CN108798698A - A kind of shield tunnel construction passing through horizontal dislocation active fault - Google Patents

A kind of shield tunnel construction passing through horizontal dislocation active fault Download PDF

Info

Publication number
CN108798698A
CN108798698A CN201810846785.2A CN201810846785A CN108798698A CN 108798698 A CN108798698 A CN 108798698A CN 201810846785 A CN201810846785 A CN 201810846785A CN 108798698 A CN108798698 A CN 108798698A
Authority
CN
China
Prior art keywords
active fault
dislocation
tunnel
shield tunnel
isolation channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810846785.2A
Other languages
Chinese (zh)
Other versions
CN108798698B (en
Inventor
肖明清
孙文昊
陈立保
游龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201810846785.2A priority Critical patent/CN108798698B/en
Publication of CN108798698A publication Critical patent/CN108798698A/en
Application granted granted Critical
Publication of CN108798698B publication Critical patent/CN108798698B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/14Layout of tunnels or galleries; Constructional features of tunnels or galleries, not otherwise provided for, e.g. portals, day-light attenuation at tunnel openings
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a kind of shield tunnel constructions passing through horizontal dislocation active fault, the shield tunnel construction includes tunnel agent structure (7) and the flexible energy dissipation structure for being arranged in tunnel agent structure (7) surrounding, in section of coming to nothing (6) of the flexible energy dissipation structure setting residing for active fault (1), it includes the loosening layer (9) for being vertically arranged at the isolation channel (5) of tunnel agent structure (7) both sides and being horizontally placed on tunnel agent structure (7) top and bottom, isolation channel (5) top connects with ground or water-bed face (8), the top top for loosening layer (9) is original bedrock formation (10) or soil layer (11), bottom end lower part is original bedrock formation (10).The shield tunnel construction of the present invention ensure that structure safety when shield driven tunnel crossing horizontal dislocation active fault, have high economy, improve constructing tunnel and build technical merit under the premise of excessively not increasing shield tunnel headroom.

Description

A kind of shield tunnel construction passing through horizontal dislocation active fault
Technical field
The invention belongs to technical field of civil engineering, more particularly, to a kind of shield passing through horizontal dislocation active fault Tunneling structure structure.
Background technology
Active fault refer to currently activity tomography, or in the recent period once had activity may without long future Again movable tomography.In Tunnel Passing fault region, active fault region is especially passed through, due to Fault Creep or sudden Earthquake can cause the region to generate certain dislocation amount, cause tunnel lateral direction failure by shear.
Existing many cases Tunnel Passing active fault case both at home and abroad, the existing burst changing of the relative positions type of active fault passed through also has compacted Slip, 30~50cm of dislocation amount is differed, but is all passed through using Mining Method.Have " backbreaking " for the mentality of designing of active fault dislocation Formula, such as Fig. 1 and Fig. 2, " hinged " formula, such as Fig. 3 and Fig. 4, " isolation energy dissipating " formula, as Fig. 5 and Fig. 6 is total to three categories form.Engineering is answered In, in such a way that even three kinds of one of which or two kinds of combinations are used entirely, and " backbreaking " and " hinged " application is relatively more.It wears More in the design of active fault Mining Method, the amount of backbreaking of " backbreaking " design is generally equivalent to active fault dislocation amount;" hinged " design one As by the way that multiple tracks aseismatic joint (seam spacing 4~6m) is arranged, to make tunnel, the changing of the relative positions reaches design changing of the relative positions amount section by section;" isolation energy dissipating " is set Meter is general to fill porous material (such as foam concrete) to prevent secondary lining from destroying in the early stage between supporting and secondary lining, fill out It fills layer thickness and should be greater than Fault Dislocation amount.
Conventional Mining Method is designed according to " backbreaking ", and entire shield section need to all use expansion section, on Technical Economy It is unreasonable, and the wide generally 1~2m of duct pieces of shield tunnel, inherently good " hinged " structure.But it is located at bedrock formation Active fault to be crushed bandwidth general relatively narrow (20m or so is in the majority), when the active fault of shield driven tunnel crossing horizontal dislocation, Under the premise of tunnel clearance is not increased excessively to ensure economy, tunnel how is prevented by " cutting " and ensures that seam waterproof is effective It is still a great problem of the pendulum in face of project planner.
Invention content
For the disadvantages described above or Improvement requirement of the prior art, the present invention provides a kind of horizontal dislocation active fault of passing through Shield tunnel construction when its object is to solve the active fault of shield driven tunnel crossing horizontal dislocation, does not increase shield tunnel excessively Road headroom, and can effectively prevent the problem of shield tunnel is by " cutting ".
To achieve the above object, the present invention provides a kind of shield tunnel construction passing through horizontal dislocation active fault, special Sign is, which includes tunnel agent structure and the flexible energy dissipation knot that is arranged in around the tunnel agent structure Structure;
The tunnel agent structure passes through the active fault of bedrock formation, and bedrock formation is divided into work by the active fault Hanging wall and active fault lower wall are moved, disk is located above the active fault in the active fault, under the active fault Disk is located at below the active fault, and disk exists with the active fault lower wall relative to the active fault in the active fault Horizontal direction occurs to generate active fault dislocation amount when dislocation;
Flexible energy dissipation structure setting the coming to nothing in section residing for the active fault, the flexible energy dissipation structure packet It includes the isolation channel for being vertically arranged at tunnel agent structure both sides and is horizontally placed on the tunnel agent structure top and bottom The loosening layer in portion, the top top for loosening layer are original bedrock formation or soil layer, and bottom end lower part is original bedrock formation, institute Isolation channel top is stated with ground or water-bed face to connect.
Further, the thickness of the isolation channel is no less than active fault dislocation amount described in three times.
Further, filling flexible material in the isolation channel, and the flexible material deformation modulus should be less than rock mass change / 10th of shape modulus.
Further, the isolation channel is close to the tunnel agent structure setting.
Further, the flexible material includes weak soil or medium coarse sand.
Further, the isolation channel direction along ng a path setting length=section of jurisdiction ring width × dislocation amount ÷ interannulars allow faulting of slab ends Amount × safety coefficient.
Further, the isolation channel is constructed using piling or grooving mode.
Further, three times of the thickness for loosening layer not less than the active fault dislocation amount.
Further, the loosening layer is using the pre- blasting method construction in ground.
In general, through the invention it is contemplated above technical scheme is compared with the prior art, can obtain down and show Beneficial effect:
(1) a kind of shield tunnel construction passing through horizontal dislocation active fault of the invention, flexible energy dissipation include vertical It is set to the isolation channel of tunnel agent structure both sides and is horizontally placed on the loosening layer of tunnel agent structure top and bottom, it is described The top top for loosening layer is original bedrock formation or soil layer, and bottom end lower part is original bedrock formation, isolation channel top and ground Or water-bed face connects, and by the way that isolation channel is arranged and loosens layer, under the premise of excessively not increasing shield tunnel headroom, ensure that shield Structure safety when structure Tunnel Passing horizontal dislocation active fault, has good economy, improves shield tunnel and build skill Art is horizontal.
(2) thickness of a kind of shield tunnel construction passing through horizontal dislocation active fault of the invention, isolation channel should be many In three times active fault dislocation amount, the flexible materials such as interior filling weak soil, medium coarse sand, and flexible material deformation modulus should be less than rock / 10th of body deformation modulus, and isolation channel is generally close to tunnel agent structure setting, forms good " flexible energy dissipation " knot Structure reduces effect of the rock mass to the direct power of tunnel agent structure.
(3) a kind of shield tunnel construction passing through horizontal dislocation active fault of the invention, the isolation channel is along track side It is to laying length:
L=D × Δ X/ Δs Y × a (1)
In formula:L:The laying length of isolation channel, unit m;
D:Section of jurisdiction ring width, unit m;
ΔX:Active fault dislocation amount, unit m;
ΔY:Interannular allows faulting of slab ends amount, unit m;
a:Safety coefficient, value range 1.5~2.
When there is horizontal direction dislocation, the dislocation for appearing in active fault range originally extends into isolation channel section paragraph, Corresponding shield tunnel dislocation length becomes the length that the isolation channel is arranged from the active fault width, described in being not provided with Isolation channel is compared, and shield interannular faulting of slab ends amount is greatly decreased, and section of jurisdiction interannular shearing resistance and hermetic seal requirement is reduced, for dislocation amount Big tomography, change can not pass through pass through, and improve the adaptability of shield driven tunnel crossing active fault.
(4) a kind of shield tunnel construction passing through horizontal dislocation active fault of the invention, isolation channel can be from ground or water Bottom surface is constructed, and using mechanical executions modes such as piling or grooving, is loosened layer and is located in shield tunnel vertical range, use ground The pre- blasting method construction in face, improves construction efficiency, reduces construction operation cost.
Description of the drawings
Fig. 1 is status diagram of backbreaking before a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 2 is status diagram of backbreaking after a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 3 is hinged status diagram before a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 4 is hinged status diagram after a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 5 is isolation energy dissipating status diagram before a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 6 is isolation energy dissipating status diagram after a kind of Tunnel Passing active fault dislocation in the prior art;
Fig. 7 is that a kind of active fault of shield tunnel construction passing through horizontal dislocation active fault of the embodiment of the present invention is horizontal Frontal plane schematic diagram occurs for dislocation;
Fig. 8 is that a kind of active fault of shield tunnel construction passing through horizontal dislocation active fault of the embodiment of the present invention is horizontal Floor map after dislocation occurs;
Fig. 9 is a kind of transverse cross for the shield tunnel construction passing through horizontal dislocation active fault of the embodiment of the present invention.
In Fig. 1~Fig. 9, the same reference numeral indicates identical structure and part, wherein:1- active faults, 2- activities Hanging wall, 3- active faults lower wall, 4- active faults dislocation amount, 5- isolation channels, 6- may come to nothing section, the tunnels 7- master Body structure, the ground 8- or water-bed face, 9- loosen layer, the original basement rock structures of 10-, 11- soil layers.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.As long as in addition, technical characteristic involved in the various embodiments of the present invention described below that Conflict is not constituted between this to can be combined with each other.
Fig. 9 is a kind of transverse cross for the shield tunnel construction passing through horizontal dislocation active fault of the embodiment of the present invention, As shown in figure 9, this system includes tunnel agent structure 7 and the flexible energy dissipation structure that is arranged in around the tunnel agent structure 7. Wherein, the tunnel agent structure 7 is traditional shield construction tunnel, and tunneling shield section of jurisdiction is general 1 to 2 meter wide, and section of jurisdiction is by steel Reinforced concrete is made, and interannular permission faulting of slab ends amount should be arranged positioned at the section of jurisdiction in the section 6 that may come to nothing, right according to faulting of slab ends amount Interannular shear structure is corresponding with gasket structure progress to be handled;The flexible energy dissipation structure setting may come to nothing in described In section 6, the flexible energy dissipation structure includes being vertically arranged at the isolation channel 5 of shield tunnel both sides and being horizontally placed on shield tunnel Loosening layer 9 at the top and bottom of road, the top top for loosening layer is original bedrock formation 10 or soil layer 11, and bottom end lower part is Original bedrock formation 10,5 top of the isolation channel connect with ground or water-bed face 8.By the way that isolation channel is arranged and loosens layer, formed Good " flexible energy dissipation " structure ensure that shield driven tunnel crossing level under the premise of excessively not increasing shield tunnel headroom Structure safety when dislocation active fault, has good economy, improves shield tunnel and build technical merit.
As shown in Figure 7 and Figure 8, the tunnel agent structure 7 passes through the active fault 1 of bedrock formation, and the activity is disconnected Bedrock formation is divided into disk 2 and active fault lower wall 3 in active fault by layer 1, and disk 2 is disconnected positioned at the activity in the active fault 1 top of layer, the active fault lower wall 3 are located at 1 lower section of the active fault;After horizontal dislocation occurs, the active fault 2 Dislocation occurs in the horizontal direction relative to the active fault 1 with the active fault 3, generates active fault dislocation amount 4.
As shown in Figure 7, Figure 8 and Figure 9, the thickness of the isolation channel 5 should be no less than active fault dislocation amount 4 described in three times, Its bottom surface should be less than shield tunnel bottom surface, the flexible materials such as internal filling weak soil, medium coarse sand, and flexible material deformation modulus is answered Less than 1/10th of Deformation Module of Rock Mass, the isolation channel 5 is generally close to the tunnel agent structure 7 and is arranged, to reduce rock Effect of the body to the direct power of tunnel agent structure.
5 direction along ng a path of the isolation channel is arranged length and is generally determined according to the active fault dislocation amount 4, the isolation Slot (5) direction along ng a path laying length is:
L=D × Δ X/ Δs Y × a (1)
In formula:L:The laying length of the isolation channel (5), unit m;
D:Section of jurisdiction ring width, unit m;
ΔX:The active fault dislocation amount (4), unit m;
ΔY:Interannular allows faulting of slab ends amount, unit m;
a:Safety coefficient, value range 1.5~2.
When earthquake causes active fault upper lower burrs rock mass the dislocation of horizontal direction occur, it is disconnected that the activity was appeared in originally The dislocation of 1 range of layer extends into 5 section paragraph of the isolation channel, corresponding dislocation siding-to-siding block length by the active fault 1 width Degree becomes the length that the isolation channel 5 is arranged, by the way that the isolation channel 5, compared with being not provided with the isolation channel 5, shield is arranged Interannular faulting of slab ends amount is greatly decreased, and reduces section of jurisdiction interannular shearing resistance and hermetic seal requirement.For the big tomography of dislocation amount, change can not It passes through as that can pass through, improves the adaptability of shield driven tunnel crossing active fault.
The thickness for loosening layer 9 is not less than three times of the active fault dislocation amount 4, when horizontal position occurs in active fault It staggers the time, plays the role of generating level of flexibility deformation.
The isolation channel 5 can construct from the ground or water-bed face 8, using mechanical executions modes such as piling or grooving, In filling the flexible materials such as weak soil, medium coarse sand in slot, the loosening layer 9 is constructed using the pre- blasting method in ground, and in shield tunnel Before road is built, in constructing in designed lines, construction efficiency is improved compared with traditional construction operating type, reduces construction operation Cost.
A kind of shield tunnel construction passing through horizontal dislocation active fault of the present invention, by the tunnel agent structure The isolation channel 5 is arranged in 7 both sides, and the horizontally arranged loosening layer 9 will appear in 1 range of the active fault originally Dislocation extends into 5 section paragraph of the isolation channel, and corresponding dislocation siding-to-siding block length becomes described from the width of the active fault 1 The length of isolation channel 5 so that 7 deflection of tunnel agent structure of unit length is compared with the change before being not added with the isolation channel 5 Shape amount greatly reduces, and shield tunnel radial force situation is made to improve.It plays and works as shield driven tunnel crossing horizontal dislocation active fault When, do not increase shield tunnel headroom not only, and can effectively prevent its effect by the stress " cutting " of the active fault 1.
As it will be easily appreciated by one skilled in the art that the foregoing is merely illustrative of the preferred embodiments of the present invention, it is not used to The limitation present invention, all within the spirits and principles of the present invention made by all any modification, equivalent and improvement etc., should all include Within protection scope of the present invention.

Claims (9)

1. a kind of shield tunnel construction passing through horizontal dislocation active fault, which is characterized in that the shield tunnel construction includes tunnel Road agent structure (7) and the flexible energy dissipation structure being arranged in around the tunnel agent structure (7);Wherein,
The tunnel agent structure (7) passes through the active fault (1) of bedrock formation, and the active fault (1) is by bedrock formation It is divided into disk in active fault (2) and active fault lower wall (3), disk (2) is located in the active fault (1) in the active fault Side, the active fault lower wall (3) are located at below the active fault (1), and disk (2) and the activity are disconnected in the active fault Layer lower wall (3) occurs to generate active fault dislocation amount (4) when dislocation relative to the active fault (1) in the horizontal direction;
In section of coming to nothing (6) of the flexible energy dissipation structure setting residing for the active fault (1), the flexible energy dissipation structure Including being vertically arranged at the isolation channel (5) of tunnel agent structure (7) both sides and being horizontally placed on the tunnel agent structure (7) top and bottom loosening layer (9), it is described loosen layer (9) top top be original bedrock formation (10) or soil layer (11), Bottom end lower part is original bedrock formation (10), and isolation channel (5) top connects with ground or water-bed face (8).
2. a kind of shield tunnel construction passing through horizontal dislocation active fault according to claim 1, which is characterized in that institute The thickness for stating isolation channel (5) is no less than active fault dislocation amount (4) described in three times.
3. a kind of shield tunnel construction passing through horizontal dislocation active fault according to claim 1, which is characterized in that institute The interior filling flexible material of isolation channel (5) is stated, and the flexible material deformation modulus should be less than 1/10th of Deformation Module of Rock Mass.
4. a kind of shield tunnel construction passing through horizontal dislocation active fault according to any one of claim 1-3, It is characterized in that, the isolation channel (5) is close to tunnel agent structure (7) setting.
5. a kind of shield tunnel construction passing through horizontal dislocation active fault according to claim 3, which is characterized in that institute It includes weak soil or medium coarse sand to state flexible material.
6. a kind of shield tunnel construction passing through horizontal dislocation active fault according to any one of claim 1-4, It is characterized in that, isolation channel (5) the direction along ng a path laying length is:
L=D × Δ X/ Δs Y × a (1)
In formula:L:The laying length of the isolation channel (5), unit m;
D:Section of jurisdiction ring width, unit m;
ΔX:The active fault dislocation amount (4), unit m;
ΔY:Interannular allows faulting of slab ends amount, unit m;
a:Safety coefficient, value range are 1.5~2.
7. a kind of shield tunnel construction passing through horizontal dislocation active fault according to any one of claim 1-4 or described in 6, It is characterized in that, the isolation channel (5) is constructed using piling or grooving mode.
8. a kind of shield tunnel construction passing through horizontal dislocation active fault according to claim 1, which is characterized in that institute The thickness for stating loosening layer (9) is not less than three times of the active fault dislocation amount (4).
9. a kind of shield tunnel construction passing through horizontal dislocation active fault according to claim 1 or 8, feature exist In the loosening layer (9) is using the pre- blasting method construction in ground.
CN201810846785.2A 2018-07-27 2018-07-27 Shield tunnel structure crossing horizontal dislocation movable fault Active CN108798698B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810846785.2A CN108798698B (en) 2018-07-27 2018-07-27 Shield tunnel structure crossing horizontal dislocation movable fault

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810846785.2A CN108798698B (en) 2018-07-27 2018-07-27 Shield tunnel structure crossing horizontal dislocation movable fault

Publications (2)

Publication Number Publication Date
CN108798698A true CN108798698A (en) 2018-11-13
CN108798698B CN108798698B (en) 2023-06-02

Family

ID=64078512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810846785.2A Active CN108798698B (en) 2018-07-27 2018-07-27 Shield tunnel structure crossing horizontal dislocation movable fault

Country Status (1)

Country Link
CN (1) CN108798698B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374628A (en) * 2019-08-02 2019-10-25 西南交通大学 One kind passing through the double-deck anti-fault structure in creep faults tunnel and construction method
CN113605926A (en) * 2021-08-26 2021-11-05 西南交通大学 Cross-fault tunnel segment lining passive vector type flexible joint structure

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0142857A2 (en) * 1983-11-21 1985-05-29 The Yokohama Rubber Co., Ltd. Pneumatic tire
JP2001173381A (en) * 1999-12-21 2001-06-26 East Japan Railway Co Precast board for secondary lining on inner surface of tunnel, secondary lining construction using this and construction method therefor
JP2007205163A (en) * 2007-05-18 2007-08-16 Kajima Corp Tunnel structure and construction method of tunnel
JP2010203211A (en) * 2009-03-06 2010-09-16 Taisei Corp Underground structure and method for constructing the same
JP2013007263A (en) * 2012-10-12 2013-01-10 Taisei Corp Underground structure crossing active fault zone
CN104895122A (en) * 2015-06-03 2015-09-09 中铁第四勘察设计院集团有限公司 Continuous beam type anti-floating structure of shield tunnel
CN107843195A (en) * 2017-11-02 2018-03-27 中铁西南科学研究院有限公司 A kind of active breaking belt tunnel structure DEFORMATION MONITORING SYSTEM and method
CN108222950A (en) * 2018-02-07 2018-06-29 宁波市交通规划设计研究院有限公司 Diversion water-conveyance tunnel penetrates through method for correcting error under a kind of weak broken wall rock geological conditions
CN108252721A (en) * 2018-01-11 2018-07-06 北京工业大学 It is a kind of to be hinged tunnel and its application for passing through the anti-disconnected type of Active Fault Area

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0142857A2 (en) * 1983-11-21 1985-05-29 The Yokohama Rubber Co., Ltd. Pneumatic tire
JP2001173381A (en) * 1999-12-21 2001-06-26 East Japan Railway Co Precast board for secondary lining on inner surface of tunnel, secondary lining construction using this and construction method therefor
JP2007205163A (en) * 2007-05-18 2007-08-16 Kajima Corp Tunnel structure and construction method of tunnel
JP2010203211A (en) * 2009-03-06 2010-09-16 Taisei Corp Underground structure and method for constructing the same
JP2013007263A (en) * 2012-10-12 2013-01-10 Taisei Corp Underground structure crossing active fault zone
CN104895122A (en) * 2015-06-03 2015-09-09 中铁第四勘察设计院集团有限公司 Continuous beam type anti-floating structure of shield tunnel
CN107843195A (en) * 2017-11-02 2018-03-27 中铁西南科学研究院有限公司 A kind of active breaking belt tunnel structure DEFORMATION MONITORING SYSTEM and method
CN108252721A (en) * 2018-01-11 2018-07-06 北京工业大学 It is a kind of to be hinged tunnel and its application for passing through the anti-disconnected type of Active Fault Area
CN108222950A (en) * 2018-02-07 2018-06-29 宁波市交通规划设计研究院有限公司 Diversion water-conveyance tunnel penetrates through method for correcting error under a kind of weak broken wall rock geological conditions

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110374628A (en) * 2019-08-02 2019-10-25 西南交通大学 One kind passing through the double-deck anti-fault structure in creep faults tunnel and construction method
CN110374628B (en) * 2019-08-02 2024-05-31 西南交通大学 Double-layer anti-fault structure of tunnel penetrating through creeping fault and construction method
CN113605926A (en) * 2021-08-26 2021-11-05 西南交通大学 Cross-fault tunnel segment lining passive vector type flexible joint structure
CN113605926B (en) * 2021-08-26 2022-06-21 西南交通大学 Cross-fault tunnel segment lining passive vector type flexible joint structure

Also Published As

Publication number Publication date
CN108798698B (en) 2023-06-02

Similar Documents

Publication Publication Date Title
CN101737063B (en) Ground fissure tunnel asphalt concrete composite lining and supporting method thereof
CN1837506B (en) Construction method for excavating box-shape structure over an operating tunnel
CN105862930B (en) A kind of protection structure to creating existing tunnel below underground engineering
KR101028535B1 (en) Construction method of double tunnel
CN102061923B (en) Tunnel construction method capable of protecting existing building
CN103114609B (en) Newly, the linkage of old diaphragm wall and construction method
CN105134248A (en) Vibration-resistant and damping method for connection part of shield tunnel and vertical shaft
CN109026016B (en) Construction method of tunnel penetrating through sliding fault
CN108798698A (en) A kind of shield tunnel construction passing through horizontal dislocation active fault
US11821316B1 (en) System and construction method of single-layer lining tunnel structure based on mine-tunnelling method
CN208578572U (en) A kind of shield tunnel construction passing through horizontal dislocation active fault
CN206581953U (en) A kind of prefabricated band rib steel slab supporting structure
CN208293317U (en) A kind of Plateau Permafrost Areas high-speed railway cutting water blocking discharge structure
CN202970720U (en) Construction structure for reinforcing deep weak structural surface of large rock slope
CN109236319A (en) The ground fissure region shield tunnel and its construction method of enlarged footing pattern are poured based on after
CN113846663A (en) Concrete continuous tooth wall structure without structural joint and construction method
CN109441478B (en) Method for damping and reinforcing IV-type and V-type surrounding rock advanced rod system arch of tunnel
JP4544775B2 (en) Seismic reinforcement method for existing underground line structures
Law A parametric study of efficiency of buttress walls in reducing the excavation-induced tunnel movement
CN205742292U (en) A kind of to the protection structure of existing tunnel below newly-built underground engineering
JP5416435B2 (en) Underground structure and construction method of underground structure
CN219733459U (en) High-strength mine filling wall
CN220013224U (en) Inclined pile reinforcing structure of side-penetrating railway pile foundation of shield tunnel
CN216765900U (en) U-shaped combined structure for in-situ protection of high-voltage cable pipe
JP2014201944A (en) Floor slab unit and pavement structure using the same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant