CN113344520A CN202110605366.1A CN202110605366A CN113344520A CN 113344520 A CN113344520 A CN 113344520A CN 202110605366 A CN202110605366 A CN 202110605366A CN 113344520 A CN113344520 A CN 113344520A
Authority
CN
China
Prior art keywords
user
survey
unit
items
responding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110605366.1A
Other languages
Chinese (zh)
Inventor
邓练兵
陈小满
逯明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Dahengqin Technology Development Co Ltd
Original Assignee
Zhuhai Dahengqin Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Dahengqin Technology Development Co Ltd filed Critical Zhuhai Dahengqin Technology Development Co Ltd
Priority to CN202110605366.1A priority Critical patent/CN113344520A/en
Publication of CN113344520A publication Critical patent/CN113344520A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/90335Query processing
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/903Querying
    • G06F16/9038Presentation of query results
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/904Browsing; Visualisation therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Databases & Information Systems (AREA)
  • Business, Economics & Management (AREA)
  • Data Mining & Analysis (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Engineering & Computer Science (AREA)
  • Computational Linguistics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The embodiment of the invention provides a survey management method and a device of a project management system, wherein the method comprises the following steps: responding to a creating request of a user of a transaction unit, creating survey items aiming at a project and inputting survey data; responding to a publishing request of a user of a coordination unit, publishing survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items; responding to a processing request of a user of a coordination unit, and inputting survey feedback data for survey items owned by the user; in response to a request for submission from a user of a coordination unit, the survey items processed by the user are submitted to the user of the transaction unit. The embodiment of the invention realizes the project management system which can support users of a plurality of organizations to jointly manage projects, and users of different organizations can manage project investigation items in the project management system, thereby meeting the actual requirements.

Description

Investigation management method and device of project management system
Technical Field
The present invention relates to the field of computer technologies, and in particular, to a survey management method and a survey management apparatus for a project management system.
Background
During the construction of a smart city, project information of related projects involved in the construction process is often managed, wherein the projects may include municipal infrastructure projects, garden comprehensive development projects, land development projects, road construction projects and the like.
The existing project management system can carry out digital management on the related information of a plurality of projects, and a user can check the related conditions of the projects through the project management system. For some projects related to multiple organizations, the current project management system cannot support users of multiple organizations to manage projects together, and cannot meet the actual requirements.
Disclosure of Invention
In view of the above problems, embodiments of the present invention are proposed to provide a survey management method of a project management system and a corresponding survey management apparatus of a project management system that overcome or at least partially solve the above problems.
In order to solve the problems, the embodiment of the invention discloses a survey management method of a project management system, wherein the project management system comprises a front end facing a user, and the front end displays a matched page according to an organization to which a login user belongs; the organization mechanism comprises a construction unit and a handling unit; the method comprises the following steps:
responding to a creation request initiated by a user of the handling unit at the front end, creating survey items aiming at the project and inputting survey data;
responding to a publishing request initiated by the user of the coordination unit at the front end, publishing survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items;
responding to a processing request initiated by a user of the coordination unit at the front end, and inputting survey feedback data for survey items owned by the user;
and submitting the survey matters processed by the user to the user of the transaction unit in response to a submission request initiated by the user of the coordination unit at the front end.
Optionally, the method further comprises:
when all the survey items for the project are processed by the coordination unit, all the survey items are acquired and the survey item processing flow is ended.
Optionally, the method further comprises:
and responding to the request initiated by the user of the handling unit at the front end, and sending a handling message to the user of the appointed coordination unit, wherein the handling message is used for reminding the user of the coordination unit to handle the checking items.
Optionally, the method further comprises:
responding to a query request initiated by a user of the transaction unit at the front end, querying the survey items created by the user, and displaying the queried survey items on a display interface of the front end;
and responding to a query request initiated by a user of the coordination unit at the front end, querying the survey items coordinated and processed by the user, and displaying the queried survey items on a display interface at the front end.
Optionally, the method further comprises:
and responding to a modification request initiated by the user of the transaction unit at the front end, and modifying the unpublished survey items of the user.
Optionally, the method further comprises:
and responding to a viewing request initiated by the user of the coordination unit at the front end, and sending survey item detail information to the user.
Optionally, the method further comprises:
and responding to a deletion request initiated by the user of the transaction unit at the front end, and deleting the investigation items which are not issued by the user.
The embodiment of the invention also provides a survey management device of the project management system, wherein the project management system comprises a front end facing the user, and the front end displays a matched page according to the organization to which the login user belongs; the organization mechanism comprises a construction unit and a handling unit; the device comprises:
the item creating module is used for responding to a creating request initiated by the user of the handling unit at the front end, creating survey items aiming at the project and inputting survey data;
the issuing module is used for responding to an issuing request initiated by the user of the handling unit at the front end, issuing survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items;
the recording module is used for responding to a processing request initiated by the user of the coordination unit at the front end and recording survey feedback data of the survey items of the user;
and the submitting module is used for responding to a submitting request initiated by the user of the coordination unit at the front end and submitting the survey items processed by the user to the user of the handling unit.
Optionally, the apparatus further comprises:
and the ending module is used for acquiring all the survey items and ending the survey item processing flow after all the survey items aiming at the project are processed by the coordination unit.
Optionally, the apparatus further comprises:
and the hastening module is used for responding to a hastening request initiated by the user of the handling unit at the front end and sending a hastening message to the user of the appointed coordination unit, wherein the hastening message is used for reminding the user of the coordination unit to process the checking items.
Optionally, the apparatus further comprises:
the first event display module is used for responding to a query request initiated by a user of the handling unit at the front end, querying the survey items created by the user and displaying the queried survey items on a display interface at the front end;
and the second item display module is used for responding to a query request initiated by a user of the coordination unit at the front end, querying the survey items coordinated and processed by the user, and displaying the queried survey items on a display interface at the front end.
Optionally, the apparatus further comprises:
and the modification module is used for responding to a modification request initiated by the user of the handling unit at the front end and modifying the survey items which are not issued by the user.
Optionally, the apparatus further comprises:
and the viewing module is used for responding to a viewing request initiated by the user of the coordination unit at the front end and sending the survey item detail information to the user.
Optionally, the apparatus further comprises:
and the deleting module is used for responding to a deleting request initiated by the user of the handling unit at the front end and deleting the investigation items which are not issued by the user.
An embodiment of the present invention further provides an electronic device, including: a processor, a memory and a computer program stored on the memory and capable of running on the processor, the computer program, when executed by the processor, implementing the steps of the survey management method of the project management system according to an embodiment of the invention.
The embodiment of the present invention further provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when the computer program is executed by a processor, the steps of the investigation management method of the project management system according to the embodiment of the present invention are implemented.
The embodiment of the invention has the following advantages:
in the embodiment of the invention, the back end of the project management system can respond to a creation request initiated by a user of a transaction unit, create survey items aiming at a project and input survey data; the back end can respond to a publishing request initiated by a user of a coordination unit, publish survey items to the user of the coordination unit specified by the user and send survey pending information to prompt the user of the coordination unit to process the survey items; the back end can respond to a processing request initiated by a user of a coordination unit and input investigation feedback data for investigation items possessed by the user; the back-end may submit the survey items processed by the user to the user of the transaction entity in response to a submission request initiated by the user of the coordination entity. The embodiment of the invention realizes the project management system which can support users of a plurality of organizations to jointly manage projects, and users of different organizations can manage project investigation items in the project management system, thereby meeting the actual requirements.
Drawings
Fig. 1 is a flowchart illustrating steps of a survey management method of a project management system according to an embodiment of the present invention;
FIG. 2 is a diagram illustrating a status change of a survey item in a survey item management process according to an embodiment of the present invention;
fig. 3 is a block diagram of a survey management apparatus of a project management system according to an embodiment of the present invention.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in further detail below.
Referring to fig. 1, a flowchart illustrating steps of a survey management method of a project management system according to an embodiment of the present invention is shown, where the project management system includes a front end facing a user, and the front end presents a matched page according to an organization to which a logged-in user belongs; the organization mechanism comprises a construction unit and a handling unit; the method may specifically comprise the steps of:
step 101, responding to a creation request initiated by the user of the handling unit at the front end, creating survey items aiming at the project and entering survey data.
The embodiment of the invention provides a project management system which can support users of a plurality of organizations to use together. The project management system is a management system which performs functions of project management, project plan management, project monthly report management, project problem management, project supervision, project investigation and the like by taking a project as a center.
The project management system includes a front end and a back end. The front end may include a Web end, an APP end, an applet, and the like. Users can log in to the project management system through the front end, and the front end can comprise a login page suitable for user login of various organizations. When a user logs in a project management system, account information of the user needs to be input in an input box of a login page of the project management system, wherein the account information can comprise a user name and a password, and then a login request is sent to a back end through a login control of the login page.
The back end can acquire account information of the user from the login request and confirm whether the account information is correct, namely whether a user name and a password are matched with user data is verified, and if the user name and the password are matched with the user data, the project management system is allowed to be logged in; if not, prompting related early warning information for reminding personnel of wrong input of the account information; the early warning information may include: username or password errors.
After logging in the project management system, the front end can display a home page matched with the display of the organization to which the user belongs. The project management system can comprise a plurality of application modules, such as a survey module, which can be used for providing compiling function and publishing function of a survey process aiming at projects. The front end can display the operation interface corresponding to each application module, and the user can conduct the operation of compiling and issuing the survey items on the operation interface corresponding to the survey module.
In the project management process, users of different organizations are assigned different rights and functions. In an embodiment of the invention, the organization may include a construction unit, a transaction unit, a coordination unit, and a superior unit. The construction unit is a unit responsible for project construction. The handling unit is the unit responsible for managing the project in the whole process. The coordination unit refers to a unit for coordinating the transaction of the project. The upper level unit is the unit responsible for leader project management.
In embodiments of the invention, a user of the office may operate at the head end to initiate a create request. The back-end can respond to the creation request, invoke the survey creation interface to create survey items for the project and enter survey data. Survey data may include coordination units and survey status.
And 102, responding to a publishing request initiated by the user of the coordination unit at the front end, publishing the survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items.
The user of the transaction entity may operate at the head end to initiate the publication request. The back end can respond to the issuing request, call the issuing interface to issue the investigation items to the designated coordination unit, and send the investigation pending information to the users of the coordination unit to prompt the users of the coordination unit to process the investigation items.
Step 103, responding to the processing request initiated by the user of the coordination unit at the front end, and inputting survey feedback data for the survey items owned by the user.
The user of the coordination unit may operate at the head end to initiate a processing request. The back-end may, in response to the processing request, invoke the processing interface to enter survey feedback data for the survey items the user has. The survey feedback data may be where the project is surveyed.
And 104, responding to a submission request initiated by the user of the coordination unit at the front end, and submitting the survey items processed by the user to the user of the handling unit.
The user of the coordination entity may operate at the head end to initiate a submit request. The back-end may respond to the submit request by invoking the submit interface to submit the processed survey items of the user to the user of the transaction entity.
In the embodiment of the invention, the back end of the project management system can respond to a creation request initiated by a user of a transaction unit, create survey items aiming at a project and input survey data; the back end can respond to a publishing request initiated by a user of a coordination unit, publish survey items to the user of the coordination unit specified by the user and send survey pending information to prompt the user of the coordination unit to process the survey items; the back end can respond to a processing request initiated by a user of a coordination unit and input investigation feedback data for investigation items possessed by the user; the back-end may submit the survey items processed by the user to the user of the transaction entity in response to a submission request initiated by the user of the coordination entity. The embodiment of the invention realizes the project management system which can support users of a plurality of organizations to jointly manage projects, and users of different organizations can manage project investigation items in the project management system, thereby meeting the actual requirements.
In the embodiment of the present invention, the method may further include the following steps:
when all the survey items for the project are processed by the coordination unit, all the survey items are acquired and the survey item processing flow is ended.
And when all the survey items aiming at the project are processed and submitted by the coordination unit, the back end automatically acquires all the survey items and ends the survey item processing flow.
In the embodiment of the present invention, the method may further include the following steps:
and responding to the request initiated by the user of the handling unit at the front end, and sending a handling message to the user of the appointed coordination unit, wherein the handling message is used for reminding the user of the coordination unit to handle the checking items.
The user of the office may operate at the head end to initiate the request for hastening. The back end can respond to the request for handling, and call the interface for handling to send a message for handling to the user of the appointed coordination unit to prompt the user of the coordination unit to process the checking items.
In the embodiment of the present invention, the method may further include the following steps:
and responding to a query request initiated by the user of the handling unit at the front end, querying the survey items created by the user, and displaying the queried survey items on a display interface at the front end.
The user of the office may operate at the head end to initiate a query request. The back end can respond to the query request, call the query interface to query the survey items created by the user, and display the queried survey items on the display interface of the front end.
In the embodiment of the present invention, the method may further include the following steps:
and responding to a query request initiated by a user of the coordination unit at the front end, querying the survey items coordinated and processed by the user, and displaying the queried survey items on a display interface at the front end.
The user of the coordination entity may operate at the head end to initiate a query request. The back end can respond to the query request, call the query interface to query the survey items coordinated by the user, and display the query survey items on the display interface of the front end.
In the embodiment of the present invention, the method may further include the following steps:
and responding to a modification request initiated by the user of the transaction unit at the front end, and modifying the unpublished survey items of the user.
The user of the transaction entity may operate at the head end to initiate a modification request. The back end can respond to the modification request and call a modification interface to modify the unpublished survey item of the user.
In the embodiment of the present invention, the method may further include the following steps:
and responding to a viewing request initiated by the user of the coordination unit at the front end, and sending survey item detail information to the user.
The user of the coordination entity may operate at the head end to initiate a request to view. The back end can respond to the viewing request and call the viewing interface to send the survey item detail information to the user.
In the embodiment of the present invention, the method may further include the following steps:
and responding to a deletion request initiated by the user of the transaction unit at the front end, and deleting the investigation items which are not issued by the user.
The user of the transaction entity may operate at the head end to initiate a delete request. The back end can respond to the deletion request and call a deletion interface to delete the investigation items which are not issued by the user.
In order to enable a person skilled in the art to better understand the embodiments of the present invention, the following description is given by way of an example: fig. 2 is a schematic diagram illustrating a status change of an investigation item in an investigation item management process according to an embodiment of the present invention.
The survey items are created by the transaction units, the survey items are in a draft state after being created, and the survey items in the draft state can be input, modified and stored by users of the transaction units.
The user of the office may issue the survey item in the draft state to the coordination office, and the state of the survey item becomes underwritten.
The system creates backlog for the users of the coordination unit, the state of the survey items is changed into processing, and the survey items in the processing can be modified and stored by the users of the coordination unit.
The user of the coordination entity may submit the survey to the transaction entity and the status of the survey becomes processed.
When all the survey items for the project are processed and submitted by the coordination unit, the system sets the status of the survey items to end.
It should be noted that, for simplicity of description, the method embodiments are described as a series of acts or combination of acts, but those skilled in the art will recognize that the present invention is not limited by the illustrated order of acts, as some steps may occur in other orders or concurrently in accordance with the embodiments of the present invention. Further, those skilled in the art will appreciate that the embodiments described in the specification are presently preferred and that no particular act is required to implement the invention.
Referring to fig. 3, a block diagram of a survey management apparatus of a project management system according to an embodiment of the present invention is shown, and the survey management apparatus may specifically include the following modules:
a transaction creation module 301, configured to respond to a creation request initiated by the user of the handling unit at the front end, create survey transactions for a project, and enter survey data;
the publishing module 302 is configured to respond to a publishing request initiated by the user of the handling unit at the front end, publish a survey item to the user of the coordination unit specified by the user, and send survey pending information, where the survey pending information is used to prompt the user of the coordination unit to process the survey item;
an entry module 303, configured to respond to a processing request initiated by a user of the coordination unit at the front end, and enter survey feedback data for survey items owned by the user;
a submitting module 304, configured to respond to a submission request initiated by the user of the coordination unit at the front end, and submit the processed survey items of the user to the user of the handling unit.
In an optional embodiment of the present invention, the apparatus further comprises:
and the ending module is used for acquiring all the survey items and ending the survey item processing flow after all the survey items aiming at the project are processed by the coordination unit.
In an optional embodiment of the present invention, the apparatus further comprises:
and the hastening module is used for responding to a hastening request initiated by the user of the handling unit at the front end and sending a hastening message to the user of the appointed coordination unit, wherein the hastening message is used for reminding the user of the coordination unit to process the checking items.
In an optional embodiment of the present invention, the apparatus further comprises:
the first event display module is used for responding to a query request initiated by a user of the handling unit at the front end, querying the survey items created by the user and displaying the queried survey items on a display interface at the front end;
and the second item display module is used for responding to a query request initiated by a user of the coordination unit at the front end, querying the survey items coordinated and processed by the user, and displaying the queried survey items on a display interface at the front end.
In an optional embodiment of the present invention, the apparatus further comprises:
and the modification module is used for responding to a modification request initiated by the user of the handling unit at the front end and modifying the survey items which are not issued by the user.
In an optional embodiment of the present invention, the apparatus further comprises:
and the viewing module is used for responding to a viewing request initiated by the user of the coordination unit at the front end and sending the survey item detail information to the user.
In an optional embodiment of the present invention, the apparatus further comprises:
and the deleting module is used for responding to a deleting request initiated by the user of the handling unit at the front end and deleting the investigation items which are not issued by the user.
In summary, in the embodiment of the present invention, the back end of the project management system may respond to a creation request initiated by a user of a transaction unit, create survey items for a project, and enter survey data; the back end can respond to a publishing request initiated by a user of a coordination unit, publish survey items to the user of the coordination unit specified by the user and send survey pending information to prompt the user of the coordination unit to process the survey items; the back end can respond to a processing request initiated by a user of a coordination unit and input investigation feedback data for investigation items possessed by the user; the back-end may submit the survey items processed by the user to the user of the transaction entity in response to a submission request initiated by the user of the coordination entity. The embodiment of the invention realizes the project management system which can support users of a plurality of organizations to jointly manage projects, and users of different organizations can manage project investigation items in the project management system, thereby meeting the actual requirements.
For the device embodiment, since it is basically similar to the method embodiment, the description is simple, and for the relevant points, refer to the partial description of the method embodiment.
An embodiment of the present invention further provides an electronic device, including:
the system comprises a processor, a memory and a computer program which is stored on the memory and can run on the processor, wherein when the computer program is executed by the processor, each process of the embodiment of the investigation management method of the project management system is realized, the same technical effect can be achieved, and the details are not repeated here to avoid repetition.
The embodiment of the present invention further provides a computer-readable storage medium, where a computer program is stored on the computer-readable storage medium, and when being executed by a processor, the computer program implements each process of the investigation management method embodiment of the project management system, and can achieve the same technical effect, and is not described herein again to avoid repetition.
The embodiments in the present specification are described in a progressive manner, each embodiment focuses on differences from other embodiments, and the same and similar parts among the embodiments are referred to each other.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, apparatus, or computer program product. Accordingly, embodiments of the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, embodiments of the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
Embodiments of the present invention are described with reference to flowchart illustrations and/or block diagrams of methods, terminal devices (systems), and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing terminal to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing terminal, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing terminal to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing terminal to cause a series of operational steps to be performed on the computer or other programmable terminal to produce a computer implemented process such that the instructions which execute on the computer or other programmable terminal provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
While preferred embodiments of the present invention have been described, additional variations and modifications of these embodiments may occur to those skilled in the art once they learn of the basic inventive concepts. Therefore, it is intended that the appended claims be interpreted as including preferred embodiments and all such alterations and modifications as fall within the scope of the embodiments of the invention.
Finally, it should also be noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or terminal that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or terminal. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or terminal that comprises the element.
The investigation management method of the project management system and the investigation management device of the project management system provided by the invention are introduced in detail, and a specific example is applied in the text to explain the principle and the implementation mode of the invention, and the description of the embodiment is only used for helping to understand the method and the core idea of the invention; meanwhile, for a person skilled in the art, according to the idea of the present invention, there may be variations in the specific embodiments and the application scope, and in summary, the content of the present specification should not be construed as a limitation to the present invention.

Claims (10)

1. A survey management method of a project management system is characterized in that the project management system comprises a front end facing a user, and the front end displays a matched page according to an organization to which a login user belongs; the organization mechanism comprises a construction unit and a handling unit; the method comprises the following steps:
responding to a creation request initiated by a user of the handling unit at the front end, creating survey items aiming at the project and inputting survey data;
responding to a publishing request initiated by the user of the coordination unit at the front end, publishing survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items;
responding to a processing request initiated by a user of the coordination unit at the front end, and inputting survey feedback data for survey items owned by the user;
and submitting the survey matters processed by the user to the user of the transaction unit in response to a submission request initiated by the user of the coordination unit at the front end.
2. The method of claim 1, further comprising:
when all the survey items for the project are processed by the coordination unit, all the survey items are acquired and the survey item processing flow is ended.
3. The method of claim 1, further comprising:
and responding to the request initiated by the user of the handling unit at the front end, and sending a handling message to the user of the appointed coordination unit, wherein the handling message is used for reminding the user of the coordination unit to handle the checking items.
4. The method of claim 1, further comprising:
responding to a query request initiated by a user of the transaction unit at the front end, querying the survey items created by the user, and displaying the queried survey items on a display interface of the front end;
and responding to a query request initiated by a user of the coordination unit at the front end, querying the survey items coordinated and processed by the user, and displaying the queried survey items on a display interface at the front end.
5. The method of claim 1, further comprising:
and responding to a modification request initiated by the user of the transaction unit at the front end, and modifying the unpublished survey items of the user.
6. The method of claim 1, further comprising:
and responding to a viewing request initiated by the user of the coordination unit at the front end, and sending survey item detail information to the user.
7. The method of claim 1, further comprising:
and responding to a deletion request initiated by the user of the transaction unit at the front end, and deleting the investigation items which are not issued by the user.
8. A survey management device of a project management system is characterized in that the project management system comprises a front end facing a user, and the front end displays a matched page according to an organization to which a login user belongs; the organization mechanism comprises a construction unit and a handling unit; the device comprises:
the item creating module is used for responding to a creating request initiated by the user of the handling unit at the front end, creating survey items aiming at the project and inputting survey data;
the issuing module is used for responding to an issuing request initiated by the user of the handling unit at the front end, issuing survey items to the user of the coordination unit appointed by the user and sending survey pending information, wherein the survey pending information is used for prompting the user of the coordination unit to process the survey items;
the recording module is used for responding to a processing request initiated by the user of the coordination unit at the front end and recording survey feedback data of the survey items of the user;
and the submitting module is used for responding to a submitting request initiated by the user of the coordination unit at the front end and submitting the survey items processed by the user to the user of the handling unit.
9. An electronic device, comprising: processor, memory and computer program stored on the memory and executable on the processor, the computer program, when executed by the processor, implementing the steps of the survey management method of the project management system according to any of claims 1-7.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the survey management method of a project management system according to any one of claims 1 to 7.
CN202110605366.1A 2021-05-31 2021-05-31 Investigation management method and device of project management system Pending CN113344520A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110605366.1A CN113344520A (en) 2021-05-31 2021-05-31 Investigation management method and device of project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110605366.1A CN113344520A (en) 2021-05-31 2021-05-31 Investigation management method and device of project management system

Publications (1)

Publication Number Publication Date
CN113344520A true CN113344520A (en) 2021-09-03

Family

ID=77473636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110605366.1A Pending CN113344520A (en) 2021-05-31 2021-05-31 Investigation management method and device of project management system

Country Status (1)

Country Link
CN (1) CN113344520A (en)

Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
CN106548322A (en) * 2016-09-29 2017-03-29 中工国际工程股份有限公司 Project examination system
KR20170081598A (en) * 2017-06-29 2017-07-12 최현규 Computer-executable to-do management method, to-do management apparatus performing the same and storage medium storing the same
KR101769421B1 (en) * 2016-04-04 2017-08-21 최현규 To-do management method based on chatting room
CN107506898A (en) * 2017-07-28 2017-12-22 山东科技大学 A kind of ecological management project information dynamic management system and method
CN107833012A (en) * 2017-10-23 2018-03-23 青岛市市北区审计局 A kind of audit project finishes management system in limited time
KR20180109785A (en) * 2018-09-21 2018-10-08 최재호 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item
US20180367666A1 (en) * 2017-06-14 2018-12-20 Naver Corporation Mobile terminal and method for providing user interface using the same, server and method for providing mobile service using the same
CN109191081A (en) * 2018-09-18 2019-01-11 温州市勘察测绘研究院 A kind of wisdom site supervision examination & approval platform
CN109583771A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of engineering supervisor method and device
CN110163562A (en) * 2019-04-26 2019-08-23 长沙迪迈数码科技股份有限公司 A kind of mine business backlog processing method
CN110299723A (en) * 2019-05-15 2019-10-01 国网安徽省电力有限公司 A kind of net source coordination integrated management approach and system applied to grid company
CN110322224A (en) * 2019-07-03 2019-10-11 福建广电网络集团股份有限公司 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
CN110490559A (en) * 2019-08-26 2019-11-22 杭州安恒信息技术股份有限公司 A kind of mobile law enforcement inspection method, device, system and server
CN110581794A (en) * 2018-06-11 2019-12-17 腾讯科技(深圳)有限公司 Information processing method, information processing device, storage medium and computer equipment
CN111382985A (en) * 2018-12-27 2020-07-07 中国石油天然气股份有限公司 To-do message integrated pushing system and working method
CN111709712A (en) * 2020-06-16 2020-09-25 中国建设银行股份有限公司 Cross-system process docking method and device, electronic equipment and storage medium
CN111815282A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system engineering supervision project guidance management system
CN111950847A (en) * 2020-07-08 2020-11-17 泰康保险集团股份有限公司 Task allocation method and device
CN112070457A (en) * 2020-08-05 2020-12-11 珠海大横琴科技发展有限公司 Project management method and device, electronic equipment and storage medium
CN112184169A (en) * 2020-09-29 2021-01-05 中国平安人寿保险股份有限公司 Dynamic planning method, device, equipment and storage medium for user backlogs

Patent Citations (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105427091A (en) * 2015-12-03 2016-03-23 国网浙江杭州市萧山区供电公司 High-voltage business expansion overall process management and control system of power marketing
KR101769421B1 (en) * 2016-04-04 2017-08-21 최현규 To-do management method based on chatting room
CN106548322A (en) * 2016-09-29 2017-03-29 中工国际工程股份有限公司 Project examination system
US20180367666A1 (en) * 2017-06-14 2018-12-20 Naver Corporation Mobile terminal and method for providing user interface using the same, server and method for providing mobile service using the same
KR20170081598A (en) * 2017-06-29 2017-07-12 최현규 Computer-executable to-do management method, to-do management apparatus performing the same and storage medium storing the same
CN107506898A (en) * 2017-07-28 2017-12-22 山东科技大学 A kind of ecological management project information dynamic management system and method
CN107833012A (en) * 2017-10-23 2018-03-23 青岛市市北区审计局 A kind of audit project finishes management system in limited time
CN110581794A (en) * 2018-06-11 2019-12-17 腾讯科技(深圳)有限公司 Information processing method, information processing device, storage medium and computer equipment
CN109191081A (en) * 2018-09-18 2019-01-11 温州市勘察测绘研究院 A kind of wisdom site supervision examination & approval platform
KR20180109785A (en) * 2018-09-21 2018-10-08 최재호 Method and apparatus for assisting strategy map management based on schedule-assessment item and todo-assessment item
CN109583771A (en) * 2018-12-04 2019-04-05 北京诺士诚国际工程项目管理有限公司 A kind of engineering supervisor method and device
CN111382985A (en) * 2018-12-27 2020-07-07 中国石油天然气股份有限公司 To-do message integrated pushing system and working method
CN110163562A (en) * 2019-04-26 2019-08-23 长沙迪迈数码科技股份有限公司 A kind of mine business backlog processing method
CN110299723A (en) * 2019-05-15 2019-10-01 国网安徽省电力有限公司 A kind of net source coordination integrated management approach and system applied to grid company
CN110322224A (en) * 2019-07-03 2019-10-11 福建广电网络集团股份有限公司 A kind of fragmentary project management method and system of CHINA RFTCOM Co Ltd
CN110490559A (en) * 2019-08-26 2019-11-22 杭州安恒信息技术股份有限公司 A kind of mobile law enforcement inspection method, device, system and server
CN111709712A (en) * 2020-06-16 2020-09-25 中国建设银行股份有限公司 Cross-system process docking method and device, electronic equipment and storage medium
CN111950847A (en) * 2020-07-08 2020-11-17 泰康保险集团股份有限公司 Task allocation method and device
CN111815282A (en) * 2020-07-09 2020-10-23 北京中百信信息技术股份有限公司 Information system engineering supervision project guidance management system
CN112070457A (en) * 2020-08-05 2020-12-11 珠海大横琴科技发展有限公司 Project management method and device, electronic equipment and storage medium
CN112184169A (en) * 2020-09-29 2021-01-05 中国平安人寿保险股份有限公司 Dynamic planning method, device, equipment and storage medium for user backlogs

Similar Documents

Publication Publication Date Title
US11588855B2 (en) Policy approval layer
RU2586866C2 (en) Differentiation of set of features of participant of leased medium and user
US20150332596A1 (en) Integrated learning system
CN102257488B (en) Techniques to automatically syndicate content over a network
US20070220016A1 (en) Secured content syndication on a collaborative place
US10095482B2 (en) Systems, methods, and media for graphical task creation
CN111401029B (en) Document version updating system and method based on document partition and collaborative editing
US8104069B2 (en) Establishment of security federations
US10769166B1 (en) Distributed integrated platforms as a service network
CN104272293A (en) Remote enterprise policy/client configuration installation for computing devices
US11599719B2 (en) System and method for electronic document interaction with external resources
EP3800601A1 (en) Collaboration hub with blockchain verification
CN113344522A (en) Supervision and management method and device of project management system
CN105453072A (en) User centric data maintenance
Chougale et al. Firebase-overview and usage
CN102844774A (en) Web page control method, computer system and program
CN116982029A (en) Hosting event-based applications
US11630708B2 (en) OSN/PCS collaboration mechanism integration
US20140278511A1 (en) Information exchange for health care providers
CN116756711A (en) Data processing method, device, equipment and medium
US12066982B2 (en) Data asset sharing
CN113344520A (en) Investigation management method and device of project management system
CN113344516A (en) Supervising and managing method and device of project management system
KR102588900B1 (en) A method and an appratus for processing action information
CN113344515A (en) Project management method and device of project management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination