CN1088283A - 地下钻机的灌浆设备 - Google Patents

地下钻机的灌浆设备 Download PDF

Info

Publication number
CN1088283A
CN1088283A CN93108958A CN93108958A CN1088283A CN 1088283 A CN1088283 A CN 1088283A CN 93108958 A CN93108958 A CN 93108958A CN 93108958 A CN93108958 A CN 93108958A CN 1088283 A CN1088283 A CN 1088283A
Authority
CN
China
Prior art keywords
drilling rod
drill bit
perfusion channel
gravity
boring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN93108958A
Other languages
English (en)
Inventor
全镇模
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kencho Kobe Co Ltd
Original Assignee
Kencho Kobe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kencho Kobe Co Ltd filed Critical Kencho Kobe Co Ltd
Publication of CN1088283A publication Critical patent/CN1088283A/zh
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B3/00Rotary drilling
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/36Concrete or concrete-like piles cast in position ; Apparatus for making same making without use of mouldpipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

一种地下钻机的灌浆设备,它可以提高土木工程 基础施工的打桩工效。其钻杆及转盘装在钻机导向 架上,带螺旋桨片的重力式钻头与钻杆下端连接,钻 杆里的水泥乳浆灌注通道与重力式钻头里的灌注通 道相通,压启阀门在灌注通道的下端,通过灌注通道 可以由外向钻孔内灌注水泥乳浆。钻孔结束后,边提 升重力式钻头边灌注水泥乳浆。通过这种处理,可防 止孔壁坍塌而使其保持原状,水泥乳浆灌入孔底下的 原始土层后还可增大基底强度。

Description

本发明涉及一种地下钻机的灌浆设备和地下孔成形方法。
在土木工程的基础施工中,通常要对各种不同的地基进行钻孔桩(现场灌注桩)施工,或者插入预应力混凝土桩、H型梁桩或钢桩等,以便提高基底的承载能力。
采用传统施工方法进行上述基础的施工时,当钻孔通过含水层、圆石层或砾石层之类的地层时,通常会出现孔壁坍塌现象,这就带来了一个前面所提到的桩等无法插到孔底的问题。即使桩能够插到孔底,也还是会带来另一个问题,那就是在某些情况下,由于地基承载能力不足,插入的桩将发生下沉。
为了解决上述问题,在现场施工时,至今采用的是类似于打桩的施工方法,钴孔后将一根圆形铁管插到孔底,清除该铁管内壁上的泥土,然后往铁管里面灌注水泥浆,当水泥开始凝固时再用另一台吊车拔出该铁管。然而,这种施工方法十分复杂,包括钻孔、插入铁管、铁管内壁清理、灌注水泥浆和铁管拔出等工序,因此需要许多种设备。而且由于各种设备的复杂调配,所需的施工费也相当高。
本发明的目的在于提供一种地下钻机的灌浆设备,用以解决上述各种经常发生的问题。
本发明者已经研制出一种改良设备,使用这种设备进行上述施工时,可以很顺利地完成钻孔施工。本发明者已提交一份名为“地下钻机”的专利申请(日本国实用新型专利申请号:平3-109630)。实际上,只要在该地下钻机中附加一台灌浆设备就可达到上述目的。
在本发明的地下钻机的灌浆设备中,钻杆和使其转动的转盘安装在钻机车身的导向架上,带螺旋浆片的重力式钻头与钻杆下端连接,在钻杆和重力式钻头内都分别有用来灌注水泥乳浆或其他类同物的灌注通道,钻杆里的灌注通道与重力式钻头里的灌注通道相通,灌注通道的下端设有压启阀门。
根据本发明的一个最佳实施例中所示,地下钻机的灌浆设备包括一个安装在钻机导向架上的钻杆及使其转动的转盘;一个带螺旋浆片并与钻杆下端连接的重力式钻头,该重力式钻头顶部的六角榫头安装在钻杆底部的六角榫孔里,六角榫头用销钉固定在钻杆上;钻杆和重力式钻头内都分别有用来灌注水泥乳浆或其他类同物的灌注通道(钻杆里的灌注通道与重力式钻头里的灌注通道相通);以及灌注通道下端的压启阀门。通过灌注入通道可以由外向钻孔内灌注水泥乳浆或其他类同物。
本发明也给出了使用上述设备形成地下钻孔的方法,钻孔用重力式钻头进行,钻孔完成之后,应一边向钻孔内壁灌注水泥乳浆或其它类同物,一边提升重力式钻头,将水泥乳浆等涂到钻孔的内壁上。
按照本发明的地下钻机的灌浆设备和地下钻孔的形成方法,钻孔结束后,在提升重力式钻头时,应向钻孔内灌注水泥乳浆(并未限定用水泥乳浆,例如,还可以用膨润土浆),这样可以防止孔壁坍塌而使其保持原状。此外,水泥乳浆灌入孔底下的原始土层后还可增大基底强度。与此相应,插入桩的侧摩擦力也可增大,从而可以最大限度地减小桩的下沉。同时,与传统施工方法相比,钻孔工序大大简化,从而大幅度地降低了施工费。
图1是本发明总体结构的侧视图。
图2取自图1的A处,是放大的钻头纵剖面图。
图3是沿图2中B-B线所截取的横断面图。
图4是沿图2中C-C线所截取的横断面图。
图5为使用本发明设备灌注水泥浆一个例子的工作简图。
现在参照附图的实施例,介绍本发明。
钻杆3及带动其转动的转盘4安装在直立于钻机车身1前部的导向架2上,带螺旋浆片5的重力式钻头6上与钻杆3的下端连接。在本结构中,钻杆3底部为六角榫孔7,重力式钻头6的顶部为六角榫头8,六角榫头8安装在六角榫孔7中,六角榫头8用销钉9固定在钻杆3上。
更进一步讲,钻杆3的截面中心加工有压缩空气注入通道3′,通道3′的两侧有水泥乳浆灌注通道10和10′;在重力式钻头里也有灌注通道11和11′,它们分别与通道10和10′相通。因此,水泥乳浆可以通过通道下端的阀门12和12′喷出。从水泥搅拌机13接出的灌浆通道,通过转盘接到水泥乳浆灌注通道10和10′,然后再延伸到重力式钻头6下端的阀门12和12′,只有当通道11和11′中产生水泥乳浆灌注压力时,阀门才会打开。
在图1中,编号14是发电机,15是空气压缩机,16是钻孔。
使用本发明的上述设备时,转动重力式钻头6就可以钻成钻孔16。借助于螺旋桨片5和钻杆3,可以很容易地清除钻孔过程中产生的泥屑。用与上面所提到的设备的同样的钻孔方法,就可以将钻孔16钻得更深。
当钻孔16的孔壁土壤为含水层、圆石层或栎石层之类的土层时,重力式钻头的提升可能会造成孔壁的坍塌,故应在驱动重力式钻头6的同时,开动水泥搅拌机13,向通道10、10′、11和11′灌注水泥乳浆。灌注的水泥乳浆所产生的灌注压力可将阀门12和12′打开,水泥乳浆喷射到钻孔16的孔壁上。与此同时,旋转中的重力式钻头将水泥乳浆涂到孔壁上,形成了水泥孔壁,故能保持钻孔的原形,从而保证桩的顺利插入。由于在钻孔16中灌有水泥乳浆,因而使得插入桩四周的摩擦力增大,同时也使地层的强度提高,故可以阻止桩的下沉。
以上我们参照本发明地下钻机的灌浆设备的一个实施例对本发明做了具体说明。应当指出:在本发明范围内,可以对本发明进行各种更改和变动。例如至少在前面实施例的结构中,可以根据钻头的形状和尺寸来增减水泥乳浆灌注通道的数量和尺寸。
与传统施工方法相比,本发明可以大大简化打桩操作,同时可以大幅度地降低基础工程的造价。

Claims (3)

1、一种地下钻机的灌浆设备,该灌浆设备包括一个安装在钻机导向架上的钻杆及使其转动的转盘,一个与钻杆下端连接的带螺旋浆片的重力式钻头,钻杆和重力式钻头里的水泥乳浆或其它类似物的灌注通道,钻杆里的灌注通道分别与重力式钻头里的灌注通道相通,还包括灌注通道下端的压启阀门。
2、一种地下钻机的灌浆设备,它具有装在钻机导向架上的钻杆及使其转动的转盘和带螺旋浆片并与钻杆下端连接的重力式钻头,所说重力式钻头顶部的六角榫头安装在钻杆底部的六角榫孔里,六角榫头用销钉固定在钻杆上,在钻杆和重力式钻头内都分别有用来灌注水泥乳浆或其他类同物的灌注通道,钻杆里的灌注通道分别与重力式钻头里的灌主通道相通,灌注通道的下端有压启阀门,通过灌注通道可以由外向钻孔内灌注水泥乳浆或其他类同物。
3、一种利用地下钻机的灌浆设备形成地下钻孔的方法,该灌浆设备包括一个安装在钻机导向架上的钻杆及使其转动的转盘,一个带螺旋桨片并与钻杆下端连接的重力式钻头,重力式钻头顶部的六角榫头安装在钻杆底部的六角榫孔里,六角榫头用销钉固定在钻杆上,还包括钻杆和重力式钻头里的水泥乳浆或其他类同物的灌注通道,钻杆里的灌注通道与重力式钻头里的灌注通道相通,还有灌注通道下端的压启阀门,其中钻孔用所述的重力式钻头进行的,钻孔完成之后,一边向钻孔内壁灌注水泥乳浆或其他类同物,一边提升重力式钻头,将水泥乳浆或其它类同物涂到钻孔的内壁上。
CN93108958A 1992-12-10 1993-07-20 地下钻机的灌浆设备 Pending CN1088283A (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR23838/92 1992-12-10
KR1019920023838A KR940015148A (ko) 1992-12-10 1992-12-10 지하천공기의 시멘트소일(cement soil)장치

Publications (1)

Publication Number Publication Date
CN1088283A true CN1088283A (zh) 1994-06-22

Family

ID=19345164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN93108958A Pending CN1088283A (zh) 1992-12-10 1993-07-20 地下钻机的灌浆设备

Country Status (6)

Country Link
US (1) US5423636A (zh)
JP (1) JPH0791930B2 (zh)
KR (1) KR940015148A (zh)
CN (1) CN1088283A (zh)
AU (1) AU666017B2 (zh)
TW (1) TW226038B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101967826A (zh) * 2010-10-14 2011-02-09 李式仁 振捣插筋长螺旋风冷钻孔嵌岩成桩方法及设备
CN102301073A (zh) * 2009-02-09 2011-12-28 瓦萨拉股份公司 用于通过喷射灌浆来用于土壤固结中的潜孔锤钻的装置
CN103898897A (zh) * 2012-12-26 2014-07-02 株式会社不动堤土乐 挖掘搅拌轴的连接轴
CN108119067A (zh) * 2018-01-29 2018-06-05 上海广大基础工程有限公司 一种环保型灌浆钻具与保持架组合结构
CN118110838A (zh) * 2024-04-26 2024-05-31 哈尔滨市第一市政工程有限公司 一种市政工程建设用注浆管埋设装置

Families Citing this family (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0718665A (ja) * 1993-06-29 1995-01-20 Kenchiyou Kobe:Kk 地下穿孔機用のスクリューロッド
US6257803B1 (en) * 1998-07-23 2001-07-10 Mccabe Howard Wendell Three component chemical grout injector
NL1018702C2 (nl) * 2001-08-03 2003-02-04 Verstraeten Funderingstech Bv Werkwijze voor het aanbrengen van een fundatiepaal in de grond, alsmede een fundatiepaal en een oplanger voor deze werkwijze, en een grondverdringingsboor.
US20040182607A1 (en) * 2002-11-07 2004-09-23 Holte Ardis L. Method of forming concrete pilings using a reverse circulation drilling system
KR100497281B1 (ko) * 2004-06-05 2005-07-01 장성두 굴착 기능이 강화된 지반 개량용 교반 장치 및 이를 이용한 연약지반개량공법
US20080131211A1 (en) * 2004-07-13 2008-06-05 Nesmith Willie M Installation effort deep foudnation method
CN100376750C (zh) * 2004-11-26 2008-03-26 王平 高性能水泥土桩的施工方法
CN100386484C (zh) * 2005-07-07 2008-05-07 何世鸣 一种水泥土桩
US7555854B2 (en) 2006-11-30 2009-07-07 Mlt Soil Co., Ltd. Earth auger head and excavation method
TW201231764A (en) * 2011-01-26 2012-08-01 jian-xian Huang Construction method and apparatus of skirt pile
JP2013002039A (ja) * 2011-06-13 2013-01-07 Kensho Co Ltd 削孔用エアハンマー装置
CN103061330B (zh) * 2013-01-25 2016-03-16 卢兴耐 X型搅拌钻机
CN103114806A (zh) * 2013-02-06 2013-05-22 上海中联重科桩工机械有限公司 旋挖钻机
CN103089145B (zh) * 2013-02-06 2016-02-03 上海中联重科桩工机械有限公司 旋挖钻机的潜孔锤动力头和旋挖钻机
CN105926626B (zh) * 2016-05-04 2017-12-15 北京建材地质工程公司 超长风动潜孔锤振动旋喷桩施工工艺
CN106481296A (zh) * 2016-09-30 2017-03-08 黑龙江省华岩桩工技术研发有限公司 钻孔压灌砼桩送风送水钻进装置及钻进方法
US11492774B2 (en) 2019-01-04 2022-11-08 Ojjo, Inc. Systems, methods and machines for driving screw anchors
CN113585981A (zh) * 2021-08-23 2021-11-02 中铁十五局集团第五工程有限公司 一种水泥土双向搅拌桩钻进切削装置及钻进方法
CN114250767A (zh) * 2022-02-09 2022-03-29 中建三局集团北京有限公司 一种基于固废利用的多轴压灌水泥土桩施工工艺

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3391544A (en) * 1966-12-05 1968-07-09 Intrusion Prepakt Inc Means and method of forming concrete piles
JPS5014803B1 (zh) * 1970-11-30 1975-05-30
US3793844A (en) * 1971-04-07 1974-02-26 Bolt Associates Inc System for increasing the load-bearing capacity of soil
US4016944A (en) * 1976-01-12 1977-04-12 Reed Tool Company Pneumatic hammer-auger earth boring apparatus
US4084648A (en) * 1976-02-12 1978-04-18 Kajima Corporation Process for the high-pressure grouting within the earth and apparatus adapted for carrying out same
JPS55113786A (en) * 1979-02-23 1980-09-02 Toyo Jozo Co Ltd Novel substance, nepranosin b or f and its preparation
JPS5523272A (en) * 1978-08-08 1980-02-19 Kunimitsu Yamada Method of boring
GB2042029B (en) * 1979-02-13 1982-11-17 Chuan Pao Chen P Method and apparatus for forming subterranean concrete piles
JPS58800B2 (ja) * 1979-03-08 1983-01-07 三和機材株式会社 接地圧調整装置つきハンマ掘削機
GB2062072B (en) * 1979-10-31 1984-01-04 Sanwa Kizai Co Ltd Ugered-in-place piles method of and apparatus for the construction of mixed or a
JPH0718164B2 (ja) * 1990-07-30 1995-03-01 敏男 榎 既製杭の埋設工法

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102301073A (zh) * 2009-02-09 2011-12-28 瓦萨拉股份公司 用于通过喷射灌浆来用于土壤固结中的潜孔锤钻的装置
CN101967826A (zh) * 2010-10-14 2011-02-09 李式仁 振捣插筋长螺旋风冷钻孔嵌岩成桩方法及设备
CN101967826B (zh) * 2010-10-14 2012-05-23 李式仁 振捣插筋长螺旋风冷钻孔嵌岩成桩方法及设备
CN103898897A (zh) * 2012-12-26 2014-07-02 株式会社不动堤土乐 挖掘搅拌轴的连接轴
CN103898897B (zh) * 2012-12-26 2015-04-22 株式会社不动堤土乐 挖掘搅拌轴的连接轴
CN108119067A (zh) * 2018-01-29 2018-06-05 上海广大基础工程有限公司 一种环保型灌浆钻具与保持架组合结构
CN108119067B (zh) * 2018-01-29 2024-06-11 上海广大基础工程有限公司 一种环保型灌浆钻具与保持架组合结构
CN118110838A (zh) * 2024-04-26 2024-05-31 哈尔滨市第一市政工程有限公司 一种市政工程建设用注浆管埋设装置

Also Published As

Publication number Publication date
US5423636A (en) 1995-06-13
JPH0791930B2 (ja) 1995-10-09
AU666017B2 (en) 1996-01-25
JPH06212870A (ja) 1994-08-02
AU4155993A (en) 1994-06-23
KR940015148A (ko) 1994-07-20
TW226038B (zh) 1994-07-01

Similar Documents

Publication Publication Date Title
CN1088283A (zh) 地下钻机的灌浆设备
CN1657711A (zh) 旋喷锚杆桩施工工艺
CN203452083U (zh) 旋扩桩成桩设备及进浆装置
CN105256795B (zh) 一种端承型螺纹芯组合桩及其施工设备和施工方法
CN106978807A (zh) 一种软土盾构掘进区穿越既有桥梁拔桩装置及施工方法
Brown Practical considerations in the selection and use of continuous flight auger and drilled displacement piles
CN1265062C (zh) 一种成桩的施工方法及工具
CN201395793Y (zh) 长螺旋高压喷射注浆搅拌成桩装置
SE9704292L (sv) Anordning för jordförstärkning, verktyg och metod
CN100485133C (zh) 塌陷区插筋高压旋喷扩盘桩成型方法
CN106013088A (zh) 高承载力钻孔植桩方法
CN101158159A (zh) 全程预引孔锤击入岩phc管桩施工工艺
CN206090565U (zh) 混凝土桩的施工设备
CN107700508A (zh) 一种型钢搅喷水泥土帷幕支护桩的施工方法
CN203080528U (zh) 钻喷一体化地基处理专用钻具组件
CN206570811U (zh) 软土盾构掘进区穿越既有桥梁拔桩装置
CN208294522U (zh) 一种富水砂卵石地层的导洞内截水帷幕
JP3596687B2 (ja) 既存基礎の耐震補強工法
CN2160679Y (zh) 螺旋沉管扩底注浆装置
CN2298338Y (zh) 粘土层大管棚施工用的钻具
CN108019211A (zh) 一种富水砂卵石地层的导洞内截水帷幕及其施工方法
GB2137678A (en) Method and apparatus for pile construction
CN101105032A (zh) 一种液压顶管成孔工艺及设备
CN216948247U (zh) 一种带异形螺旋锚的钢管土钉
JPS6229597B2 (zh)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C01 Deemed withdrawal of patent application (patent law 1993)
WD01 Invention patent application deemed withdrawn after publication