CN108867214A - Cyclic annular city - Google Patents
Cyclic annular city Download PDFInfo
- Publication number
- CN108867214A CN108867214A CN201710315740.8A CN201710315740A CN108867214A CN 108867214 A CN108867214 A CN 108867214A CN 201710315740 A CN201710315740 A CN 201710315740A CN 108867214 A CN108867214 A CN 108867214A
- Authority
- CN
- China
- Prior art keywords
- city
- annular
- annular channel
- channel
- road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/002—Design or lay-out of roads, e.g. street systems, cross-sections ; Design for noise abatement, e.g. sunken road
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C1/00—Design or layout of roads, e.g. for noise abatement, for gas absorption
- E01C1/04—Road crossings on different levels; Interconnections between roads on different levels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
Abstract
Cyclic annular city, belong to urban planning and construction technical field, it solves at present according to low speed, the city subsidiary-centers of general fast traffic requirements of the times planning construction, new district, its urban transportation form, road network structure and city layout, it is unable to satisfy the requirement in high-speed transit epoch, people are unable to satisfy for expressway around city traffic the problem of needs, technical solution is:Overhead railway, parallel elevated road and station series connection with multiple band-like hinges and for connecting these band-like hinges, constitutes the annular channel of rail-road cooperation, and annular channel and the urban function region of annular channel two sides, residential area collectively form cyclic annular city;The different of different cities are adapted to by the modification of annular channel itself to require;It is arranged by the setting of the short distances of two or more annular channels, connection and with the short distance of high-speed rail state iron, the service range of annular channel can be expanded, also just expand the scale in cyclic annular city in this way.
Description
(1) technical field:
The present invention relates to urban plannings, the city of annular channel and annular channel two sides specifically with rail-road
The cyclic annular city that functional areas, residential area collectively form.
(2) background technique:
Present most of big cities are single centre big cities, although or have satellite city, sub-center, it is most main
Want, the maximum amount of urban economy social activities and work position are still gathered in main city, be especially collected on the center in main city
Area, such as:London, Paris, New York, Tokyo, Beijing, Shanghai etc. are all single centre big cities.Single centre big city can assemble
A variety of different city functions, aggregation class is complete, and aggregation extent is high.Aggregation shortens the time-space matrix of people's contacts, transaction, can
To share many great infrastructure, selectivity is big, and chance is more, and transaction cost is low, but also brings traffic congestion, commuting simultaneously
The problems such as distance is too far, commuting time-consuming too long, energy consumption pollution, such issues that be collectively referred to as "urban disease".
Urban border delimited, city function is discongested, " jumping out " construction city subsidiary-centers, new district are current treatment " cities
The main method of disease ", such as:Beijing is existing to build " Tongzhou sub-center ", also to build " Xiong Anxinqu ".
The planning construction in " sub-center ", " new district " will by starting period, starting phase, mid-term, long term, with time sequencing,
The characteristics of area is cumulative, and planning construction is assembled according to city function to down town, using a variety of different grid type road network knots
Structure has become fixed pattern.Such road network once it is determined that, change and be difficult.When grid type road network structure is low speed, general fast traffic above-ground
The product in generation, it ensure that distance is most short, investment is minimum, meets urban development in chronological order, by stages the rule of step by step input.
Grid type road network structure is most suitable for personalized car, in the city of grid type road network structure, compared with public transport, and small vapour
Vehicle has apparent superiority.
City size is small, and grid type road network is advantageous to personalized traffic, very rationally;But gradually with city size
Expand, the density of population is gradually increased, car quantity is more and more, and operating range is increasingly longer, and urban disease gradually highlights, by
Gradually aggravate.One of the main reason for one of the main reason for car is urban sprawl, car is also urban disease.In grid type
The city of road network structure, the methods such as traffic lights, viaduct, traffic law, intelligence can only suitably improve traffic, can not eradicate
"urban disease", it is necessary to population controlling density, it is necessary to control city size.
In addition, according to not undue concentration, in intercity " the annular city " that need to retain the construction of buffer strip principle, and " jump out
Go " thinking of construction Urban New District is almost the same, and only formulation is different.
The progress of high-speed rail technology provides new possibility to cure "urban disease".Present CRH6F type inter-city passenger rail
Motor-car can achieve:Operate F-Zero 160km/h, starting loop 0.8m/s, deceleration 1m/s, station spacing 5-
15km, average speed per hour can achieve 100km/h.The average speed per hour of inter-city passenger rail motor-car is about the 2-3 of road public transport average speed per hour
Times, the average speed per hour of inter-city passenger rail motor-car has been more than car, this gets rid of for city and provides possibility to the dependence of car, this
For compared with car public transport have a clear superiority and provide possibility.Inter-city passenger rail motor-car, road public transport, bicycle, step
Capable organic cooperation, that is, low-carbon high, medium and low speed mode of transportation organic cooperation, can not only pull open different cities function
The space length of energy, the time gap for the different cities function that can also further.Inter-city passenger rail motor-car can be used not only for city it
Between, it is also possible to the leading effect with core is played in the public transport in big city itself.
The present invention is proposed on the basis of existing two patented technologies.This two patented technologies are:1, " in parallel high
Frame through street ", referred to as:" parallel elevated road ", because of application difference, " parallel elevated road " is also referred to as:" link road ", " specially
With overpass ", " road public transport ".2, " band-like transport hub " abbreviation:" band-like hinge ".
By investigating to existing technology, and related technical periodical, patent document are consulted, not found and the present invention
Same technical solution.
In order to facilitate the understanding of the present invention, retrieve, examine, useful background technique file is as follows:
1, Tagayasu Den parallel overhead expressway:China, ZL200520001065.4 [P] day for announcing 2007.2.14.
2, the city rail traffic route of Tagayasu Den twisting ring linear:China, 200910000364.9 [P]
Publication date 2009.5.20. publication number CN 101435178A.
3, the column station canopy of the island station of Tagayasu Den parallel elevated road:China, 200910163025.2 [P]
Application for a patent for invention day 2009.8.20. publication date 2010.1.20. publication number CN 101629410A.
4, the middle concave pier stud bent cap of the intermediate ring road of Tagayasu Den parallel elevated road:China, 200910163026.7 [P]
Application for a patent for invention day 2009.8.20. publication date 2010.3.17. publication number CN 101671983A.
5, the ladder-shaped platform of Tagayasu Den island type station of parallel elevated road:China, number of patent application:200910259811.2
[P].
101709573 A of application for a patent for invention day 2009.12.15. date of publication 2010.05.19 publication No. CN
6, the overhead grade crossing of Tagayasu Den parallel elevated road and transfer stop:China, number of patent application:
[201010143840.5 P] application for a patent for invention day 2010.4.12.
7, the winding type flyover crossing of Tagayasu Den parallel elevated road and transfer stop:China, number of patent application:
[201010145773.0 P] application for a patent for invention day 2010.4.14.
8, the band-like transport hub that Tagayasu Den parallel elevated road station and overhead railway passenger station are constituted parallel, China, patent
Number:ZL 201010210134.8, patent application day:On 06 28th, 2010, authorized announcement date:On 03 23rd, 2016,
9, imagination [J] city bridge and flood control of the Tagayasu Den about parallel overhead expressway, 2008, (9):114.
10, Tagayasu Den parallel overhead expressway [J] traffic standardization, 2009, (2/3) upper half monthly magazine:118.
11, imagination [J] city bridge and flood control of the Tagayasu Den about parallel elevated road and twisting ring linear subway, 2009,
(6):24.
12, the intermediate ring road of Tagayasu Den parallel elevated road and island station station canopy [J] city bridge and flood control, 2010,
(1):132.
13, the ladder-shaped platform of Tagayasu Den island type station of parallel elevated road and transfer stop [J] city bridge and flood control,
2010, (4):17.
14, subway [J] Urban Mass Transit of Tagayasu Den twisting ring linear, 2010, (6):11.
15, Tagayasu Den with parallel overhead expressway guide urban agglomeration land use [0L] sina blog, [2010,6,
15],
http://blog.sina.com.cn/blgjksl
16, overhead railway passenger station and band-like transport hub research [J] railway standard design of Tagayasu Den file arranged in series,
2010, (11):19.
17, band-like railway passenger transport hub discussion [J] multi-transportation of Tagayasu Den, 2016, (7):69.
(3) summary of the invention:
[1] cyclic annular city proposed by the present invention the technical problem to be solved is that:At present according to low speed, general fast traffic epoch
It is required that the city subsidiary-centers of planning construction, new district, urban transportation form, road network structure and city layout, are unable to satisfy high speed
The requirement in traffic epoch is unable to satisfy people to expressway around city traffic the problem of needs.
In other words:The technical problem to be solved by the present invention is to:Be proposed for the inter-city passenger rail motor-car of high speed, road public transport,
Bicycle, the organic cooperation of walking mass transit corridor the most advantageous, with such mass transit corridor and mass transit corridor
The urban function region of two sides, residential area collectively form the problem of public transport advantageous city.
Because having significant difference with existing annular city, the present invention is named:Cyclic annular city.Cyclic annular city, annular
City, though only the change of one wordThe difference lies in a single word, technical solution, actual effect are very different.
[2] technical solution used by cyclic annular city proposed by the present invention is:
1, with multiple band-like hinges 51,51 ' etc. and the overhead railway 57 for connecting these band-like hinges 51,51 ' etc.,
The rail-road in series such as parallel elevated road 56 and station 52 ', 52 ' ' cooperates channel, and rail-road cooperation channel is connected to become annular composition
Urban function region 54,54 ' of annular channel 41, annular channel 41 and 41 two sides of annular channel etc., residential area 53,53 ' etc., jointly
Constitute cyclic annular city 4.
2, by the deformation of annular channel 41a itself, cause the short distance of two sections of annular channel 41a itself flat
Row, the urban function region of the two sides annular channel 41a of the annular channel 41a and deformation of deformation, residential area together constitute ring-type
City.
3, by the torsion of annular channel 41b itself, two sections of annular channel 41b itself is caused to generate three-dimensional hand over
Fork, forms the annular channel 41b of torsion;The city function of the two sides annular channel 41b of the annular channel 41b and torsion of torsion
Area, residential area together constitute cyclic annular city.
4, two or more annular channel 41c, 41c ' etc. can closely be arranged, two or more low coverages
Annular channel 41c, 41c from setting ' etc. urban function region with its two sides, residential area, together constitute cyclic annular city.
5, annular channel 41c and long-distance high-speed rail state iron 7c can be closely arranged, closely setting annular channel 41c with
The urban function region of the two sides of long-distance high-speed rail state iron 7c, residential area, together constitute cyclic annular city.
6, two or more annular channels (41d and 41d ' etc., 41e and 41e ' etc., 41f and 41f ' etc.) can be used
Parallel elevated road or overhead railway are attached individually or simultaneously, two or more use parallel elevated road and overhead railway
The urban function region of the annular channel and its two sides that individually or are simultaneously attached, residential area, together constitute cyclic annular city.
7, according to patent:The right of " the band-like transport hub that parallel elevated road station and overhead railway passenger station are constituted parallel "
It is required that 1, the signified band-like hinge of the present invention in most cases all only one overhead railway passenger station.
8, the so-called city function of the present invention refers to that the density of population is high, mobility of people is big, job is more, service object
It is more, big to traffic dependence, be suitable for industry in city survival and development, such as:Administrative, business, finance, education, medical treatment, text
Body, amusement, scientific research, service, industry more than the small job of pollution etc., region is known as " urban function region ".
9, because subterranean railway, the construction of road, operation cost height, easily clash with underground utilities, to high-speed railway
Unfavorable, the reasons such as passenger's feeling for taking difference, annular channel 41 generallys use overhead form, but can also use subterranean formation.
[3], the beneficial effect in cyclic annular city proposed by the present invention is:
1, abundant conducive to urban resource.Compared with current Urban New District, urban land use is continuous and compact, city function
Can not assemble to down town, but assemble along the short distance of annular channel two sides in ring-band shape, aggregation space is big, this benefit
Urban resource in cyclic annular city is abundant.It is resourceful, to live to balance convenient for shared, duty be three masters for judging urban construction quality
Want standard.
2, public transport is with the obvious advantage.Make full use of the inter-city passenger rail motor-car of high speed, road public transport, bicycle, walking respective
Advantage, transfer is convenient, and intensive good, waiting time is short, and compared with car, the public transport in cyclic annular city has apparent excellent
Gesture.
3, shared conducive to urban resource.The inter-city passenger rail motor-car and bus of high speed are run in cycles on annular channel,
Service condition is simple, can to avoid the excessive aggregation of the vehicles, city function spatially, meanwhile, and shorten traffic work
The time that tool calls, city function is assembled, the ratio that the remoter high speed public transport of people's trip road is shared is bigger, is conducive to city
Resource-sharing.
4, it is conducive to duty to live to balance.Each band-like hinge, parallel elevated road station are a small-sized transport hub, city function
Energy area, residential area are centered around the two sides of small-sized transport hub, and area only has several square kilometres, is equivalent to a samll cities and towns.In this way
Samll cities and towns be conducive to duty live balance, the daily traffic of people substantially can be by bicycle, walking.The traffic side in cyclic annular city
Formula, road network structure, city layout are advantageous to public transport, unfavorable to car.
5, effects of energy saving and emission reduction is obvious.
6, above 5 comprehensive functions, the economic society in cyclic annular city is high-efficient, and the Happiness Index of people is high.
(4) Detailed description of the invention:
Fig. 1 is the single centre big city schematic diagram of vertical grid road network structure.
Fig. 2 is the single centre big city schematic diagram for radiating lattice road network structure.
Fig. 3 is the relationship in big city and Urban New District and the schematic diagram of respective city road network structure.
Fig. 1, Fig. 2, Fig. 3 are the background display as the invention of cyclic annular city.
Fig. 4 is the overall schematic in cyclic annular city.
Fig. 5 is the partial section schematic diagram in cyclic annular city.
Fig. 6 is cross-sectional view of the cyclic annular city in band-like hinge section.
Fig. 7 is the different form of the annular channel in cyclic annular city.
Fig. 7 a is the ring for causing two sections short distance of annular channel itself parallel by the deformation of annular channel itself
The schematic diagram in shape channel.
Fig. 7 b is that two sections of annular channel itself is caused to generate crossings on different level by the torsion of annular channel itself,
Form the schematic diagram of the annular channel of torsion.
Fig. 7 c is the schematic diagram that two annular channels are closely arranged, while being annular channel and long-distance high-speed rail state iron low coverage
Schematic diagram from setting.
Fig. 7 d is the schematic diagram of two annular channel parallel elevated roads connection.
Fig. 7 e is the schematic diagram of two annular channel overhead railways connection.
Fig. 7 f is that two annular channel rail-roads cooperate channel attached schematic diagram.
(5) specific embodiment:
Fig. 1 is the single centre big city schematic diagram of vertical grid road network structure.Fig. 1 is marked:Lateral surface road 11, city
City functional areas 12, residential area 13, longitudinal surface road 14, the A B C on Fig. 1 are indicated as single centre big city, the single centre
The class of the city function of big city aggregation includes A, B, C etc., and type is more.Beijing is exactly in the list of vertical grid road network structure
Heart big city.
Fig. 2 is the single centre big city schematic diagram for radiating lattice road network structure.Fig. 2 is marked:Annular surface road 21, city
City functional areas 22, residential area 23, radial surface road 24, the A B C on Fig. 2 are indicated as single centre big city, in the list
The class of the city function of heart big city aggregation includes A, B, C etc., and type is more.Paris is exactly the list for radiating lattice road network structure
Center big city.
Fig. 3 is the relationship in big city and Urban New District and the schematic diagram of respective city road network structure.Fig. 3 is marked:Big city
The surface road 311 of city A, A, urban function region 312, residential area 313, surface road 321, the urban function region of city B, B
322, residential area 323, the surface road 331 of Urban New District C, C, urban function region 332, residential area 333;City A, B, C are in sky
Between be laid out it is upper to avoid being connected, city A, B, C railway 34, the connection of road 35, in city, the centre of A, B, C are " green
The heart ".In Fig. 3, the road network of city A is vertical grid structure, and A kind city function is mainly gathered in the city A;City B's
Road network is radiation network, and B kind city function is mainly gathered in the city B;The road network of city C is vertical grid knot
Structure, C kind city function are mainly gathered in city C.Fig. 3 is indicated, is gathered in metropolitan city function A, B, a C, quilt originally
Three cities are discongested, city size receives control, and still, the connection between tri- kinds of city functions of A, B, C must pass through
Railway 34 or road 35, and each city to center assemble, to respective transport hub assemble the characteristics of so that the tri- kinds of cities A, B, C
Connection between city's function is not so good as to facilitate in the same big city.
Fig. 1, Fig. 2, Fig. 3 are shown as the background of invention in cyclic annular city.
Fig. 4 is the overall schematic in cyclic annular city.Fig. 4 is marked:Cyclic annular city 4, annular channel 41, urban function region and
Facilitate ground 44, the ground vertical with annular channel 41 of walking under residential area 42, urban function region and residential area 43, annular channel
Face road 45, Fig. 4 also designate the green heart in cyclic annular city 4:A, tri- kinds of city functions of B, C be gathered in respectively cyclic annular city 4 A,
B, C section, tri- kinds of city functions of A, B, C along 41 short distance of annular channel aggregation, this aspect convenient for its respectively inside
Connection, is also convenient for its mutual connection.
Fig. 5 is the partial section schematic diagram in cyclic annular city.Fig. 5 is marked:Annular channel 41, band-like hinge 51, band-like pivot
The parallel elevated road station 52 of knob, residential area 53, urban function region 54, parallel elevated road station 52 ', ground main roads 55,
Facilitate under parallel elevated road 56, band-like hinge 51 ', cyclic annular city 4, annular channel the ground 44 ' of walking, overhead railway 57,
Facilitate the ground 44 of walking under face main roads 55 ', urban function region 54 ', residential area 53 ', annular channel, hang down with annular channel
The railway station 58 of straight surface road 45, band-like hinge, parallel elevated road station 52 ", Fig. 5 is also marked:It is suitable for two kinds of A, B
For city function in A, B section of cyclic annular urban agglomerations, A kind city function lives in concentrated communities the A section in cyclic annular city, B kind city function
It is gathered in the B section in cyclic annular city.The variation of band-like 51 and 51 ' the section road network of hinge of Fig. 5, it is shown that cyclic annular city is set
The flexibility of meter, rich, artistry.
Fig. 6 is cross-sectional view of the cyclic annular city in band-like hinge section.Fig. 6 is marked:Residential area 53, ground are main
Road 55, urban function region 54, cyclic annular city 4, annular channel 41, band-like hinge 51, band-like hinge railway station 58, noise
Facilitate under divider wall 61, urban function region 54 ', ground main roads 55 ', residential area 53 ', annular channel walking ground 44,
The parallel elevated road station 52 of the surface road 45, band-like hinge vertical with annular channel, routine bus system station 62a, 62b,
62c, 62d, 62e, 62f, 62g, 62h, surface road one-way road 63,63 '.Bullet train is run in densely populated city, noise
It is isolated critically important, noise isolation wall 61 is more thick and heavy;The building that urban function region 54,54 ' faces annular channel 41 also has noise
The effect of isolation.
Fig. 7 is the different form of the annular channel in cyclic annular city.According to the different form of annular channel, cyclic annular city also can
There is different form, in order to simply clear, Fig. 7 only depicts the different form of annular channel.
Fig. 7 a is the ring for causing two sections short distance of annular channel itself parallel by the deformation of annular channel itself
The schematic diagram in shape channel.Fig. 7 a is marked:The parallel point 41as of annular channel 41a, two sections short distances, sets station in 41as point
It can be used for changing to.Situation shown in Fig. 7 a is suitable for lesser city, is also applied for centered on point 41as, urban resource ratio
The case where compared with concentrating.
Fig. 7 b is that two sections of annular channel itself is caused to generate crossings on different level by the torsion of annular channel itself,
Form the schematic diagram of the annular channel of torsion.Fig. 7 b is marked:Annular channel 41b, two sections generate the point of crossings on different level
41bs, setting station in 41bs point can be used for changing to.Situation shown in Fig. 7 b is suitable for lesser city, is also applied for point 41bs
Centered on, the case where urban resource compares concentration.
Fig. 7 c is the schematic diagram that two annular channels are closely arranged, while being annular channel and long-distance high-speed rail state iron low coverage
Schematic diagram from setting.Fig. 7 c is marked:Annular channel 41c, two annular channels short distance set website 41cs, circular passage
41c ', long-distance high-speed rail state iron 7c, long-distance high-speed rail state iron 7c and circular passage 41c short distance set website 7cs.Two or two with
Closely setting and annular channel and long-distance high-speed rail state iron are closely arranged in upper annular channel, can expand annular channel
Service range is equivalent to the scale for expanding cyclic annular city.
Fig. 7 d is the schematic diagram of two annular channel parallel elevated roads connection.Fig. 7 d is marked:Annular channel 41d, simultaneously
Join viaduct 56dL, annular channel 41d ' parallel elevated road 56dL '.By the connection of parallel elevated road, annular channel is expanded
Service range, be equivalent to the scale for expanding cyclic annular city.
Fig. 7 e is the schematic diagram of two annular channel overhead railways connection.Fig. 7 e is marked:It is annular channel 41e, overhead
Railway 57eL, annular channel 41e ', overhead railway 57eL '.By the connection of overhead railway, the service model of annular channel is expanded
It encloses, is equivalent to the scale for expanding cyclic annular city.
Fig. 7 f is that two annular channel rail-roads cooperate channel attached schematic diagram.Fig. 7 f is marked:Annular channel 41f,
Rail-road cooperates channel 41fL, and annular channel 41f ', rail-road cooperate channel 41fL '.Cooperate channel 41fL, 41fL by rail-road '
Connection, forms new annular channel, expands the service range of annular channel, be equivalent to the scale for expanding cyclic annular city.
Lead to from figure 7 above d, Fig. 7 e, Fig. 7 f as it can be seen that playing the parallel elevated road of connection function, overhead railway, rail-road and cooperating
It road can be very short or very long.
From figure 7 above c, 7d, 7e, 7f and to the explanation of figure it is found that being approached with various ways to annular channel, even
It connects, the service range of annular channel can be expanded, also just expand the scale in cyclic annular city.Because of the marshalling of bullet train, from 3
Being grouped into 20 marshallings, there are many schemes, and transport capacity adaptation range is very wide, and the duty in cyclic annular city lives to balance in addition, so
The scale in cyclic annular city is not restricted by traffic.That is, cyclic annular city can change existing single centre big city, one
On the other hand aspect is drawn because constantly assembling again because existing urban resource is abundant, and attracts the continuous aggregation of various resources
"urban disease" is played, and needs to delimit urban border, discongest city function.
Claims (7)
1. cyclic annular city, it is characterised in that:With multiple band-like hinges (51,51 ' etc.) and for connecting these band-like hinges
Overhead railway (57), parallel elevated road (56) and station (52 ', 52 " etc.) rail-road in series of (51,51 ' etc.) cooperate channel,
Rail-road cooperation channel is connected to become annular and constitutes annular channel (41), the city of annular channel (41) and annular channel (41) two sides
Functional areas (54,54 ' etc.), residential area (53,53 ' etc.), together constitute cyclic annular city (4).
2. ring-type city according to claim 1, it is further characterized in that:By the deformation of annular channel (41a) itself, make
Circlewise channel (41a) itself two sections short distance it is parallel, the annular channel of the annular channel (41a) of deformation and deformation
The urban function region of the two sides (41a), residential area, together constitute cyclic annular city.
3. ring-type city according to claim 1, it is further characterized in that:By the torsion of annular channel (41b) itself, make
Circlewise channel (41b) itself two sections generate crossings on different level, form the annular channel (41b) of torsion;The ring-type of torsion
The urban function region of channel (41b) and the annular channel two sides of torsion, residential area, together constitute cyclic annular city.
4. ring-type city according to claim 1, it is further characterized in that:Two or more annular channels (41c,
41c ' etc.) can closely it be arranged, two or more the closely annular channel (41c, 41c ' etc.) of setting and its two sides
Urban function region, residential area, together constitute cyclic annular city.
5. ring-type city according to claim 1, it is further characterized in that:Annular channel (41c) and long-distance high-speed rail state iron
(7c) can be closely arranged, closely the city function of the two sides of the annular channel (41c) and long-distance high-speed rail state iron (7c) of setting
Energy area, residential area, together constitute cyclic annular city.
6. ring-type city according to claim 1, it is further characterized in that:Two or more annular channels (41d with
41d ' etc., 41e and 41e ' etc., 41f and 41f ' etc.) it can individually or simultaneously be connected with parallel elevated road or overhead railway
It connects, two or more annular channels individually or being simultaneously attached with parallel elevated road and overhead railway and its two sides
Urban function region, residential area, together constitute cyclic annular city.
7. ring-type city according to claim 1, it is further characterized in that:Annular channel (41) generallys use overhead form,
But it is not excluded for using subterranean formation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710315740.8A CN108867214A (en) | 2017-05-08 | 2017-05-08 | Cyclic annular city |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710315740.8A CN108867214A (en) | 2017-05-08 | 2017-05-08 | Cyclic annular city |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108867214A true CN108867214A (en) | 2018-11-23 |
Family
ID=64287655
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710315740.8A Pending CN108867214A (en) | 2017-05-08 | 2017-05-08 | Cyclic annular city |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867214A (en) |
-
2017
- 2017-05-08 CN CN201710315740.8A patent/CN108867214A/en active Pending
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102425090B (en) | Urban three-dimensional road for aggregating and utilizing land and avoiding traffic jam | |
Newman et al. | Greening urban transportation | |
CN102061648A (en) | Elevated passenger railway with parallel elevated road upper and lower lanes respectively arranged at both sides of line | |
CN103806353B (en) | Based on the method for designing of the speedway bus system of Expressway Service | |
CN108867214A (en) | Cyclic annular city | |
Hagler et al. | Where high-speed rail works best | |
CN102191733A (en) | Urban traffic system without traffic lights | |
CN2869104Y (en) | Parallel overhead expressway | |
CN101806027A (en) | Roundabout stereo intersection and transfer station of parallel elevated roads | |
Marathe et al. | A review of research on Monorail as an alternative mass rapid transit system | |
Jones | 27. Rethinking the urban arterial: from car mobility to urban liveability | |
Losa et al. | The integration of buses with a high level of service in the medium cities urban context | |
MAKAROVA et al. | INTEGRATION OF BIKE LANES NETWORK WITH PUBLIC TRANSPORT ROUTES TO SOLVE THE LAST MILE PROBLEM | |
CN203938945U (en) | The traffic organization of subway station synthesis and operational system | |
Keeling | Transit oriented development in Buenos Aires, Argentina: comparing Puerto Madero and the Microcentro | |
Tang | Designing a personal rapid transit system for the University of Delaware based on student schedule data | |
WO2022057639A1 (en) | Cross interchange for urban arterial road | |
CN101806026A (en) | Elevated planar intersection and transfer station of parallel elevated roads | |
WO2020119741A1 (en) | Multi-dimensional urban express road network | |
Zhang et al. | Experience and reference of implementing public transport priority strategy dominated by urban rail transit in Tokyo | |
Yüce | An assessment of the planning and operational performance of the bus rapid transit in Istanbul | |
Ofsevit | Estimating the impacts of route changes for Chicago's rapid transit system | |
Prusov et al. | Modeling of Passenger Flows in Agglomerations of Large Developing Cities (on the Example of Kyiv) | |
Luo et al. | New urban roadway form in China: a case study for Kunming | |
Dovey et al. | Space/time mapping of urban transit: isochrones, car-dependency and mode-choice in Melbourne |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181123 |
|
WD01 | Invention patent application deemed withdrawn after publication |