CN108862014A - A kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM - Google Patents
A kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM Download PDFInfo
- Publication number
- CN108862014A CN108862014A CN201811073770.3A CN201811073770A CN108862014A CN 108862014 A CN108862014 A CN 108862014A CN 201811073770 A CN201811073770 A CN 201811073770A CN 108862014 A CN108862014 A CN 108862014A
- Authority
- CN
- China
- Prior art keywords
- welded
- assembled wall
- lifting
- shoulder pole
- hoisting structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 25
- 239000010959 steel Substances 0.000 title claims abstract description 25
- 230000001681 protective effect Effects 0.000 claims abstract description 33
- 230000000694 effects Effects 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000003466 welding Methods 0.000 description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The assembled wall lifting that the invention discloses a kind of based on BIM steel shoulder pole hoisting structure, the both ends of the slinging beam have been welded with flap seat, and the upper end for playing flap seat is welded with lifting boom, the upper end of the lifting boom is welded with hoisting ring, the lower end of described flap seat is welded with protective plate, the lower end of the slinging beam is equipped with hanging rod, and the lower end of hanging rod is welded with hook, and the leading exterior surface screw connection of the slinging beam has graduated scale.The assembled wall lifting steel shoulder pole hoisting structure based on BIM, it is provided with better protection effect, the generation of danger caused by wall is fallen during lifting can effectively be avoided, the structure can be applied in combination by user, come while lifting by crane multiple walls, the situation that can effectively avoid lifting rope from sliding from hook simultaneously occurs, and user can be allowed to be convenient to use the hoisting structure to lift by crane different size of assembled wall.
Description
Technical field
The present invention relates to hoisting structure field, specially a kind of assembled wall lifting based on BIM is lifted by crane with steel shoulder pole
Structure.
Background technique
Assembled architecture is as prefabricated component component building made of assemble in site, and assembled wall is assembled architecture
One of important component, assembled wall need lifting appliance to carry out lifting movement to it during installation, lifting by crane
Will use hoisting structure in journey, existing hoisting structure, during lifting, the protection that the wall of lifting obtains is not good enough,
It is not able to satisfy the use demand of user, and the lanyard lifted by crane in use is easy to fall off from hook, while existing
Hoisting structure be mostly be used alone, prevent user from lifting by crane multiple walls simultaneously, brings to the use of hoisting structure
It is certain to influence.
Summary of the invention
(One)The technical issues of solution
In view of the deficiencies of the prior art, the assembled wall lifting that the present invention provides a kind of based on BIM is lifted by crane with steel shoulder pole and is tied
Structure is somebody's turn to do the assembled wall lifting steel shoulder pole hoisting structure based on BIM, is provided with better protection effect, can be effective
The generation for avoiding danger caused by wall is fallen during lifting, the structure can be applied in combination by user, comes simultaneously
The situation lifted by crane multiple walls, while can effectively avoid lifting rope from sliding from hook occurs, and can allow user
The hoisting structure is convenient to use to lift by crane different size of assembled wall.
(Two)Technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs:A kind of assembled wall lifting based on BIM
With steel shoulder pole hoisting structure, the both ends of the slinging beam have been welded with flap seat, and the upper end for playing flap seat is welded with lifting boom,
The upper end of the lifting boom is welded with hoisting ring, and the lower end of described flap seat is welded with protective plate, the lower end of the slinging beam
Lower end equipped with hanging rod, and hanging rod is welded with hook, and the leading exterior surface screw connection of the slinging beam has graduated scale, and rises
The leading exterior surface for hanging crossbeam offers the first connecting hole close to the position of side, and the leading exterior surface of the slinging beam is close
The position of the other side offers the second connecting hole, and the inside of first connecting hole and the second connecting hole is through there is connecting column, institute
The upper end outer surface for stating slinging beam is welded with auxiliary rod, and the upper end of auxiliary rod is welded with auxiliary hanging ring.
Preferably, the inside of the slinging beam offers link slot, and the inside of link slot is plugged with link block, described
Link block and hanging rod are integrally formed component, and hanging rod is flexibly connected by link block with link slot.
Preferably, the inner surface of the slinging beam offers threaded hole, and the internal whorl of threaded hole is connected with fixation
Screw.
Preferably, the inner surface of the protective plate offers third connecting hole, and the inside of third connecting hole be plugged with it is anti-
The both ends of guard bar, the fender rod are threaded with limit sleeve.
Preferably, the inner surface splicing of the hook has rubber pad, and the side external surface linked up with is equipped with protective block, described
The inside of protective block, which is run through, connecting shaft.
Preferably, the protective block is flexibly connected with hook by connecting shaft, and the rotation angle range of protective block is
0 ° to 180 °.
Preferably, the inner surface of the connecting column offers limit hole, and the inside of limit hole is plugged with limit shaft, and limits
Position axis passes through limit hole and is flexibly connected with connecting column.
Preferably, the limit hole is evenly distributed in the inner surface of connecting column, and the quantity of limit shaft is at least four.
(Three)Beneficial effect
The assembled wall lifting that the present invention provides a kind of based on BIM steel shoulder pole hoisting structure, has following beneficial effect:
(1), should assembled wall lifting steel shoulder pole hoisting structure based on BIM, by be arranged in the first connecting hole and second
Connecting column in connecting hole, when user needs while lifting by crane multiple walls, connecting column can be inserted into the first company by user
It connects in hole and the second connecting hole, then limit shaft is screwed into interface in limit hole, connecting column is consolidated slinging beam by stable
Get up calmly, that is, allows user that easily the hoisting structure can combine use.
(2), should assembled wall lifting steel shoulder pole hoisting structure based on BIM, pass through the protective plate of setting, user
It can be inserted into fender rod in the third connecting hole on protective plate, then limit sleeve is spun on behind the both ends of fender rod i.e. so that protection
Bar is stably fixed on protective plate, and protective plate is combined with caused by fender rod can prevent during lifting wall to fall off
Danger occurs, and also allows user that can effectively promote the structural shielding effect.
(3), should assembled wall lifting steel shoulder pole hoisting structure based on BIM, link slot and connection by setting
Block, hanging rod are mounted in the link slot on slinging beam by link block, so that the position for the adjusting hanging rod that user can be convenient
It sets, to allow user that can adjust the position between hanging rod according to the size of wall, that is, adjusts the position between hook,
To allow what the structure can be convenient to be used to lift the wall of not same dimension, then it is combined with graduated scale and allows user can be more
Accurately adjust the position between hanging rod.
(4), should assembled wall lifting steel shoulder pole hoisting structure based on BIM, cooperated by the threaded hole of setting solid
Determine screw, after user regulates the position of hanging rod, fixed screw can be screwed into hanging rod in threaded hole by user
Position is fixed, to avoid hanging rod from sliding on slinging beam.
(5), should assembled wall lifting steel shoulder pole hoisting structure based on BIM, pass through the protective block and rubber of setting
Pad, protective block are mounted on hook by connecting shaft, and the lanyard that rubber pad can be avoided lifting slides in hook, while can also
User can rotate protective block and seal the notch on hook to avoid the lanyard of lifting from falling off from hook, allow user's energy
Enough safeties for easily promoting the structure.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 matches view with a flap seat is played for slinging beam of the invention;
Fig. 3 is that slinging beam of the invention matches view with hanging rod;
Fig. 4 is the enlarged view in Fig. 3 of the invention at A;
Fig. 5 is that slinging beam of the invention matches view with connecting column;
Fig. 6 is that connecting column of the invention matches view with limit shaft;
Fig. 7 is that protective plate of the invention matches view with fender rod;
Fig. 8 is slinging beam and hanging rod connection structure view of the invention;
In figure:1, slinging beam;101, auxiliary rod;102, hanging ring is assisted;103, threaded hole;104, link slot;105, fixed
Screw;2, flap seat is played;3, lifting boom;4, hoisting ring;5, protective plate;501, third connecting hole;502, fender rod;503, it limits
Set;6, hanging rod;601, link block;7, it links up with;701, rubber pad;702, protective block;703, connecting shaft;8, graduated scale;9, first
Connecting hole;10, the second connecting hole;11, connecting column;111, limit hole;112, limit shaft.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Fig. 1-8 is please referred to, the present invention provides a kind of technical solution:A kind of assembled wall lifting steel based on BIM is flat
It carries on a shoulder pole hoisting structure and has been welded with hoisting ring in 3 upper end of lifting boom in use, a flap seat 2 has been welded at the both ends of slinging beam 1
4, user first connects the hoist steel cable of equipment externally within is rich on hoisting ring 4, then by the hook 7 of 6 lower end of hanging rod welding with
Wall can be lifted by crane after being linked together between wall to be lifted by rope, protection has been welded in the lower end for playing flap seat 2
Plate 5, the leading exterior surface screw connection of slinging beam 1 graduated scale 8 make when user needs while lifting by crane multiple walls
User can penetrate into connecting column 11 in first connecting hole 9 and the second connecting hole 10, and two hoisting structures are linked together
Come while lifting by crane wall, when needing to carry out multiple walls while lifting by crane, needs the auxiliary hanging ring 102 on auxiliary rod 101
It is connect with the wirerope of external lifting appliance.
The inside of slinging beam 1 offers link slot 104, and the inside of link slot 104 is plugged with link block 601, connection
Block 601 and hanging rod 6 are integrally formed component, and hanging rod 6 is flexibly connected by link block 601 with link slot 104, allow user's energy
Enough convenient positions for adjusting hanging rod 6;The inner surface of slinging beam 1 offers threaded hole 103, and the inside spiral shell of threaded hole 103
Line is connected with fixed screw 105;The inner surface of protective plate 5 offers third connecting hole 501, and the inside of third connecting hole 501
It is plugged with fender rod 502, the both ends of fender rod 502 are threaded with limit sleeve 503, effectively improve the protection effect of the structure
Fruit;The inner surface splicing of hook 7 has rubber pad 701, and a side external surface of hook 7 is equipped with protective block 702, protective block 702
Inside can effectively avoid lifting from falling off from hook 7 through there is connecting shaft 703;Protective block 702 passes through connecting shaft 703
It is flexibly connected with hook 7, and the rotation angle range of protective block 702 is 0 ° to 180 °, rotation protective block 702 will link up with 7
Notch seals up;The inner surface of connecting column 11 offers limit hole 111, and the inside of limit hole 111 is plugged with limit shaft 112,
And limit shaft 112 passes through limit hole 111 and is flexibly connected with connecting column 11, limit shaft 112, which will be inserted into limit hole 111, will rise
The stabilization of crossbeam 1 is hung to be fixed up;Limit hole 111 is evenly distributed in the inner surface of connecting column 11, and the quantity of limit shaft 112 is extremely
It is less four, slinging beam 1 can more preferably be fixed up by the setting of multiple limit shafts 112.
In conclusion it is somebody's turn to do the assembled wall lifting steel shoulder pole hoisting structure based on BIM, in use, slinging beam 1
A flap seat 2 has been welded at both ends, has been welded with hoisting ring 4 in 3 upper end of lifting boom, user is first by the lifting of equipment externally within
Wirerope is rich to be connect on hoisting ring 4, then will be connected to one by rope between the hook 7 and wall to be lifted of the welding of 6 lower end of hanging rod
Wall can be lifted by crane after rising, hanging rod 6 is mounted in the link slot 104 on slinging beam 1 by link block 601, so that
User can be convenient adjusting hanging rod 6 position, thus allow user can be adjusted according to the size of wall hanging rod 6 it
Between position, after user regulates the position of hanging rod 6, fixed screw 105 can be screwed into threaded hole 103 by user
The position of hanging rod 6 is fixed, to avoid hanging rod 6 from sliding on slinging beam 1, that is, the position between hook 7 is adjusted, to allow
What the structure can be convenient is used to lift the wall of not same dimension, then is combined with graduated scale 8 and makes user more accurate
The position adjusted between hanging rod 6, user can be inserted into fender rod 502 in the third connecting hole 501 on protective plate 5, then
After limit sleeve 503 to be spun on to the both ends of fender rod 502, i.e., so that fender rod 502 is stably fixed on protective plate 5, protection
Plate 5 is combined with fender rod 502 wall can be prevented to fall off during lifting caused by it is dangerous occur, also allow user square
Just the promotion structural shielding effect, protective block 702 are mounted on hook 7 by connecting shaft 703, and rubber pad 701 can be avoided
The lanyard of lifting slides in hook 7, while user can also rotate protective block 702 and seal the notch linked up on 7 to keep away
The lanyard for exempting from lifting falls off from hook 7, allows user that can easily promote the safety of the structure, when user needs together
When lifting by crane multiple walls, when user needs while lifting by crane multiple walls, connecting column 11 can be inserted into first by user
In connecting hole 9 and the second connecting hole 10, then limit shaft 112 is screwed into interface in limit hole 111, connecting column 11 will be lifted by crane
Crossbeam 1 is fixed up by stable, that is, allow user can easily by the use that combines of structure, need to carry out it is multiple
When wall lifts by crane simultaneously, the auxiliary hanging ring 102 on auxiliary rod 101 is needed to connect with the wirerope of external lifting appliance.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.In the absence of more restrictions.By sentence " element limited including one ..., it is not excluded that
There is also other identical elements in the process, method, article or apparatus that includes the element ", the electricity occurred in this article
Device element is electrically connected with extraneous main controller and 220V alternating current, and main controller can play the routine of control for computer etc.
Know equipment.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding
And modification, the scope of the present invention is defined by the appended.
Claims (8)
1. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM, including slinging beam(1), it is characterised in that:
The slinging beam(1)Both ends be welded with flap seat(2), and play flap seat(2)Upper end be welded with lifting boom(3), described
Lifting boom(3)Upper end be welded with hoisting ring(4), described flap seat(2)Lower end be welded with protective plate(5), the lifting cross
Beam(1)Lower end be equipped with hanging rod(6), and hanging rod(6)Lower end be welded with hook(7), the slinging beam(1)Front end appearance
Face screw connection has graduated scale(8), and slinging beam(1)Leading exterior surface offer the first connecting hole close to the position of side
(9), the slinging beam(1)Leading exterior surface offer the second connecting hole close to the position of the other side(10), described first
Connecting hole(9)With the second connecting hole(10)Inside through there is connecting column(11), the slinging beam(1)Upper end outer surface weldering
It is connected to auxiliary rod(101), and auxiliary rod(101)Upper end be welded with auxiliary hanging ring(102).
2. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The slinging beam(1)Inside offer link slot(104), and link slot(104)Inside be plugged with link block
(601), the link block(601)With hanging rod(6)Be integrally formed component, and hanging rod(6)Pass through link block(601)With link slot
(104)It is flexibly connected.
3. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The slinging beam(1)Inner surface offer threaded hole(103), and threaded hole(103)Internal whorl be connected with fixation
Screw(105).
4. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The protective plate(5)Inner surface offer third connecting hole(501), and third connecting hole(501)Inside be plugged with it is anti-
Guard bar(502), the fender rod(502)Both ends be threaded with limit sleeve(503).
5. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The hook(7)Inner surface splicing have rubber pad(701), and link up with(7)A side external surface be equipped with protective block(702),
The protective block(702)Inside through there is connecting shaft(703).
6. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 5, feature exist
In:The protective block(702)Pass through connecting shaft(703)With hook(7)It is flexibly connected, and protective block(702)Rotation angle
Range is 0 ° to 180 °.
7. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The connecting column(11)Inner surface offer limit hole(111), and limit hole(111)Inside be plugged with limit shaft
(112), and limit shaft(112)Across limit hole(111)With connecting column(11)It is flexibly connected.
8. a kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM according to claim 1, feature exist
In:The limit hole(111)It is evenly distributed in connecting column(11)Inner surface, and limited post(111)Quantity be at least four
It is a.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811073770.3A CN108862014B (en) | 2018-09-14 | 2018-09-14 | Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811073770.3A CN108862014B (en) | 2018-09-14 | 2018-09-14 | Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108862014A true CN108862014A (en) | 2018-11-23 |
CN108862014B CN108862014B (en) | 2020-09-08 |
Family
ID=64324036
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811073770.3A Expired - Fee Related CN108862014B (en) | 2018-09-14 | 2018-09-14 | Assembled wall body hoists with steel shoulder pole structure of lifting by crane based on BIM |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108862014B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112027893A (en) * | 2020-09-09 | 2020-12-04 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
CN113019761A (en) * | 2021-05-11 | 2021-06-25 | 黄胜 | Manufacturing, forming and coating process for automobile chassis crossbeam structure |
CN113213347A (en) * | 2021-05-11 | 2021-08-06 | 平凉市新世纪建筑工程有限责任公司 | Hoisting equipment for building and hoisting method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100007159A1 (en) * | 2006-03-06 | 2010-01-14 | Forges De L'eminee, S.A.S. | Lifting hook with chain length reducer |
CN203558707U (en) * | 2013-10-29 | 2014-04-23 | 大连叉车有限责任公司 | Dual-arm hanger and dual-arm hanger for hoisting and transporting packaged articles |
CN206053369U (en) * | 2016-12-07 | 2017-03-29 | 浙江省建工集团有限责任公司 | A kind of auxiliary assembled architecture lifting device of adjustable length |
CN207158599U (en) * | 2017-06-14 | 2018-03-30 | 广州南沙海港集装箱码头有限公司 | A kind of suspender of three 40 chi empty vans capable of hoisting |
CN207276038U (en) * | 2017-06-29 | 2018-04-27 | 西安赛特思迈钛业有限公司 | A kind of multifunctional safe lifts clamp |
CN207524829U (en) * | 2017-11-20 | 2018-06-22 | 无锡市天密石化通用件厂 | A kind of mechanical hook convenient for control |
-
2018
- 2018-09-14 CN CN201811073770.3A patent/CN108862014B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100007159A1 (en) * | 2006-03-06 | 2010-01-14 | Forges De L'eminee, S.A.S. | Lifting hook with chain length reducer |
CN203558707U (en) * | 2013-10-29 | 2014-04-23 | 大连叉车有限责任公司 | Dual-arm hanger and dual-arm hanger for hoisting and transporting packaged articles |
CN206053369U (en) * | 2016-12-07 | 2017-03-29 | 浙江省建工集团有限责任公司 | A kind of auxiliary assembled architecture lifting device of adjustable length |
CN207158599U (en) * | 2017-06-14 | 2018-03-30 | 广州南沙海港集装箱码头有限公司 | A kind of suspender of three 40 chi empty vans capable of hoisting |
CN207276038U (en) * | 2017-06-29 | 2018-04-27 | 西安赛特思迈钛业有限公司 | A kind of multifunctional safe lifts clamp |
CN207524829U (en) * | 2017-11-20 | 2018-06-22 | 无锡市天密石化通用件厂 | A kind of mechanical hook convenient for control |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112027893A (en) * | 2020-09-09 | 2020-12-04 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
CN112027893B (en) * | 2020-09-09 | 2022-04-22 | 湖南汇渠建筑科技有限公司 | Hoisting accessory that assembled wall body hoist and mount were used based on BIM |
CN113019761A (en) * | 2021-05-11 | 2021-06-25 | 黄胜 | Manufacturing, forming and coating process for automobile chassis crossbeam structure |
CN113213347A (en) * | 2021-05-11 | 2021-08-06 | 平凉市新世纪建筑工程有限责任公司 | Hoisting equipment for building and hoisting method |
CN113213347B (en) * | 2021-05-11 | 2022-07-12 | 平凉市新世纪建筑工程有限责任公司 | Hoisting equipment for building and hoisting method |
CN113019761B (en) * | 2021-05-11 | 2022-10-28 | 黄胜 | Manufacturing, forming and coating process for automobile chassis crossbeam structure |
Also Published As
Publication number | Publication date |
---|---|
CN108862014B (en) | 2020-09-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108862014A (en) | A kind of steel shoulder pole hoisting structure of the assembled wall lifting based on BIM | |
CN201785175U (en) | Hoisting basket for high-voltage steel tower | |
CN107425475A (en) | A kind of overhead earth wire lifter and its lifting installation method | |
CN203895908U (en) | Balance cross-arm | |
CN205976551U (en) | Safety precaution type platform of unloading | |
CN206529229U (en) | It is a kind of to increase the tower crane device of independence and freedom height | |
CN104860245B (en) | A kind of two grades of inspection platforms of energy-saving appliance of boiler | |
CN206947829U (en) | Portable assembled transformer safety band hangs support | |
CN108502700A (en) | Engine rooms of wind power generators suspender | |
CN205802765U (en) | A kind of crane balance beam suspender | |
CN201883932U (en) | Hoop-type vertical insulating single ladder | |
CN107522112A (en) | A kind of multifunctional safe tower crane | |
CN206727573U (en) | A kind of cable wiring structure of staged bridge joint | |
CN204737588U (en) | Compensating beam for bridge crane | |
CN208835636U (en) | A kind of fixed hanger in gantry end | |
CN205933005U (en) | Novel intelligent lifting device of super high -rise building core section of thick bamboo component | |
CN205662228U (en) | Stealthily dirty pump lifts by crane with hanging hook component | |
CN207434865U (en) | One kind is used for tower crane hook rope broken protector | |
CN201580924U (en) | Safety protector for body of tower hoist | |
CN206616875U (en) | A kind of building safety protector | |
CN103552905A (en) | Pipe fitting hoisting box | |
CN207588323U (en) | A kind of outdoor maintenance mast-up | |
CN205653025U (en) | Wind wheel lifting device | |
CN203474207U (en) | Tower material hoisting tool of steel tube tower | |
CN204357146U (en) | Safety net is chosen outside integrally detachable |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A BIM based steel pole lifting structure for prefabricated wall lifting Effective date of registration: 20220621 Granted publication date: 20200908 Pledgee: China Co. truction Bank Corp Dongguan branch Pledgor: GUANGDONG HUAKUN CONSTRUCTION GROUP Co.,Ltd. Registration number: Y2022980008357 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200908 |
|
CF01 | Termination of patent right due to non-payment of annual fee |