CN108805407A - A kind of electricity power engineering safety estimation system based on big data - Google Patents

A kind of electricity power engineering safety estimation system based on big data Download PDF

Info

Publication number
CN108805407A
CN108805407A CN201810422249.XA CN201810422249A CN108805407A CN 108805407 A CN108805407 A CN 108805407A CN 201810422249 A CN201810422249 A CN 201810422249A CN 108805407 A CN108805407 A CN 108805407A
Authority
CN
China
Prior art keywords
subsystem
project
security
management
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810422249.XA
Other languages
Chinese (zh)
Other versions
CN108805407B (en
Inventor
常政威
陈缨
彭倩
刘涛
陈少卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Sichuan Electric Power Co Ltd
Priority to CN201810422249.XA priority Critical patent/CN108805407B/en
Publication of CN108805407A publication Critical patent/CN108805407A/en
Application granted granted Critical
Publication of CN108805407B publication Critical patent/CN108805407B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06313Resource planning in a project environment
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention discloses a kind of electricity power engineering safety estimation system based on big data, including engineering information management unit, personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem, security evaluation analytic unit and risk estimate prewarning unit;The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem data-interface be connected with the engineering information management unit and security evaluation analytic unit, the security evaluation analytic unit estimates prewarning unit data-interface with the risk and is connected;The present invention improves the safety management level of electricity power engineering.

Description

A kind of electricity power engineering safety estimation system based on big data
Technical field
The present invention relates to administration of power networks field more particularly to a kind of electricity power engineering safety estimation systems based on big data.
Background technology
Although Safety standardization work has achieved a series of great achievements, country, power industry and national grid Company publication Safety standardization specification and requirement mainly in construction and power supply enterprise, for electric power debugging unit for, Not fully it is suitble to, the work on the spot of DianKeYuan is mainly the projects such as electricity power engineering debugging, technical supervision, with power grid infrastructure project Project is compared, the characteristics of having its own, in current project management, referring especially to State Grid Corporation of China's infrastructure project mark Standardization management requires, but the management system biases toward the engineerings such as capital construction, installation, for projects such as debugging, technical supervisions It is required that and it is indefinite inside entire State Grid Corporation of China, lack with specific aim, unified management mode.
Traditional safety management mode, means and method cannot meet high-level, individual character of the operation power to safety Change, the demand of fining, meanwhile, the electricity power engineering project faced at present(Such as extra-high voltage, Tibetan area power grid)Safety management hand Section to be relied on based on manual operation, and intelligent, information-based not yet universal, there are many short slabs for management means.For this purpose, to reference to state The requirement of net company Construction Project standardized management is refined, does specific aim and repair volume, formed and be suitble to enterprise's own service The engineering project standardized management system of feature is particularly important, and this set standards system must have the management and control made to measure Feature, while also must be introduced into " internet+" to grow with each passing hour.
To solve the above-mentioned problems, the present invention proposes a kind of electricity power engineering safety estimation system based on big data.This hair It is bright to realize the scientific and perspective of each department's work plan establishment, it can effectively prevent super masterpiece in conjunction with Analysis of Bearing Capacity Industry;Realize the handling situations at all levels of management personnel scene of can grasping at any time, the problem violating the regulations to being ubiquitous, regular can To carry out emphasis management and control;It realizes and differentiation management and control is implemented by hierarchical, optimize management Resource allocation and smoothings at different levels, realize scene peace The comprehensive management and control of full operation.
Invention content
To solve the above-mentioned problems, the present invention proposes a kind of electricity power engineering safety estimation system based on big data.
Specifically, a kind of electricity power engineering safety estimation system based on big data, including:Engineering information management unit, people Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem, Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project; It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item Purpose is estimated safely, and is reminded possible security risk.
Preferably, the engineering information management unit, according to standardized management template it is difficult according to project scale and management Degree is divided into mega project, medium-sized project, working in dispersion;The mega project, medium-sized project, working in dispersion include project people Member is related to profession, work period, task.
Preferably, the personal management subsystem further includes personnel's qualification information, personnel's job information, personnel's work post letter Breath, the certificate term of validity.
Preferably, the Equipment Foundations database in the equipment management subsystem is used to preserve and the basis of maintained equipment is believed Breath;The Chemical Apparatus Importance Classification evaluation module is for assessing the significance level of equipment and assigning weight;The equipment fault Probability analysis module is used to combine historical data, assesses the probability of malfunction of equipment;The equipment disturbance degree evaluation module It is influenced caused by engineering safety for assessment equipment failure.
Preferably, the material base database in the handling of goods and materials subsystem is used to preserve and safeguard the basis letter of material Breath;The material importance evaluation module is for assessing the significance level of material and assigning weight;The material safety Analysis of Potential is used to combine historical data, assesses safe probability caused by material possibility;The material disturbance degree assessment Module is influenced for assessing material security risk caused by engineering safety.
Preferably, the complete degree evaluation module of the workpaper subsystem includes manual evaluation and automatic assessment;It is described Manual evaluation assesses the quality of workpaper for manager;Described to be evaluated as automatically, comparisons report value of feedback Deviation between the standard value being previously set is determined.
Preferably, the production environment secure subsystem uses the side that image identification system and artificial reporting system are combined Method;Described image identifying system includes the site environment image acquisition units being sequentially connected, image processing unit, image transmission list Member;The artificial reporting system includes mobile terminal, dedicated transmissions system;The Environmental security hidden danger evaluation module is used for figure As the hidden danger in production environment that identifying system and artificial reporting system acquire is summarized, and it is important for the incipient fault identification Property weight;The hidden danger risk evaluation module is used to combine historical data, assesses the probability of happening of hidden danger;The risk Coefficient is influenced for assessing influence of the hidden danger to engineering safety.
Preferably, the security evaluation analytic unit includes data interface unit, calculates analytic unit, storage unit, goes through History database and result database;For summarizing the personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem The security assessment result of system, workpaper subsystem, production environment secure subsystem carries out comprehensive analysis;And it is tied according to analysis Fruit updates historical data;The comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
Preferably, the risk estimates assessment result of the prewarning unit for showing security evaluation analytic unit, and output should The Integral safety evaluation value of engineering project, while security evaluation score value in item security is shown, and to safe deviation value It is maximum one or more to be reminded.
Preferably, the system also includes project emergency preplan units, and prewarning unit data-interface is estimated with the risk It is connected;Project emergency preplan for the additional recommendations after the risk estimates the risk project after prewarning unit;The item Mesh emergency preplan unit includes personal injury love scene disposal method, geological disaster site disposal scheme, flood damage scene Disposal method, scene of a traffic accident disposal method, electric shock accidents site disposal scheme, food poisoning site disposal scheme, It is one or more in acute infectious disease love scene disposal method, important equipment damage love scene disposal method.
The beneficial effects of the present invention are:
1. realizing the scientific and perspective of each department's work plan establishment, can effectively prevent super in conjunction with Analysis of Bearing Capacity Masterpiece industry;
2. realize the handling situations at all levels of management personnel scene of can grasping at any time, to being ubiquitous, regular violating the regulations ask Topic can carry out emphasis management and control;
Differentiation management and control is implemented by hierarchical 3. realizing, optimizes management Resource allocation and smoothings at different levels, realizes that site safety operation is complete Orientation management and control.
Description of the drawings
Fig. 1 is the system diagram of the present invention.
Specific implementation mode
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control illustrates this hair Bright specific implementation mode.
Specifically, a kind of electricity power engineering safety estimation system based on big data, including:Engineering information management unit, people Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem, Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project; It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item Purpose is estimated safely, and is reminded possible security risk.
As preferred embodiment, the engineering information management unit, according to standardized management template according to engineering Scale and management difficulty are divided into mega project, medium-sized project, working in dispersion;The mega project, medium-sized project, working in dispersion are equal Including project personnel, it is related to profession, work period, task.
As preferred embodiment, the personal management subsystem further include personnel's qualification information, personnel's job information, Personnel's work post information, the certificate term of validity.
As preferred embodiment, the Equipment Foundations database in the equipment management subsystem is for preserving and safeguarding The basic information of equipment;The Chemical Apparatus Importance Classification evaluation module is for assessing the significance level of equipment and assigning weight; The probability of equipment failure analysis module is used to combine historical data, assesses the probability of malfunction of equipment;The equipment shadow Loudness evaluation module is influenced for assessment equipment failure caused by engineering safety.
As preferred embodiment, the material base database in the handling of goods and materials subsystem is for preserving and safeguarding The basic information of material;The material importance evaluation module is for assessing the significance level of material and assigning weight; The material security even analysis is used to combine historical data, assesses safe probability caused by material possibility;The object Material disturbance degree evaluation module is influenced for assessing material security risk caused by engineering safety.
As preferred embodiment, the complete degree evaluation module of the workpaper subsystem includes manual evaluation and oneself Dynamic assessment;The manual evaluation assesses the quality of workpaper for manager;It is described to be evaluated as automatically, comparisons Deviation between report value of feedback and the standard value being previously set is determined.
As preferred embodiment, the production environment secure subsystem is using image identification system and artificial report The method that system is combined;Described image identifying system includes the site environment image acquisition units being sequentially connected, image procossing list Member, image transmission unit;The artificial reporting system includes mobile terminal, dedicated transmissions system;The Environmental security hidden danger is commented Estimate hidden danger of the module in the production environment to image identification system and the acquisition of artificial reporting system to summarize, and for institute State incipient fault identification weights of importance;The hidden danger risk evaluation module is used to combine historical data, to the probability of happening of hidden danger into Row assessment;The venture influence coefficient is for assessing influence of the hidden danger to engineering safety.
As preferred embodiment, the security evaluation analytic unit include data interface unit, calculate analytic unit, Storage unit, historical data base and result database;For summarizing the personal management subsystem, the equipment management subsystem, object Expects pipe manages the security assessment result of subsystem, workpaper subsystem, production environment secure subsystem, carries out comprehensive analysis;And Historical data is updated according to analysis result;The comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
As preferred embodiment, the risk estimates assessment of the prewarning unit for showing security evaluation analytic unit As a result, exporting the Integral safety evaluation value of the engineering project, while security evaluation score value in item security is shown, and right Safe deviation value is maximum one or more to be reminded.
As preferred embodiment, the system also includes project emergency preplan units, and early warning is estimated with the risk Cell data interface is connected;Project for the additional recommendations after the risk estimates the risk project after prewarning unit is emergent Prediction scheme;The project emergency preplan unit includes personal injury love scene disposal method, geological disaster site disposal scheme, flood Water disaster site disposal scheme, scene of a traffic accident disposal method, electric shock accidents site disposal scheme, food poisoning scene One kind in disposal method, acute infectious disease love scene disposal method, important equipment damage love scene disposal method Or it is a variety of.
It should be noted that for each embodiment of the method above-mentioned, for simple description, therefore it is all expressed as to a system The combination of actions of row, but those skilled in the art should understand that, the application is not limited by the described action sequence, because For according to the application, certain some step can be performed in other orders or simultaneously.Secondly, those skilled in the art also should Know, embodiment described in this description belongs to preferred embodiment, involved action and unit not necessarily this Shen It please be necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in some embodiment Part, may refer to the associated description of other embodiment.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the program can be stored in computer read/write memory medium In, the program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic Dish, CD, ROM, RAM etc..
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.

Claims (10)

1. a kind of electricity power engineering safety estimation system based on big data, which is characterized in that including engineering information management unit, people Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem, Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project; It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item Purpose is estimated safely, and is reminded possible security risk.
2. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the work Journey information management unit, according to standardized management template be divided into mega project, medium-sized item according to project scale and management difficulty Mesh, working in dispersion;The mega project, medium-sized project, working in dispersion include project personnel, are related to profession, work period, work Make task.
3. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the people Member's management subsystem further includes personnel's qualification information, personnel's job information, personnel's work post information, the certificate term of validity.
4. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that described to set Equipment Foundations database in standby management subsystem is used to preserve and the basic information of maintained equipment;The Chemical Apparatus Importance Classification assessment Module is for assessing the significance level of equipment and assigning weight;The probability of equipment failure analysis module is used to combine and go through History data assess the probability of malfunction of equipment;The equipment disturbance degree evaluation module is for assessment equipment failure to engineering Influence caused by safety.
5. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the object Material base database in expects pipe reason subsystem is used to preserve and safeguard the basic information of material;The material importance assessment Module is for assessing the significance level of material and assigning weight;The material security even analysis is used to combine history number According to, to material may caused by safe probability assess;The material disturbance degree evaluation module is hidden safely for assessing material Suffer from the influence caused by engineering safety.
6. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the work The complete degree evaluation module of industry report subsystem includes manual evaluation and automatic assessment;The manual evaluation is for manager to making The quality that retribution for sins is accused is assessed;Described to be evaluated as automatically, comparisons are reported between value of feedback and the standard value being previously set Deviation be determined.
7. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the life Production Environmental security subsystem uses the method that image identification system and artificial reporting system are combined;Described image identifying system packet Include the site environment image acquisition units being sequentially connected, image processing unit, image transmission unit;The artificial reporting system packet Include mobile terminal, dedicated transmissions system;The Environmental security hidden danger evaluation module is used for image identification system and artificial report Hidden danger in the production environment of system acquisition is summarized, and for the incipient fault identification weights of importance;The hidden danger risk Evaluation module is used to combine historical data, assesses the probability of happening of hidden danger;The venture influence coefficient is for assessing institute State influence of the hidden danger to engineering safety.
8. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the peace Full analysis and assessment unit includes data interface unit, calculates analytic unit, storage unit, historical data base and result database; For summarizing the personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production The security assessment result of Environmental security subsystem carries out comprehensive analysis;And historical data is updated according to analysis result;Described Comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
9. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the wind Assessment result of the prewarning unit for showing security evaluation analytic unit is estimated in danger, exports the Integral safety evaluation of the engineering project Value, while showing security evaluation score value in item security, and one or more is carried to safe deviation value is maximum It wakes up.
10. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that described System further includes project emergency preplan unit, and estimating prewarning unit data-interface with the risk is connected;For in the risk Estimate the project emergency preplan of additional recommendations after the risk project after prewarning unit;The project emergency preplan unit includes people Body injures and deaths event site disposal scheme, geological disaster site disposal scheme, flood damage site disposal scheme, the scene of a traffic accident Disposal method, electric shock accidents site disposal scheme, food poisoning site disposal scheme, the disposition of acute infectious disease love scene It is one or more in scheme, important equipment damage love scene disposal method.
CN201810422249.XA 2018-05-04 2018-05-04 Power grid engineering safety assessment system based on big data Active CN108805407B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810422249.XA CN108805407B (en) 2018-05-04 2018-05-04 Power grid engineering safety assessment system based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810422249.XA CN108805407B (en) 2018-05-04 2018-05-04 Power grid engineering safety assessment system based on big data

Publications (2)

Publication Number Publication Date
CN108805407A true CN108805407A (en) 2018-11-13
CN108805407B CN108805407B (en) 2021-10-19

Family

ID=64093354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810422249.XA Active CN108805407B (en) 2018-05-04 2018-05-04 Power grid engineering safety assessment system based on big data

Country Status (1)

Country Link
CN (1) CN108805407B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111062650A (en) * 2020-01-19 2020-04-24 国网河南省电力公司信息通信公司 Big data-based power grid safety management information system
CN111768098A (en) * 2020-06-28 2020-10-13 湖北省科技传媒有限责任公司 Innovation evaluation monitoring system and evaluation method thereof
CN111950134A (en) * 2020-07-25 2020-11-17 重庆六零七工程勘察设计有限公司 BIM-based geological disaster assessment method and device and computer-readable storage medium
CN112016803A (en) * 2020-07-23 2020-12-01 浙江图盛输变电工程有限公司温州科技分公司 Cross-professional power grid risk safety management and control system fusing operation big data
CN116307745A (en) * 2023-05-25 2023-06-23 北京联讯星烨科技有限公司 Intelligent risk supervision and early warning method and system for engineering project
CN116882763A (en) * 2023-09-01 2023-10-13 广州技客信息科技有限公司 Industrial production risk assessment system based on big data

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN102611101A (en) * 2012-03-08 2012-07-25 湖北省电力公司 Method for evaluating operational safety of interconnected power grid
US8429593B1 (en) * 2008-03-28 2013-04-23 Cadence Design Systems, Inc. Method and apparatus to use physical design information to detect IR drop prone test patterns
CN103107535A (en) * 2013-01-17 2013-05-15 中国电力科学研究院 Comprehensive evaluation method on safety of grid structure based on entropy weight method
CN104517188A (en) * 2014-12-25 2015-04-15 国家电网公司 Engineering project security management intelligent integrated machine
CN105139082A (en) * 2015-08-10 2015-12-09 国网上海市电力公司 Risk evaluation index system of multi-dimensional power distribution grid
CN105184656A (en) * 2015-04-27 2015-12-23 国电南瑞科技股份有限公司 Key device identification method for integrated device and power grid operation risks
CN105426980A (en) * 2014-09-22 2016-03-23 国家电网公司 Power distribution network health index assessment engineering application system
CN105760985A (en) * 2016-01-25 2016-07-13 武汉大学 Low frequency risk comprehensive evaluation method for nuclear power accessed to grid
CN106056314A (en) * 2016-06-29 2016-10-26 李明洋 Risk assessment method for intelligent distribution network
CN107016490A (en) * 2017-03-13 2017-08-04 国网安徽省电力公司蚌埠供电公司 Power networks risk takes precautions against pre-control practical application method, apparatus and system

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8429593B1 (en) * 2008-03-28 2013-04-23 Cadence Design Systems, Inc. Method and apparatus to use physical design information to detect IR drop prone test patterns
CN102521710A (en) * 2011-12-22 2012-06-27 上海建科工程咨询有限公司 Building construction quality safety online risk assessment system
CN102611101A (en) * 2012-03-08 2012-07-25 湖北省电力公司 Method for evaluating operational safety of interconnected power grid
CN103107535A (en) * 2013-01-17 2013-05-15 中国电力科学研究院 Comprehensive evaluation method on safety of grid structure based on entropy weight method
CN105426980A (en) * 2014-09-22 2016-03-23 国家电网公司 Power distribution network health index assessment engineering application system
CN104517188A (en) * 2014-12-25 2015-04-15 国家电网公司 Engineering project security management intelligent integrated machine
CN105184656A (en) * 2015-04-27 2015-12-23 国电南瑞科技股份有限公司 Key device identification method for integrated device and power grid operation risks
CN105139082A (en) * 2015-08-10 2015-12-09 国网上海市电力公司 Risk evaluation index system of multi-dimensional power distribution grid
CN105760985A (en) * 2016-01-25 2016-07-13 武汉大学 Low frequency risk comprehensive evaluation method for nuclear power accessed to grid
CN106056314A (en) * 2016-06-29 2016-10-26 李明洋 Risk assessment method for intelligent distribution network
CN107016490A (en) * 2017-03-13 2017-08-04 国网安徽省电力公司蚌埠供电公司 Power networks risk takes precautions against pre-control practical application method, apparatus and system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
NHDX070: "《国家电网公司电网工程施工安全风险识别、评估及控制方法(试行)》word文字版", 《网页在线公开:DOCIN.COM/P-1457548553.HTML》 *
于旭: "电力安全性评价系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *
杨飞等: "电力工程项目施工安全风险评估研究", 《湖北第二师范学院学报》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111062650A (en) * 2020-01-19 2020-04-24 国网河南省电力公司信息通信公司 Big data-based power grid safety management information system
CN111768098A (en) * 2020-06-28 2020-10-13 湖北省科技传媒有限责任公司 Innovation evaluation monitoring system and evaluation method thereof
CN112016803A (en) * 2020-07-23 2020-12-01 浙江图盛输变电工程有限公司温州科技分公司 Cross-professional power grid risk safety management and control system fusing operation big data
CN111950134A (en) * 2020-07-25 2020-11-17 重庆六零七工程勘察设计有限公司 BIM-based geological disaster assessment method and device and computer-readable storage medium
CN111950134B (en) * 2020-07-25 2024-01-26 重庆六零七工程勘察设计有限公司 BIM-based geological disaster assessment method and device and computer-readable storage medium
CN116307745A (en) * 2023-05-25 2023-06-23 北京联讯星烨科技有限公司 Intelligent risk supervision and early warning method and system for engineering project
CN116307745B (en) * 2023-05-25 2023-08-08 北京联讯星烨科技有限公司 Intelligent risk supervision and early warning method and system for engineering project
CN116882763A (en) * 2023-09-01 2023-10-13 广州技客信息科技有限公司 Industrial production risk assessment system based on big data

Also Published As

Publication number Publication date
CN108805407B (en) 2021-10-19

Similar Documents

Publication Publication Date Title
CN108805407A (en) A kind of electricity power engineering safety estimation system based on big data
CN105354614B (en) A kind of electric network information O&M active forewarning method based on big data
CN104850963A (en) Drainage basin sudden water pollution accident warning and emergency disposal method and drainage basin sudden water pollution accident warning and emergency disposal system
CN109947806B (en) Case-based reasoning ultrahigh-rise construction safety accident emergency auxiliary decision-making method
CN109672663A (en) A kind of the closed loop network security monitoring and managing method and system of security threat event
CN103226661B (en) The computer estimation method of power consumer reliability requirement under market environment
CN114821946B (en) Fire disaster early warning method, monitoring terminal and system for transformer substation alternating current power supply
CN105488118A (en) Electrical equipment fault information display method and device
CN111310803B (en) Environment data processing method and device
CN110910031A (en) Online risk assessment system of building construction quality safety
CN116070917A (en) Dangerous chemical risk level evaluation system based on artificial intelligent storage
CN108764544A (en) Circuit hidden danger prediction technique and device
Bing et al. Study on coal mine safety management system based on “hazard, latent danger and emergency responses”
CN114331055A (en) Enterprise safety production risk early warning method, device, equipment and storage medium
CN110942235A (en) Electric power emergency evaluation system
CN104486148B (en) A kind of server recycling and control method and device
CN115511234A (en) Grading early warning management method and system for dangerous chemical safety production risk
CN113064399A (en) Industrial monitoring software prediction maintenance system based on big data distributed programming framework
CN202218244U (en) Information technology (IT) operation and maintenance system for business system monitoring
CN106485408A (en) A kind of engineering construction overall process intelligent management system and its application
CN115374088A (en) Database health degree analysis method, device and equipment and readable storage medium
CN114358514A (en) Fire safety risk quantification method and device and storage medium
CN112860673B (en) Intelligent device applied to environmental protection measurement and control and application method
CN111091266A (en) Grade determination method and device of empty management station and storage medium
CN116822941B (en) Intelligent safety management system based on new energy workstation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant