- Publication number
- CN108805407A CN108805407A CN201810422249.XA CN201810422249A CN108805407A CN 108805407 A CN108805407 A CN 108805407A CN 201810422249 A CN201810422249 A CN 201810422249A CN 108805407 A CN108805407 A CN 108805407A
- Authority
- CN
- China
- Prior art keywords
- subsystem
- project
- security
- management
- unit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/06—Electricity, gas or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Abstract
The invention discloses a kind of electricity power engineering safety estimation system based on big data, including engineering information management unit, personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem, security evaluation analytic unit and risk estimate prewarning unit;The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem data-interface be connected with the engineering information management unit and security evaluation analytic unit, the security evaluation analytic unit estimates prewarning unit data-interface with the risk and is connected;The present invention improves the safety management level of electricity power engineering.
Description
Technical field
The present invention relates to administration of power networks field more particularly to a kind of electricity power engineering safety estimation systems based on big data.
Background technology
Although Safety standardization work has achieved a series of great achievements, country, power industry and national grid
Company publication Safety standardization specification and requirement mainly in construction and power supply enterprise, for electric power debugging unit for,
Not fully it is suitble to, the work on the spot of DianKeYuan is mainly the projects such as electricity power engineering debugging, technical supervision, with power grid infrastructure project
Project is compared, the characteristics of having its own, in current project management, referring especially to State Grid Corporation of China's infrastructure project mark
Standardization management requires, but the management system biases toward the engineerings such as capital construction, installation, for projects such as debugging, technical supervisions
It is required that and it is indefinite inside entire State Grid Corporation of China, lack with specific aim, unified management mode.
Traditional safety management mode, means and method cannot meet high-level, individual character of the operation power to safety
Change, the demand of fining, meanwhile, the electricity power engineering project faced at present(Such as extra-high voltage, Tibetan area power grid)Safety management hand
Section to be relied on based on manual operation, and intelligent, information-based not yet universal, there are many short slabs for management means.For this purpose, to reference to state
The requirement of net company Construction Project standardized management is refined, does specific aim and repair volume, formed and be suitble to enterprise's own service
The engineering project standardized management system of feature is particularly important, and this set standards system must have the management and control made to measure
Feature, while also must be introduced into " internet+" to grow with each passing hour.
To solve the above-mentioned problems, the present invention proposes a kind of electricity power engineering safety estimation system based on big data.This hair
It is bright to realize the scientific and perspective of each department's work plan establishment, it can effectively prevent super masterpiece in conjunction with Analysis of Bearing Capacity
Industry;Realize the handling situations at all levels of management personnel scene of can grasping at any time, the problem violating the regulations to being ubiquitous, regular can
To carry out emphasis management and control;It realizes and differentiation management and control is implemented by hierarchical, optimize management Resource allocation and smoothings at different levels, realize scene peace
The comprehensive management and control of full operation.
Invention content
To solve the above-mentioned problems, the present invention proposes a kind of electricity power engineering safety estimation system based on big data.
Specifically, a kind of electricity power engineering safety estimation system based on big data, including:Engineering information management unit, people
Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem,
Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment
The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented
Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering
Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould
Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel
Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault
The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and
Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project;
It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree
Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project
Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation
The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project
Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project
Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item
Purpose is estimated safely, and is reminded possible security risk.
Preferably, the engineering information management unit, according to standardized management template it is difficult according to project scale and management
Degree is divided into mega project, medium-sized project, working in dispersion;The mega project, medium-sized project, working in dispersion include project people
Member is related to profession, work period, task.
Preferably, the personal management subsystem further includes personnel's qualification information, personnel's job information, personnel's work post letter
Breath, the certificate term of validity.
Preferably, the Equipment Foundations database in the equipment management subsystem is used to preserve and the basis of maintained equipment is believed
Breath;The Chemical Apparatus Importance Classification evaluation module is for assessing the significance level of equipment and assigning weight;The equipment fault
Probability analysis module is used to combine historical data, assesses the probability of malfunction of equipment;The equipment disturbance degree evaluation module
It is influenced caused by engineering safety for assessment equipment failure.
Preferably, the material base database in the handling of goods and materials subsystem is used to preserve and safeguard the basis letter of material
Breath;The material importance evaluation module is for assessing the significance level of material and assigning weight;The material safety
Analysis of Potential is used to combine historical data, assesses safe probability caused by material possibility;The material disturbance degree assessment
Module is influenced for assessing material security risk caused by engineering safety.
Preferably, the complete degree evaluation module of the workpaper subsystem includes manual evaluation and automatic assessment;It is described
Manual evaluation assesses the quality of workpaper for manager;Described to be evaluated as automatically, comparisons report value of feedback
Deviation between the standard value being previously set is determined.
Preferably, the production environment secure subsystem uses the side that image identification system and artificial reporting system are combined
Method;Described image identifying system includes the site environment image acquisition units being sequentially connected, image processing unit, image transmission list
Member;The artificial reporting system includes mobile terminal, dedicated transmissions system;The Environmental security hidden danger evaluation module is used for figure
As the hidden danger in production environment that identifying system and artificial reporting system acquire is summarized, and it is important for the incipient fault identification
Property weight;The hidden danger risk evaluation module is used to combine historical data, assesses the probability of happening of hidden danger;The risk
Coefficient is influenced for assessing influence of the hidden danger to engineering safety.
Preferably, the security evaluation analytic unit includes data interface unit, calculates analytic unit, storage unit, goes through
History database and result database;For summarizing the personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem
The security assessment result of system, workpaper subsystem, production environment secure subsystem carries out comprehensive analysis;And it is tied according to analysis
Fruit updates historical data;The comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results
Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
Preferably, the risk estimates assessment result of the prewarning unit for showing security evaluation analytic unit, and output should
The Integral safety evaluation value of engineering project, while security evaluation score value in item security is shown, and to safe deviation value
It is maximum one or more to be reminded.
Preferably, the system also includes project emergency preplan units, and prewarning unit data-interface is estimated with the risk
It is connected;Project emergency preplan for the additional recommendations after the risk estimates the risk project after prewarning unit;The item
Mesh emergency preplan unit includes personal injury love scene disposal method, geological disaster site disposal scheme, flood damage scene
Disposal method, scene of a traffic accident disposal method, electric shock accidents site disposal scheme, food poisoning site disposal scheme,
It is one or more in acute infectious disease love scene disposal method, important equipment damage love scene disposal method.
The beneficial effects of the present invention are:
1. realizing the scientific and perspective of each department's work plan establishment, can effectively prevent super in conjunction with Analysis of Bearing Capacity
Masterpiece industry;
2. realize the handling situations at all levels of management personnel scene of can grasping at any time, to being ubiquitous, regular violating the regulations ask
Topic can carry out emphasis management and control;
Differentiation management and control is implemented by hierarchical 3. realizing, optimizes management Resource allocation and smoothings at different levels, realizes that site safety operation is complete
Orientation management and control.
Description of the drawings
Fig. 1 is the system diagram of the present invention.
Specific implementation mode
For a clearer understanding of the technical characteristics, objects and effects of the present invention, now control illustrates this hair
Bright specific implementation mode.
Specifically, a kind of electricity power engineering safety estimation system based on big data, including:Engineering information management unit, people
Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem,
Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment
The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented
Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering
Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould
Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel
Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault
The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and
Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project;
It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree
Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project
Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation
The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project
Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project
Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item
Purpose is estimated safely, and is reminded possible security risk.
As preferred embodiment, the engineering information management unit, according to standardized management template according to engineering
Scale and management difficulty are divided into mega project, medium-sized project, working in dispersion;The mega project, medium-sized project, working in dispersion are equal
Including project personnel, it is related to profession, work period, task.
As preferred embodiment, the personal management subsystem further include personnel's qualification information, personnel's job information,
Personnel's work post information, the certificate term of validity.
As preferred embodiment, the Equipment Foundations database in the equipment management subsystem is for preserving and safeguarding
The basic information of equipment;The Chemical Apparatus Importance Classification evaluation module is for assessing the significance level of equipment and assigning weight;
The probability of equipment failure analysis module is used to combine historical data, assesses the probability of malfunction of equipment;The equipment shadow
Loudness evaluation module is influenced for assessment equipment failure caused by engineering safety.
As preferred embodiment, the material base database in the handling of goods and materials subsystem is for preserving and safeguarding
The basic information of material;The material importance evaluation module is for assessing the significance level of material and assigning weight;
The material security even analysis is used to combine historical data, assesses safe probability caused by material possibility;The object
Material disturbance degree evaluation module is influenced for assessing material security risk caused by engineering safety.
As preferred embodiment, the complete degree evaluation module of the workpaper subsystem includes manual evaluation and oneself
Dynamic assessment;The manual evaluation assesses the quality of workpaper for manager;It is described to be evaluated as automatically, comparisons
Deviation between report value of feedback and the standard value being previously set is determined.
As preferred embodiment, the production environment secure subsystem is using image identification system and artificial report
The method that system is combined;Described image identifying system includes the site environment image acquisition units being sequentially connected, image procossing list
Member, image transmission unit;The artificial reporting system includes mobile terminal, dedicated transmissions system;The Environmental security hidden danger is commented
Estimate hidden danger of the module in the production environment to image identification system and the acquisition of artificial reporting system to summarize, and for institute
State incipient fault identification weights of importance;The hidden danger risk evaluation module is used to combine historical data, to the probability of happening of hidden danger into
Row assessment;The venture influence coefficient is for assessing influence of the hidden danger to engineering safety.
As preferred embodiment, the security evaluation analytic unit include data interface unit, calculate analytic unit,
Storage unit, historical data base and result database;For summarizing the personal management subsystem, the equipment management subsystem, object
Expects pipe manages the security assessment result of subsystem, workpaper subsystem, production environment secure subsystem, carries out comprehensive analysis;And
Historical data is updated according to analysis result;The comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results
Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
As preferred embodiment, the risk estimates assessment of the prewarning unit for showing security evaluation analytic unit
As a result, exporting the Integral safety evaluation value of the engineering project, while security evaluation score value in item security is shown, and right
Safe deviation value is maximum one or more to be reminded.
As preferred embodiment, the system also includes project emergency preplan units, and early warning is estimated with the risk
Cell data interface is connected;Project for the additional recommendations after the risk estimates the risk project after prewarning unit is emergent
Prediction scheme;The project emergency preplan unit includes personal injury love scene disposal method, geological disaster site disposal scheme, flood
Water disaster site disposal scheme, scene of a traffic accident disposal method, electric shock accidents site disposal scheme, food poisoning scene
One kind in disposal method, acute infectious disease love scene disposal method, important equipment damage love scene disposal method
Or it is a variety of.
It should be noted that for each embodiment of the method above-mentioned, for simple description, therefore it is all expressed as to a system
The combination of actions of row, but those skilled in the art should understand that, the application is not limited by the described action sequence, because
For according to the application, certain some step can be performed in other orders or simultaneously.Secondly, those skilled in the art also should
Know, embodiment described in this description belongs to preferred embodiment, involved action and unit not necessarily this Shen
It please be necessary.
In the above-described embodiments, it all emphasizes particularly on different fields to the description of each embodiment, is not described in some embodiment
Part, may refer to the associated description of other embodiment.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with
Relevant hardware is instructed to complete by computer program, the program can be stored in computer read/write memory medium
In, the program is when being executed, it may include such as the flow of the embodiment of above-mentioned each method.Wherein, the storage medium can be magnetic
Dish, CD, ROM, RAM etc..
The above disclosure is only the preferred embodiments of the present invention, cannot limit the right model of the present invention with this certainly
It encloses, therefore equivalent changes made in accordance with the claims of the present invention, is still within the scope of the present invention.
Claims (10)
1. a kind of electricity power engineering safety estimation system based on big data, which is characterized in that including engineering information management unit, people
Member management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment secure subsystem,
Security evaluation analytic unit and risk estimate prewarning unit;
The personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production environment
The data-interface of secure subsystem is connected with the engineering information management unit and security evaluation analytic unit, and the safety is commented
Estimate analytic unit and estimate prewarning unit data-interface with the risk and is connected;
The engineering information management unit is used to, according to standardized management template, in conjunction with detailed programs, establish the basis letter of engineering
Breath, and form corresponding project security evaluation frame;The basic information includes increasing project profile, establishing project account mould
Plate generates report template, determines safety index;
The performance level of management and appraiser configuration of the personal management subsystem for project personnel;Including personnel
Basic information and personnel's certificate information;
The equipment management subsystem is led for the equipment management of project and the integrity of evaluation item equipment and equipment fault
The project of cause is lost;Including Equipment Foundations database, Chemical Apparatus Importance Classification evaluation module, probability of equipment failure analysis module, and
Equipment disturbance degree evaluation module;
The handling of goods and materials subsystem is used for the handling of goods and materials of project, and assessment quality of material to the security association degree of project;
It is assessed including material base database, material importance evaluation module, material security even analysis module and material disturbance degree
Module;
The workpaper subsystem is used for the account management of project, and the complete degree of assessment account to the security implication journey of project
Degree;Including management account record, job log record and engineering archive record;Further include to management account record, operation
The complete degree evaluation module and relevance impact analysis module of log recording and engineering archive record;
The production environment secure subsystem is used for the production environment management of project, and the safety of assessment production environment and project
Property influence;Including Environmental security hidden danger evaluation module, hidden danger risk evaluation module and venture influence coefficient;
The security evaluation analytic unit is used to assess the security situation for assessing current project from dimension, and to the peace of current project
Full short slab is ranked up, in order to which user is targetedly handled;
The risk estimate prewarning unit for combine current security evaluation data and history secure data, to current engineering item
Purpose is estimated safely, and is reminded possible security risk.
2. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the work
Journey information management unit, according to standardized management template be divided into mega project, medium-sized item according to project scale and management difficulty
Mesh, working in dispersion;The mega project, medium-sized project, working in dispersion include project personnel, are related to profession, work period, work
Make task.
3. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the people
Member's management subsystem further includes personnel's qualification information, personnel's job information, personnel's work post information, the certificate term of validity.
4. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that described to set
Equipment Foundations database in standby management subsystem is used to preserve and the basic information of maintained equipment;The Chemical Apparatus Importance Classification assessment
Module is for assessing the significance level of equipment and assigning weight;The probability of equipment failure analysis module is used to combine and go through
History data assess the probability of malfunction of equipment;The equipment disturbance degree evaluation module is for assessment equipment failure to engineering
Influence caused by safety.
5. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the object
Material base database in expects pipe reason subsystem is used to preserve and safeguard the basic information of material;The material importance assessment
Module is for assessing the significance level of material and assigning weight;The material security even analysis is used to combine history number
According to, to material may caused by safe probability assess;The material disturbance degree evaluation module is hidden safely for assessing material
Suffer from the influence caused by engineering safety.
6. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the work
The complete degree evaluation module of industry report subsystem includes manual evaluation and automatic assessment;The manual evaluation is for manager to making
The quality that retribution for sins is accused is assessed;Described to be evaluated as automatically, comparisons are reported between value of feedback and the standard value being previously set
Deviation be determined.
7. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the life
Production Environmental security subsystem uses the method that image identification system and artificial reporting system are combined;Described image identifying system packet
Include the site environment image acquisition units being sequentially connected, image processing unit, image transmission unit;The artificial reporting system packet
Include mobile terminal, dedicated transmissions system;The Environmental security hidden danger evaluation module is used for image identification system and artificial report
Hidden danger in the production environment of system acquisition is summarized, and for the incipient fault identification weights of importance;The hidden danger risk
Evaluation module is used to combine historical data, assesses the probability of happening of hidden danger;The venture influence coefficient is for assessing institute
State influence of the hidden danger to engineering safety.
8. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the peace
Full analysis and assessment unit includes data interface unit, calculates analytic unit, storage unit, historical data base and result database;
For summarizing the personal management subsystem, the equipment management subsystem, handling of goods and materials subsystem, workpaper subsystem, production
The security assessment result of Environmental security subsystem carries out comprehensive analysis;And historical data is updated according to analysis result;Described
Comprehensive analysis comprises the steps of:
S1 calculates the difference between the security evaluation score value of item security and standard value, is ranked up, and assigned according to ranking results
Give weight order;
S2 carries out tagged word extraction to item security, calculates the frequency of occurrences of the tagged word in historical data base;
Weight order is multiplied with the frequency of occurrences, obtains safe deviation value, and be ranked up by S3;
S4 carries out item security sequencing display according to ranking results in S3;
S5:According to the update threshold value of setting, the tagged word that safe deviation value is more than to update threshold value is added to historical data base.
9. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that the wind
Assessment result of the prewarning unit for showing security evaluation analytic unit is estimated in danger, exports the Integral safety evaluation of the engineering project
Value, while showing security evaluation score value in item security, and one or more is carried to safe deviation value is maximum
It wakes up.
10. a kind of electricity power engineering safety estimation system based on big data as described in claim 1, which is characterized in that described
System further includes project emergency preplan unit, and estimating prewarning unit data-interface with the risk is connected;For in the risk
Estimate the project emergency preplan of additional recommendations after the risk project after prewarning unit;The project emergency preplan unit includes people
Body injures and deaths event site disposal scheme, geological disaster site disposal scheme, flood damage site disposal scheme, the scene of a traffic accident
Disposal method, electric shock accidents site disposal scheme, food poisoning site disposal scheme, the disposition of acute infectious disease love scene
It is one or more in scheme, important equipment damage love scene disposal method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810422249.XA CN108805407B (en) | 2018-05-04 | 2018-05-04 | Power grid engineering safety assessment system based on big data |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810422249.XA CN108805407B (en) | 2018-05-04 | 2018-05-04 | Power grid engineering safety assessment system based on big data |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108805407A true CN108805407A (en) | 2018-11-13 |
CN108805407B CN108805407B (en) | 2021-10-19 |
Family
ID=64093354
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810422249.XA Active CN108805407B (en) | 2018-05-04 | 2018-05-04 | Power grid engineering safety assessment system based on big data |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108805407B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111062650A (en) * | 2020-01-19 | 2020-04-24 | 国网河南省电力公司信息通信公司 | Big data-based power grid safety management information system |
CN111768098A (en) * | 2020-06-28 | 2020-10-13 | 湖北省科技传媒有限责任公司 | Innovation evaluation monitoring system and evaluation method thereof |
CN111950134A (en) * | 2020-07-25 | 2020-11-17 | 重庆六零七工程勘察设计有限公司 | BIM-based geological disaster assessment method and device and computer-readable storage medium |
CN112016803A (en) * | 2020-07-23 | 2020-12-01 | 浙江图盛输变电工程有限公司温州科技分公司 | Cross-professional power grid risk safety management and control system fusing operation big data |
CN116307745A (en) * | 2023-05-25 | 2023-06-23 | 北京联讯星烨科技有限公司 | Intelligent risk supervision and early warning method and system for engineering project |
CN116882763A (en) * | 2023-09-01 | 2023-10-13 | 广州技客信息科技有限公司 | Industrial production risk assessment system based on big data |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102521710A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk assessment system |
CN102611101A (en) * | 2012-03-08 | 2012-07-25 | 湖北省电力公司 | Method for evaluating operational safety of interconnected power grid |
US8429593B1 (en) * | 2008-03-28 | 2013-04-23 | Cadence Design Systems, Inc. | Method and apparatus to use physical design information to detect IR drop prone test patterns |
CN103107535A (en) * | 2013-01-17 | 2013-05-15 | 中国电力科学研究院 | Comprehensive evaluation method on safety of grid structure based on entropy weight method |
CN104517188A (en) * | 2014-12-25 | 2015-04-15 | 国家电网公司 | Engineering project security management intelligent integrated machine |
CN105139082A (en) * | 2015-08-10 | 2015-12-09 | 国网上海市电力公司 | Risk evaluation index system of multi-dimensional power distribution grid |
CN105184656A (en) * | 2015-04-27 | 2015-12-23 | 国电南瑞科技股份有限公司 | Key device identification method for integrated device and power grid operation risks |
CN105426980A (en) * | 2014-09-22 | 2016-03-23 | 国家电网公司 | Power distribution network health index assessment engineering application system |
CN105760985A (en) * | 2016-01-25 | 2016-07-13 | 武汉大学 | Low frequency risk comprehensive evaluation method for nuclear power accessed to grid |
CN106056314A (en) * | 2016-06-29 | 2016-10-26 | 李明洋 | Risk assessment method for intelligent distribution network |
CN107016490A (en) * | 2017-03-13 | 2017-08-04 | 国网安徽省电力公司蚌埠供电公司 | Power networks risk takes precautions against pre-control practical application method, apparatus and system |
-
2018
- 2018-05-04 CN CN201810422249.XA patent/CN108805407B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8429593B1 (en) * | 2008-03-28 | 2013-04-23 | Cadence Design Systems, Inc. | Method and apparatus to use physical design information to detect IR drop prone test patterns |
CN102521710A (en) * | 2011-12-22 | 2012-06-27 | 上海建科工程咨询有限公司 | Building construction quality safety online risk assessment system |
CN102611101A (en) * | 2012-03-08 | 2012-07-25 | 湖北省电力公司 | Method for evaluating operational safety of interconnected power grid |
CN103107535A (en) * | 2013-01-17 | 2013-05-15 | 中国电力科学研究院 | Comprehensive evaluation method on safety of grid structure based on entropy weight method |
CN105426980A (en) * | 2014-09-22 | 2016-03-23 | 国家电网公司 | Power distribution network health index assessment engineering application system |
CN104517188A (en) * | 2014-12-25 | 2015-04-15 | 国家电网公司 | Engineering project security management intelligent integrated machine |
CN105184656A (en) * | 2015-04-27 | 2015-12-23 | 国电南瑞科技股份有限公司 | Key device identification method for integrated device and power grid operation risks |
CN105139082A (en) * | 2015-08-10 | 2015-12-09 | 国网上海市电力公司 | Risk evaluation index system of multi-dimensional power distribution grid |
CN105760985A (en) * | 2016-01-25 | 2016-07-13 | 武汉大学 | Low frequency risk comprehensive evaluation method for nuclear power accessed to grid |
CN106056314A (en) * | 2016-06-29 | 2016-10-26 | 李明洋 | Risk assessment method for intelligent distribution network |
CN107016490A (en) * | 2017-03-13 | 2017-08-04 | 国网安徽省电力公司蚌埠供电公司 | Power networks risk takes precautions against pre-control practical application method, apparatus and system |
Non-Patent Citations (3)
Title |
---|
NHDX070: "《国家电网公司电网工程施工安全风险识别、评估及控制方法(试行)》word文字版", 《网页在线公开:DOCIN.COM/P-1457548553.HTML》 * |
于旭: "电力安全性评价系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
杨飞等: "电力工程项目施工安全风险评估研究", 《湖北第二师范学院学报》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111062650A (en) * | 2020-01-19 | 2020-04-24 | 国网河南省电力公司信息通信公司 | Big data-based power grid safety management information system |
CN111768098A (en) * | 2020-06-28 | 2020-10-13 | 湖北省科技传媒有限责任公司 | Innovation evaluation monitoring system and evaluation method thereof |
CN112016803A (en) * | 2020-07-23 | 2020-12-01 | 浙江图盛输变电工程有限公司温州科技分公司 | Cross-professional power grid risk safety management and control system fusing operation big data |
CN111950134A (en) * | 2020-07-25 | 2020-11-17 | 重庆六零七工程勘察设计有限公司 | BIM-based geological disaster assessment method and device and computer-readable storage medium |
CN111950134B (en) * | 2020-07-25 | 2024-01-26 | 重庆六零七工程勘察设计有限公司 | BIM-based geological disaster assessment method and device and computer-readable storage medium |
CN116307745A (en) * | 2023-05-25 | 2023-06-23 | 北京联讯星烨科技有限公司 | Intelligent risk supervision and early warning method and system for engineering project |
CN116307745B (en) * | 2023-05-25 | 2023-08-08 | 北京联讯星烨科技有限公司 | Intelligent risk supervision and early warning method and system for engineering project |
CN116882763A (en) * | 2023-09-01 | 2023-10-13 | 广州技客信息科技有限公司 | Industrial production risk assessment system based on big data |
Also Published As
Publication number | Publication date |
---|---|
CN108805407B (en) | 2021-10-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108805407A (en) | A kind of electricity power engineering safety estimation system based on big data | |
CN105354614B (en) | A kind of electric network information O&M active forewarning method based on big data | |
CN104850963A (en) | Drainage basin sudden water pollution accident warning and emergency disposal method and drainage basin sudden water pollution accident warning and emergency disposal system | |
CN109947806B (en) | Case-based reasoning ultrahigh-rise construction safety accident emergency auxiliary decision-making method | |
CN109672663A (en) | A kind of the closed loop network security monitoring and managing method and system of security threat event | |
CN103226661B (en) | The computer estimation method of power consumer reliability requirement under market environment | |
CN114821946B (en) | Fire disaster early warning method, monitoring terminal and system for transformer substation alternating current power supply | |
CN105488118A (en) | Electrical equipment fault information display method and device | |
CN111310803B (en) | Environment data processing method and device | |
CN110910031A (en) | Online risk assessment system of building construction quality safety | |
CN116070917A (en) | Dangerous chemical risk level evaluation system based on artificial intelligent storage | |
CN108764544A (en) | Circuit hidden danger prediction technique and device | |
Bing et al. | Study on coal mine safety management system based on “hazard, latent danger and emergency responses” | |
CN114331055A (en) | Enterprise safety production risk early warning method, device, equipment and storage medium | |
CN110942235A (en) | Electric power emergency evaluation system | |
CN104486148B (en) | A kind of server recycling and control method and device | |
CN115511234A (en) | Grading early warning management method and system for dangerous chemical safety production risk | |
CN113064399A (en) | Industrial monitoring software prediction maintenance system based on big data distributed programming framework | |
CN202218244U (en) | Information technology (IT) operation and maintenance system for business system monitoring | |
CN106485408A (en) | A kind of engineering construction overall process intelligent management system and its application | |
CN115374088A (en) | Database health degree analysis method, device and equipment and readable storage medium | |
CN114358514A (en) | Fire safety risk quantification method and device and storage medium | |
CN112860673B (en) | Intelligent device applied to environmental protection measurement and control and application method | |
CN111091266A (en) | Grade determination method and device of empty management station and storage medium | |
CN116822941B (en) | Intelligent safety management system based on new energy workstation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |