CN112070457A - Project management method and device, electronic equipment and storage medium - Google Patents

Project management method and device, electronic equipment and storage medium Download PDF

Info

Publication number
CN112070457A
CN112070457A CN202010779800.3A CN202010779800A CN112070457A CN 112070457 A CN112070457 A CN 112070457A CN 202010779800 A CN202010779800 A CN 202010779800A CN 112070457 A CN112070457 A CN 112070457A
Authority
CN
China
Prior art keywords
project
target
page
item
administrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010779800.3A
Other languages
Chinese (zh)
Inventor
邓练兵
文少杰
李大铭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Dahengqin Technology Development Co Ltd
Original Assignee
Zhuhai Dahengqin Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Dahengqin Technology Development Co Ltd filed Critical Zhuhai Dahengqin Technology Development Co Ltd
Priority to CN202010779800.3A priority Critical patent/CN112070457A/en
Publication of CN112070457A publication Critical patent/CN112070457A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/604Tools and structures for managing or administering access control systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F21/00Security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F21/60Protecting data
    • G06F21/62Protecting access to data via a platform, e.g. using keys or access control rules
    • G06F21/6218Protecting access to data via a platform, e.g. using keys or access control rules to a system of files or objects, e.g. local or distributed file system or database
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2221/00Indexing scheme relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/21Indexing scheme relating to G06F21/00 and subgroups addressing additional information or applications relating to security arrangements for protecting computers, components thereof, programs or data against unauthorised activity
    • G06F2221/2141Access rights, e.g. capability lists, access control lists, access tables, access matrices

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Human Resources & Organizations (AREA)
  • General Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Software Systems (AREA)
  • Computer Security & Cryptography (AREA)
  • Computer Hardware Design (AREA)
  • General Health & Medical Sciences (AREA)
  • Bioethics (AREA)
  • Economics (AREA)
  • Automation & Control Theory (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application provides a project management method, a project management device, electronic equipment and a storage medium; the method comprises the following steps: acquiring a project creation request sent by a user logging in a development platform; generating a project page to be filled in according to the project creating request; receiving input operation of a user aiming at a project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as a manager of the target project; and acquiring member configuration operation of an administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise the permission for viewing the target project. The created project can be disclosed to project members, so that the transparency of the project is reflected to a certain degree while the safety of the project is ensured; and the user can check which project members belong to by logging in the development platform, and can check the progress condition of any project with permission, thereby bringing great convenience to the user.

Description

Project management method and device, electronic equipment and storage medium
Technical Field
The present application relates to the field of internet technologies, and in particular, to a method and an apparatus for project management, an electronic device, and a storage medium.
Background
With the development of information-based construction, the application services used by units and enterprises are gradually increased. In order to meet the needs of users and facilitate the users to use various application services, a city portal system of web sites capable of providing single-point access to applications and information has been developed. The developer provides a development platform to develop and release the application based on the city portal system. The requirement of project management is involved in the development of the application by the developer.
In the prior art, project management is relatively dispersed, project reserve submission and auditing processes and project execution management are generally transmitted through lines, a systematic management method is lacked, project states cannot be seen transparently, and project process management and control are difficult to achieve. Furthermore, it is also difficult for the user to know exactly which items they have participated in, and to know exactly the progress of each item.
Disclosure of Invention
In view of the above, the present application is proposed to provide a method and apparatus, an electronic device, a storage medium for item management that overcome or at least partially solve the above problems, including:
a project management method is applied to a development platform of a developer portal system, wherein the developer portal system is deployed in a city portal system; the method comprises the following steps:
acquiring a project creation request sent by a user logging in the development platform;
generating a project page to be filled in according to the project creating request;
receiving an input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project;
and acquiring member configuration operation of the administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise permission for viewing the target project.
Optionally, the step of obtaining an operation of the administrator for performing member configuration on the target project and determining a project member of the target project includes:
acquiring a new member request sent by the administrator in a member configuration page of the target project;
generating a dialog box of the newly added member according to the request of the newly added member; the new member dialog box comprises new members to be filled in and role distribution;
and receiving the filling operation of the administrator on the dialog box of the newly added member, and determining the newly added member of the target project.
Optionally, the step of receiving a filling operation of the administrator on the dialog box of the new member and determining the new member of the target item further includes:
acquiring a development process of the target project;
determining roles corresponding to each development node and authorities corresponding to the roles according to the development nodes of the development process;
and determining the authority of the newly added member according to the role of the newly added member.
Optionally, after the step of receiving a filling operation of the administrator on the dialog box of the new member and determining the new member of the target item, the method further includes:
and adding the member information of the newly added member into a member list of the member configuration page, wherein the member information comprises a member account and a role.
Optionally, the member list further includes the authority of each item member; the method further comprises the following steps:
and acquiring the modification operation of the administrator on the authority of any item member in the member list, and updating the authority of the item member.
Optionally, after the step of obtaining the member configuration of the administrator for the target project and determining the project member of the target project, the method further includes:
and sending the project information of the target project to an account corresponding to the project member so that the project member can log in the development platform to view the target project by using the account.
Optionally, the method further comprises:
acquiring a viewing request aiming at the target project, which is sent by a project member logging in the development platform;
displaying an item profile of the target item according to the viewing request; the project profile includes progress, milestones, and risk data for the target project.
A project management device is applied to a development platform of a developer portal system, wherein the developer portal system is deployed in a city portal system; the device comprises:
the request acquisition module is used for acquiring a project creation request sent by a user logging in the development platform;
the page generation module is used for generating a project page to be filled according to the project creation request;
the project creating module is used for receiving input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project;
and the member determining module is used for acquiring member configuration operation of the administrator for the target item and determining the item members of the target item, wherein the item members at least comprise the permission for viewing the target item.
Optionally, the determining the member module includes:
the request acquisition submodule is used for acquiring a new member request sent by the administrator in a member configuration page of the target project;
the dialog box generation submodule is used for generating a dialog box of the newly added member according to the request of the newly added member; the new member dialog box comprises new members to be filled in and role distribution;
and the information receiving submodule is used for receiving the filling operation of the administrator on the dialog box of the newly added member and determining the newly added member of the target project.
Optionally, the information receiving sub-module further includes:
the development process acquisition sub-module is used for acquiring the development process of the target project;
the development node acquisition submodule is used for determining roles corresponding to each development node and authorities corresponding to the roles according to the development nodes of the development process;
and the permission determining submodule is used for determining the permission of the newly added member according to the role of the newly added member.
Optionally, the apparatus further comprises:
and the member information adding submodule is used for adding the member information of the newly added member into a member list of the member configuration page, and the member information comprises a member account and a role.
Optionally, the member list further includes the authority of each item member; the device further comprises:
and the permission updating module is used for acquiring the modification operation of the administrator on the permission of any item member in the member list and updating the permission of the item member.
Optionally, the apparatus further comprises:
and the project sending module is used for sending the project information of the target project to an account corresponding to the project member so that the project member can log in the development platform by using the account to check the target project.
Optionally, the apparatus further comprises:
the viewing request acquisition module is used for acquiring a viewing request aiming at the target project, which is sent by a project member logging in the development platform;
the item profile display module is used for displaying the item profile of the target item according to the viewing request; the project profile includes progress, milestones, and risk data for the target project.
An electronic device comprising a processor, a memory and a computer program stored on the memory and being executable on the processor, the computer program, when executed by the processor, implementing the steps of the method as described above.
A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method as set forth above.
The application has the following advantages:
in the embodiment of the application, a project creation request sent by a user logging in the development platform is obtained; generating a project page to be filled in according to the project creating request; receiving an input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project; and acquiring member configuration operation of the administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise permission for viewing the target project. The created project can be disclosed to project members, so that the transparency of the project is reflected to a certain degree while the safety of the project is ensured; and the user can check which project members belong to by logging in the development platform, and can check the progress condition of any project with permission, thereby bringing great convenience to the user.
Drawings
In order to more clearly illustrate the technical solutions of the present application, the drawings needed to be used in the description of the present application will be briefly introduced below, and it is apparent that the drawings in the following description are only some embodiments of the present application, and it is obvious for those skilled in the art that other drawings can be obtained according to the drawings without inventive labor.
FIG. 1 is a flowchart illustrating steps of a method for project management according to an embodiment of the present application;
FIG. 2 is a schematic diagram of a development project list module page according to an embodiment of the present application;
FIG. 3 is a schematic diagram of a project page to be filled in according to an embodiment of the present application;
FIG. 4 is a schematic diagram of a development project list module page after a target project is created based on the development project list module page shown in FIG. 2 according to an embodiment of the present application;
FIG. 5 is a schematic diagram of a member configuration page according to an embodiment of the present application;
FIG. 6 is a diagram illustrating a dialog box of a newly added member according to an embodiment of the present application;
fig. 7 is a schematic diagram of a member configuration page after a member is added on the basis of the member configuration page shown in fig. 5 according to an embodiment of the present application;
fig. 8 is a block diagram of a project management apparatus according to an embodiment of the present application.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present application more comprehensible, the present application is described in further detail with reference to the accompanying drawings and the detailed description. It is to be understood that the embodiments described are only a few embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.
The city portal system is a public platform portal which integrates comprehensive internet information aiming at city planning and provides comprehensive application services. The service objects of the city portal system include: government, individual, enterprise, developer, can provide a plurality of comprehensive services such as government affairs service, individual service, enterprise service, etc.
The city portal system can comprise a front-end system, a back-end system, an authentication platform, an API development platform, an operation center, a developer portal system and other application service platforms.
The front-end system is an operation system facing the user, and the user can access consultation, application, service and system functions in the urban portal system through the front-end system.
The authentication platform is responsible for providing unified authentication services in the urban portal system, including authentication of user identity and authentication of various contents (e.g., applications) published to the urban portal system.
Referring to fig. 1, a method for project management provided by an embodiment of the present application is illustrated, and the method is applied to a development platform of a developer portal system, which is deployed in a city portal system.
In the urban portal system, a developer rapidly develops and releases applications using environments, components, templates and the like provided by the platform based on the platform provided by the urban portal system. The developer portal system is deployed in the urban portal system and provides the developer with an environment for application, algorithm and data development and deployment, as well as general AI building blocks, technical building blocks and business building blocks. The developer portal system also provides a one-stop unified development and release management platform for the developer for API services and applications and algorithms. The developer portal system comprises a development platform, and the development platform integrates three platforms of application development, algorithm development and data development.
The method specifically comprises the following steps:
step 101, acquiring a project creation request sent by a user logging in the development platform;
step 102, generating a project page to be filled in according to the project creating request;
103, receiving an input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project;
and 104, acquiring member configuration operation of the administrator for the target item, and determining item members of the target item, wherein the item members at least comprise permission for viewing the target item.
In the embodiment of the application, a project creation request sent by a user logging in a development platform is obtained; generating a project page to be filled in according to the project creating request; receiving input operation of a user aiming at a project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as a manager of the target project; and acquiring member configuration operation of an administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise the permission for viewing the target project. The created project can be disclosed to project members, so that the transparency of the project is reflected to a certain degree while the safety of the project is ensured; and the user can check which project members belong to by logging in the development platform, and can check the progress condition of any project with permission, thereby bringing great convenience to the user.
Next, a method of project management in the present exemplary embodiment will be further described.
In step 101, a project creation request sent by a user logging in the development platform is obtained.
In the embodiment, the home page and part of the content display page of the developer portal system can be opened for the user who does not log in the developer portal system to access; but only open access to logged-on users with developer role privileges, related to business functions. For example, a development platform portal is exposed in the top page of the developer portal system, and when a user needs to utilize the relevant functions of the development platform, the user must log in the developer portal system.
Specifically, a user finds a development platform entry from a home page of a developer portal system, clicks a control related to the development platform entry, and if the user does not log in the developer portal system, the page jumps to a login page. If the user logs in the developer portal system before clicking the control related to the development platform entrance, the user can be considered to have the right of logging in the development platform, and the page is directly jumped to the home page of the development platform. A user finds a development project list module in a home page of a development platform and enters a development project list module page; as shown in fig. 2, the development project list module page includes a new development project control, and a user clicks the new development project control to generate a project creation request, and sends the request to the development platform.
In step 102, a project page to be filled in is generated according to the project creation request.
In this embodiment, when the development platform receives a project creation request sent by a user, a corresponding project page to be filled in is generated, and the project page to be filled in is displayed in a currently displayed page. Optionally, the item page to be filled in may be displayed on the uppermost layer of the currently displayed page in a form of a dialog window; the current display page may also be skipped to the project page to be filled in, which is not limited in the present application. As shown in fig. 3, the item page to be filled in includes the name of the item to be filled in, the openness of the item to be selected, the business item to be filled in, and the description of the item to be filled in. It should be noted that, at the stage of creating a project, the name of the project to be filled and the openness of the project to be selected are the necessary filling options, and the business project to be filled and the description of the project to be filled may be the filling options; for example, when the newly created project is one of the development projects in a business project, the name of the business project or the number of the business project needs to be filled in the business project. The business project can be understood as a project with a specific contract code under contract, and one business project can correspond to one development project or a plurality of development projects. In practical application, the corresponding project public selection can be carried out according to the safety of the project; in order to ensure the security of the created target item, the embodiment of the present application describes the item disclosure as private, that is, only the member is visible.
In step 103, an input operation of the user for the item page to be filled in is received, a corresponding target item is created according to the content of the input operation, and the user is determined as an administrator of the target item.
In the embodiment, after a user inputs corresponding contents aiming at necessary filling options and selected filling options in a project page to be filled, a submission creation control in the project page to be filled is clicked; the development platform can acquire necessary filling options in a project page to be filled by a user, select filling options to input corresponding contents, and create a target project corresponding to the input contents; it is understood that the input operations include a fill-in operation in which the user inputs corresponding content for a required fill-in option in a project page to be filled in, and a click operation for triggering the submission of the creation control. The user who clicks the submission creation control is the administrator of the target project; after the target project is created, the administrator also has the authority to modify the project disclosure of the target project, the business project to which the project belongs and the project description.
Further, when the project page to be filled in is displayed on the uppermost layer of the current display page in a dialog window mode, automatically closing the dialog window corresponding to the project page to be filled in after the target project is established; when the whole display page is full of the project page to be filled, automatically jumping to other pages after the target project is created, for example, the other pages can be development project list module pages, also can be the first page of a development platform, and also can be member configuration pages corresponding to the target project; this is not limited by the present application. And, after the target project is created, automatically adding the target project to the development project list module page; the administrator can check the target project through a development project list module page and set other configurations of the target project; as shown in fig. 4, in the development project list module page, the relevant information of the target project is correspondingly filled into the corresponding position of the development project list; and under the operation title bar of the development project list, the system also comprises an application architecture management control, a project management control and an API design control, and a manager can set the corresponding configuration of the target project by clicking the related control.
In step 104, acquiring the member configuration operation of the administrator for the target item, and determining the item member of the target item, where the item member at least includes a right to view the target item.
In this embodiment, the administrator of the target project has the authority to perform member configuration on the target project so as to distribute the development work of the target project to the corresponding responsible person for processing. For example, member configuration can be performed according to organization structure information corresponding to the target project; the organization structure information comprises at least one role and authority corresponding to each role, and different roles can correspond to different work duties.
The development platform acquires member configuration operation of an administrator for a target project, and determines project members of the target project, and it can be understood that the development platform can acquire account numbers of the project members according to the member configuration operation of the administrator for the target project, and after determining the project members of the target project, sends project information of the target project to account numbers corresponding to the project members, so that the project members log in the development platform by using the corresponding account numbers to view and/or process the target project.
In an embodiment, the step 104 may include:
acquiring a new member request sent by the administrator in a member configuration page of the target project;
generating a dialog box of the newly added member according to the request of the newly added member; the new member dialog box comprises new members to be filled in and role distribution;
and receiving the filling operation of the administrator on the dialog box of the newly added member, and determining the newly added member of the target project.
In one embodiment, after the target item is created, the member configuration page corresponding to the target item is automatically jumped to. In another embodiment, an administrator can check the target project through a development project list module page, click a project management control of the target project to enter a project management interface, then find a member configuration control in the project management interface and click, and then generate a member configuration request; and the development platform receives the member configuration request, generates a member configuration page of the target project, and displays the member configuration page in the current display page. Optionally, the member configuration page may be displayed on the uppermost layer of the currently displayed page in a form of a dialog window; the current display page may also be skipped to the member configuration page, which is not limited in this application.
As shown in fig. 5, the member configuration page includes a new member control, and a new member request is generated by clicking the new member control by a user and is sent to the development platform; and the development platform generates a dialog box of the new member after acquiring the request of the new member and displays the dialog box of the new member on the uppermost layer of the current page. As shown in fig. 6, the dialog box of the new member includes the new member to be filled in and role assignment, where an account number of the new member should be filled in an input box corresponding to the new member, and the account number has uniqueness, for example, the account number or the id number used by the user to log in the development platform. In addition, the role assignment can be more than one, that is, the same member can correspond to a plurality of roles to bear the responsibilities corresponding to the plurality of roles.
Optionally, the step of receiving the filling operation of the administrator on the dialog box of the new member and determining the new member of the target item may further include:
acquiring a development process of the target project;
determining roles corresponding to each development node and authorities corresponding to the roles according to the development nodes of the development process;
and determining the authority of the newly added member according to the role of the newly added member.
In this embodiment, the development process of the target project includes a plurality of development nodes, a development task from each development node to a next development node is responsible for by a corresponding role, and the right corresponding to the role is a right to process the target project from the development node to the next development node in the development process. For example, when the target project is a software application, the development process of the target project at least includes constructing a system architecture, front-end development, back-end development, and UI (User Interface) design; the first development node can be considered as a system architecture, the corresponding role can be a system architect, and the authority of the system architect is to construct the system architecture of the target project; the second development node is used for front-end development, the corresponding role can be a front-end development engineer, and the authority of the second development node is to perform the front-end development on the target project; the third development node is used for back-end development, the corresponding role can be a back-end development engineer, and the authority of the third development node is to perform the back-end development on the target project; the fourth distribution node is designed for UI, the corresponding role can be a UI design engineer, and the authority of the UI design engineer is to design the UI of the target project. The administrator can assign corresponding roles according to the characteristics of the participating target project members, so that the project members of the roles have the corresponding permissions of the roles. It should be noted that, in an alternative embodiment, the administrator of the target project may have rights corresponding to all roles.
Further, when the development process of the target project is carried out to any development node, a prompt message is sent to the project member of the role corresponding to the development node.
In order to improve the development efficiency of the target project, when the development process of the target project is carried out to any development node, the development platform sends a prompt message to a project member corresponding to the development node. Specifically, a prompt message may be sent to the account of the corresponding project member; or sending a prompt message to the mobile phone number bound to the account number of the corresponding project member. For example, when a system architect of a first development node completes a system architecture task of constructing a target project, a development flow of the target project enters a second development node, and at the moment, a development platform sends a prompt message to a front-end development engineer of the second development node to remind the front-end development engineer to process in time, so that the development progress of the target project is improved.
Further, after the step of receiving the filling operation of the administrator on the dialog box of the new member and determining the new member of the target item, the method further includes:
and adding the member information of the newly added member into a member list of the member configuration page, wherein the member information comprises a member account and a role.
In this embodiment, after the administrator assigns and inputs corresponding content to the new member and the role to be filled in the dialog box of the new member, the administrator clicks the determination control in the dialog box of the new member, the development platform may obtain information of the new member of the target project, closes the dialog box of the current new member, and then updates the member configuration page according to the information of the new member. Specifically, after acquiring the information of the newly added member of the target project, the development platform automatically adds the information of the newly added member to a member list of a member configuration page. As shown in fig. 7, fig. 7 is a configuration page of a member when logging in an administrator account, where a row where the administrator is located includes a viewing authority control and a handover control under an operation title bar of a member list; and the row of other project members comprises a viewing authority control and a deleting control. It can be understood that when the administrator clicks the view permission control, the permission information of the corresponding item member in the target item can be viewed, and the permission of the item member in the target item can be changed; specifically, when the administrator clicks the viewing permission control of any one of the other project members, a permission dialog box can be presented in the current page, the permission dialog box contains permission names of all roles, each permission name corresponds to one selection control, and the selection control corresponding to the permission name of the project member is in a selected state by default; the administrator can change the authority of the project member by modifying the operation, namely modifying the state of the selection control corresponding to the authority name. And the development platform acquires the modification operation of the administrator on the authority of any project member in the member list and updates the authority of the project member. When the administrator clicks the transfer control of the row where the administrator is located, the method is used for transferring the role of the administrator to any one of the other project members; when the administrator clicks the deletion control of the row where other item members are located, the other item members of the corresponding row can be deleted.
It should be noted that when the account of other project members is logged in, only a viewing permission control is under an operation title bar of a corresponding member configuration page, and when other project members click any viewing permission control of a project member including an administrator, a permission dialog box can be presented in the current page, the permission dialog box contains permission names of all roles, each permission name corresponds to a selection control, and the selection control corresponding to the permission name of the project member is in a selected state by default; other project members do not have the authority to change the state of the selection control; it will be appreciated that other item members can only see which rights the item member has, and not change the rights of the item member.
Further, in an embodiment, the method further comprises:
acquiring a viewing request aiming at the target project, which is sent by a project member logging in the development platform;
displaying an item profile of the target item according to the viewing request; the project profile includes progress, milestones, and risk data for the target project.
In this embodiment, a project member (including an administrator) of a target project has a right to log in and access a development platform, when the project member logs in the development platform, project information of the target project can be found from a related display page of the development platform, a viewing request is generated by clicking a related viewing control, and after receiving the viewing request, the development platform displays a project overview page of the target project on a current display page, or jumps to the project overview page of the target project from the current display page; a project profile is presented in a project profile page, the project profile including progress, milestones, and risk data for the target project, among others.
After the project member logs in the development platform, finding a development project list module in a home page of the development platform, entering a development project list module page, and displaying all project information participated by the project member in a project list of the development project list module page; the project member can find a target project from all the participated projects, click the related viewing control to generate a viewing request, and the development platform displays a project overview page of the target project on the current display page after receiving the viewing request, or jumps to the project overview page of the target project from the current display page so that the project member can view the project overview of the target project. If the projects participated by the project member are more, and the target project is difficult to quickly find in a one-by-one searching mode, a search function in a development project list module page can be used, after the name of the target project is input in a search bar, a query control is clicked, a search request can be generated, after the development platform receives the search request, the target project is found from a plurality of projects according to the project name corresponding to the search request, and only the target project is displayed in a project list, or a special visual identification is added to the target project, so that the project member can quickly find the target project.
In the embodiment of the application, a project creation request sent by a user logging in a development platform is obtained; generating a project page to be filled in according to the project creating request; receiving input operation of a user aiming at a project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as a manager of the target project; and acquiring member configuration operation of an administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise the permission for viewing the target project. The created project can be disclosed to project members, so that the transparency of the project is reflected to a certain degree while the safety of the project is ensured; and the user can check which project members belong to by logging in the development platform, and can check the progress condition of any project with permission, thereby bringing great convenience to the user.
Referring to fig. 8, a block diagram of a project management apparatus provided in an embodiment of the present application is shown, where the project management apparatus is applied to a development platform of a developer portal system, and the developer portal system is deployed in a city portal system. The method specifically comprises the following modules:
a request obtaining module 801, configured to obtain a project creation request sent by a user logging in the development platform;
a page generating module 802, configured to generate a project page to be filled in according to the project creation request;
a project creating module 803, configured to receive an input operation of the user on the project page to be filled in, create a corresponding target project according to the content of the input operation, and determine the user as an administrator of the target project;
a member determining module 804, configured to obtain an operation that the administrator performs member configuration on the target item, and determine an item member of the target item, where the item member at least includes a right to view the target item.
In a preferred embodiment of the present application, the module 804 for determining a member may include:
the request acquisition submodule is used for acquiring a new member request sent by the administrator in a member configuration page of the target project;
the dialog box generation submodule is used for generating a dialog box of the newly added member according to the request of the newly added member; the new member dialog box comprises new members to be filled in and role distribution;
and the information receiving submodule is used for receiving the filling operation of the administrator on the dialog box of the newly added member and determining the newly added member of the target project.
In a preferred embodiment of the present application, the information receiving sub-module further includes:
the development process acquisition sub-module is used for acquiring the development process of the target project;
the development node acquisition submodule is used for determining roles corresponding to each development node and authorities corresponding to the roles according to the development nodes of the development process;
and the permission determining submodule is used for determining the permission of the newly added member according to the role of the newly added member.
In a preferred embodiment of the embodiments of the present application, the apparatus further comprises:
and the member information adding submodule is used for adding the member information of the newly added member into a member list of the member configuration page, and the member information comprises a member account and a role.
In a preferred embodiment of the present application, the member list further includes the authority of each item member; the device further comprises:
and the permission updating module is used for acquiring the modification operation of the administrator on the permission of any item member in the member list and updating the permission of the item member.
In a preferred embodiment of the embodiments of the present application, the apparatus further comprises:
and the project sending module is used for sending the project information of the target project to an account corresponding to the project member so that the project member can log in the development platform by using the account to check the target project.
In a preferred embodiment of the embodiments of the present application, the apparatus further comprises:
the viewing request acquisition module is used for acquiring a viewing request aiming at the target project, which is sent by a project member logging in the development platform;
the item profile display module is used for displaying the item profile of the target item according to the viewing request; the project profile includes progress, milestones, and risk data for the target project.
For the device embodiment, since it is basically similar to the method embodiment, the description is simple, and for the relevant points, refer to the partial description of the method embodiment.
The embodiment of the application also discloses an electronic device, which comprises a processor, a memory and a computer program stored on the memory and capable of running on the processor, wherein when the computer program is executed by the processor, the steps of the method for project management of the embodiment are realized.
The embodiment of the application also discloses a computer readable storage medium, wherein a computer program is stored on the computer readable storage medium, and when the computer program is executed by a processor, the steps of the project management method of the embodiment are realized.
The embodiments in the present specification are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
As will be appreciated by one of skill in the art, embodiments of the present application may be provided as a method, apparatus, or computer program product. Accordingly, embodiments of the present application may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, embodiments of the present application may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
Embodiments of the present application are described with reference to flowchart illustrations and/or block diagrams of methods, terminal devices (systems), and computer program products according to embodiments of the application. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing terminal to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing terminal, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing terminal to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing terminal to cause a series of operational steps to be performed on the computer or other programmable terminal to produce a computer implemented process such that the instructions which execute on the computer or other programmable terminal provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present application have been described, additional variations and modifications of these embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including the preferred embodiment and all such alterations and modifications as fall within the true scope of the embodiments of the application.
Finally, it should also be noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or terminal that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or terminal. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or terminal that comprises the element.
The method for project management, the device for project management, the electronic device and the storage medium provided by the present application are introduced in detail above, and specific examples are applied in the present application to explain the principle and the implementation of the present application, and the description of the above embodiments is only used to help understand the method and the core idea of the present application; meanwhile, for a person skilled in the art, according to the idea of the present application, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present application.

Claims (10)

1. A method for project management is characterized in that the method is applied to a development platform of a developer portal system, and the developer portal system is deployed in a city portal system; the method comprises the following steps:
acquiring a project creation request sent by a user logging in the development platform;
generating a project page to be filled in according to the project creating request;
receiving an input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project;
and acquiring member configuration operation of the administrator aiming at the target project, and determining project members of the target project, wherein the project members at least comprise permission for viewing the target project.
2. The method of claim 1, wherein the step of obtaining member configuration of the administrator for the target project, determining project members of the target project, comprises:
acquiring a new member request sent by the administrator in a member configuration page of the target project;
generating a dialog box of the newly added member according to the request of the newly added member; the new member dialog box comprises new members to be filled in and role distribution;
and receiving the filling operation of the administrator on the dialog box of the newly added member, and determining the newly added member of the target project.
3. The method according to claim 2, wherein the step of receiving the filling operation of the administrator on the dialog box of the new member and determining the new member of the target item further comprises:
acquiring a development process of the target project;
determining roles corresponding to each development node and authorities corresponding to the roles according to the development nodes of the development process;
and determining the authority of the newly added member according to the role of the newly added member.
4. The method according to claim 3, wherein after the step of receiving the filling operation of the administrator on the dialog box of the new member and determining the new member of the target item, the method further comprises:
and adding the member information of the newly added member into a member list of the member configuration page, wherein the member information comprises a member account and a role.
5. The method of claim 4, wherein the member list further includes permissions of each item member; the method further comprises the following steps:
and acquiring the modification operation of the administrator on the authority of any item member in the member list, and updating the authority of the item member.
6. The method of claim 5, after the step of obtaining member configuration of the administrator for the target project, determining project members of the target project, further comprising:
and sending the project information of the target project to an account corresponding to the project member so that the project member can log in the development platform to view the target project by using the account.
7. The method of claim 6, further comprising:
acquiring a viewing request aiming at the target project, which is sent by a project member logging in the development platform;
displaying an item profile of the target item according to the viewing request; the project profile includes progress, milestones, and risk data for the target project.
8. The project management device is applied to a development platform of a developer portal system, wherein the developer portal system is deployed in a city portal system; the device comprises:
the request acquisition module is used for acquiring a project creation request sent by a user logging in the development platform;
the page generation module is used for generating a project page to be filled according to the project creation request;
the project creating module is used for receiving input operation of the user for the project page to be filled, creating a corresponding target project according to the content of the input operation, and determining the user as an administrator of the target project;
and the member determining module is used for acquiring member configuration operation of the administrator for the target item and determining the item members of the target item, wherein the item members at least comprise the permission for viewing the target item.
9. An electronic device comprising a processor, a memory and a computer program stored on the memory and capable of running on the processor, the computer program, when executed by the processor, implementing the steps of the method of item management according to any one of claims 1 to 7.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method of project management according to any one of claims 1 to 7.
CN202010779800.3A 2020-08-05 2020-08-05 Project management method and device, electronic equipment and storage medium Pending CN112070457A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010779800.3A CN112070457A (en) 2020-08-05 2020-08-05 Project management method and device, electronic equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010779800.3A CN112070457A (en) 2020-08-05 2020-08-05 Project management method and device, electronic equipment and storage medium

Publications (1)

Publication Number Publication Date
CN112070457A true CN112070457A (en) 2020-12-11

Family

ID=73657006

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010779800.3A Pending CN112070457A (en) 2020-08-05 2020-08-05 Project management method and device, electronic equipment and storage medium

Country Status (1)

Country Link
CN (1) CN112070457A (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112612397A (en) * 2020-12-30 2021-04-06 广州酷狗计算机科技有限公司 Multimedia list management method, device, equipment and storage medium
CN112884445A (en) * 2021-03-05 2021-06-01 新奥数能科技有限公司 Energy project delivery platform and delivery method
CN112947990A (en) * 2021-03-23 2021-06-11 四川虹美智能科技有限公司 Development library creating method and device and computer readable medium
CN112988017A (en) * 2021-04-12 2021-06-18 无锡奥特维科技股份有限公司 Method and device for managing groups
CN113344513A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project information management method and device, electronic equipment and storage medium
CN113344520A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Investigation management method and device of project management system
CN113467669A (en) * 2021-05-31 2021-10-01 珠海大横琴科技发展有限公司 Information processing method and device, electronic equipment and readable medium
CN113590121A (en) * 2021-08-02 2021-11-02 中国银行股份有限公司 Single-project multi-project group management method and device of JIRA system
CN114168244A (en) * 2021-11-23 2022-03-11 北京快乐茄信息技术有限公司 Information processing method and device, electronic equipment and storage medium
CN114253518A (en) * 2022-03-01 2022-03-29 上海金仕达软件科技有限公司 Intelligent project management method and system
CN114500431A (en) * 2022-02-18 2022-05-13 武汉夜莺科技有限公司 Project processing method and device and electronic equipment
CN114741134A (en) * 2022-04-22 2022-07-12 深圳依时货拉拉科技有限公司 Application starting method and device, computer readable storage medium and computer equipment
CN115082042A (en) * 2022-07-20 2022-09-20 灵智信息服务(深圳)有限公司 Project management method based on data set, computer equipment and storage medium
CN115577690A (en) * 2022-09-23 2023-01-06 海南乾唐视联信息技术有限公司 Project report generation method and device, electronic equipment and storage medium
CN115907695A (en) * 2023-01-06 2023-04-04 中化现代农业有限公司 Agricultural data systematized management method and system, electronic equipment and storage medium
CN117473798A (en) * 2023-12-26 2024-01-30 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105654254A (en) * 2016-03-22 2016-06-08 成都甲图乙网络科技有限公司 Multiparty interactive project management method and system
CN106096907A (en) * 2016-06-01 2016-11-09 比美特医护在线(北京)科技有限公司 A kind of item information processing method and system
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management
CN108876281A (en) * 2018-04-25 2018-11-23 盈东科技(北京)有限公司 A kind of project management system and device
CN110223040A (en) * 2019-05-31 2019-09-10 深圳市元征科技股份有限公司 Project management method, device, electronic equipment and storage medium
CN110298638A (en) * 2019-07-05 2019-10-01 合巨变(杭州)科技有限公司 Project Management Software Systems

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105654254A (en) * 2016-03-22 2016-06-08 成都甲图乙网络科技有限公司 Multiparty interactive project management method and system
CN106096907A (en) * 2016-06-01 2016-11-09 比美特医护在线(北京)科技有限公司 A kind of item information processing method and system
CN107909349A (en) * 2017-11-30 2018-04-13 郑州云海信息技术有限公司 A kind of project management Cloud Server and its method for realizing project management
CN108876281A (en) * 2018-04-25 2018-11-23 盈东科技(北京)有限公司 A kind of project management system and device
CN110223040A (en) * 2019-05-31 2019-09-10 深圳市元征科技股份有限公司 Project management method, device, electronic equipment and storage medium
CN110298638A (en) * 2019-07-05 2019-10-01 合巨变(杭州)科技有限公司 Project Management Software Systems

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112612397B (en) * 2020-12-30 2022-08-23 广州酷狗计算机科技有限公司 Multimedia list management method, device, equipment and storage medium
CN112612397A (en) * 2020-12-30 2021-04-06 广州酷狗计算机科技有限公司 Multimedia list management method, device, equipment and storage medium
CN112884445A (en) * 2021-03-05 2021-06-01 新奥数能科技有限公司 Energy project delivery platform and delivery method
CN112947990A (en) * 2021-03-23 2021-06-11 四川虹美智能科技有限公司 Development library creating method and device and computer readable medium
CN112988017A (en) * 2021-04-12 2021-06-18 无锡奥特维科技股份有限公司 Method and device for managing groups
CN113344513A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Project information management method and device, electronic equipment and storage medium
CN113344520A (en) * 2021-05-31 2021-09-03 珠海大横琴科技发展有限公司 Investigation management method and device of project management system
CN113467669A (en) * 2021-05-31 2021-10-01 珠海大横琴科技发展有限公司 Information processing method and device, electronic equipment and readable medium
CN113590121A (en) * 2021-08-02 2021-11-02 中国银行股份有限公司 Single-project multi-project group management method and device of JIRA system
CN114168244A (en) * 2021-11-23 2022-03-11 北京快乐茄信息技术有限公司 Information processing method and device, electronic equipment and storage medium
CN114500431A (en) * 2022-02-18 2022-05-13 武汉夜莺科技有限公司 Project processing method and device and electronic equipment
CN114500431B (en) * 2022-02-18 2024-04-26 武汉夜莺科技有限公司 Project processing method and device and electronic equipment
CN114253518A (en) * 2022-03-01 2022-03-29 上海金仕达软件科技有限公司 Intelligent project management method and system
CN114741134A (en) * 2022-04-22 2022-07-12 深圳依时货拉拉科技有限公司 Application starting method and device, computer readable storage medium and computer equipment
CN115082042A (en) * 2022-07-20 2022-09-20 灵智信息服务(深圳)有限公司 Project management method based on data set, computer equipment and storage medium
CN115577690A (en) * 2022-09-23 2023-01-06 海南乾唐视联信息技术有限公司 Project report generation method and device, electronic equipment and storage medium
CN115907695A (en) * 2023-01-06 2023-04-04 中化现代农业有限公司 Agricultural data systematized management method and system, electronic equipment and storage medium
CN117473798A (en) * 2023-12-26 2024-01-30 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium
CN117473798B (en) * 2023-12-26 2024-05-14 国家超级计算天津中心 Simulation project management method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
CN112070457A (en) Project management method and device, electronic equipment and storage medium
US8955037B2 (en) Access management architecture
US9628492B2 (en) Method and system for restricting access rights on user profile information using a new notion of peer
US7240288B2 (en) Method and system for making resources available
US9489194B2 (en) Rapidly configurable program
US20100281528A1 (en) Methods and systems for generating and delivering an interactive application delivery store
US8316420B2 (en) Access control on dynamically instantiated portal applications
US8204949B1 (en) Email enabled project management applications
CN107222487B (en) Account docking system in hybrid cloud environment
CN102656562A (en) Methods and systems for selecting a desktop execution location
CN111680310B (en) Authority control method and device, electronic equipment and storage medium
US11928605B2 (en) Techniques for cyber-attack event log fabrication
CN110782251A (en) Method for automatically deploying block chain network based on intelligent contracts
CN112134779B (en) Network information processing method, device, system, client and readable storage medium
US20120151311A1 (en) System and method for generating a customized task list
CN114760088B (en) Flight plan data management method, system, electronic device and storage medium
CN114095200B (en) Resource access authority management method and device, electronic equipment and medium
CN114691741A (en) Information sharing method and device, electronic equipment and computer storage medium
CN114282210A (en) Sandbox automatic construction method and system, computer equipment and readable storage medium
CN113822557A (en) Data fusion management system, data fusion management device, electronic device, and medium
Larsen et al. HUBCAP: A Novel Collaborative Approach to Model-Based Design of Cyber-Physical Systems
Dobreva et al. Integrate Power BI With Wpf Desktop Applications
Jillepalli HiFiPol: Browser-securing the web browsing ecosystem
US8972939B1 (en) Systems and methods for processing and producing content for web sites
Sinclair Developing a report map for an energy supplier company with React

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination