CN108832682B - Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment - Google Patents

Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment Download PDF

Info

Publication number
CN108832682B
CN108832682B CN201810670355.XA CN201810670355A CN108832682B CN 108832682 B CN108832682 B CN 108832682B CN 201810670355 A CN201810670355 A CN 201810670355A CN 108832682 B CN108832682 B CN 108832682B
Authority
CN
China
Prior art keywords
charging
power
terminal
facility
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810670355.XA
Other languages
Chinese (zh)
Other versions
CN108832682A (en
Inventor
戴晨松
刘隽
吴广涛
陈炯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIO Holding Co Ltd
Original Assignee
NIO Anhui Holding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIO Anhui Holding Co Ltd filed Critical NIO Anhui Holding Co Ltd
Priority to CN201810670355.XA priority Critical patent/CN108832682B/en
Publication of CN108832682A publication Critical patent/CN108832682A/en
Application granted granted Critical
Publication of CN108832682B publication Critical patent/CN108832682B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • H02J7/0027

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of charging and battery replacing, in particular to a power distribution system, a capacity sharing system, an intermediate node, a terminal, a method and equipment, and aims to solve the problem of how to add a charging facility in the conventional power distribution system. The capacity sharing system comprises at least one terminal group, intermediate nodes corresponding to the terminal group one by one and a server; the terminal group comprises at least one acquisition and test terminal and at least one acquisition and execution terminal; the acquisition and testing terminal is used for acquiring the power consumption data on the corresponding power distribution equipment and uploading the power consumption data to the corresponding intermediate node; the acquisition terminal is used for acquiring a charging request of a corresponding charging facility and uploading the charging request to a corresponding intermediate node; the intermediate node is used for generating a charging instruction according to the electricity utilization data and sending the charging instruction to the collecting and executing terminal corresponding to the charging request; uploading the charging service data to a server; and the server judges the operation condition of the power distribution system according to the service data. The invention realizes the electric energy sharing and the orderly charging of the charging facilities in the specific area.

Description

Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment
Technical Field
The invention relates to the technical field of charging and battery replacing, in particular to a power distribution system, a capacity sharing system, an intermediate node, a terminal, a method and equipment.
Background
With the popularization of new energy automobiles, how to effectively supply energy to new energy automobiles with insufficient energy becomes a focus of attention of owners and manufacturers. Among them, building a charging facility (e.g., building a charging pile capable of providing a charging power source for the battery of the electric vehicle) is one of the mainstream solutions for solving the above problems. Taking the charging pile of the electric automobile as an example, the charging pile is widely installed in places with relatively concentrated charging demands, such as parking lots, residential quarters, large shopping malls, service areas and the like, due to the factors of small occupied area, low cost, convenient use and the like. The user is when using charging pile, only need to follow the rifle socket that charges with the rifle of charging and extract and insert the interface that charges on the electric automobile can charge for electric automobile's power battery, only need after charging to insert the rifle that charges once more back in the rifle socket that charges can. However, as the holding capacity of electric vehicles continues to increase, some problems associated with charging facilities also follow.
As the amount of electric vehicles kept increases greatly, the demand for charging facilities also increases greatly, and users prefer to have enough charging facilities in a cell or a parking lot for charging electric vehicles. However, planning, construction and upgrading of the power grid are a long-term process, and the construction of charging facilities of electric vehicles as an emerging thing is not usually in the planning of the existing power grid. If a charging facility is to be built in a centralized large-area manner, it is difficult to find a place capable of providing a corresponding power supply capacity. Even if the charging facility is put into use, the charging facility is limited by the rated power of the power grid. This kind of problem is especially outstanding in the project is add to the electric pile of filling in current parking area and old district: the power consumption capacity of the existing parking lot or the old community is generally planned and cannot be increased in capacity under the general condition, if a large number of charging facilities are additionally arranged regardless of the power consumption capacity, the power grid is likely to be impacted due to simultaneous use of a plurality of charging facilities, so that large-area power failure accidents are caused, the daily life and normal traveling of users are influenced, and the frequent occurrence of the power failure accidents is not beneficial to popularization of electric automobiles.
Disclosure of Invention
In order to solve the problems in the prior art, the invention provides a power distribution system, a capacity sharing system, an intermediate node, a terminal, a method and equipment, which effectively solve the problem of how to add a charging facility on the basis of the capacity of the existing power grid and the electric facility, realize the optimized utilization of the power grid and obviously improve the response speed of the system.
In one aspect of the present invention, an intermediate node for capacity sharing is provided, where the intermediate node includes: the charging system comprises a power consumption data receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the power consumption data receiving module is configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: generating a charging instruction according to the electricity utilization data, and sending the charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: uploading charging service data to a server;
wherein the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal; the charging instructions include whether charging is allowed and available power information if charging is allowed.
Preferably, the charging control module includes: the device comprises a data updating unit, an instruction generating unit and an instruction sending unit;
the data update unit is configured to: updating capacity allocation data according to the power utilization data; the instruction generation unit is configured to: after receiving the charging request, inquiring the capacity distribution data, and generating the charging instruction according to an inquiry result; the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
Preferably, the electricity consumption data includes: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
correspondingly, the data updating unit is specifically configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data; wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
Preferably, the instruction generating unit includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server;
the power allocation subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
Preferably, the charging strategy comprises:
when the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility; when the minimum value of the first residual power is larger than the rated power, the charging is allowed, and the rated power is used as the available power of the charging facility.
Preferably, the charging strategy further comprises: and when the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting charging or reducing the available power of one or more charging facilities in a charging state, so as to distribute the available power to the charging facility corresponding to the charging request.
Preferably, the intermediate node further comprises: a charging state receiving module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
accordingly, the charging control module further comprises:
a verification unit configured to: calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the corresponding charging facility is located; verifying whether the corresponding first remaining power is correct based on the second remaining power.
Preferably, the charging strategy further comprises: and when the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting charging, or adjusting the available power of each charging facility in a charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Preferably, the charging service data at least includes: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
The charging facility includes: direct current charging pile and/or alternating current charging pile.
Preferably, the server is arranged at a cloud end, and the server and the intermediate node communicate through a wired network or a wireless network; the intermediate node communicates with the acquisition and test terminals and the acquisition and test terminals in the corresponding terminal groups through a wired network, a wireless network or a power line carrier.
In another aspect of the present invention, an intermediate node for capacity sharing is provided, the intermediate node comprising: the charging system comprises a charging state receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each acquisition and execution terminal in a corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: generating service data according to the charging instruction, and sending the service data to a server;
wherein the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal; the charging instructions include whether charging is allowed and available power information if charging is allowed.
Preferably, the charging control module includes: the device comprises a data updating unit, an instruction generating unit and an instruction sending unit;
the data update unit is configured to: updating charging state data according to the charging facility working state data; the instruction generation unit is configured to: after receiving the charging request, inquiring the charging state data, and generating the charging instruction according to an inquiry result; the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
Preferably, the charging facility operating state data includes: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
correspondingly, the data updating unit is specifically configured to: calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time; wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
Preferably, the instruction generating unit includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the charging state data, second residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server;
the power allocation subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
Preferably, the charging strategy comprises: when the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility; when the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility; and when the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in a charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Preferably, the intermediate node further comprises: a power utilization data receiving module,
is configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the charging control module further comprises: a verification unit configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal; verifying whether the corresponding second remaining power is correct based on the first remaining power.
In a third aspect of the present invention, an execution terminal for capacity sharing is provided, where the execution terminal includes: the charging system comprises a charging request acquisition module, a communication module and a control module;
the charging request acquisition module is configured to: acquiring a charging request of a charging facility corresponding to the collecting and executing terminal; the communication module is configured to: uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed; the control module is configured to: and controlling the charging equipment to perform charging service by using the available power according to the charging instruction.
Preferably, the control module is specifically configured to:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
Preferably, the execution terminal further includes: a charging facility data acquisition module;
the charging facility data acquisition module is configured to: collecting working state data of a charging facility corresponding to the collecting and executing terminal, and uploading the working state data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located through the communication module; wherein the operating state data of the charging facility at least comprises: and the acquisition terminal corresponds to the current charging power and the charged time of the charging facility.
Preferably, the adoption terminal acquires the charging request of the corresponding charging facility by the following method: the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
Preferably, the execution terminal communicates with the corresponding charging facility through one of WIFI, bluetooth, Zigbee, NBIoT, power carrier, or field bus.
In a fourth aspect of the present invention, there is also provided a capacity sharing system for a power distribution system including at least one stage of power distribution equipment, wherein a plurality of charging facilities are connected to the power distribution equipment, and a sum of rated powers of the plurality of charging facilities is greater than a power available to the charging facilities from the power distribution equipment, the capacity sharing system including: at least one terminal group, the intermediate node for capacity sharing as described above, the server, corresponding one-to-one to the terminal group;
the terminal grouping includes: at least one acquisition and test terminal, at least one acquisition and test terminal for capacity sharing as described above;
the acquisition and testing terminal is configured as follows: collecting power consumption data on corresponding power distribution equipment, and uploading the power consumption data to the intermediate nodes corresponding to the terminal group where the collecting and testing terminal is located;
the adoption terminal is configured to: acquiring a charging request corresponding to a charging facility, and uploading the charging request to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located;
the intermediate node is configured to: receiving the power utilization data uploaded by the acquisition and testing terminals and the charging request uploaded by the acquisition and execution terminals in the corresponding terminal groups, and sending a charging instruction to the acquisition and execution terminals corresponding to the charging request according to the power utilization data; uploading charging service data to the server;
the server is configured to: judging the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
In a fifth aspect of the present invention, a power distribution system is further provided, which includes at least one stage of power distribution equipment, and further includes the capacity sharing system as described above, wherein the power distribution equipment can be connected with a plurality of charging facilities. Wherein the sum of the rated power of the plurality of charging facilities is greater than the power available to the charging facility by the power distribution device.
In a sixth aspect of the present invention, a capacity sharing method is further provided, including the following steps:
the intermediate node receives power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
sending a charging instruction to the collecting and executing terminal corresponding to each charging request according to the power utilization data;
uploading charging service data to a server;
wherein the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal; the charging instructions include whether charging is allowed and available power information if charging is allowed.
Preferably, the capacity allocation data is updated according to the electricity consumption data; and after receiving the charging request, inquiring the capacity distribution data, generating the charging instruction according to an inquiry result, and sending the charging instruction to a collecting and executing terminal corresponding to the charging request.
Preferably, the electricity consumption data includes: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the step of "updating the capacity allocation data according to the electricity consumption data" includes:
calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data;
wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
Preferably, the step of "inquiring the capacity allocation data and generating the charging instruction according to the inquiry result" includes:
according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
Preferably, the charging strategy comprises: if the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility;
and if the minimum value of the first residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility.
Preferably, the charging strategy further comprises: if the minimum value of the first residual power is smaller than the preset minimum charging power value, the charging is refused, or
And reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
Preferably, the method further comprises:
receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the charging facility is located corresponding to the data;
verifying whether the corresponding first remaining power is correct based on the second remaining power.
Preferably, the charging strategy further comprises: and if the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting charging, or adjusting the available power of each charging facility in a charging state according to the working state data of the charging facility, so as to distribute the available power to the charging facility corresponding to the charging request.
Preferably, the charging service data at least includes: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
Preferably, the charging facility comprises: direct current charging pile and/or alternating current charging pile.
Preferably, the server is arranged at a cloud end, and the server and the intermediate node communicate with each other through a wired network or a wireless network.
Preferably, the intermediate node communicates with the sampling and testing terminals and the sampling and executing terminals in the corresponding terminal group through a wired network, a wireless network or a power carrier.
The seventh aspect of the present invention provides a capacity sharing method, including the following steps:
the intermediate node receives the charging facility working state data uploaded by each acquisition and execution terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
generating charging service data according to the charging instruction, and sending the charging service data to a server;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
Preferably, the charging state data is updated according to the charging facility working state data;
and after receiving the charging request, inquiring the charging state data, generating the charging instruction according to an inquiry result, and sending the charging instruction to the corresponding collecting and executing terminal.
Preferably, the charging facility operating state data includes: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
accordingly, the step of "updating the charging status data according to the charging facility operating status data" includes:
calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time;
wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
Preferably, the step of "inquiring the charging state data and generating the charging instruction according to the inquiry result" includes:
according to the charging state data, second residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
Preferably, the charging strategy comprises: if the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility;
if the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility;
and if the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Preferably, the method further comprises: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
correspondingly, calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of use of the power distribution equipment corresponding to the acquisition and measurement terminal; verifying whether the corresponding second remaining power is correct based on the first remaining power.
In an eighth aspect of the present invention, a capacity sharing method is further provided, including the following steps:
the collecting and executing terminal obtains a charging request corresponding to a charging facility;
uploading the charging request to an intermediate node corresponding to the terminal group, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
and controlling the charging equipment to perform charging service by using the available power according to the charging instruction.
Preferably, "controlling the charging facility to perform the charging service at the available power according to the charging instruction" includes:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
Preferably, after "controlling the charging facility to perform the charging service with the available power according to the charging instruction", the method further includes:
collecting the working state data of the charging facility and uploading the data to the intermediate node;
wherein the operating state data of the charging facility at least comprises: current charging power, charged time of the charging facility.
Preferably, the adoption terminal acquires the charging request of the corresponding charging facility by the following method:
the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or,
and the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
Preferably, the execution terminal communicates with the corresponding charging facility through one of WIFI, bluetooth, Zigbee, NBIoT, power carrier, or field bus.
In a ninth aspect of the present invention, a capacity sharing method is further provided, including the following steps:
the method comprises the steps that a collection and test terminal collects electricity utilization data on corresponding power distribution equipment and uploads the electricity utilization data to an intermediate node corresponding to a terminal group where the collection and test terminal is located;
acquiring a charging request of a corresponding charging facility by a collecting and executing terminal, and uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located;
the intermediate node sends a charging instruction to a collection execution terminal corresponding to the charging request according to the electricity utilization data and the charging request;
the intermediate node generates charging service data and uploads the charging service data to the server;
the server judges the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
In the tenth aspect of the present invention, a non-centrally controlled capacity sharing method is further proposed, in which the power of each charging facility in a specific area is limited according to the power utilization capacity of the specific area, so as to ensure that the power utilization capacity of the specific area is not exceeded when all the charging facilities in the area operate simultaneously.
In an eleventh aspect of the present invention, a storage device is further proposed, in which a program is stored, the program being adapted to be loaded and executed by a processor to implement the above-mentioned capacity sharing method, or to implement the above-mentioned non-centrally controlled capacity sharing method.
In the twelfth aspect of the present invention, a processing apparatus is further provided, including:
a processor adapted to execute a program; and
a storage device adapted to store the program;
the program is adapted to be loaded and executed by a processor to implement the capacity sharing method described above, or to implement the non-centrally controlled capacity sharing method described above.
Compared with the closest prior art, the invention has the following beneficial effects:
according to the capacity sharing system provided by the invention, the acquisition and measurement terminal and the acquisition and execution terminal are added on the basis of the existing electrical facilities in a specific area, the electricity utilization data of each power distribution device and each charging facility are acquired or measured in real time and uploaded to the middle node, the electricity utilization data in the specific area are summarized and calculated by the middle node, and the electric energy sharing and the ordered charging of the charging facilities are realized on the basis of ensuring that the power of each level of power distribution device in the power distribution system does not exceed the rated power of each level of power distribution device.
The invention can realize interconnection and intercommunication of all charging facilities within a certain range, and particularly can effectively improve the data transmission rate and reduce the network delay by adding the intermediate node at the location of the terminal group in the area which can not be covered by the 3G/4G network, thereby improving the control stability. Meanwhile, the intermediate nodes and the terminal groups can be independently laid in clusters, so that the flexibility of the configuration of the charging facility is increased.
Scheme 1, an intermediate node for capacity sharing, characterized in that the intermediate node comprises: the charging system comprises a power consumption data receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the power consumption data receiving module is configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: generating a charging instruction according to the electricity utilization data, and sending the charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: uploading charging service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instructions include whether charging is allowed and available power information if charging is allowed.
Scheme 2, the intermediate node for capacity sharing according to scheme 1, wherein the charging control module comprises: the device comprises a data updating unit, an instruction generating unit and an instruction sending unit;
the data update unit is configured to: updating capacity allocation data according to the power utilization data;
the instruction generation unit is configured to: after receiving the charging request, inquiring the capacity distribution data, and generating the charging instruction according to an inquiry result;
the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
Scheme 3, the intermediate node for capacity sharing according to scheme 2, wherein the power consumption data includes: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
correspondingly, the data updating unit is specifically configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data;
wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
Scheme 4, the intermediate node for capacity sharing according to scheme 3, wherein the instruction generating unit includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
the power allocation subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
Scheme 5, the intermediate node for capacity sharing according to scheme 4, wherein the charging policy includes:
when the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility;
when the minimum value of the first residual power is larger than the rated power, the charging is allowed, and the rated power is used as the available power of the charging facility.
Scheme 6, the intermediate node for capacity sharing according to scheme 5, wherein the charging policy further includes:
rejecting charging when the minimum value of the first remaining power is less than the preset minimum charging power value, or
And reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
Scheme 7, the intermediate node for capacity sharing according to scheme 5, further comprising: a charging state receiving module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
accordingly, the charging control module further comprises:
a verification unit configured to: calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the corresponding charging facility is located; verifying whether the corresponding first remaining power is correct based on the second remaining power.
Scheme 8, the intermediate node for capacity sharing according to scheme 7, wherein the charging policy further includes:
and when the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting charging, or adjusting the available power of each charging facility in a charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Scheme 9, the intermediate node for capacity sharing according to any of schemes 1 to 8, wherein the charging service data at least includes: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
Scheme 10, the intermediate node for capacity sharing according to any of schemes 1-8, wherein the charging facility comprises: a direct current charging pile and/or an alternating current charging pile;
the server is arranged at the cloud end, and the server and the intermediate node are communicated through a wired network or a wireless network; the intermediate node and the acquisition and test terminal and the acquisition and execution terminal in the corresponding terminal group are communicated through a wired network, a wireless network or a power line carrier.
Scheme 11, an intermediate node for capacity sharing, the intermediate node comprising: the charging system comprises a charging state receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each acquisition and execution terminal in a corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: generating service data according to the charging instruction, and sending the service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instructions include whether charging is allowed and available power information if charging is allowed.
Scheme 12, the intermediate node for capacity sharing according to scheme 11, wherein the charging control module comprises: the device comprises a data updating unit, an instruction generating unit and an instruction sending unit;
the data update unit is configured to: updating charging state data according to the charging facility working state data;
the instruction generation unit is configured to: after receiving the charging request, inquiring the charging state data, and generating the charging instruction according to an inquiry result;
the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
Scheme 13, the intermediate node for capacity sharing according to scheme 12, wherein the charging facility operating state data includes: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
correspondingly, the data updating unit is specifically configured to:
calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time;
wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
Scheme 14, the intermediate node for capacity sharing according to scheme 13, wherein the instruction generating unit includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the charging state data, second residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
the power distribution subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
Scheme 15, the intermediate node for capacity sharing according to scheme 14, wherein the charging policy includes:
when the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility;
when the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility;
and when the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in a charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Scheme 16, the intermediate node for capacity sharing according to scheme 15, further comprising:
an electricity consumption data receiving module configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the charging control module further comprises:
a verification unit configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal; verifying whether the corresponding second remaining power is correct based on the first remaining power.
In the scheme 17, an acquiring and executing terminal for capacity sharing is provided, where the acquiring and executing terminal includes: the charging system comprises a charging request acquisition module, a communication module and a control module;
the charging request acquisition module is configured to: acquiring a charging request of a charging facility corresponding to the collecting and executing terminal;
the communication module is configured to: uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the control module is configured to: and controlling the charging equipment to perform charging service by using the available power according to the charging instruction.
In claim 18, the execution terminal for capacity sharing according to claim 17, wherein the control module is specifically configured to:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
Scheme 19, the adoption terminal for capacity sharing according to scheme 18, characterized in that the adoption terminal further includes: a charging facility data acquisition module;
the charging facility data acquisition module is configured to: collecting working state data of a charging facility corresponding to the collecting and executing terminal, and uploading the working state data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located through the communication module;
wherein the operating state data of the charging facility at least comprises: and the acquisition terminal corresponds to the current charging power and the charged time of the charging facility.
Scheme 20, the adoption terminal for capacity sharing according to any of the schemes 17 to 19, characterized in that the adoption terminal obtains the charging request of the corresponding charging facility by:
the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or,
and the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
Scheme 21 and the adoption terminal for capacity sharing according to any one of schemes 17 to 19, wherein the adoption terminal and the corresponding charging facility communicate with each other through one of WIFI, bluetooth, Zigbee, NBIoT, power carrier or field bus.
Scheme 22, a capacity sharing system, for a power distribution system including at least one stage of power distribution equipment, wherein a plurality of charging facilities are connected to the power distribution equipment, and a sum of rated powers of the plurality of charging facilities is greater than a power available to the charging facilities from the power distribution equipment, wherein the capacity sharing system includes: at least one terminal group, an intermediate node for capacity sharing according to any one of schemes 1-10 or 11-16, which corresponds to the terminal group in a one-to-one manner, and a server;
the terminal grouping includes: at least one acquisition and test terminal, at least one acquisition and test terminal for capacity sharing according to any one of the schemes 17-21;
the acquisition and testing terminal is configured as follows: collecting power consumption data on corresponding power distribution equipment, and uploading the power consumption data to the intermediate nodes corresponding to the terminal group where the collecting and testing terminal is located;
the adoption terminal is configured to: acquiring a charging request corresponding to a charging facility, and uploading the charging request to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located;
the intermediate node is configured to: receiving the power utilization data uploaded by the acquisition and testing terminals and the charging request uploaded by the acquisition and execution terminals in the corresponding terminal groups, and sending a charging instruction to the acquisition and execution terminals corresponding to the charging request according to the power utilization data; uploading charging service data to the server;
the server is configured to: judging the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
Scheme 23, a power distribution system, comprising at least one stage of power distribution equipment, and further comprising the capacity sharing system as described in scheme 22, wherein the power distribution equipment can be connected with a plurality of charging facilities.
Scheme 24 the power distribution system of claim 23 wherein the sum of the rated power of a plurality of charging facilities is greater than the power available to the charging facility by the power distribution device.
Scheme 25, a capacity sharing method, characterized by comprising the steps of:
the intermediate node receives power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
sending a charging instruction to the collecting and executing terminal corresponding to each charging request according to the power utilization data;
uploading charging service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instructions include whether charging is allowed and available power information if charging is allowed.
The capacity sharing method according to claim 26 or 25, wherein,
updating capacity allocation data according to the power utilization data;
and after receiving the charging request, inquiring the capacity distribution data, generating the charging instruction according to an inquiry result, and sending the charging instruction to a collecting and executing terminal corresponding to the charging request.
The capacity sharing method according to claim 27 or 26, wherein the power consumption data includes: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the step of "updating the capacity allocation data according to the electricity consumption data" includes:
calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data;
wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
The capacity sharing method according to claim 28 or 27, wherein the step of "inquiring the capacity allocation data and generating the charging instruction according to the inquiry result" includes:
according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
The capacity sharing method according to claim 29 or 28, wherein the charging policy includes:
if the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility;
and if the minimum value of the first residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility.
Scheme 30 and the capacity sharing method according to scheme 29, wherein the charging policy further includes:
if the minimum value of the first residual power is smaller than the preset minimum charging power value, the charging is refused, or
And reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
Scheme 31, the capacity sharing method according to scheme 29, further comprising:
receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the charging facility is located corresponding to the data;
verifying whether the corresponding first remaining power is correct based on the second remaining power.
Scheme 32 and the capacity sharing method according to scheme 31, wherein the charging policy further includes:
if the minimum value of the first residual power is smaller than the preset minimum charging power value, the charging is refused, or
And adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Scheme 33, the capacity sharing method according to any of schemes 25 to 32, wherein the charging service data at least includes: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
Scheme 34, the capacity sharing method according to any one of schemes 25 to 32, wherein the charging facility includes: direct current charging pile and/or alternating current charging pile.
Scheme 35, the capacity sharing method according to any one of schemes 25 to 32, wherein the server is disposed in a cloud, and the server and the intermediate node communicate with each other through a wired network or a wireless network; the intermediate node communicates with the acquisition and test terminals and the acquisition and test terminals in the corresponding terminal groups through a wired network, a wireless network or a power line carrier.
Scheme 36, a capacity sharing method, characterized by comprising the steps of:
the intermediate node receives the charging facility working state data uploaded by each acquisition and execution terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
generating charging service data according to the charging instruction, and sending the charging service data to a server;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
The capacity sharing method according to claim 37 or 36, wherein,
updating charging state data according to the charging facility working state data;
and after receiving the charging request, inquiring the charging state data, generating the charging instruction according to an inquiry result, and sending the charging instruction to the corresponding collecting and executing terminal.
Scheme 38, the capacity sharing method according to scheme 37, wherein the charging facility operating state data includes: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
accordingly, the step of "updating the charging status data according to the charging facility operating status data" includes:
calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time;
wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
The capacity sharing method according to claim 39 and claim 38, wherein the step of "inquiring the charging state data and generating the charging command according to the inquiry result" includes:
according to the charging state data, second residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
Scheme 40, the capacity sharing method according to scheme 39, wherein the charging policy includes:
if the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility;
if the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility;
and if the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
Scheme 41, the capacity sharing method according to scheme 40, the method further comprising: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the number of the first and second electrodes,
calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal;
verifying whether the corresponding second remaining power is correct based on the first remaining power.
Scheme 42, a capacity sharing method, characterized by comprising the steps of:
the collecting and executing terminal obtains a charging request corresponding to a charging facility;
uploading the charging request to an intermediate node corresponding to the terminal group, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
and controlling the charging equipment to perform charging service by using the available power according to the charging instruction.
The capacity sharing method according to claim 43 or 42, wherein the step of controlling the charging facility to perform the charging service with the available power according to the charging command includes:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
The method according to claim 44 or 43, wherein after the step of controlling the charging facility to perform the charging service with the available power according to the charging command, the method further comprises:
collecting the working state data of the charging facility and uploading the data to the intermediate node;
wherein the operating state data of the charging facility at least comprises: current charging power, charged time of the charging facility.
Scheme 45, the capacity sharing method according to any one of schemes 42 to 44, wherein the adoption terminal obtains the charging request of the corresponding charging facility by:
the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or,
and the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
Scheme 46 and the capacity sharing method according to any one of schemes 42 to 44, wherein the execution terminals communicate with the corresponding charging facilities through one of WIFI, bluetooth, Zigbee, NBIoT, power carrier, or fieldbus.
Scheme 47, a capacity sharing method, characterized by comprising the steps of:
the method comprises the steps that a collection and test terminal collects electricity utilization data on corresponding power distribution equipment and uploads the electricity utilization data to an intermediate node corresponding to a terminal group where the collection and test terminal is located;
acquiring a charging request of a corresponding charging facility by a collecting and executing terminal, and uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located;
the intermediate node sends a charging instruction to a collection execution terminal corresponding to the charging request according to the electricity utilization data and the charging request;
the intermediate node generates charging service data and uploads the charging service data to the server;
the server judges the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
Scheme 48, a non-centrally controlled capacity sharing method, characterized in that, according to the power capacity of a specific area, the power of each charging facility in the specific area is limited, so as to ensure that the power capacity of the specific area is not exceeded when all charging facilities in the area work simultaneously.
Scheme 49, a storage device having a program stored therein, characterized in that the program is adapted to be loaded and executed by a processor to implement the capacity sharing method of any of the schemes 25-35 or 36-41 or 42-46 or 47, or to implement the non-centrally controlled capacity sharing method of scheme 48.
Scheme 50, a processing apparatus, comprising:
a processor adapted to execute a program; and
a storage device adapted to store the program;
wherein the program is adapted to be loaded and executed by a processor to implement the capacity sharing method of any one of claims 25-35 or 36-41 or 42-46 or 47, or the non-centrally controlled capacity sharing method of claim 48.
Drawings
FIG. 1 is a schematic diagram of a power distribution system according to an embodiment of the present invention;
FIG. 2 is a simplified schematic diagram of the power distribution system of FIG. 1 in an embodiment of the present invention;
fig. 3 is a schematic diagram of an alternative terminal grouping method of the capacity sharing system in the embodiment of the present invention;
FIG. 4 is a schematic diagram of a first embodiment of an intermediate node for capacity sharing according to the present invention;
FIG. 5 is a schematic diagram of a second embodiment of an intermediate node for capacity sharing according to the present invention;
FIG. 6 is a schematic diagram of a third embodiment of an intermediate node for capacity sharing according to the present invention;
FIG. 7 is a schematic diagram of a fourth embodiment of an intermediate node for capacity sharing according to the present invention;
fig. 8 is a schematic diagram of a configuration of a sampling terminal for capacity sharing in the embodiment of the present invention;
FIG. 9 is a diagram illustrating the main steps of a first embodiment of the capacity sharing method of the present invention;
FIG. 10 is a diagram illustrating the main steps of a second embodiment of the capacity sharing method of the present invention;
FIG. 11 is a diagram illustrating the main steps of a third embodiment of the capacity sharing method of the present invention;
fig. 12 is a schematic diagram of the main steps of a fourth embodiment of the capacity sharing method of the present invention.
Detailed Description
Preferred embodiments of the present invention are described below with reference to the accompanying drawings. It should be understood by those skilled in the art that these embodiments are only for explaining the technical principle of the present invention, and are not intended to limit the scope of the present invention.
It should be noted that the terms "first" and "second" in the description of the present invention are used for convenience of description only and do not indicate or imply relative importance of the devices, elements or parameters, and therefore should not be construed as limiting the present invention.
On a temporal and spatial scale, the charging demand has a spatial-temporal imbalance. The charging demand is initiated by a user on a charging facility, and is reflected by the overall load demand on the power grid through the power transmission and distribution system to the power supply side. The charging demand itself has an imbalance in space-time, and if the power supply and distribution facilities are designed under the unbalanced input, the demand on the power supply equipment for power transmission and distribution is increased, and the impact on the power grid is increased. But on the other hand, the charging requirement of the user can also be flexibly realized, if the charging requirement can be adjusted in a space-time two-dimension mode through sharing and ordered scheduling, the load is required smoothly, the investment and the transformation cost of power transmission and distribution equipment can be reduced, and the impact of charging on a power grid can also be reduced under the existing condition.
The above needs are directly reflected in the following application scenarios:
(1) public parking area installation fills electric pile scene:
in order to promote the development of new energy automobiles, a lot of local governments stipulate that the proportion of charging piles equipped in parking lots is not less than 10% of the total amount. This policy is often limited in implementation by the parking lot power distribution capacity. For example, charging piles need to be installed in 100 parking spaces of a parking lot, 700kW of power consumption capacity is needed if the rated power of each pile is 7kW, but a power distribution facility of the parking lot can only support 300kW of power distribution capacity, and at this time, the installation of 100 piles needs to be completed by using a capacity sharing and orderly charging method according to the space-time imbalance of the charging demand.
(2) The new user installation of district electric automobile fills electric pile scene:
many electric vehicle users cannot obtain approval due to the limit of the power distribution capacity of the cell when installing the electric vehicle. For example, the cell capacity has a margin of only 140kW, still noted 7kW per stake power rating, and can only be installed for the first 20 users. If at this moment can utilize capacity sharing and orderly charging according to the space-time imbalance of the charging demand, even other electric loads of the community, it is possible to install the charging pile for the user who reports the installation later.
In order to know the electricity utilization condition in the power distribution system in time and realize the capacity sharing, the invention provides a capacity sharing system which comprises the following components: the method comprises the following steps that a corresponding acquisition and measurement terminal is arranged for the power distribution equipment and is used for acquiring and measuring power consumption data of the power distribution equipment; a corresponding collecting and executing terminal is arranged for the charging facility and is used for acquiring the charging request and the working state data of the charging facility; in addition, a server is also provided. Considering that many places where charging piles are installed do not have wired access conditions, wireless communication is generally adopted for terminals (acquisition and testing terminals and acquisition and execution terminals), when the terminals adopt a wireless scheme, if the terminals directly communicate with a server, a 3G/4G network is generally preferred, but the following problems exist when the 3G/4G network is adopted:
(1) the coverage is limited by 3G/4G network signals, especially in remote areas and basements;
(2) communication rate and bandwidth are limited by network characteristics;
(3) when the data volume is large, the communication cost is high.
For the reasons, the intermediate node is arranged for receiving the functions of part of the servers, so that the data uploading speed of the terminal is improved, and the network delay of the charging facility when the charging facility responds to the ordered scheduling command is reduced.
The collecting and testing terminal is divided into a plurality of terminal groups, and each terminal group corresponds to one intermediate node. Each intermediate node and the corresponding terminal group form a cluster, namely a local area network. The local area network is preferably realized in a form of a wireless self-organizing Mesh network, and an intermediate node is used as an access node to access the Ethernet and realize communication with a cloud server. The intermediate node can be laid in a place covered by a wireless network or provided with a wired access condition so as to realize communication interconnection with the cloud server. The role of the intermediate node is illustrated below with a specific example:
if a terminal-server direct connection scheme is adopted, the performance of a 3G/4G network in a terminal laying area needs to reach the index, and the challenge is great in some areas. If the intermediate node scheme is adopted and a wireless local area network such as Zigbee is laid between the intermediate node and the terminal equipment, the network performance index can be achieved within the protocol allowable range.
In view of the above-mentioned problems, the present invention provides an embodiment of a power distribution system, where the power distribution system of this embodiment includes at least one stage of power distribution equipment, and further includes a capacity sharing system, where the power distribution equipment can be connected to a plurality of charging facilities, and a sum of rated powers of the plurality of charging facilities is greater than a power available to the charging facilities from the power distribution equipment.
Fig. 1 is a schematic diagram of the configuration of an embodiment of a power distribution system of the present invention. As shown in fig. 1, the power distribution system of the present embodiment includes two levels of power distribution devices, wherein the first level of power distribution device is a transformer, and the second level of power distribution device is a distribution box. The lowermost box in the figure is the original one, behind which "other loads" such as lighting, heating, cooling, motors, etc. are connected. The rest distribution boxes are newly added, and a charging facility (a direct current charging pile and an alternating current charging pile are connected behind the newly added distribution boxes. Given that the sum of the rated power of the charging facilities in the distribution system is greater than the power available to the transformers for these charging facilities, capacity sharing is required based on the charging demand, the space-time imbalance of other loads.
With continued reference to fig. 1, an embodiment of the capacity sharing system of the present invention comprises: at least one terminal group (at least one sampling terminal 10 and at least one sampling terminal 20 are included in the terminal group), intermediate nodes 30 for capacity sharing in one-to-one correspondence with the terminal group, and a server 40.
In this embodiment, one acquisition and measurement terminal 10 is installed for all power distribution devices (transformers and distribution boxes) in the power distribution system, one acquisition and measurement terminal 20 is installed for all charging facilities, the acquisition and measurement terminals 10 and the acquisition and measurement terminals 20 are classified into the same terminal group, the terminal group communicates with corresponding intermediate nodes 30, and a server 40 is further arranged on a cloud platform. The intermediate node 30 is used for receiving and analyzing the electricity utilization data and making decisions; the server 40 is used to manage data and interact with third party platforms, and the server 40 can also communicate with the mobile terminal to guide the client to avoid peak periods of electricity usage or avoid certain areas with insufficient remaining power. The server 40 performs big data statistics according to the charging service data, can grasp in a certain specific area which time periods have the highest utilization rate of the charging facilities and which time periods have more idle charging facilities, and guides the client to avoid the peak period as much as possible; or, in the same time period, the utilization rate of the charging facilities in certain areas is higher, and the idle charging facilities in certain areas are more (namely, surplus power is available), so that the customer can be guided to the areas with relatively surplus power to charge.
Here, the "sampling and testing terminal" and the "sampling and execution terminal" are explained:
the measurement of the finger-shaped state quantity can measure branch current (effective value), branch voltage (effective value), active power, reactive power (or phase angle, power factor), accumulated electric quantity and the like; "mining" refers to data collection, and objects mainly include two types: the system comprises an electric measuring module or an electric meter, and a data interface of charging facilities (a charging pile, a charging station, a battery replacement station and the like); the 'execution' refers to the execution of a command, receives a control instruction issued by the intermediate node, confirms that an instruction control object is correct, and forwards the instruction to a downstream charging facility.
In order to clearly show the transfer relationship between data and power between different devices, we simplify fig. 1 to fig. 2. As shown in fig. 2, the power distribution system of the present embodiment includes: the capacity sharing system (composed of the acquisition and testing terminal 10, the acquisition and execution terminal 20, the intermediate node 30 and the server 40), the transformer 100 and the distribution box 200. The load of the power distribution system comprises: charging facility 300, other loads 400.
Wherein, the sampling and testing terminal 10 is configured as: collecting power consumption data on corresponding power distribution equipment, and uploading the power consumption data to an intermediate node 30 corresponding to a terminal group where the collecting and testing terminal is located; the adoption terminal 20 is configured to: acquiring a charging request corresponding to the charging facility 300, and uploading the charging request to an intermediate node 30 corresponding to a terminal group where the collecting and executing terminal is located; the intermediate node 30 is configured to: receiving power consumption data uploaded by the acquisition and test terminal 10 and a charging request uploaded by the acquisition and execution terminal 20 in the corresponding terminal group, and sending a charging instruction to the acquisition and execution terminal 20 corresponding to the charging request according to the power consumption data; charging service data are also uploaded to the server 40, and a charging strategy is obtained through the server 40; the server 40 is configured to: and receiving the charging service data uploaded by the intermediate node 30, and sending a charging strategy to the intermediate node 30. The charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed; the charging service data at least comprises: the charging request information received in the terminal group corresponding to the intermediate node 30, and the available power allocated accordingly. In addition, the charging service data may further include: the intermediate node corresponds to the type and ID of the acquisition and measurement terminal in the terminal group, the type and ID of the acquisition and measurement terminal, the electric quantity and state (normal operation or fault) of each branch, actual charging current, available capacity and the like. The server 40 can determine the operation status of the power distribution system according to the charging service data, for example, whether the power distribution system is working normally, whether each branch has remaining capacity, how many charging facilities are charging, and the charging current. The server can also display the current operating condition of the power distribution system through a human-computer interaction interface and receive a charging strategy set by an operation manager. The server may also interact with the user terminal, e.g. displaying charging information, accepting a subscription request, etc.
The charging facility 300 mentioned in the embodiment of the present invention includes: direct current charging pile and/or alternating current charging pile. The server 40 is disposed in the cloud, and the server 40 and the intermediate node 30 communicate with each other through a wired network or a wireless network. The intermediate node 30 communicates with the sampling terminal 10 and the sampling terminal 20 in the corresponding terminal group via a wired network, a wireless network, or a power carrier. The wireless network includes: 3G/4G, WIFI, Bluetooth, Zigbee, or NBIoT. The adoption terminal and the corresponding charging facility communicate with each other through one of WIFI, Bluetooth, Zigbee, NBIoT, power carrier waves or field buses.
It should be noted that: in practice there may be more levels of distribution equipment. In this embodiment, the power distribution devices and the sampling and testing terminals, and the charging facilities and the sampling and testing terminals are all in a one-to-one relationship, and in practical application, the relationship may also be a many-to-one relationship, that is, a plurality of power distribution devices configure the same sampling and testing terminal, and a plurality of charging facilities configure the same sampling and testing terminal.
In fig. 2, the sampling terminals and the sampling terminals in the same transformer power supply area are allocated to the same terminal group. Fig. 3 is a schematic diagram of an alternative terminal grouping method of the capacity sharing system of the present invention. As shown in fig. 3, the sampling terminals 10 and 20 in the same transformer 100 power supply area are allocated to different terminal groups. In actual use, the sampling and testing terminals and the sampling and executing terminals in different transformer power supply areas can be distributed to the same terminal group, as long as the actual transmission conditions meet the required timeliness.
To describe the capacity sharing system of the present invention in more detail, the intermediate node and the acquiring terminal in the capacity sharing system will be described below with reference to fig. 4 to 12, respectively.
Fig. 4 is a schematic configuration diagram of a first embodiment of an intermediate node for capacity sharing according to the present invention. As shown in fig. 4, the intermediate node 30 of the present embodiment includes: the system comprises an electricity consumption data receiving module 31, a charging request receiving module 32, a charging control module 33 and a service data uploading module 34.
Wherein, the power consumption data receiving module 31 is configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; the charging request receiving module 32 is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal; the charging control module 33 is configured to: generating a charging instruction according to the electricity utilization data, and sending the charging instruction to the execution terminal corresponding to each charging request; the service data upload module 34 is configured to: and uploading the charging service data to the server.
The terminal group here includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal; the charging instructions include whether charging is allowed and available power information if charging is allowed.
Specifically, the charging control module 33 may include: a data updating unit 331, an instruction generating unit 332, and an instruction transmitting unit 333.
Wherein, the data updating unit 331 is configured to: updating the capacity allocation data according to the power utilization data; the instruction generation unit 332 is configured to: after receiving a charging request, inquiring capacity distribution data, and generating a charging instruction according to an inquiry result; the instruction transmitting unit 333 is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
In this embodiment, the electricity consumption data may include: and acquiring and measuring the actual total power used by the power distribution equipment corresponding to the terminal.
Accordingly, the data updating unit 331 may be specifically configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating capacity distribution data; wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
The instruction generating unit 332 may include: a selecting subunit 3321, a charging policy obtaining subunit 3322, and a power allocating subunit 3323.
The selecting subunit 3321 is configured to: and inquiring the first residual power of each level of power distribution equipment at the front end of the electric branch where the charging facility corresponding to the charging request is located according to the capacity distribution data, and taking the minimum value of the first residual power.
Because we have added new distribution equipment to the distribution system of fig. 1, the sum of the power ratings of all the distribution boxes in fig. 1 may exceed the power rating of the transformer, not only should we consider that distribution equipment connected to the charging facility cannot be overloaded, but also should consider that the previous transformer cannot be overloaded. In practical applications, there may be multiple levels of distribution equipment in the distribution system, and it is necessary to ensure that the load on each level of distribution equipment on the electrical branch from the distribution equipment connected to the charging facility to the transformer cannot exceed the rated capacity of the distribution equipment. Therefore, it is necessary to calculate the remaining power of these power distribution devices and take the minimum value thereof for power distribution in the subsequent step.
The charging policy acquisition subunit 3322 is configured to: and acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server.
Power distribution subunit 3323 is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating a charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
In this embodiment, the charging policy includes: when the minimum value of the first residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility; when the minimum value of the first residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility; and when the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting the charging or reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
Here, "reduce the available power of one or more charging facilities in a charging state so as to allocate the available power to the charging facility corresponding to the charging request" may employ the following method:
finding the power distribution equipment corresponding to the minimum value of the first residual power, and reducing the power of the charging facility directly or indirectly connected with the rear end of the power distribution equipment according to the user priority or the charging time length, namely: and reducing the charging power of the charging facility corresponding to the user with lower priority according to a certain proportion, or reducing the charging power of the charging facility with later charging starting time according to a certain proportion. By the method, the minimum value of the first residual power is larger than or equal to the preset minimum charging power, so that the available power is distributed to the charging facility corresponding to the current charging request. If the requirement cannot be met after the adjustment according to the method calculated in advance, the current charging request is directly rejected without adjustment.
In this embodiment, if the minimum value of the first remaining power is greater than the preset minimum charging power, a maximum allocation policy is adopted, and a random allocation policy may also be adopted in practical application: selecting a random number between a preset minimum charging power and a minimum value of the first residual power, and if the random number is greater than or equal to the rated power of the charging facility, taking the rated power of the charging facility as available power, otherwise, taking the random number as available power.
If the intermediate node receives charging requests sent by a plurality of execution terminals within a set time period, the available power can be distributed to the charging facilities corresponding to the charging requests according to an average distribution strategy: dividing the residual capacity of the power distribution system (namely the first residual power of the transformer) by the number of the current charging requests according to the capacity distribution data to obtain an average value; for each charging facility which initiates a charging request at present, selecting a minimum value from the average value and first residual powers of all levels of front-end distribution equipment corresponding to the charging facility; if the minimum value is greater than or equal to the rated power of the charging facility, allowing the charging facility to be charged and taking the rated power of the charging facility as available power; and if the minimum value is smaller than the rated power of the charging facility and is larger than or equal to the preset minimum charging power, allowing the charging facility to be charged and taking the minimum value as the available power. And if the minimum value is less than the preset minimum charging power, the charging facility is not allowed to be charged.
Fig. 5 is a schematic configuration diagram of a second embodiment of an intermediate node for capacity sharing according to the present invention. As shown in fig. 5, the intermediate node 50 of the present embodiment includes: the charging system comprises a power consumption data receiving module 51, a charging request receiving module 52, a charging control module 53, a service data uploading module 54 and a charging state receiving module 55.
The configurations of the electricity consumption data receiving module 51, the charging request receiving module 52, and the service data uploading module 54 are respectively the same as the corresponding modules in the first intermediate node embodiment.
The charge status receiving module 55 is configured to: and receiving the charging facility working state data uploaded by each acquisition and execution terminal in the corresponding terminal group. The charging facility operating state data includes: and acquiring the current charging power, the charged time and the like of the charging facility corresponding to the terminal.
The charging control module 53 includes: data updating unit 531, instruction generating unit 532, instruction transmitting unit 533, and verifying unit 534. The configurations of the data updating unit 531, the instruction generating unit 532, and the instruction sending unit 533 are the same as the configurations of the corresponding units in the first intermediate node embodiment; the verification unit 534 is configured to: calculating second residual power of each level of distribution equipment according to the working state data of the charging facility and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located; verifying whether the corresponding first remaining power is correct based on the second remaining power.
Because the first residual power is calculated by collecting the data of the power distribution equipment through the collection and measurement terminal, not only the rear-stage charging facility but also other loads and rear-stage line loss are considered, and the second residual power only considers the rear-stage charging facility, the first residual power of the same power distribution equipment is necessarily smaller than the second residual power under normal conditions, if the first residual power of certain power distribution equipment is found to be larger than the second residual power through the verification result, the corresponding collection and measurement terminal or the collection and measurement terminal possibly has a problem and needs to be overhauled immediately.
In this embodiment, the charging policy includes: when the minimum value of the first residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility; when the minimum value of the first residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility; and when the minimum value of the first residual power is smaller than the preset minimum charging power value, rejecting charging, or adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power for the charging facility corresponding to the charging request.
It can be seen that, different from the charging strategy in the first intermediate node embodiment, in the charging strategy of this embodiment, when the minimum value of the first remaining power is found to be smaller than the preset minimum charging power value, in this embodiment, "the available power of each charging facility in the charging state may be adjusted according to the charging facility operating state data", specifically: and selecting the charging facility with smaller charging power according to the current charging power of the charging facility to reduce the power by a certain proportion. Since the charging facility, which is less powerful to charge, is already completing its current charging task quickly, reducing its available power appropriately does not have a large impact on it. If it is calculated in advance that the minimum value of the first remaining power adjusted by the method is still smaller than the preset minimum charging power value, the charging request is directly rejected without adjustment. Of course, we can also use the charging strategy in the first embodiment of the intermediate node to adjust.
In the case that all loads in the power distribution system are charging facilities, or in the case that access terminals of other loads in the power distribution system are additionally provided with adoption terminals, the intermediate node for capacity sharing may also adopt the following third embodiment or fourth embodiment.
Fig. 6 is a schematic configuration diagram of a third embodiment of an intermediate node for capacity sharing according to the present invention. As shown in fig. 6, the intermediate node 60 of the present embodiment includes: the charging system comprises a charging state receiving module 61, a charging request receiving module 62, a charging control module 63 and a service data uploading module 64.
Wherein the charging state receiving module 61 is configured to: receiving charging facility working state data uploaded by each acquisition and execution terminal in a corresponding terminal group; the charging request receiving module 62 is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal; the charging control module 63 is configured to: according to the working state data of the charging facility, sending a charging instruction to the collecting and executing terminal corresponding to each charging request; the service data upload module 64 is configured to: and generating service data according to the charging instruction, and sending the service data to the server.
The terminal group here includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal; the charging instructions include whether charging is allowed and available power information if charging is allowed.
Specifically, the charging control module 63 may include: a data updating unit 631, an instruction generating unit 632, and an instruction transmitting unit 633.
The data updating unit 631 is configured to: updating the charging state data according to the charging facility working state data; the instruction generation unit 632 is configured to: after receiving a charging request, inquiring charging state data, and generating a charging instruction according to an inquiry result; the instruction transmitting unit 633 is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
In this embodiment, the charging facility operating state data includes: the current charging power, the charged time and the like of the charging facility corresponding to the acquisition terminal which transmits the data.
Accordingly, the data updating unit 631 is specifically configured to: and calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating charging state data according to the second residual power and the charged time.
In this embodiment, the charging status data at least includes: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
Specifically, the instruction generating unit 632 may include: a selecting subunit 6321, a charging policy acquiring subunit 6322, and a power allocating subunit 6323.
The selecting subunit 6321 is configured to: according to the charging state data, second residual power of each level of power distribution equipment at the front end of the electric branch where the charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken; the charging policy acquisition subunit 6322 is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server; the power allocation subunit 6323 is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
In this embodiment, the charging policy is: when the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility; when the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility; and when the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power for the charging facility corresponding to the charging request.
Here, "adjusting the available power of each charging facility in the charging state according to the charging facility operating state data" specifically includes: and selecting a charging facility with smaller charging power according to the current charging power of the charging facility to reduce the power by a certain proportion, or reducing the charging power of the charging facility corresponding to a user with lower priority by a certain proportion, or reducing the charging power of the charging facility with later charging starting time by a certain proportion. By the method, the minimum value of the second residual power is larger than or equal to the preset minimum charging power, so that the available power is distributed to the charging facility corresponding to the current charging request. If the requirement cannot be met after the adjustment according to the method calculated in advance, the current charging request is directly rejected without adjustment.
Fig. 7 is a schematic configuration diagram of a fourth embodiment of the intermediate node for capacity sharing according to the present invention. As shown in fig. 7, the intermediate node 70 of the present embodiment includes: the charging system comprises a charging state receiving module 71, a charging request receiving module 72, a charging control module 73, a service data uploading module 74 and a power consumption data receiving module 75.
The charging state receiving module 71, the charging request receiving module 72, and the service data uploading module 74 are respectively the same as the corresponding modules in the third intermediate node embodiment; the electricity data receiving module 75 is configured to: and receiving the power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group. The electricity consumption data includes: and acquiring and measuring the actual total power used by the power distribution equipment corresponding to the terminal.
The charging control module 73 in the present embodiment includes: a data update unit 731, an instruction generation unit 732, an instruction transmission unit 733, and a verification unit 734.
The data updating unit 731, the instruction generating unit 732, and the instruction sending unit 733 are respectively the same as the corresponding units in the third embodiment of the intermediate node; verification unit 734 is configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the collecting and testing terminal; verifying whether the corresponding second remaining power is correct based on the first remaining power.
As we said in the second intermediate node embodiment, since the first remaining power is calculated by collecting data of the power distribution equipment by the collection and measurement terminal, in which both the subsequent charging facility and other loads and subsequent line losses are considered, and the second remaining power is only the subsequent charging facility, the first remaining power on the same power distribution equipment is necessarily smaller than the second remaining power in a normal situation, and if the first remaining power of a certain power distribution equipment is found to be larger than the second remaining power as a result of the verification, it may be that the corresponding collection and measurement terminal or collection and execution terminal has a problem and needs to be serviced immediately.
Fig. 8 is a schematic configuration diagram of an embodiment of the acquisition terminal for capacity sharing according to the present invention. As shown in fig. 8, the execution terminal 20 of the present embodiment includes: the charging system comprises a charging request acquisition module 21, a communication module 22, a control module 23 and a charging facility data acquisition module 24.
The charging request obtaining module 21 is configured to: acquiring a charging request of a charging facility corresponding to the collecting and executing terminal; the communication module 22 is configured to: uploading the charging request to an intermediate node corresponding to the terminal group where the collecting and executing terminal is located, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed; the control module 23 is configured to: judging whether charging is allowed according to the charging instruction, if so, unlocking the charging facility, and controlling the charging facility to perform charging service by using available power; the charging facility data collection module 24 is configured to: collecting the working state data of the corresponding charging facility of the collecting and executing terminal, and uploading the data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located through the communication module 22; the operational status data of the charging facility includes: the collecting and executing terminal corresponds to the current charging power, the charged time and the like of the charging facility.
The adoption terminal 20 obtains the charging request of the corresponding charging facility in the following two ways: the adoption terminal 20 monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or the terminal 20 receives the charging request transmitted from the corresponding charging facility.
In the present application, the capacity sharing system is divided into modules and units only for better understanding of the functions related to the technical solution of the present invention, and in practice, the functions corresponding to these modules may be loaded and executed by a single hardware.
Based on the same technical concept as the capacity sharing system, the present invention also provides several embodiments of capacity sharing methods, which are described below with reference to fig. 9-12.
Fig. 9 is a schematic diagram of the main steps of a first embodiment of the capacity sharing method of the present invention. As shown in FIG. 9, the present embodiment includes steps A1-A6:
in step a1, the collection and testing terminal collects the electricity consumption data on the corresponding power distribution equipment, and uploads the electricity consumption data to the intermediate node corresponding to the terminal group where the collection and testing terminal is located. The electricity consumption data includes: and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal.
In step a2, the collecting and executing terminal obtains the charging request of the corresponding charging facility, and uploads the charging request to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located. The charging request is a charging request of the corresponding charging facility acquired by the acquiring terminal.
In step a3, the intermediate node sends a charging instruction to the execution terminal corresponding to the charging request according to the electricity consumption data. Wherein, the charging instruction contains whether to allow charging and available power information under the condition of allowing charging. The method specifically comprises the following steps of A31-A32:
in step a31, the intermediate node updates capacity allocation data according to the power consumption data, that is, calculates a first remaining power of the power distribution equipment according to the total rated power and the total actually used power of the power distribution equipment corresponding to the collection and measurement terminal, and updates the capacity allocation data; the capacity allocation data includes at least: a first remaining power of each power distribution device in the power distribution system.
In step a32, the capacity allocation data is queried, a charging command is generated according to the query result, and the charging command is sent to the execution terminal corresponding to the charging request. The steps further specifically include steps a321-a 324:
in step a321, according to the capacity distribution data, the first remaining power of each level of power distribution equipment at the front end of the electrical branch where the charging facility corresponding to the charging request is located is queried, and the minimum value of the first remaining power is taken.
In step a322, a charging policy preset in the intermediate node is obtained, or the charging policy is obtained through the server.
Wherein the charging strategy comprises:
and judging whether the minimum value of the first residual power is greater than or equal to a preset minimum charging power and smaller than the rated power of the charging facility, if so, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility.
Judging whether the minimum value of the first residual power is larger than the rated power or not, if so, allowing charging, and taking the rated power as the available power of the charging facility;
and judging whether the minimum value of the first residual power is smaller than a preset minimum charging power value or not, if so, rejecting charging, or reducing the available power of one or more charging facilities in a charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
In step a323, distributing available power to a charging facility corresponding to the charging request according to the acquired charging policy, and further generating a charging instruction; wherein the allocated available power is guaranteed to be less than or equal to a minimum value of the first remaining power.
In step a324, the charging instruction is sent to the execution terminal corresponding to the charging request.
In step a4, the collecting and executing terminal determines whether to allow charging according to the charging instruction; and if the charging is allowed, unlocking the corresponding charging facility, and controlling the charging facility to perform the charging service at the specified available power.
In step a5, the intermediate node uploads charging service data to the server.
In step a6, the server determines the operating condition of the power distribution system according to the received charging service data.
It should be noted that: in the present embodiment, the step of "updating the capacity allocation data according to the electricity consumption data" is performed after the charging request is received (i.e., step a31), and in practical applications, the updating of the capacity allocation data may be performed every time the electricity consumption data is received, that is, may be performed between steps a1 and a 2.
Fig. 10 is a schematic diagram of the main steps of the second embodiment of the capacity sharing method of the present invention. As shown in FIG. 10, the present embodiment includes steps B1-B9:
in step B1, the collection and testing terminal collects the electricity consumption data on the corresponding power distribution equipment, and uploads the electricity consumption data to the intermediate node corresponding to the terminal group where the collection and testing terminal is located. Wherein, the power consumption data includes: and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal.
In step B2, the intermediate node updates the capacity allocation data according to the power consumption data, that is, calculates a first remaining power of the power distribution equipment according to the total rated power and the total actually used power of the power distribution equipment corresponding to the sampling and testing terminal, and updates the capacity allocation data; the capacity allocation data includes at least: a first remaining power of each power distribution device in the power distribution system.
In step B3, the collecting and executing terminal collects the working status data of the corresponding charging facility and uploads the data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located. Wherein, the charging facility operating condition data includes: and acquiring the current charging power, the charged time and the like of the charging facility corresponding to the terminal.
In step B4, the intermediate node checks the capacity allocation data based on the charging facility operating status data. The method specifically comprises the following steps B41-B42:
step B41, calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the charging facility is located corresponding to the data;
and step B42, verifying whether the corresponding first residual power is correct or not based on the second residual power.
In step B5, the execution terminal obtains the charging request of the corresponding charging facility and uploads the charging request to the corresponding intermediate node. The charging request is a charging request of the corresponding charging facility acquired by the acquiring terminal.
In step B6, the intermediate node queries the capacity allocation data, generates a charging instruction according to the query result, and sends the charging instruction to the execution terminal corresponding to the charging request. Wherein, the charging instruction contains whether to allow charging and available power information under the condition of allowing charging. The steps specifically include steps B61-B64:
wherein, the steps B61, B62, B63, and B64 are respectively the same as the steps a321, a322, a323, and a324 in the first embodiment of the capacity sharing method, and are not repeated herein.
However, the preset charging strategy in this embodiment is different from the first embodiment of the capacity sharing method: in the case that the minimum value of the first remaining power is smaller than the preset minimum charging power value, charging may be rejected, or the available power of each charging facility in the charging state may be adjusted according to the charging facility operating state data, so as to allocate the available power to the charging facility corresponding to the charging request. It can be seen that, in this embodiment, the available power is adjusted according to the working state data of the charging facility, and the adjustment strategy is more reasonable.
In step B7, the execution terminal determines whether to allow charging according to the charging instruction; and if the charging is allowed, unlocking the corresponding charging facility, and controlling the charging facility to perform the charging service at the specified available power.
In step B8, the intermediate node uploads the charging service data to the server;
in step B9, the server determines the operating condition of the power distribution system according to the received charging service data.
Fig. 11 is a schematic diagram of the main steps of the third embodiment of the capacity sharing method of the present invention. As shown in FIG. 11, the present embodiment includes steps C1-C6:
in step C1, the collecting and executing terminal collects the working status data of the corresponding charging facility and uploads the data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located. The charging facility operating state data includes: the current charging power, the charged time and the like of the charging facility corresponding to the acquisition terminal which transmits the data.
In step C2, the execution terminal obtains the charging request of the corresponding charging facility and uploads the charging request to the corresponding intermediate node. Wherein, the charging request is the charging request of the corresponding charging facility acquired by the collecting and executing terminal.
In step C3, the intermediate node sends a charging instruction to the execution acquisition terminal corresponding to each charging request according to the charging facility operating state data; wherein, the charging instruction contains whether to allow charging and available power information under the condition of allowing charging. The method specifically comprises the following steps of C31-C32:
in step C31, the charging status data is updated according to the charging facility operating status data, that is, the second remaining power of each level of power distribution equipment is calculated according to the current charging power and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and the charging status data is updated according to the second remaining power and the charged time. The charge state data includes at least: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
In step C32, the charging status data is queried, and a charging command is generated according to the query result and sent to the corresponding execution terminal. The method specifically comprises the following steps C321-C324:
in step C321, according to the charging state data, second remaining powers of the power distribution devices at the front end of the electrical branch in which the charging facility corresponding to the charging request is located are queried, and a minimum value of the second remaining powers is taken.
In step C322, a charging policy preset in the intermediate node is acquired, or the charging policy is acquired through the server;
wherein, the charging strategy is:
and judging whether the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, if so, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility.
And judging whether the minimum value of the second residual power is greater than the rated power, if so, allowing charging, and taking the rated power as the available power of the charging facility.
And judging whether the minimum value of the second residual power is smaller than a preset minimum charging power value or not, if so, adjusting the available power of each charging facility in the charging state according to the working state data of the charging facility, and distributing the available power to the charging facility corresponding to the charging request.
In step C323, allocating available power to the charging facility corresponding to the charging request according to the acquired charging policy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
In step C324, the charging instruction is sent to the execution terminal corresponding to the charging request. The charging instructions include whether charging is allowed and available power information if charging is allowed.
In step C4, the execution terminal determines whether to allow charging according to the charging instruction; and if the charging is allowed, unlocking the corresponding charging facility, and controlling the charging facility to perform the charging service at the specified available power.
In step C5, the intermediate node generates charging service data according to the charging instruction, and sends the charging service data to the server;
in step C6, the server determines the operating condition of the power distribution system according to the received charging service data.
It should be noted that: in the present embodiment, the step of "updating the charging state data according to the charging facility operating state data" is performed after the charging request is received (i.e., in step C31), and in practical applications, the updating of the charging state data may be performed once every time the charging facility operating state data is received, that is, may be performed between steps C1 and C2.
Fig. 12 is a schematic diagram of the main steps of a fourth embodiment of the capacity sharing method of the present invention. As shown in FIG. 12, the present embodiment includes steps D1-D9:
in step D1, the collection and execution terminal collects the operating status data of the corresponding charging facility and uploads the data to the corresponding intermediate node.
Wherein, the charging facility operating condition data includes: the current charging power, the charged time and the like of the charging facility corresponding to the acquisition terminal which transmits the data.
In step D2, the intermediate node updates the charging state data according to the charging facility operating state data, that is, calculates a second remaining power of each level of power distribution equipment according to the current charging power and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updates the charging state data according to the second remaining power and the charged time. The charge state data includes at least: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
In step D3, the collection and testing terminal collects the electricity consumption data of the corresponding power distribution equipment and uploads the electricity consumption data to the corresponding intermediate node. The electricity consumption data includes: and acquiring and measuring the actual total power used by the power distribution equipment corresponding to the terminal.
In step D4, the intermediate node checks the charging status data according to the power consumption data. The method specifically comprises the following steps of D41-D42:
in step D41, a first remaining power of the power distribution equipment is calculated according to the total rated power and the total actually used power of the power distribution equipment corresponding to the sampling terminal.
In step D42, it is verified whether the corresponding second remaining power is correct based on the first remaining power.
In step D5, the execution terminal obtains a charging request of a corresponding charging facility, and uploads the charging request to a corresponding intermediate node; wherein, the charging request is the charging request of the corresponding charging facility acquired by the collecting and executing terminal.
In step D6, the intermediate node queries the charging status data, generates a charging instruction according to the query result, and sends the charging instruction to the corresponding execution terminal; wherein, the charging instruction contains whether to allow charging and available power information under the condition of allowing charging. The steps specifically include steps D61-D64:
the steps D61-D64 are respectively the same as the steps C321-C324 in the third embodiment of the capacity sharing method, and are not repeated here.
In step D7, the execution terminal determines whether to allow charging according to the charging instruction; and if the charging is allowed, unlocking the corresponding charging facility, and controlling the charging facility to perform the charging service at the specified available power.
In step D8, the intermediate node uploads the charging service data to the server.
In step D9, the server determines the operating condition of the power distribution system according to the received charging service data.
In this embodiment, the working state data of the charging facility includes: current charging power, charged time of the charging facility, etc. The adoption terminal obtains the charging request of the corresponding charging facility in the following two ways: the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or the adoption terminal receives the charging request sent by the corresponding charging facility.
Although the foregoing embodiments of the capacity sharing method in the first to the fourth embodiments have been described in terms of the foregoing sequence, those skilled in the art will understand that, in order to achieve the effect of the present embodiment, different steps need not be executed in such a sequence, and may be executed simultaneously (in parallel) or in an inverse sequence, and these simple changes are all within the protection scope of the present invention.
The invention also provides an embodiment of a non-centrally controlled capacity sharing method, which limits the power of each charging facility in a specific area according to the power utilization capacity of the specific area so as to ensure that the power utilization capacity of the specific area cannot be exceeded when all the charging facilities in the area work simultaneously. The method does not need an intermediate node and a server for unified control, and can set the rated power of each charging facility to a smaller value in advance according to the capacity and load condition of the power distribution system so as to ensure that all the charging facilities work simultaneously and do not exceed the total capacity.
Based on the above capacity sharing method and non-centrally controlled capacity sharing method, the present invention also proposes an embodiment of a storage device, in which a program is stored, the program being adapted to be loaded and executed by a processor to implement the above capacity sharing method or the non-centrally controlled capacity sharing method.
Further, based on the above capacity sharing method and the non-centrally controlled capacity sharing method, the present invention also provides a processing device comprising a processor and a storage device. Wherein the processor is adapted to execute a program; the storage device is adapted to store the program; the program is adapted to be loaded and executed by a processor to implement the capacity sharing method described above or a non-centrally controlled capacity sharing method.
Those of skill in the art will appreciate that the method steps of the examples described in connection with the embodiments disclosed herein may be embodied in electronic hardware, computer software, or combinations of both, and that the components and steps of the examples have been described above generally in terms of their functionality in order to clearly illustrate the interchangeability of electronic hardware and software. Whether such functionality is implemented as electronic hardware or software depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
So far, the technical solutions of the present invention have been described in connection with the preferred embodiments shown in the drawings, but it is easily understood by those skilled in the art that the scope of the present invention is obviously not limited to these specific embodiments. Equivalent changes or substitutions of related technical features can be made by those skilled in the art without departing from the principle of the invention, and the technical scheme after the changes or substitutions can fall into the protection scope of the invention.

Claims (45)

1. An intermediate node for capacity sharing, the intermediate node comprising: the charging system comprises a power consumption data receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the power consumption data receiving module is configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: generating a charging instruction according to the electricity utilization data, and sending the charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: uploading charging service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the charging control module includes an instruction generation unit that includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where the charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
the power allocation subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
2. The intermediate node for capacity sharing of claim 1, wherein the charging control module comprises: the device comprises a data updating unit and an instruction sending unit;
the data update unit is configured to: updating capacity allocation data according to the power utilization data;
the instruction generation unit is configured to: after receiving the charging request, inquiring the capacity distribution data, and generating the charging instruction according to an inquiry result;
the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
3. The intermediate node for capacity sharing of claim 2, wherein the electricity usage data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
correspondingly, the data updating unit is specifically configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data;
wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
4. The intermediate node for capacity sharing of claim 3, wherein the charging policy comprises:
when the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility;
when the minimum value of the first residual power is larger than the rated power, the charging is allowed, and the rated power is used as the available power of the charging facility.
5. The intermediate node for capacity sharing of claim 4, wherein the charging policy further comprises:
rejecting charging when the minimum value of the first remaining power is less than the preset minimum charging power value, or
And reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
6. The intermediate node for capacity sharing according to claim 4, wherein the intermediate node further comprises: a charging state receiving module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
accordingly, the charging control module further comprises:
a verification unit configured to: calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the corresponding charging facility is located; verifying whether the corresponding first remaining power is correct based on the second remaining power.
7. The intermediate node for capacity sharing of claim 6, wherein the charging policy further comprises:
rejecting charging when the minimum value of the first remaining power is less than the preset minimum charging power value, or
And adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
8. Intermediate node for capacity sharing according to any of claims 1-7, characterized in that the charging service data comprises at least: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
9. The intermediate node for capacity sharing of any one of claims 1-7, wherein the charging facility comprises: a direct current charging pile and/or an alternating current charging pile;
the server is arranged at the cloud end, and the server and the intermediate node are communicated through a wired network or a wireless network; the intermediate node and the acquisition and test terminal and the acquisition and execution terminal in the corresponding terminal group are communicated through a wired network, a wireless network or a power line carrier.
10. An intermediate node for capacity sharing, the intermediate node comprising: the charging system comprises a charging state receiving module, a charging request receiving module, a charging control module and a service data uploading module;
the charge status receiving module is configured to: receiving charging facility working state data uploaded by each acquisition and execution terminal in a corresponding terminal group;
the charging request receiving module is configured to: receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
the charging control module is configured to: according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
the service data uploading module is configured to: generating service data according to the charging instruction, and sending the service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the charging control module includes an instruction generation unit that includes: selecting a subunit, a charging strategy acquisition subunit and a power distribution subunit;
the selecting subunit is configured to: according to the charging state data, second residual power of each level of power distribution equipment at the front end of the electric branch where the charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
the charging policy acquisition subunit is configured to: acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
the power distribution subunit is configured to: distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
11. The intermediate node for capacity sharing of claim 10, wherein the charging control module comprises: the device comprises a data updating unit and an instruction sending unit;
the data update unit is configured to: updating charging state data according to the charging facility working state data;
the instruction generation unit is configured to: after receiving the charging request, inquiring the charging state data, and generating the charging instruction according to an inquiry result;
the instruction transmitting unit is configured to: and sending the charging instruction to a collection and execution terminal corresponding to the charging request.
12. The intermediate node for capacity sharing of claim 11, wherein the charging facility operating state data comprises: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
correspondingly, the data updating unit is specifically configured to:
calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time;
wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
13. The intermediate node for capacity sharing of claim 12, wherein the charging policy comprises:
when the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility;
when the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility;
and when the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in a charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
14. The intermediate node for capacity sharing according to claim 13, wherein the intermediate node further comprises:
an electricity consumption data receiving module configured to: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the charging control module further comprises:
a verification unit configured to: calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal; verifying whether the corresponding second remaining power is correct based on the first remaining power.
15. A pick-and-execute terminal for capacity sharing, the pick-and-execute terminal comprising: the charging system comprises a charging request acquisition module, a communication module and a control module;
the charging request acquisition module is configured to: acquiring a charging request of a charging facility corresponding to the collecting and executing terminal;
the communication module is configured to: uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the control module is configured to: controlling the charging facility to perform charging service by using the available power according to the charging instruction;
wherein the intermediate node employs the intermediate node for capacity sharing of any one of claims 1 to 14.
16. The adoption terminal for capacity sharing according to claim 15, wherein the control module is specifically configured to:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
17. The acquisition terminal for capacity sharing according to claim 16, wherein the acquisition terminal further comprises: a charging facility data acquisition module;
the charging facility data acquisition module is configured to: collecting working state data of a charging facility corresponding to the collecting and executing terminal, and uploading the working state data to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located through the communication module;
wherein the operating state data of the charging facility at least comprises: and the acquisition terminal corresponds to the current charging power and the charged time of the charging facility.
18. The adoption terminal for capacity sharing according to any one of claims 15-17, characterized in that the adoption terminal obtains the charging request of the corresponding charging facility by:
the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or,
and the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
19. The adoption terminal for capacity sharing according to any one of claims 15-17, wherein the adoption terminal and the corresponding charging facility communicate with each other through one of WIFI, bluetooth, Zigbee, NBIoT, power carrier or fieldbus.
20. A capacity sharing system for use in a power distribution system including at least one stage of power distribution equipment, the power distribution equipment having a plurality of charging facilities connected thereto, and a sum of rated powers of the plurality of charging facilities being greater than a power available to the charging facilities from the power distribution equipment, wherein the capacity sharing system comprises: at least one terminal group, an intermediate node for capacity sharing according to any one of claims 1-9 or 10-14 in one-to-one correspondence with the terminal group, and a server;
the terminal grouping includes: at least one sampling terminal, at least one sampling terminal for capacity sharing according to any one of claims 15-19;
the acquisition and testing terminal is configured as follows: collecting power consumption data on corresponding power distribution equipment, and uploading the power consumption data to the intermediate nodes corresponding to the terminal group where the collecting and testing terminal is located;
the adoption terminal is configured to: acquiring a charging request corresponding to a charging facility, and uploading the charging request to the intermediate node corresponding to the terminal group where the collecting and executing terminal is located;
the intermediate node is configured to: receiving the power utilization data uploaded by the acquisition and testing terminals and the charging request uploaded by the acquisition and execution terminals in the corresponding terminal groups, and sending a charging instruction to the acquisition and execution terminals corresponding to the charging request according to the power utilization data; uploading charging service data to the server;
the server is configured to: judging the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
21. A power distribution system comprising at least one stage of power distribution equipment, further comprising the capacity sharing system of claim 20, wherein the power distribution equipment is connectable to a plurality of charging facilities.
22. The power distribution system of claim 21, wherein the sum of the power ratings of the plurality of charging facilities is greater than the power available to the charging facility from the power distribution device.
23. A method of capacity sharing, comprising the steps of:
the intermediate node receives power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
sending a charging instruction to the collecting and executing terminal corresponding to each charging request according to the power utilization data;
uploading charging service data to a server;
wherein,
the terminal grouping includes: the system comprises at least one collecting and testing terminal and at least one collecting and executing terminal;
the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the method further comprises the steps of inquiring capacity allocation data and generating the charging instruction according to an inquiry result by the following steps:
according to the capacity distribution data, inquiring first residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located, and taking the minimum value of the first residual power;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through a server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the first remaining power.
24. The capacity sharing method according to claim 23,
updating capacity allocation data according to the power utilization data;
and after receiving the charging request, inquiring the capacity distribution data, generating the charging instruction according to an inquiry result, and sending the charging instruction to a collecting and executing terminal corresponding to the charging request.
25. The capacity sharing method according to claim 24, wherein the electricity usage data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the step of "updating the capacity allocation data according to the electricity consumption data" includes:
calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal, and updating the capacity distribution data;
wherein the capacity allocation data comprises at least: a first remaining power of each power distribution device in the power distribution system.
26. The capacity sharing method of claim 25, wherein the charging policy comprises:
if the minimum value of the first residual power is greater than or equal to a preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the first residual power as the available power of the charging facility;
and if the minimum value of the first residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility.
27. The capacity sharing method of claim 26, wherein the charging policy further comprises:
if the minimum value of the first residual power is smaller than the preset minimum charging power value, the charging is refused, or
And reducing the available power of one or more charging facilities in the charging state, so as to distribute the available power for the charging facility corresponding to the charging request.
28. The capacity sharing method according to claim 26, wherein the method further comprises:
receiving charging facility working state data uploaded by each collecting and executing terminal in a corresponding terminal group, wherein the charging facility working state data at least comprises: the current charging power and the charged time of the charging facility corresponding to the collecting and executing terminal;
calculating second residual power of each level of power distribution equipment according to the working state data of the charging facility and the total rated power of each level of power distribution equipment at the front end of the electrical branch where the charging facility is located corresponding to the data;
verifying whether the corresponding first remaining power is correct based on the second remaining power.
29. The capacity sharing method of claim 28, wherein the charging policy further comprises:
if the minimum value of the first residual power is smaller than the preset minimum charging power value, the charging is refused, or
And adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
30. The capacity sharing method according to any one of claims 23 to 29, wherein the charging service data comprises at least: the charging request information received in the terminal grouping corresponding to the intermediate node, and the available power, the terminal grouping equipment information and/or the electricity utilization data which are distributed correspondingly.
31. The capacity sharing method according to any one of claims 23 to 29, wherein the charging facility includes: direct current charging pile and/or alternating current charging pile.
32. The capacity sharing method according to any one of claims 23 to 29, wherein the server is disposed in a cloud, and the server and the intermediate node communicate with each other through a wired network or a wireless network; the intermediate node communicates with the acquisition and test terminals and the acquisition and test terminals in the corresponding terminal groups through a wired network, a wireless network or a power line carrier.
33. A method of capacity sharing, comprising the steps of:
the intermediate node receives the charging facility working state data uploaded by each acquisition and execution terminal in the corresponding terminal group;
receiving one or more charging requests from each executing terminal in the corresponding terminal group; the charging request is a charging request of a corresponding charging facility acquired by the collecting and executing terminal;
according to the charging facility working state data, sending a charging instruction to the collecting and executing terminal corresponding to each charging request;
generating charging service data according to the charging instruction, and sending the charging service data to a server;
wherein the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
the method also comprises the following steps of inquiring the charging state data and generating the charging instruction according to the inquiring result:
according to the charging state data, second residual power of each level of power distribution equipment at the front end of an electrical branch where a charging facility corresponding to the charging request is located is inquired, and the minimum value of the second residual power is taken;
acquiring a preset charging strategy in the intermediate node, or acquiring the charging strategy through the server;
distributing available power for the charging facility corresponding to the charging request according to the obtained charging strategy, and further generating the charging instruction; wherein the allocated available power is less than or equal to the minimum value of the second remaining power.
34. The capacity sharing method of claim 33,
updating charging state data according to the charging facility working state data;
and after receiving the charging request, inquiring the charging state data, generating the charging instruction according to an inquiry result, and sending the charging instruction to the corresponding collecting and executing terminal.
35. The capacity sharing method of claim 34, wherein the charging facility operating status data comprises: sending the current charging power and the charged time of the charging facility corresponding to the data acquisition and execution terminal;
accordingly, the step of "updating the charging status data according to the charging facility operating status data" includes:
calculating second residual power of each level of distribution equipment according to the current charging power and the total rated power of each level of distribution equipment at the front end of the electrical branch where the corresponding charging facility is located, and updating the charging state data according to the second residual power and the charged time;
wherein the charge state data at least comprises: the current charging power, the charged time, and a second remaining power for each power distribution device for each charging facility in a charging state.
36. The capacity sharing method of claim 35, wherein the charging policy comprises:
if the minimum value of the second residual power is greater than or equal to the preset minimum charging power and is less than the rated power of the charging facility, allowing charging, and taking the minimum value of the second residual power as the available power of the charging facility;
if the minimum value of the second residual power is larger than the rated power, allowing charging, and taking the rated power as the available power of the charging facility;
and if the minimum value of the second residual power is smaller than the preset minimum charging power value, adjusting the available power of each charging facility in the charging state according to the charging facility working state data, so as to distribute the available power to the charging facility corresponding to the charging request.
37. The capacity sharing method of claim 36, wherein the method further comprises: receiving power consumption data of the power distribution equipment uploaded by each acquisition and test terminal in the corresponding terminal group; wherein the electricity consumption data comprises: the actual total power of the power distribution equipment corresponding to the mining and testing terminal;
accordingly, the number of the first and second electrodes,
calculating first residual power of the power distribution equipment according to the total rated power and the actual total power of the power distribution equipment corresponding to the acquisition and measurement terminal;
verifying whether the corresponding second remaining power is correct based on the first remaining power.
38. A method of capacity sharing, comprising the steps of:
the collecting and executing terminal obtains a charging request corresponding to a charging facility;
uploading the charging request to an intermediate node corresponding to the terminal group, and receiving a charging instruction returned by the intermediate node; the charging instruction comprises whether charging is allowed or not and available power information under the condition that charging is allowed;
controlling the charging facility to perform charging service by using the available power according to the charging instruction;
wherein the intermediate node employs the intermediate node for capacity sharing of any one of claims 1 to 14.
39. The capacity sharing method of claim 38, wherein controlling the charging facility to perform charging services at the available power according to the charging instruction comprises:
judging whether charging is allowed or not according to the charging instruction; and if the charging is allowed, unlocking the charging facility, and controlling the charging facility to perform charging service by using the available power.
40. The capacity sharing method according to claim 39, further comprising, after controlling the charging facility to perform charging service with the available power according to the charging instruction:
collecting the working state data of the charging facility and uploading the data to the intermediate node;
wherein the operating state data of the charging facility at least comprises: current charging power, charged time of the charging facility.
41. The capacity sharing method according to any one of claims 38 to 40, wherein the adoption terminal acquires the charging request of the corresponding charging facility by:
the collecting and receiving terminal monitors the output state of the corresponding charging facility and determines whether the charging facility needs to start charging according to the output state; or,
and the collecting and executing terminal receives the charging request sent by the corresponding charging facility.
42. The capacity sharing method according to any one of claims 38 to 40, wherein the execution terminals communicate with the corresponding charging facilities via one of WIFI, Bluetooth, Zigbee, NBIoT, power carrier or field bus.
43. A capacity sharing method applied to the capacity sharing system according to claim 20, the method comprising the steps of:
the method comprises the steps that a collection and test terminal collects electricity utilization data on corresponding power distribution equipment and uploads the electricity utilization data to an intermediate node corresponding to a terminal group where the collection and test terminal is located;
acquiring a charging request of a corresponding charging facility by a collecting and executing terminal, and uploading the charging request to an intermediate node corresponding to a terminal group where the collecting and executing terminal is located;
the intermediate node sends a charging instruction to a collection execution terminal corresponding to the charging request according to the electricity utilization data and the charging request;
the intermediate node generates charging service data and uploads the charging service data to the server;
the server judges the operation state of the power distribution system according to the charging service data;
wherein the charging instruction includes whether charging is allowed or not and available power information in case of allowing charging.
44. A storage device having a program stored therein, the program being adapted to be loaded and executed by a processor to implement the capacity sharing method of any of claims 23-32 or 33-37 or 38-42 or 43.
45. A processing device, comprising:
a processor adapted to execute a program; and
a storage device adapted to store the program;
wherein the program is adapted to be loaded and executed by a processor to implement the capacity sharing method of any of claims 23-32 or 33-37 or 38-42 or 43.
CN201810670355.XA 2018-06-26 2018-06-26 Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment Active CN108832682B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810670355.XA CN108832682B (en) 2018-06-26 2018-06-26 Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810670355.XA CN108832682B (en) 2018-06-26 2018-06-26 Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment

Publications (2)

Publication Number Publication Date
CN108832682A CN108832682A (en) 2018-11-16
CN108832682B true CN108832682B (en) 2021-10-15

Family

ID=64138690

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810670355.XA Active CN108832682B (en) 2018-06-26 2018-06-26 Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment

Country Status (1)

Country Link
CN (1) CN108832682B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102020205885A1 (en) * 2020-02-26 2021-08-26 Siemens Aktiengesellschaft Electric charging infrastructure for mobile energy storage and methods for operating an electric charging infrastructure
CN115817254A (en) * 2021-09-17 2023-03-21 台达电子企业管理(上海)有限公司 Charging pile cluster power sharing control method, system and device

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010187453A (en) * 2009-02-11 2010-08-26 Chubu Electric Power Co Inc Charging system for collective housing, and charging control device
CN102386646A (en) * 2010-08-30 2012-03-21 索尼公司 Information processing apparatus, information processing method, information processing system, and transportation mean
CN102655335A (en) * 2012-02-24 2012-09-05 东北大学秦皇岛分校 Charging management system and method of district electric automobile based on queue management
CN103391208A (en) * 2012-05-10 2013-11-13 北京基业达电气有限公司 Electric vehicle charging station metropolitan area network management system
CN105337331A (en) * 2014-08-12 2016-02-17 青岛特锐德电气股份有限公司 Electromobile group charging method and system
CN105539176A (en) * 2011-04-27 2016-05-04 电动车智能电源 ELECTRIC VEHICLE CLUSTERED CHARGE DISTRIBUTION AND PRIORITIZATION METHOD and SYSTEM
CN105610218A (en) * 2016-01-22 2016-05-25 石家庄科林电气股份有限公司 Coordinated control method for intelligent charging of electromobile
CN105703427A (en) * 2016-03-03 2016-06-22 北京新能源汽车股份有限公司 Charging pile power consumption capacity distribution system and control method thereof
CN106655231A (en) * 2016-12-26 2017-05-10 上海蔚来汽车有限公司 System and method for dispatching charging facilities
CN106956610A (en) * 2017-04-01 2017-07-18 江苏万帮德和新能源科技有限公司 One kind charging pile group Poewr control method and device
CN107528316A (en) * 2017-08-23 2017-12-29 江苏中科瀚星数据科技有限公司 A kind of charging pile intelligent power distribution method under taiwan area transformer capacity confined condition
CN107521356A (en) * 2016-06-17 2017-12-29 上海悦充网络科技有限公司 Charging management system and its management method for electric automobile
CN107681672A (en) * 2017-11-15 2018-02-09 清华大学 The interactive approach of charging pile interactive terminal and charging pile access power network
CN107994654A (en) * 2017-12-29 2018-05-04 长园深瑞继保自动化有限公司 Charging pile clustered control adaptive tracking control method
CN108058611A (en) * 2017-12-19 2018-05-22 广州汇图计算机信息技术有限公司 A kind of electric power management method, device and the processing terminal of new energy charging yard

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9637017B2 (en) * 2013-10-25 2017-05-02 Korea Institute Of Energy Research Power-sharing charging system, charging device, and method for controlling the same
WO2015084385A1 (en) * 2013-12-06 2015-06-11 Schneider Electric USA, Inc. Branch energy management for multiple evses
US9770994B2 (en) * 2014-06-06 2017-09-26 Control Module, Inc. Multiple EVSE installation with power sharing system for Evse pairs sharing a circuit breaker

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010187453A (en) * 2009-02-11 2010-08-26 Chubu Electric Power Co Inc Charging system for collective housing, and charging control device
CN102386646A (en) * 2010-08-30 2012-03-21 索尼公司 Information processing apparatus, information processing method, information processing system, and transportation mean
CN105539176A (en) * 2011-04-27 2016-05-04 电动车智能电源 ELECTRIC VEHICLE CLUSTERED CHARGE DISTRIBUTION AND PRIORITIZATION METHOD and SYSTEM
CN102655335A (en) * 2012-02-24 2012-09-05 东北大学秦皇岛分校 Charging management system and method of district electric automobile based on queue management
CN103391208A (en) * 2012-05-10 2013-11-13 北京基业达电气有限公司 Electric vehicle charging station metropolitan area network management system
CN105337331A (en) * 2014-08-12 2016-02-17 青岛特锐德电气股份有限公司 Electromobile group charging method and system
CN105610218A (en) * 2016-01-22 2016-05-25 石家庄科林电气股份有限公司 Coordinated control method for intelligent charging of electromobile
CN105703427A (en) * 2016-03-03 2016-06-22 北京新能源汽车股份有限公司 Charging pile power consumption capacity distribution system and control method thereof
CN107521356A (en) * 2016-06-17 2017-12-29 上海悦充网络科技有限公司 Charging management system and its management method for electric automobile
CN106655231A (en) * 2016-12-26 2017-05-10 上海蔚来汽车有限公司 System and method for dispatching charging facilities
CN106956610A (en) * 2017-04-01 2017-07-18 江苏万帮德和新能源科技有限公司 One kind charging pile group Poewr control method and device
CN107528316A (en) * 2017-08-23 2017-12-29 江苏中科瀚星数据科技有限公司 A kind of charging pile intelligent power distribution method under taiwan area transformer capacity confined condition
CN107681672A (en) * 2017-11-15 2018-02-09 清华大学 The interactive approach of charging pile interactive terminal and charging pile access power network
CN108058611A (en) * 2017-12-19 2018-05-22 广州汇图计算机信息技术有限公司 A kind of electric power management method, device and the processing terminal of new energy charging yard
CN107994654A (en) * 2017-12-29 2018-05-04 长园深瑞继保自动化有限公司 Charging pile clustered control adaptive tracking control method

Also Published As

Publication number Publication date
CN108832682A (en) 2018-11-16

Similar Documents

Publication Publication Date Title
CN108879831B (en) Power distribution system, capacity sharing system, master station, slave station, method and equipment
CN108923479B (en) Power distribution system, capacity sharing system, server, terminal, method and equipment
JP7455531B2 (en) Charging control device and its method, program; Charging management device, its method, program
US10078315B2 (en) Collaborative balancing of renewable energy overproduction with electricity-heat coupling and electric and thermal storage for prosumer communities
US20130307466A1 (en) System and Method for Charging Car Batteries
KR102131275B1 (en) Method for supplying power of electric vehicle charging device
CN108674247A (en) Energy storage type freely links DC charging system
JP7213335B2 (en) POWER RECEIVING CONTROL METHOD OF POWER RECEIVING ELEMENT AND POWER RECEIVING CONTROL DEVICE
WO2017066790A1 (en) Adaptive charging algorithms for a network of electric vehicles
KR20090119832A (en) Scheduling and control in a power aggregation system for distributed electric resources
JP7377854B2 (en) Power reception control method for power storage element and power reception control device
US20140091753A1 (en) Gateway apparatus, method thereof and charge/discharge system
CN108832682B (en) Power distribution system, capacity sharing system, intermediate node, terminal, method and equipment
US20230420941A1 (en) Aggregation platform for intelligent local energy management system
US11865942B2 (en) Electrical vehicle charging station with power management
WO2018147218A1 (en) Power supply system in which a plurality of storage batteries are remotely group-controlled and power supply method
CN209169969U (en) Distribution system, capacity shared system, main website and substation
EP2822140A1 (en) Method for power allocation and resource management system
Said et al. Advanced scheduling protocol for electric vehicle home charging with time-of-use pricing
CN208849476U (en) It distribution system, capacity shared system, intermediate node and adopts and holds terminal
JP2019165580A (en) Power system, controller, power management method, program, and power management server
US11747781B1 (en) Intelligent local energy management system at local mixed power generating sites for providing grid services
CN208849477U (en) It distribution system, capacity shared system, server and adopts and holds terminal
CN117022025B (en) Charging pile power balance distribution system and method thereof
KR102718910B1 (en) Multi-agent system-based microgrid operation optimization method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200917

Address after: Susong Road West and Shenzhen Road North, Hefei Economic and Technological Development Zone, Anhui Province

Applicant after: Weilai (Anhui) Holding Co., Ltd

Address before: 30 Floor of Yihe Building, No. 1 Kangle Plaza, Central, Hong Kong, China

Applicant before: NIO NEXTEV Ltd.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant