the recipient
Between intermediate auditor;
Communication request is sent to the intermediate auditor;
If it is determined that the intermediate auditor agrees to the communication request, then establishes between the applicant and the recipient and be used for
The communicative channel of synchronizing project information.
3. system as claimed in claim 2, which is characterized in that if it is determined that the applicant has and recipient communication
Permission then establishes the communicative channel between the applicant and the recipient, including:
If it is determined that the corresponding power and responsibility of the applicant is greater than or equal to the corresponding power and responsibility of the recipient or the applicant couple
The power and responsibility answered is less than the power and responsibility of the recipient and the corresponding power and responsibility of the applicant in the corresponding power and responsibility range of the recipient
It is interior, then it establishes between the applicant and the recipient and is used for the communicative channel of synchronizing project information.
4. system as claimed in claim 2 or claim 3, which is characterized in that if it is determined that the applicant does not have and the recipient
The permission of communication, it is determined that the intermediate auditor between the applicant and the recipient, including:
If it is determined that the corresponding power and responsibility of the applicant is less than the corresponding power and responsibility of the recipient, and the corresponding power and responsibility of the applicant
Not within the scope of the corresponding power and responsibility of the recipient, it is determined that the intermediate auditor between the applicant and the recipient,
The corresponding power and responsibility of the maximum intermediate auditor of power and responsibility power and responsibility corresponding with the recipient is identical in the intermediate auditor.
5. the system as claimed in claim 1, which is characterized in that the system also includes:
Operation record module, for recording the operation note of the program member in the system, the operation note includes
Following at least one:The system that program member logs in records, program member invites record, log deletion record, log submission note
Record is shared in record with log.
6. the system as claimed in claim 1, which is characterized in that be equipped with the pass of the project in the project process update module
Key timing node, then the project process update module, is specifically used for:
When the timing node for determining the project is identical as the material time node, the program member is prompted.
7. the system as claimed in claim 1, which is characterized in that the project information further includes the phased mission of the project,
The then project process update module, is specifically used for:
The phased mission of the project is obtained from the project information management module;
Log associated with the phased mission of the project is obtained from the log management module;
According to log associated with the phased mission of the project and the project stage task, the reality of the project is updated
Border progress.
8. the system as claimed in claim 1, which is characterized in that the project information further includes for characterizing the program member
The information of the predicted duration for the project task being responsible in the project, then the project process update module, is also used to:
According to the practical progress time of program member project task responsible in the project and project information management
The information of the predicted duration for the project task that the program member of module storage is responsible in the project, described in update
The progress for the project task that program member is responsible in the project.
9. the system as claimed in claim 1, which is characterized in that the log management module is also used to:
Obtain the log of program member's input;
Determination has the program member for checking the log permission;
The log is sent to and described has the program member for checking the log permission.
10. system as claimed in claim 9, which is characterized in that described after the log is sent to the visible people
Operation record module is also used to:
Has the record for checking that the program member of the log permission checks the log described in record;
By it is described have check that the program member of the log permission checks that the record of the log is fed back to and records the log
Program member.
11. the system as claimed in claim 1, which is characterized in that the system also includes:
Neighbouring personnel's display module, for showing personal information nearby, the personal information nearby includes the affiliated of neighbouring personnel
Company, title contact method and position.
12. a kind of project management device, which is characterized in that including:
Member management unit, for obtaining the power and responsibility mark and program member's title of the program member of project in the project;
Rights management unit, power and responsibility mark and program member's title for being obtained according to the member management module, builds
Found the corresponding relationship of program member's title with corresponding power and responsibility information;
Member links up unit, based on the corresponding relationship that the authority management module is established, to meet default communication condition
Program member establishes the communicative channel for being used for synchronizing project information;
Project information management unit, for storing the project information of the project, the project information includes at least project label
And the information of the predicted duration for characterizing the project;The duration, including duration and/or it is lasting when
Between section;
Project process updating unit, for according to the practical progress time of the project and the storage of project information management module
The predicted duration information, update the progress of the project;The practical progress time, including practical progress duration
And/or the practical progress period;
Log management unit, for obtaining the log for corresponding to the project label, the log recording that will acquire is to item
In the file of the project label name of mesh information management module storage.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810379447.2A CN108876281A (en) | 2018-04-25 | 2018-04-25 | A kind of project management system and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810379447.2A CN108876281A (en) | 2018-04-25 | 2018-04-25 | A kind of project management system and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108876281A true CN108876281A (en) | 2018-11-23 |
Family
ID=64327245
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810379447.2A Pending CN108876281A (en) | 2018-04-25 | 2018-04-25 | A kind of project management system and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108876281A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344311A (en) * | 2018-12-04 | 2019-02-15 | 北京诺士诚国际工程项目管理有限公司 | A kind of generation method of work diary, the generation method of supervision diary and system |
CN109961270A (en) * | 2019-03-18 | 2019-07-02 | 安徽理工大学 | A kind of project management system based on list of engineering |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN110264156A (en) * | 2019-05-31 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of project management method, device, electronic equipment and storage medium |
CN110263132A (en) * | 2019-04-17 | 2019-09-20 | 阿里巴巴集团控股有限公司 | Project case method for pushing and device |
CN110298638A (en) * | 2019-07-05 | 2019-10-01 | 合巨变(杭州)科技有限公司 | Project Management Software Systems |
CN111932202A (en) * | 2020-07-31 | 2020-11-13 | 中建八局第二建设有限公司 | Construction log compiling system and method based on cloud service |
CN112070457A (en) * | 2020-08-05 | 2020-12-11 | 珠海大横琴科技发展有限公司 | Project management method and device, electronic equipment and storage medium |
CN112202873A (en) * | 2020-09-28 | 2021-01-08 | 山东浪潮通软信息科技有限公司 | Data issuing method and device, computer and computer readable medium |
CN112561466A (en) * | 2020-11-30 | 2021-03-26 | 乐刷科技有限公司 | Project management method, project management platform and computer readable storage medium |
CN113344512A (en) * | 2021-05-31 | 2021-09-03 | 珠海大横琴科技发展有限公司 | Project information display method and device, electronic equipment and storage medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101296196A (en) * | 2008-06-13 | 2008-10-29 | 腾讯科技(深圳)有限公司 | Authentication method and authentication device |
CN104468323A (en) * | 2014-11-13 | 2015-03-25 | 深圳市玖昔物联科技发展有限公司 | Chatroom data storage system |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN106108205A (en) * | 2016-07-27 | 2016-11-16 | 国网山东省电力公司惠民县供电公司 | A kind of have communication data interactive monitoring system based on power distribution network maintenance |
CN106453059A (en) * | 2016-11-11 | 2017-02-22 | 王柯 | Method and system for realizing group templates |
-
2018
- 2018-04-25 CN CN201810379447.2A patent/CN108876281A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101296196A (en) * | 2008-06-13 | 2008-10-29 | 腾讯科技(深圳)有限公司 | Authentication method and authentication device |
CN104468323A (en) * | 2014-11-13 | 2015-03-25 | 深圳市玖昔物联科技发展有限公司 | Chatroom data storage system |
CN105373896A (en) * | 2015-11-24 | 2016-03-02 | 杭州构家网络科技有限公司 | Project management system |
CN106108205A (en) * | 2016-07-27 | 2016-11-16 | 国网山东省电力公司惠民县供电公司 | A kind of have communication data interactive monitoring system based on power distribution network maintenance |
CN106453059A (en) * | 2016-11-11 | 2017-02-22 | 王柯 | Method and system for realizing group templates |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109344311A (en) * | 2018-12-04 | 2019-02-15 | 北京诺士诚国际工程项目管理有限公司 | A kind of generation method of work diary, the generation method of supervision diary and system |
CN109961270A (en) * | 2019-03-18 | 2019-07-02 | 安徽理工大学 | A kind of project management system based on list of engineering |
CN110263132B (en) * | 2019-04-17 | 2023-01-10 | 创新先进技术有限公司 | Project case pushing method and device |
CN110263132A (en) * | 2019-04-17 | 2019-09-20 | 阿里巴巴集团控股有限公司 | Project case method for pushing and device |
CN110264042A (en) * | 2019-05-25 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of method and relevant apparatus of project management |
CN110264156A (en) * | 2019-05-31 | 2019-09-20 | 深圳市元征科技股份有限公司 | A kind of project management method, device, electronic equipment and storage medium |
CN110298638A (en) * | 2019-07-05 | 2019-10-01 | 合巨变(杭州)科技有限公司 | Project Management Software Systems |
CN111932202A (en) * | 2020-07-31 | 2020-11-13 | 中建八局第二建设有限公司 | Construction log compiling system and method based on cloud service |
CN112070457A (en) * | 2020-08-05 | 2020-12-11 | 珠海大横琴科技发展有限公司 | Project management method and device, electronic equipment and storage medium |
CN112202873A (en) * | 2020-09-28 | 2021-01-08 | 山东浪潮通软信息科技有限公司 | Data issuing method and device, computer and computer readable medium |
CN112202873B (en) * | 2020-09-28 | 2022-05-10 | 浪潮通用软件有限公司 | Data issuing method and device, computer and computer readable medium |
CN112561466A (en) * | 2020-11-30 | 2021-03-26 | 乐刷科技有限公司 | Project management method, project management platform and computer readable storage medium |
CN113344512A (en) * | 2021-05-31 | 2021-09-03 | 珠海大横琴科技发展有限公司 | Project information display method and device, electronic equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108876281A (en) | A kind of project management system and device | |
US10284611B2 (en) | Systems and methods for organizational collaboration | |
US10102501B2 (en) | System for status reporting and invoicing of work tracked from a work tracker | |
US9836546B2 (en) | Method and apparatus for collecting and disseminating information over a computer network | |
US7072940B1 (en) | System and method for managing communications and collaboration among team members | |
US6684212B1 (en) | System and method for data sharing between members of diverse organizations | |
US7213030B1 (en) | Web-enabled transaction and collaborative management system | |
US7155435B1 (en) | Method for resolving issues within a team environment | |
US20050038687A1 (en) | Business communication solutions | |
US7904322B2 (en) | Network based, interactive project management apparatus and method | |
US20160224939A1 (en) | Systems and methods for managing tasks | |
US20110119230A1 (en) | Method for automatically associating contacts in an online social network | |
US20140208325A1 (en) | Systems and methods for managing tasks | |
US20150295872A1 (en) | Aggregating digital file and message content into a singular and chronologically organized conversation | |
US20080091750A1 (en) | Web-based secured forum for collaborative inventions creation | |
US20140101780A1 (en) | Method for comment response request feeds to a social networking profile | |
CN113191517A (en) | Integrated management system | |
US6983263B1 (en) | Electronic boardroom | |
JP4431300B2 (en) | Electronic document circulation system | |
US11429932B1 (en) | System and method for event management | |
JP2017161983A (en) | Information processing apparatus, and schedule adjustment method and program | |
WO2003098518A2 (en) | Patent resource systems and methods | |
CN118333363A (en) | Reporting method, reporting device, reporting equipment and storage medium | |
CA2361095A1 (en) | Method for facilitating communications among team members and non-team members | |
CA2361127A1 (en) | System and method for managing communications and collaboration among team members |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181123 |
|
RJ01 | Rejection of invention patent application after publication |