CN108817891A - The assembling equipment of bus handle - Google Patents

The assembling equipment of bus handle Download PDF

Info

Publication number
CN108817891A
CN108817891A CN201810684527.9A CN201810684527A CN108817891A CN 108817891 A CN108817891 A CN 108817891A CN 201810684527 A CN201810684527 A CN 201810684527A CN 108817891 A CN108817891 A CN 108817891A
Authority
CN
China
Prior art keywords
rope
sliding rail
machine table
rope band
blower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810684527.9A
Other languages
Chinese (zh)
Other versions
CN108817891B (en
Inventor
高飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Huiteng Intellectual Property Consulting Co., Ltd.
Original Assignee
高飞
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 高飞 filed Critical 高飞
Priority to CN201810684527.9A priority Critical patent/CN108817891B/en
Publication of CN108817891A publication Critical patent/CN108817891A/en
Application granted granted Critical
Publication of CN108817891B publication Critical patent/CN108817891B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/001Article feeders for assembling machines
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B60VEHICLES IN GENERAL
    • B60NSEATS SPECIALLY ADAPTED FOR VEHICLES; VEHICLE PASSENGER ACCOMMODATION NOT OTHERWISE PROVIDED FOR
    • B60N3/00Arrangements or adaptations of other passenger fittings, not otherwise provided for
    • B60N3/02Arrangements or adaptations of other passenger fittings, not otherwise provided for of hand grips or straps

Abstract

The present invention relates to bus handles to assemble field,In particular to the assembling equipment of bus handle,Including machine table and machine table one end is set and the unwinding device for unreeling rope band,It further include riding upon at the top of machine table and being located to dial rope device at unwinding device downstream,It is symmetricly set on the identical feeding device of two structures for dialling rope device both sides and positioned at the material conveying device dialled above rope device,The same side of two feeding devices is respectively arranged with riveting set and rivet charging gear,Riveting set is provided with blower device towards the front end for dialling rope device,The side of blower device is installed with the localization tool to put handle,Riveting set,Rivet charging gear and all feeding devices are respectively positioned on the top for dialling rope device,The present invention can replace the assembly work for being accomplished manually handle and rope band,Greatly improve the efficiency and quality of production.

Description

The assembling equipment of bus handle
Technical field
The present invention relates to bus handles to assemble field, in particular to the assembling equipment of bus handle.
Background technique
Bus is the daily vehicles often taken of people, it is one of the important vehicles in a city, it A large amount of personnel can be carried simultaneously to convey.Bus considers the maximization of conveying personnel, the meeting of internal seats Fewer, purpose gives people there are gap and stands, may be more crowded on bus for early evening peak, then some People can only stand in the car;So multiple rows of railing can be provided in bus, multiple handles can be housed on railing, these handles are used The steady of body can be kept by it in people stand, can guarantee passenger's during encountering bus and touching on the brake Safety.
Since present bus quantity is increasing, and with the use of time, handle can be worn, so needing The handle more renewed ensures maximum safety with this.The link that so these requirements, some producers assemble handle Due to so as to cause low output, being further unable to satisfy the demand in market using manually.
Summary of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide the assembling equipment of bus handle.
To solve the above problems, the present invention provides following technical scheme:The assembling equipment of bus handle, including machine table Unwinding device with machine table one end is arranged in and for unreeling rope band further includes riding upon at the top of machine table and being located to put Dialling rope device, being symmetricly set on the identical feeding device of two structures for dialling rope device both sides and be located at winding apparatus downstream The material conveying device above rope device is dialled, the same side of two feeding devices is respectively arranged with riveting set and rivet feed dress It sets, riveting set is provided with blower device towards the front end for dialling rope device, and the side of blower device is installed with to put handle Localization tool, riveting set, rivet charging gear and all feeding devices be respectively positioned on dial rope device top;
The material conveying device includes passing material sliding rail, hydraulic stem, guide holder and lead screw motor, passs material sliding rail and is erected at group rope device Top, guide holder, which movable can be mounted on, to be passed on material sliding rail, and the bottom of guide holder is arranged to be open, and installation in the opening There is Bidirectional-screw, is symmetrically arranged on Bidirectional-screw there are two sliding block, the bottom of two sliding blocks is separately installed with a clamping breast board, Lead screw motor is mounted on the top of guide holder and to drive Bidirectional-screw around own axis, and hydraulic stem, which is mounted on, passs material The one end of sliding rail far from rivet charging gear, the output rod of hydraulic stem are connect with guide holder.
Further, the blower device includes air blower, traveling sliding rail and rectangular box, and traveling sliding rail is erected at machine table Top, air blower movable can be mounted on traveling sliding rail by base, and rectangular box is open towards the front side for dialling rope device The back side of setting, rectangular box is connected to by metal tube with air blower, and rectangular box is located at the top of air blower, traveling sliding rail One end is provided with for driving movable first electric pole of base.
Further, the top of machine table movable can be arranged in by the second electric pole for the localization tool, through second Electric pole drive localization tool can be close to or far from the downstream of unwinding device at.
Beneficial effect:The assembling equipment of bus handle of the invention can replace the dress for being accomplished manually handle and rope band With work, the efficiency and quality of production are greatly improved.
Detailed description of the invention
Fig. 1 is schematic perspective view one of the invention;
Fig. 2 is the enlarged drawing in Fig. 1 at A;
Fig. 3 is the enlarged drawing in Fig. 1 at B;
Fig. 4 is schematic perspective view two of the invention;
Fig. 5 is the enlarged drawing in Fig. 4 at C;
Fig. 6 is the enlarged drawing in Fig. 4 at D;
Fig. 7 is the schematic perspective view of material conveying device in the present invention;
Fig. 8 is sectional perspective structural schematic diagram one of the invention;
Fig. 9 is sectional perspective structural schematic diagram two of the invention;
Figure 10 is sectional perspective structural schematic diagram three of the invention;
Figure 11 is the enlarged drawing in Figure 10 at E;
Figure 12 is sectional perspective structural schematic diagram four of the invention;
Description of symbols:Machine table 1, unwinding device 2 dial rope device 3, stir motor 3a, swing rod 3b, plectrum 3c, cross wind groove 3d, the second vacuum pump 3e, air-actuated jaw 3k, clamping plate 3m, feeding device 4 avoid cylinder 4a, horizontal slide rail 4b, thin cylinder 4c, Motor 4d, first U-shaped 4e, first vacuum pump 4f, contact block 4k are overturn, notch 4q, the first cylinder block 4m, material conveying device are riveted 5, guide holder 5a pass material sliding rail 5b, hydraulic stem 5c, Bidirectional-screw 5d, clamp breast board 5e, lead screw motor 5f, riveting set 7, riveting Cylinder 7a is met, briquetting 7b is riveted, rivet charging gear 8 avoids sliding rail 8a, reset cylinder 8b, feed cylinder 8c, feeding motor 8d is fed suction block 8e, third vacuum pump 8f, blower device 9, air blower 9a, traveling sliding rail 9b, rectangular box 9c, metal tube 9d, the One electric pole 9e, localization tool 10, the second electric pole 11, handle 12, rope band 13 splice shell 14, and conveyer belt 15 lifts cylinder 16.
Specific embodiment
With reference to the accompanying drawings of the specification and embodiment, specific embodiments of the present invention are described in further detail:
Referring to figs. 1 to the assembling equipment of bus handle shown in Figure 12, including machine table 1, setting in 1 one end of machine table and Rope device is dialled for unreeling the unwinding device 2 of rope band 13, riding upon 1 top of machine table and be located at 2 downstream of unwinding device 3, it is symmetricly set on and dials the identical feeding device 4 of two structures of 3 both sides of rope device, filled positioned at the material of passing dialled above rope device 3 Set 5.The same side of two feeding devices 4 is respectively arranged with riveting set 7 and rivet charging gear 8, and riveting set 7 is towards dialling The front end of rope device 3 is provided with blower device 9, and the side of blower device 9 is installed with to be controlled to the positioning for putting the positioning of handle 12 Tool 10, riveting set 7, rivet charging gear 8 and all feeding devices 4 are respectively positioned on the top for dialling rope device 3.
The feeding device 4 includes evacuation cylinder 4a, horizontal slide rail 4b, thin cylinder 4c and overturns motor 4d, laterally Sliding rail 4b is erected at the top of machine table 1, and the feed direction for extending perpendicularly to unwinding device 2 of horizontal slide rail 4b is lateral Be equipped on sliding rail 4b can therewith activity cooperation first U-shaped 4e, the opening of first U-shaped 4e is face-down, thin cylinder 4c is connect in the opening of first U-shaped 4e by the first cylinder block 4m axis, and overturning motor 4d is mounted on the top of first U-shaped 4e And to drive the first cylinder block 4m towards flip-flop movement outside the opening of first U-shaped 4e, evacuation cylinder 4a is mounted on transverse direction The output rod of the one end of sliding rail 4b far from unwinding device 2, evacuation cylinder 4a is connect with first U-shaped 4e, under each feeding device 4 Side is provided with the conveyer belt 15 to convey the splicing shell 14 being in contact with rope band 13;It avoids cylinder 4a and drives the first U-shaped seat Transversely sliding rail 4b is moved 4e, can be used for adjusting the spacing between unwinding device 2, afterwards turns over motor 4d work, so that the One cylinder block 4m rotation, so that thin cylinder 4c is overturn to posture downwards;Illustrate simultaneously, the first cylinder block 4m is in normal Under state, thin cylinder 4c is in horizontal attitude, that is, the rope band 13 that outbound course unreels out towards unwinding device 2;Unreel dress It sets 2 predominantly multiple emptying rollers and gas expansion shaft to constitute, is the prior art, so being no longer described in detail herein.
The feeding device 4 further includes that the first vacuum pump 4f and contact block 4k, the first vacuum pump 4f are pacified by the first supporting plate Mounted in the top of overturning motor 4d, one end of contact block 4k and the output axis connection of thin cylinder 4c, the other end of contact block 4k Extend outwardly, and extend perpendicularly to the extending direction of horizontal slide rail 4b, the outwardly extending one end contact block 4k offers Rivet notch 4q, and the one end of contact block 4k is hollow structure, the one end of contact block 4k is towards the front side of unwinding device 2 Multiple adsorption holes in distributed rectangular are offered, the output end of the first vacuum pump 4f is outwardly extending by hose and contact block 4k One end connection, when thin cylinder 4c is in vertical posture, thin cylinder 4c work, output shaft is under contact block 4k Drop, and the first vacuum pump 4f can work, and be sucked by adsorption hole by shell 14 is spliced by hollow one end of contact block 4k, subsequent phase It overturns after by overturning motor 4d to horizontal attitude, is passing through the close rope band 13 unreeled out of evacuation cylinder 4a;On contact block 4k Adsorption hole be around riveting notch 4q periphery setting.
Described group of rope device 3 includes symmetrical two and stirs motor 3a, stirs motor 3a in being vertically arranged, each stirs electricity The main shaft of machine 3a is mounted on swing rod 3b, and two swing rod 3b are in the normal state down, and the extending direction of the two is backwards to setting, each swing rod The free end of 3b is mounted on the plectrum 3c extended straight up, and the top of plectrum 3c offered wind groove 3d, and its this one End is hollow structure, and the front side of the top plectrum 3c towards blower device 9 offers multiple adsorption holes in distributed rectangular, each to dial The side of dynamic motor 3a is separately installed with a second vacuum pump 3e, and the output end of each second vacuum pump 3e passes through one respectively The top plectrum 3c of the corresponding position of hose is connected to, and the rope band 13 that unwinding device 2 unreels out is understood clamped by material conveying device 5, And there are spacing with material conveying device 5 for the free end of rope band 13, and further, one close to 13 free end of rope band is stirred motor 3a Main shaft rotated with swing rod 3b, further swing rod 3b is contradicted by plectrum 3c to the rope band 13, then the second vacuum pump 3e work Make, is sucked rope band 13 by the adsorption hole on plectrum 3c, the adsorption hole on these plectrums 3c is the week for surrounding wind groove 3d Side ring is around setting, and swing rod 3b is persistently rotated, and plectrum 3c is in a disguised form rolled over rope band 13 part of the rope band 13 in unreeling It is curved, 13 part of rope band of the middle motor 3a, the cutting group on subsequent unwinding device 2 are specifically also just namely stirred close to two Rope band 13 can be in another and stir the partial cut of the position motor 3a by part, and cutting assembly is some in unwinding device 2 Component part will herein be described in detail, this stirs the rope band that motor 3a can cut off this by the swing rod 3b and plectrum 3c of its position 13 one end also dial to the stop place of the former swing rod 3b movement for stirring motor 3a, that is, by the end of two rope bands 13 It coincides.
The middle that motor 3a is stirred described in two is equipped in vertical air-actuated jaw 3k, the clamping end of air-actuated jaw 3k It is symmetrical arranged the clamping plate 3m there are two U-shaped structure, the opening of clamping plate 3m is arranged vertically upwards, and first is stirred what motor 3a was stirred 13 end of rope band march to two stir the middle motor 3a after, the clamping plate 3m on air-actuated jaw 3k be in open configuration, And it is had below air-actuated jaw 3k and lifts cylinder 16, so that air-actuated jaw 3k is able to reciprocal ascending motion, stirred to aforementioned 13 end of rope band is adjacent to two 13 part of rope band for stirring the middle motor 3a by motor 3a, then at this time air-actuated jaw 3k by The active force for lifting cylinder 16 rises, and synchronous is that clamping plate 3m can be tightened, and clamping plate 3m is only at the lower edge of rope band 13 It is clamped, then the main shaft reversion for stirring motor 3a, so that swing rod 3b resets, the stroke of feeding and release among the above In, blower device 9 guarantees that 13 end of rope band will not be misplaced by the moment that plectrum 3c discharges persistently to blowing in the region, Then another is stirred in motor 3a work, and air-actuated jaw 3k is incited somebody to action down again and clamping plate 3m discharges, previous rope band 13 at this time The stabilization source of the holding initial attitude of end then still relies on blower device 9, then to the subsequent swing rod 3b for stirring motor 3a After cut-off 13 end of rope band is conformed to previous end, air-actuated jaw 3k continues to rise, and clamping plate 3m is to the two The end of rope band 13 is clamped.
The riveting set 7 includes being erected at the riveting cylinder 7a of 1 top of machine table and being mounted on to rivet cylinder 7a's Riveting briquetting 7b on output end, riveting briquetting 7b are located at two middles for stirring motor 3a, drive riveting through riveting cylinder 7a It meets briquetting 7b and advances to the direction motor 3a is stirred, after the both ends of rope band 13 all coincide, two feeding devices 4 can be by each autobiography It send the splicing shell 14 on band 15 to be drawn, and is moved to the outer two sides of rope band 13, one of splicing shell 14 is by rope band 13, which are previously stirred the both ends that motor 3a coincides by two, is adjacent to, another is then the position that coincides relative to 13 both ends of rope band Back side splice shell 14 and generate therewith and interlocks, two splicing blocks in a disguised form press rope band 13 due to the U-shaped structure characteristic of clamping plate 3m Next, riveting cylinder 7a can start to work, and rivet charging gear 8 is cooperated to constitute between two splicings shell 14 and rope bands 13 Assembly work.
The rivet charging gear 8 include evacuation sliding rail 8a, reset cylinder 8b, feed cylinder 8c, feeding motor 8d and Be fed suction block 8e, evacuation sliding rail 8a is erected at the top of machine table 1, avoid be equipped on sliding rail 8a can therewith activity cooperation the The opening of two U-shaped seats, the second U-shaped seat is face-down, and feed cylinder 8c connects the opening in the second U-shaped seat by the second cylinder block axis It is interior, feeding motor 8d be mounted on the top of the second U-shaped seat and to drive the second cylinder block towards the second U-shaped seat opening outside Flip-flop movement, reset cylinder 8b are mounted on the evacuation one end of sliding rail 8a far from unwinding device 2, the output rod of reset cylinder 8b and the Two U-shaped seat connections, feed suction block 8e are mounted on the output end of feed cylinder 8c, and it is true to be equipped with third above feeding motor 8d The output end of sky pump 8f, third vacuum pump 8f are connected to by hose with feed suction block 8e, the lower section meeting of rivet charging gear 8 first Vibrating disk to be fed rivet is installed, reset cylinder 8b can drive the second U-shaped seat to move along evacuation sliding rail 8a, in movement, Feeding motor 8d overturns the second cylinder block, and further allowing feed cylinder 8c rotation is in inverted posture, then feed cylinder The output end of 8c works, and subsequent third vacuum pump 8f is inhaled the rivet in vibrating disk discharging track by feed suction block 8e Tightly, horizontal attitude is successively then reset to by feed cylinder 8c and reset cylinder 8b and close to the direction of splicing shell 14, given Material suction block 8e can contact 14 back side of splicing shell of the position by the riveting notch 4q on the contact block 4k of its position, and be fed Rivet on suction block 8e can be inserted into the riveted holes on the splicing shell 14, at this time rivet can due to stroke force puncture rope band 13 and It marches in the riveted holes of another splicing shell 14, simultaneously rivets cylinder 7a and to rivet briquetting 7b also by its position Riveting notch 4q on contact block 4k contacts another splicing shell 14, and then in stroke, cooperation feed suction block 8e completes riveting work Make.
The material conveying device 5 includes passing material sliding rail 5b, hydraulic stem 5c, guide holder 5a and lead screw motor 5f, passs material sliding rail 5b, which is erected at, dials 3 top of rope device, and guide holder 5a, which movable can be mounted on, to be passed on material sliding rail 5b, and the bottom of guide holder 5a is spacious Mouthful setting, and is equipped with Bidirectional-screw 5d in the opening, be symmetrically arranged on Bidirectional-screw 5d there are two sliding block, two sliding blocks Bottom is separately installed with a clamping breast board 5e, and lead screw motor 5f is mounted on the top of guide holder 5a and to drive two-way silk Bar 5d is around own axis, and hydraulic stem 5c, which is mounted on, passs the material one end of sliding rail 5b far from rivet charging gear 8, hydraulic stem 5c's Output rod is connect with guide holder 5a, and unwinding device 2 carries out during unreeling rope band 13, on Bidirectional-screw 5d is two sections and is opened respectively Equipped with positive and negative rotation screw thread, so two sliding blocks can be matched, opposite or movement backwards is realized, so lead screw motor 5f It drives Bidirectional-screw 5d around own axis, two sliding blocks is further allowed to move toward one another, that is, rely on clamping breast board 5e by rope band 13 unreeled after downstream part clamped, keep its horizontal stability, and clamped 13 end of rope band reserves A little it is able to be stirred for the subsequent motor 3a that stirs.Handle 12 is placed on localization tool 10, is connected with rope band 13 The port of one end can pass through rope band 13 clamped by clamping breast board 5e, then the plectrum 3c of motor 3a to be stirred is by the rope band 13 After end sucks, two clamping breast board 5e are moved backwards, that is, are opened, discharge the folder to rope band 13 by lead screw motor 5f reversion Hold, then by hydraulic stem 5c far from it is subsequent stir motor 3a work in the range of, and also cooperated subsequent unwinding device 2 The rope band 13 unreeled out is cut off.
The blower device 9 includes air blower 9a, traveling sliding rail 9b and rectangular box 9c, and traveling sliding rail 9b is erected at machine table 1 top, air blower 9a movable can be mounted on traveling sliding rail 9b by base, and rectangular box 9c is towards before dialling rope device 3 Side is open setting, and the back side of rectangular box 9c is connected to by metal tube 9d with air blower 9a, and rectangular box 9c is located at air blower The top of 9a, one end of traveling sliding rail 9b are provided with for driving the movable first electric pole 9e of base, due to stirring motor 3a's Plectrum 3c to rope band 13 dial to two stir the middle motor 3a after, need to discharge, at this time in order to consider the rope band 13 be detached from The stability of plectrum 3c can carry out effectively rope band 13 in the air-supply face by rectangular box 9c by the work of air blower 9a Blow, prevent rope band 13 from itself falling, in the work of subsequent feeding device 4, in order to not influence them, then pass through the first electric pole 9e Move out the region of feeding splicing shell 14.
The top of machine table 1 movable can be arranged in by the second electric pole 11 for the localization tool 10, through the second electric pole 11 driving localization tools 10 can be close to or far from the downstream of unwinding device 2 at, the second electric pole 11 drive localization tool 10 can It is cooperation loading and unloading close to or far from purpose at the downstream of unwinding device 2, can be offered on localization tool 10 and insert handle 12 It is located at interior type groove, the posture that handle 12 plugs is the rope that the port face unwinding device 2 being connected with rope band 13 unreels out With 13 ends.
Working principle:Second electric pole 11 drives localization tool 10 can be close to or far from purpose at the downstream of unwinding device 2 It is cooperation loading and unloading, can be offered on localization tool 10 and handle 12 is plugged in interior type groove, manually insert single handle 12 Enter to type groove, at this time 12 port face unwinding device 2 of handle unreel in 13 end of rope band;Unwinding device 2 carries out unreeling rope During band 13, lead screw motor 5f is rotated forward, driving Bidirectional-screw 5d relies on clamping breast board 5e by rope band around own axis 13 unreeled after downstream part clamped, keep its horizontal stability, and clamped 13 end of rope band reserves It a little is able to be stirred for the subsequent motor 3a that stirs, the second electric pole 11 drives localization tool 10 with 12 direction of handle at this time 13 direction of rope band in unwinding device 2 is advanced, i.e., 12 port of handle, which is passed through, clamps the portion that breast board 5e clamps rope band 13 by two Point, further, a main shaft for stirring motor 3a close to 13 free end of rope band is rotated with swing rod 3b, and further swing rod 3b is logical It crosses plectrum 3c to contradict to 13 side of the rope band, then the second vacuum pump 3e works, by the adsorption hole on plectrum 3c by rope band 13 It sucks, after sucking, the release work of two clamping breast board 5e is realized in lead screw motor 5f reversion, then hydraulic stem 5c driving guiding Seat 5a is with lead screw motor 5f and clamping breast board 5e far from stirring motor 3a and handle 12;Due to keeping away for lead screw motor 5f Allow, at this time by the plectrum 3c that 13 end of rope band sucks continue to be stirred by its position motor 3a rotational swing rod 3b pass through plectrum 3c will 13 bending of rope band stirs the middle motor 3a to two, is bonded with 13 side of rope band of the two middle, and subsequent plectrum 3c is released It puts, since air blower 9a works in release, is blown by rectangular box 9c towards the part that 13 end of rope band is overlapped with 13 side of rope band, After guaranteeing plectrum 3c release, the stabilization of 13 end of rope band, and air-actuated jaw 3k is risen by lifting cylinder 16 at this time, and gas Dynamic fixture 3k clamps the lower edge part that rope band 13 coincides with its free end by clamping plate 3m, immediately in unwinding device 2 Cutting assembly can stir the rope band 13 of the position motor 3a to another and cut, then this, which stirs motor 3a, can rely on its position 13 one end of rope band that the swing rod 3b and plectrum 3c set cuts off this also dials to the former swing rod 3b movement for stirring motor 3a Stop place, that is, the end of two rope bands 13 is coincided, the air-actuated jaw 3k decline in this trip, and clamping plate 3m Release, air blower 9a continue to blow, and keep stablizing, air-actuated jaw 3k rises reset again immediately, by clamping plate 3m to rope band 13 The part that both ends are overlapped clamps, latter two right feeding device 4 can draw the splicing shell 14 on respective conveyer belt 15, and And the outer two sides of rope band 13 are moved to, one of splicing shell 14 is that rope band 13 is previously stirred motor 3a by two to coincide Both ends are adjacent to, another is then the back side of position of coinciding relative to 13 both ends of rope band, since the U-shaped structure of clamping plate 3m is special Property, splicing shell 14 generates therewith to interlock, and two splicing blocks in a disguised form compress rope band 13, and then position cylinder can drive the second U-shaped seat It is moved along evacuation sliding rail 8a, in movement, feeding motor 8d overturns the second cylinder block, further allows feed cylinder 8c to rotate and is in Inverted posture, the then output end work of feed cylinder 8c, subsequent third vacuum pump 8f is by being fed suction block 8e for vibrating disk Rivet in discharging track is sucked, then by feed cylinder 8c and reset cylinder 8b be successively reset to horizontal attitude and Close to the direction of splicing shell 14, feed suction block 8e can contact the position by the riveting notch 4q on the contact block 4k of its position Splice 14 back side of shell, and the rivet being fed on suction block 8e can be inserted into the riveted holes on the splicing shell 14, and rivet can be by this time Rope band 13 is punctured in stroke force and is marched in the riveted holes of another splicing shell 14, is simultaneously riveted cylinder 7a and is made riveting Connect briquetting 7b also by the riveting notch 4q on the contact block 4k of its position contact another splicing shell 14 match then in stroke It closes feed suction block 8e and completes riveting work.
The above described is only a preferred embodiment of the present invention, not making any limit to technical scope of the invention System, therefore any subtle modifications, equivalent variations and modifications to the above embodiments according to the technical essence of the invention, In the range of still falling within technical solution of the present invention.

Claims (3)

1. the assembling equipment of bus handle, including machine table(1)With setting in machine table(1)One end and for unreeling rope band (13)Unwinding device(2), it is characterised in that:It further include riding upon machine table(1)Top and be located at unwinding device(2)Downstream Rope device is dialled at place(3), be symmetricly set on dial rope device(3)The identical feeding device of two structures of both sides(4)And it is located at Dial rope device(3)The material conveying device of top(5), two feeding devices(4)The same side be respectively arranged with riveting set(7)And Rivet charging gear(8), riveting set(7)Towards group rope device(3)Front end be provided with blower device(9), blower device(9) Side be installed with to put handle(12)Localization tool(10), riveting set(7), rivet charging gear(8)With it is all Feeding device(4)It is respectively positioned on and dials rope device(3)Top;
The material conveying device(5)Including passing material sliding rail(5b), hydraulic stem(5c), guide holder(5a)And lead screw motor(5f), pass Expect sliding rail(5b)It is erected at and dials rope device(3)Top, guide holder(5a)It movable can be mounted on and pass material sliding rail(5b)On, guiding Seat(5a)Bottom be open setting, and Bidirectional-screw is installed in the opening(5d), Bidirectional-screw(5d)On be symmetrically arranged There are two sliding blocks, and the bottom of two sliding blocks is separately installed with a clamping breast board(5e), lead screw motor(5f)It is mounted on guide holder (5a)Top and to drive Bidirectional-screw(5d)Around own axis, hydraulic stem(5c)It is mounted on and passs material sliding rail(5b) Far from rivet charging gear(8)One end, hydraulic stem(5c)Output rod and guide holder(5a)Connection.
2. the assembling equipment of bus handle according to claim 1, it is characterised in that:The blower device(9)Including Air blower(9a), traveling sliding rail(9b)And rectangular box(9c), traveling sliding rail(9b)It is erected at machine table(1)Top, air blower (9a)Traveling sliding rail movable can be mounted on by base(9b)On, rectangular box(9c)Towards group rope device(3)Front side be Opening setting, rectangular box(9c)Back side pass through metal tube(9d)With air blower(9a)Connection, and rectangular box(9c)Positioned at drum Blower(9a)Top, traveling sliding rail(9b)One end be provided with for driving movable first electric pole of base(9e).
3. the assembling equipment of bus handle according to claim 1, it is characterised in that:The localization tool(10)Pass through Second electric pole(11)Movable it can be arranged in machine table(1)Top, through the second electric pole(11)Drive localization tool(10)Energy Enough close to or far from unwinding device(2)Downstream at.
CN201810684527.9A 2018-06-28 2018-06-28 Assembling equipment for bus handles Active CN108817891B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810684527.9A CN108817891B (en) 2018-06-28 2018-06-28 Assembling equipment for bus handles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810684527.9A CN108817891B (en) 2018-06-28 2018-06-28 Assembling equipment for bus handles

Publications (2)

Publication Number Publication Date
CN108817891A true CN108817891A (en) 2018-11-16
CN108817891B CN108817891B (en) 2020-02-07

Family

ID=64137863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810684527.9A Active CN108817891B (en) 2018-06-28 2018-06-28 Assembling equipment for bus handles

Country Status (1)

Country Link
CN (1) CN108817891B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059992A (en) * 2020-09-15 2020-12-11 芜湖瑞明汽车部件有限公司 Mounting mechanism for automobile door handle component

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5408732A (en) * 1994-02-18 1995-04-25 William D. Leseberg Wheel hub puller particularly suited for heavy duty trucks, buses and trailers
US20090134613A1 (en) * 2006-03-29 2009-05-28 Matthias Eber Hanging Strap
CN202825193U (en) * 2012-09-07 2013-03-27 惠州建邦精密塑胶有限公司 Assembly device used for automobile handle
CN205798911U (en) * 2016-06-01 2016-12-14 海瑞恩自动化科技(昆山)有限公司 A kind of automobile door handle kludge
CN107605276A (en) * 2017-10-20 2018-01-19 南京泓凯动力系统科技有限公司 A kind of device for installing automobile door handle components interior spring
CN107696154A (en) * 2017-10-14 2018-02-16 江苏荣胜长江塑业有限公司 Flexible girth of rings and handle production system are cut in a kind of vehicle inside decoration turn compacting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5408732A (en) * 1994-02-18 1995-04-25 William D. Leseberg Wheel hub puller particularly suited for heavy duty trucks, buses and trailers
US20090134613A1 (en) * 2006-03-29 2009-05-28 Matthias Eber Hanging Strap
CN202825193U (en) * 2012-09-07 2013-03-27 惠州建邦精密塑胶有限公司 Assembly device used for automobile handle
CN205798911U (en) * 2016-06-01 2016-12-14 海瑞恩自动化科技(昆山)有限公司 A kind of automobile door handle kludge
CN107696154A (en) * 2017-10-14 2018-02-16 江苏荣胜长江塑业有限公司 Flexible girth of rings and handle production system are cut in a kind of vehicle inside decoration turn compacting
CN107605276A (en) * 2017-10-20 2018-01-19 南京泓凯动力系统科技有限公司 A kind of device for installing automobile door handle components interior spring

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059992A (en) * 2020-09-15 2020-12-11 芜湖瑞明汽车部件有限公司 Mounting mechanism for automobile door handle component

Also Published As

Publication number Publication date
CN108817891B (en) 2020-02-07

Similar Documents

Publication Publication Date Title
US11146009B2 (en) Automatic terminal fitting device for a four-pin electrical connector
CN109119587A (en) A kind of cell polar ear automatic welding is cut, rubberizing and bending production line and its production technology
CN107768725A (en) A kind of battery core retainer installs equipment
CN107452502A (en) A kind of transformer sleeve-penetrating coiling adhesive tape wrapping machine
CN204156036U (en) The kludge of the rubberizing of a kind of square aluminum hull lithium battery electric core, upper spacer ring
CN206077176U (en) Cam wire binding machine for stator
CN206059531U (en) A kind of head is around glue machine
CN109051149A (en) Paste shading rubber belt equipment
CN111029639A (en) Film coating mechanism
CN108817891A (en) The assembling equipment of bus handle
CN107732308B (en) A kind of lithium battery taping machine positioning blowing and pressure zone one
CN108817303B (en) Bus handle assembly machine
CN201151024Y (en) Spot welding device for packaging batteries
CN108942206A (en) The kludge of bus handle
CN216763789U (en) Automatic shaft pulling system for splitting machine
CN105609865A (en) Pole piece rubberizing machine
CN107826308B (en) The efficient coated technique of battery
CN108788720A (en) Bus handle assembles device
CN203360784U (en) Lifting belt sewing device for double-rib cylindrical flexible container
CN216001505U (en) Production and packaging integrated machine for plane mask
CN107521740B (en) The automatic socket mechanisms of packing machine
CN211518852U (en) Flexible printing device for packaging carton
CN203592758U (en) Side face covering machine of packaging box
CN209720028U (en) A kind of Full-automatic film sticking machine
CN107528092B (en) A kind of lithium battery rubberizing taping machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20200110

Address after: 234000 Room 303, building 8, modern Jiayuan, Xichang South Road, Yongqiao District, Suzhou City, Anhui Province

Applicant after: Suzhou Huiteng Intellectual Property Consulting Co., Ltd.

Address before: 241006 Room 601, Unit 1, Building C5, Yuanfeng Decoration City, Yinhu Middle Road, Jinghu District, Wuhu City, Anhui Province

Applicant before: Gao Fei

GR01 Patent grant
GR01 Patent grant