CN108846238A CN201810706538.2A CN201810706538A CN108846238A CN 108846238 A CN108846238 A CN 108846238A CN 201810706538 A CN201810706538 A CN 201810706538A CN 108846238 A CN108846238 A CN 108846238A
Authority
CN
China
Prior art keywords
tbm
country rock
fpi
real
indicating means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810706538.2A
Other languages
Chinese (zh)
Inventor
杜立杰
洪开荣
陈馈
孙振川
董安然
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Tiedao University
State Key Laboratory of Shield Machine and Boring Technology
China Railway Tunnel Group Co Ltd CRTG
Original Assignee
Shijiazhuang Tiedao University
State Key Laboratory of Shield Machine and Boring Technology
China Railway Tunnel Group Co Ltd CRTG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Tiedao University, State Key Laboratory of Shield Machine and Boring Technology, China Railway Tunnel Group Co Ltd CRTG filed Critical Shijiazhuang Tiedao University
Priority to CN201810706538.2A priority Critical patent/CN108846238A/en
Publication of CN108846238A publication Critical patent/CN108846238A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention provides the real-time indicating means of country rock changing features in a kind of TBM tunneling process, and this approach includes the following steps:S1, it defines TBM and digs sex index FPI, and this can dig sex index FPI and can be calculated by the relevant parameter that the data collection system inside TBM acquires in real time, show in TBM operating room display screen;S2, country rock situation and variation tendency are judged according to the size of FPI value.The real-time indicating means of Change in surrounding rocks in TBM tunneling process of the present invention; sex index FPI is dug by definition TBM; and this that can dig sex index FPI can be calculated by the relevant parameter that the data collection system inside TBM acquires in real time; to may make TBM manipulator to judge according only to the size of FPI value country rock situation; guarantee that manipulator can understand the complexity and variation tendency of country rock driving in time; to adjust boring parameter or to carry out which kind of supporting preparation or shutdown inspection in advance, to improve safety and the driving speed of TBM construction.

Description

The real-time indicating means of country rock changing features in TBM tunneling process
Technical field
The present invention relates to technical field of tunnel construction, in particular to country rock changing features are real-time in a kind of TBM tunneling process Indicating means.
Background technique
It, can not be directly to face in TBM tunneling process due to by TBM cutterhead, headstock and the isostructural limitation of shield body The situation of rock is observed in real time, simultaneously because face generally has the distance of 5m or more to shield body tail portion, if cannot In time understand face rock conditions, when country rock exposure shield body again go observation hole wall country rock, it is possible that rock crusher or Tomography landslide fails immediate support, can degenerate also or seriously because of country rock and fail to stop driving in time and TBM is caused to occur Situations such as card machine, carrys out very big influence to TBM construction progress and safety belt.So far, there are no real-time reflections in the prior art The indicating means of face country rock situation and variation tendency that TBM is being tunneled.
Summary of the invention
In view of this, the present invention is directed to propose the real-time indicating means of country rock changing features in a kind of TBM tunneling process, so as to Country rock situation is judged in timely in the construction process, and there is preferable using effect.
In order to achieve the above objectives, the technical proposal of the invention is realized in this way:
The real-time indicating means of country rock changing features in a kind of TBM tunneling process, this approach includes the following steps:
S1, define TBM dig sex index FPI, and this can dig sex index FPI and can be acquired by the data inside TBM and be The relevant parameter acquired in real time of uniting is calculated, and shows in TBM operating room display screen;
S2, country rock situation and variation tendency are judged according to the size of FPI value.
Further, in step sl, the sex index FPI that digs is determined by formula (1) and formula (2),
FPI=F/P (1)
F=F0/n (2)
In formula, F is single hobboing cutter average thrust, unit KN on the TBM cutterhead;
P is that the TBM cutterhead is often turned into face country rock depth, unit mm/r;
F0For the TBM cutterhead gross thrust, unit kN;
N is the hobboing cutter number on the TBM cutterhead, and while being manufactured by TBM determines;
The TBM cutterhead gross thrust F0Often being turned into face country rock depth P with the TBM cutterhead can be by the data Acquisition system collects in real time.
Further, in step s 2, country rock is divided into I grade, II grade, III grade of three grade according to flintiness and integrity degree Not, the grade the high, shows that country rock is harder, more complete.
Further, in the step S2, the judgment criteria of the country rock situation is:
If FPI value≤λ1, country rock situation is then defined as I grade;
If λ1< FPI value < λ2, country rock situation is then defined as II grade;
If FPI value >=λ2, country rock situation is then defined as III grade;
In formula:λ1And λ2The respectively judgment threshold of state of surrounding rock.
Further, the λ1For 18-22, the λ2=58-62.
Further, the λ1=20, the λ2=60.
Compared with the existing technology, the present invention has the advantage that:
The real-time indicating means of country rock changing features in TBM tunneling process of the present invention, by the pick property for defining TBM Index FPI, and this that can dig sex index FPI can be calculated by relevant parameter that the data collection system inside TBM acquires in real time It obtains, is shown in TBM operating room display screen, so that manipulator may make to carry out according only to the size of FPI value to country rock situation Judgement, guarantee manipulator can understand in time country rock driving complexity and variation tendency, so as to adjust boring parameter or Which kind of supporting preparation or shutdown inspection are carried out in advance, to improve safety and the driving speed of TBM construction.
Detailed description of the invention
The attached drawing for constituting a part of the invention is used to provide further understanding of the present invention, schematic reality of the invention It applies example and its explanation is used to explain the present invention, do not constitute improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is a certain in the real-time indicating means of country rock changing features in TBM tunneling process described in the embodiment of the present invention FPI value change curve in section tunneling process;
Specific embodiment
It should be noted that in the absence of conflict, the feature in embodiment and embodiment in the present invention can phase Mutually combination.
The present invention will be described in detail below with reference to the accompanying drawings and embodiments.
The present embodiment is related to the real-time indicating means of country rock changing features in a kind of TBM tunneling process, and this method includes following Step:
S1, define TBM dig sex index FPI, and this can dig sex index FPI and can be acquired by the data inside TBM and be The relevant parameter acquired in real time of uniting is calculated, and shows in TBM operating room display screen;S2, it is enclosed according to the judgement of the size of FPI value Rock situation and variation tendency.
In step sl, the sex index FPI calculation formula of digging is determined by following formula (1) formula (2):
FPI=F/P (1)
F=F0/n (2)
In formula (1) and formula (2),
F is single hobboing cutter average thrust, unit kN on the TBM cutterhead;
P is that the TBM cutterhead is often turned into face country rock depth, unit mm/r;
F0For the TBM cutterhead gross thrust, unit kN;
N is the hobboing cutter number on the TBM cutterhead, and while being manufactured by TBM determines;
Cutterhead gross thrust F after TBM manufactures and designs, when driving0It can be acquired by the data of control room with pile penetration P value System recording and displaying.Meanwhile calculation procedure can be placed in the present embodiment in data collection system, it is calculated with that can synchronize FPI value, and the change curve of FPI value is shown on TBM operating display in time, as shown in Figure 1.By described in the present embodiment Single hobboing cutter average thrust F value and pile penetration P value are calculated can dig sex index FPI on TBM cutterhead, on the one hand can avoid introducing Extra computation parameter and bring trouble, and there is preferable using effect after site operation is verified, while also eliminating TBM The influence factor of cutter diameter size and cutter number, the TBM suitable for any specification.
Country rock in step s 2, can be divided into I grade, II grade, III grade three according to flintiness and integrity degree by the present embodiment Rank, the grade the high, shows that country rock is harder, more complete.By the way that country rock situation is divided into three ranks in the present embodiment, On the one hand the frequent grade classification that can avoid manipulator, on the other hand also provide that manipulator's dead-soft or extremely hard country rock occur mentions Show.
Country rock situation is specifically classified and see the table below:
Country rock situation corresponding to 1 country rock grade of table
Rank Country rock situation
Weak broken
Intensity and integrality are moderate
It is hard complete
According to the classification of country rock situation, the country rock situation judgment criteria in the present embodiment in step S2 is:
If FPI value≤λ1, country rock situation is then defined as I grade;
If λ1< FPI value < λ2, country rock situation is then defined as II grade;
If FPI value >=λ2, country rock situation is then defined as III grade;
In formula:λ1And λ2The respectively judgment threshold of state of surrounding rock, the λ1For 18-22, optimal is 20, the λ2=58- 62, optimal is 60, and λ is used in the present embodiment1And λ2Subregion is carried out to FPI value, and works as λ1When being 20 and λ2It, can shape when being 60 Pairs of FPI value forms reasonable region division, can be on the basis of guaranteeing safety driving, so that FPI value is more as far as possible It falls into in II grade, convenient for the adjustment of subsequent boring parameter and corresponding support options.
The real-time indicating means of country rock changing features in this TBM tunneling process, it is real-time by the data collection system inside TBM The relevant parameter of acquisition, which synchronizes, calculates FPI value, and shows FPI change curve in time on TBM operating display, so as to make Manipulator is obtained by the FPI changing value on TBM display, and compare above-mentioned table 1 to understand the face in tunneling in real time Country rock situation and variation tendency prompt manipulator to judge wall rock condition in time, are to be easy to tunnel also to be difficult to tunnel, are to become It is good still to degenerate, to adjust boring parameter or to carry out which kind of supporting preparation or shutdown inspection in advance, to improve TBM construction Safety and driving speed.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Within mind and principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (6)

1. the real-time indicating means of country rock changing features in a kind of TBM tunneling process, it is characterised in that this approach includes the following steps:
S1, define TBM dig sex index FPI, and this can dig sex index FPI can be real by the data collection system inside TBM When the relevant parameter that acquires be calculated, the change curve of FPI value is shown in TBM operating room display screen;
S2, country rock situation and variation tendency are judged according to the size of FPI value.
2. the real-time indicating means of country rock changing features in TBM tunneling process according to claim 1, it is characterised in that:
In step sl, the sex index FPI that digs is determined by formula (1) and formula (2),
FPI=F/P (1)
F=F0/n (2)
In formula, F is single hobboing cutter average thrust, unit kN on the TBM cutterhead;
P is that the TBM cutterhead is often turned into face country rock depth, unit mm/r;
F0For the TBM cutterhead gross thrust, unit kN;
N is the hobboing cutter number on the TBM cutterhead, and while being manufactured and designed by TBM determines;
The TBM cutterhead gross thrust F0Often being turned into face country rock depth P with the TBM cutterhead can be acquired by the data System collects in real time.
3. the real-time indicating means of country rock changing features in TBM tunneling process according to claim 1 or 2, it is characterised in that: In step s 2, country rock is divided into I grade, II grade, III grade of three rank according to flintiness and integrity degree, the grade the high, shows Country rock is harder, more complete.
4. the real-time indicating means of country rock changing features in TBM tunneling process according to claim 3, it is characterised in that:Institute It states in step S2, the judgment criteria of the country rock situation is:
If FPI value≤λ1, country rock situation is then defined as I grade;
If λ1< FPI value < λ2, country rock situation is then defined as II grade;
If FPI value >=λ2, country rock situation is then defined as III grade;
The λ1With the λ2The respectively judgment threshold of state of surrounding rock.
5. the real-time indicating means of country rock changing features in TBM tunneling process according to claim 4, it is characterised in that:Institute State λ1For 18-22, the λ2=58-62.
6. the real-time indicating means of country rock changing features in TBM tunneling process according to claim 5, it is characterised in that:Institute State λ1=20, the λ2=60.
CN201810706538.2A 2018-07-02 2018-07-02 The real-time indicating means of country rock changing features in TBM tunneling process Pending CN108846238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810706538.2A CN108846238A (en) 2018-07-02 2018-07-02 The real-time indicating means of country rock changing features in TBM tunneling process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810706538.2A CN108846238A (en) 2018-07-02 2018-07-02 The real-time indicating means of country rock changing features in TBM tunneling process

Publications (1)

Publication Number Publication Date
CN108846238A true CN108846238A (en) 2018-11-20

Family

ID=64201610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810706538.2A Pending CN108846238A (en) 2018-07-02 2018-07-02 The real-time indicating means of country rock changing features in TBM tunneling process

Country Status (1)

Country Link
CN (1) CN108846238A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110045412A (en) * 2019-04-04 2019-07-23 中国科学院武汉岩土力学研究所 One kind being based on TBM detritus microseism information front of tunnel heading unfavorable geologic body detection method
CN111852486A (en) * 2020-08-07 2020-10-30 中国电建集团成都勘测设计研究院有限公司 Method for comparing TBM tunneling suitability

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106761790A (en) * 2017-01-12 2017-05-31 中铁隧道集团有限公司 A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
US20170218757A1 (en) * 2015-03-11 2017-08-03 Shandong University Rock breaking seismic source and active source three-dimensional seismic combined advanced detection system using tunnel boring machine
CN107480400A (en) * 2017-08-31 2017-12-15 上海交通大学 A kind of hard rock mole Vibration Absorption Designing method based on multiple tuned mass damper
CN107577862A (en) * 2017-08-30 2018-01-12 中铁工程装备集团有限公司 A kind of TBM is in pick rock mass state real-time perception system and method
CN107748103A (en) * 2017-09-01 2018-03-02 中国科学院武汉岩土力学研究所 A kind of tunnel Rockburst Prediction Method, equipment, storage medium and system
CN107885899A (en) * 2017-06-06 2018-04-06 中铁隧道集团有限公司 A kind of shield TBM unnelling performancet integrated evaluating methods

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20170218757A1 (en) * 2015-03-11 2017-08-03 Shandong University Rock breaking seismic source and active source three-dimensional seismic combined advanced detection system using tunnel boring machine
CN106761790A (en) * 2017-01-12 2017-05-31 中铁隧道集团有限公司 A kind of open type TBM crosses tunneling boring carbonaceous slate driving and method for protecting support
CN107885899A (en) * 2017-06-06 2018-04-06 中铁隧道集团有限公司 A kind of shield TBM unnelling performancet integrated evaluating methods
CN107577862A (en) * 2017-08-30 2018-01-12 中铁工程装备集团有限公司 A kind of TBM is in pick rock mass state real-time perception system and method
CN107480400A (en) * 2017-08-31 2017-12-15 上海交通大学 A kind of hard rock mole Vibration Absorption Designing method based on multiple tuned mass damper
CN107748103A (en) * 2017-09-01 2018-03-02 中国科学院武汉岩土力学研究所 A kind of tunnel Rockburst Prediction Method, equipment, storage medium and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杜立杰等: "基于现场数据的TBM可掘性和掘进性能预测方法", 《煤炭学报》 *
薛亚东,等: "基于掘进性能的TBM施工围岩综合分级方法", 《岩土力学与工程学报》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110045412A (en) * 2019-04-04 2019-07-23 中国科学院武汉岩土力学研究所 One kind being based on TBM detritus microseism information front of tunnel heading unfavorable geologic body detection method
CN110045412B (en) * 2019-04-04 2020-07-10 中国科学院武汉岩土力学研究所 Method for detecting unfavorable geologic body in front of tunnel face based on TBM (Tunnel boring machine) rock fragmentation microseismic information
CN111852486A (en) * 2020-08-07 2020-10-30 中国电建集团成都勘测设计研究院有限公司 Method for comparing TBM tunneling suitability

Similar Documents

Publication Publication Date Title
CN110132084B (en) Tunnel over-under-excavation control method
CN207879337U (en) The shield formula TBM of system is monitored with country rock convergent deformation
CN108805352A (en) A kind of exploiting field overlying strata separation layer water water damage hazard assessment method
CN108846238A (en) The real-time indicating means of country rock changing features in TBM tunneling process
CN104141483B (en) Digital drilling control method and system for open-pit deep hole blasting
CN104863602B (en) A kind of soil property shield tunnel construction disease advanced prediction method
CN108868805A (en) Shield method for correcting error based on statistical analysis in conjunction with XGboost
EP2188491B1 (en) Method and software product for designing drilling pattern for rock cavity excavation
CN105571415B (en) Precise control method for smooth surface blasting of fractured rock mass of highway tunnel
CN105334548A (en) Geological forecasting method for tunnel construction in karst area
CN107085235A (en) A kind of earthquake forward probe system and method applied to development machine
EP2994613B1 (en) Arrangement for assigning and drilling bore holes
JP2017057708A (en) Natural ground evaluation method and system in front of tunnel working face
CN112922606A (en) Full-section smooth blasting construction method suitable for all-computer three-arm rock drilling jumbo for III-grade and IV-grade surrounding rock large-section railway tunnels
CN106296817A (en) A kind of work surface coal seam based on geologic data three-dimensional modeling method
CN109736796A (en) A kind of intensification blasthole forward probe mechanism and its forecasting procedure
KR20110020401A (en) Excavation method for pre-nailed tunneling
CN106761773A (en) A kind of method for tunnel construction
CN102679826A (en) Method for precisely excavating directional window on high and large concrete chimney
CN109162723A (en) A kind of more pilot tunnel tunnel temporary steel support Demolition Construction methods of big cross section
NO316892B1 (en) Method for controlling rock drilling
CN112432566A (en) Full-section rapid excavation method for large-section tunnel
CN110777804A (en) Arch bridge arch center excavation construction method suitable for steep mountain
CN110043317A (en) Knowledge method for early warning is sentenced in a kind of mine disaster many reference amounts local danger area
CN114018113A (en) Small-section tunnel blasting hole distribution structure and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination