CN108798648A - A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method - Google Patents

A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method Download PDF

Info

Publication number
CN108798648A
CN108798648A CN201810578242.7A CN201810578242A CN108798648A CN 108798648 A CN108798648 A CN 108798648A CN 201810578242 A CN201810578242 A CN 201810578242A CN 108798648 A CN108798648 A CN 108798648A
Authority
CN
China
Prior art keywords
well
gas nozzle
throttling
gas
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810578242.7A
Other languages
Chinese (zh)
Inventor
聂仁仕
陈天齐
王正
樊晓辉
邓祺
周浩
欧进晶
王杰
周杰
周贤宗
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201810578242.7A priority Critical patent/CN108798648A/en
Publication of CN108798648A publication Critical patent/CN108798648A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells

Abstract

The present invention discloses a kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method, includes the following steps:Collect and arrange low permeability tight gas reservoir exploration pilot production target well be drilled well, well logging, coring data, and comprehensive analysis is carried out to data, obtains the basic parameter of gas reservoir and gas well;To target well, the improvement positive sequence test pattern that 5 passes are opened using 5 carries out exploration pilot production work, wherein the gas nozzle size that drives a well amplified step by step, to obtain the increased gas well gas testing yield that drives a well step by step;In the well opening time and closed-in time of improved positive sequence test, a pass closed-in time opens well opening time more than one, remaining closed-in time is identical as well opening time, carries out well test analysis, exports explanation results.The present invention is easily obtained stable working system, and pressure recovery is not influenced more by more pass working system variations are opened, and can not only be obtained preferably test effect and be also ad save steady operation system in order to well test analysis and press later the testing time of extensive well testing.

Description

A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method
Technical field
The invention belongs to oil-gas mining technical fields, and in particular to a kind of hypotonic tight gas reservoir tries whens improving positive sequence amendment etc. Well test method.
Background technology
Low permeability gas reservoir is widely distributed in the world, and stock number is big, all takes much count of the exploitation to such gas field both at home and abroad at present. Low permeability gas reservoir reservoir is fine and close, reserves abundance is low, anisotropism is strong, realizes that Efficient Development difficulty is big.To exploration initial pilot development Low permeability gas reservoir, in the case where development data is still not perfect, the working system that pilot production test is explored to it is studied, and can be The exploration of gas reservoir is found and rationally Efficient Development provides technical support.
It is surveyed frequently with existing conventional positive sequence modified isochronal currently, carrying out pilot production to low permeability tight gas reservoir exploratory well Method for testing, as shown in Figure 1.Conventional modified isochronal is continuously with 3-4 constant rate of production qgi(i=1,2,3,4) opening well and making production Whether identical time t (it is required that entering the Radial Flow stage) reaches stable but regardless of stream pressure.It is typically to take yield (gas Mouth) by the small program gradually increased.The shut-in pressure recovery time injected between each different gas nozzle opening well and making productions is identical, such as All closing well tsTime, and the closed-in time is identical as well opening time, i.e. ts=t.Shut-in pressure is not required for being restored to stratum each time Pressure finally carries out delay test, then implements final shut-in again.Measure the constant rate of production q produced every timegi(i=1,2,3,4, 5), the stream of its distal point presses pwfiThe yield q of (i=1,2,3,4 in general, they are non-stationary flow pressures), delay testg5 P is pressed with stationary flowwf, and the shut-in pressure p at closing well end every timewsi(i=1,2,3,4 in general, they are all unstable passes Well pressure)." unstable capacity point " [q is used on log-log papergi,(p2 wsi-p2 wfi)] (i=1,2,3,4) work exponential form Deliverability curve, i.e. (p2 R-p2 wf) and qgRelation curve, straight line should be obtained, this is that " unstable (exponential form) production capacity is bent Line ", as shown in Figure 2.After stable productivity point [qg5,(p2 R-p2 wf)] make the parallel lines of transient deliverbility plot, as stablize production Energy curve, as shown in Figure 2.
Hypotonic tight gas reservoir reservoir is fine and close, and anisotropism is strong, has hypotonic characteristic, existing positive sequence modified isochronal Test pattern is not exclusively suitable for hypotonic tight gas reservoir.Low permeability tight gas reservoir anisotropism is strong, and some well physical property are good, yield Height, some well physical property are medium, yield is medium, and some well physical property are poor, low output, therefore, to different exploration gas testing yield Well should separately design its rational pilot production test job system.
For high gas rate well (q>5×104m3/ d), physical property is good, and reservoir gas supply capacity is strong, is equivalent to middle and high infiltration gas reservoir, is easy Stable working system is measured, shut-in pressure is easy to be restored to original formation pressure.Therefore, for such prospect pit, it is proposed that use Existing routine positive sequence modified isochronal design.
For gas stringer (q<5×103m3/ d) physical property is poor, and reservoir gas supply capacity is weak, it is difficult to measure stable duty Degree, or even (such as 8mm and 10mm oil nozzles) possibly can not measure effective gas well flow under higher working system.Therefore, for this Class prospect pit, it is difficult to the deliverability testing data obtained, it is proposed that open 1 pass only with existing routine 1 and press extensive Well Test Design, and 1 opens (such as 4mm oil nozzles) is produced with small working system, as shown in Figure 3.It is recommended that using the nothing for pressing extensive well test analysis result to remove to estimate the well Choked flow amount.
For middle gas-producing well (5 × 103m3/d<q<5×104m3/ d), physical property is medium, and reservoir gas supply capacity is medium, if to low Permeating tight gas reservoir exploratory well uses existing positive sequence modified isochronal test pattern, continuous increased preceding 4 systems of driving a well to make There are stronger deficits for stratum energy, and low permeability gas reservoirs well periphery natural gas feed speed is slow, causes 5 to open and is difficult to obtain stabilization Production flowing bottomhole pressure (FBHP) and 5 close in short-term in be also difficult to be restored to original formation pressure, then can cause gas well test effect it is poor, It can not carry out effective deliverability testing and press extensive well test analysis.Therefore, for hypotonic tight gas reservoir gas-producing well, carry out exploration wells Reasonable Study on Test Method, undoubtedly have great importance.
Invention content
The present invention mainly overcomes shortcoming in the prior art, proposes that a kind of low permeability tight gas reservoir exploration gas testing is closed Test method is managed, this method is easily obtained stable working system, and pressure recovery is not by the shadows for more opening more pass working system variations It rings, preferably test effect can not only be obtained and also a save steady operation system in order to well test analysis and press extensive examination later The testing time of well.
The present invention solves the technical solution that above-mentioned technical problem is provided:A kind of hypotonic tight gas reservoir improvement positive sequence amendment Isochronal well testing test method, includes the following steps:
Step S10, collection and arrange low permeability tight gas reservoir exploration pilot production target well be drilled well, well logging, coring money Material, and comprehensive analysis is carried out to data, obtain the basic parameter of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom;
Step S30, exploration pilot production work is carried out using the 5 improvement positive sequence test patterns for opening 5 passes to target well, wherein step by step The gas nozzle size that drives a well of amplification, to obtain the increased gas well gas testing yield that drives a well step by step;In the test of improved positive sequence when driving a well Between and the closed-in time in, one pass the closed-in time open well opening time more than one, remaining closed-in time is identical as well opening time;
Step S40, after the pilot production test jobs that 5 open 5 passes, using well test analysis software by the electron pressure of taking-up Meter is read out, and is drawn the 5 of gas well pilot production and is opened 5 pass duty history curve graphs, carry out well test analysis, exports explanation results.
Further embodiment is, in the step S30 the specific steps are:
Step S301, first throttle gas nozzle d is placed in gas well mouth1, by the 1st well opening time t1Carry out the 1st work that drives a well Industry obtains stable working system and the first gas well mouth aerogenesis flow q1
Step S302, the 1st closed-in time t is pressed1sThe 1st closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the second throttling gas nozzle d2
Step S303, the 2nd well opening time t is pressed2The 2nd operation that drives a well is carried out, is worked with small working system, is obtained Unstable operation system point, and obtain the second gas well mouth aerogenesis flow q2
Step S304, the 2nd closed-in time t is pressed2sThe 2nd closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well replaces third throttling gas nozzle d3
Step S305, the 3rd well opening time t is pressed3The 3rd operation that drives a well is carried out, increases working system and works, obtain Unstable operation system point, and obtain third gas well mouth aerogenesis flow q3
Step S306, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the 4th throttling gas nozzle d4
Step S307, the 4th well opening time t is pressed4It carries out the 4th to drive a well operation, increases working system and work, obtain Unstable operation system point, and obtain the 4th gas well mouth aerogenesis flow q4
Step S308, the 4th closed-in time t is pressed4sThe 4th closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the 5th throttling gas nozzle d5
Step S309, the 5th well opening time t is pressed5It carries out the 5th to drive a well operation, increases working system and work, obtain Unstable operation system point, and obtain the 5th gas well mouth aerogenesis flow q5
Step S310, the 5th closed-in time t is pressed5sThe 5th closing well operation is carried out, electronic pressure gauge is taken out after closing well, Using pressure build-up test explanation is carried out, to obtain effective formation characteristics parameter.
Further embodiment is the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, Four throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter pass through the permeability k of target well and determine;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th Throttle gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 3mm, 3mm, 5mm, 7mm, 9mm respectively;
When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3、 4th throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 4mm, 4mm, 6mm, 8mm, 10mm respectively;
When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, Four throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 5mm, 5mm, 7mm, 9mm, 11mm respectively;
When permeability 0.1<k<When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th Throttle gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 6mm, 6mm, 8mm, 10mm, 12mm respectively;
As permeability k>When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling Gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 7mm, 7mm, 9mm, 11mm, 13mm respectively.
Further embodiment is the 1st well opening time t1For 1000h, the 1st closed-in time t5sFor 2000h, the 5th well opening time t5, the 2nd well opening time t2, the 3rd well opening time t3, the 4th well opening time t4, the 5th Secondary closed-in time t5s, the 2nd closed-in time t2s, the 3rd closed-in time t3s, the 4th closed-in time t4sIt is for 24 hours.
The beneficial effects of the invention are as follows:The present invention considers that low permeability tight gas reservoir reserves abundance is low, anisotropism is strong, low The characteristic oozed devises the rational exploration pilot production well test method for being suitble to its strata condition.It is easily obtained stable duty Degree, pressure recovery are not influenced more by more pass working system variations are opened, and can not only obtain better test effect in order to try Well is explained, is also ad save steady operation system and is pressed later the testing time of extensive well testing.
Description of the drawings
Fig. 1 is existing positive sequence modified isochronal test pattern schematic diagram;
Fig. 2 is existing positive sequence modified isochronal exponential form deliverability curve figure;
Fig. 3 is that conventional one open-one close presses extensive well testing test pattern schematic diagram;
Fig. 4 is improved positive sequence modified isochronal test design diagram.
Specific implementation mode
Further description is done to the present invention with reference to embodiment and attached drawing.
A kind of hypotonic tight gas reservoir of the present invention improves positive sequence modified isochronal test method, includes the following steps:
Step S10, collection and arrange low permeability tight gas reservoir exploration pilot production target well be drilled well, well logging, coring money Material, and comprehensive analysis is carried out to data, obtain the basic parameter of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom;
Step S30, exploration pilot production work is carried out using the 5 improvement positive sequence test patterns for opening 5 passes to target well, wherein step by step The gas nozzle size that drives a well of amplification, the gas nozzle that drives a well includes first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, Four throttling gas nozzle d4, the 5th throttling gas nozzle d5(d1=d2<d3<d4<d5), to obtain the increased gas well gas testing yield that drives a well step by step, The gas well gas testing yield that wherein drives a well includes the first gas well mouth aerogenesis flow q1, the second gas well mouth aerogenesis flow q2, third gas well Well head aerogenesis flow q3, the 4th gas well mouth aerogenesis flow q4, the 5th gas well mouth aerogenesis flow q5(q1<q2<q3<q4<q5);? In the well opening time and closed-in time of the test of improved positive sequence, a pass closed-in time opens well opening time more than one, when remaining closing well Between it is identical as well opening time;
Step S301, first throttle gas nozzle d is placed in gas well mouth1, by the 1st well opening time t1Carry out the 1st work that drives a well Industry obtains stable working system and the first gas well mouth aerogenesis flow q1
Step S302, the 1st closed-in time t is pressed1sThe 1st closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the second throttling gas nozzle d2
Step S303, the 2nd well opening time t is pressed2The 2nd operation that drives a well is carried out, is worked with small working system, is obtained Unstable operation system point, and obtain the second gas well mouth aerogenesis flow q2
Step S304, the 2nd closed-in time t is pressed2sThe 2nd closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well replaces third throttling gas nozzle d3
Step S305, the 3rd well opening time t is pressed3The 3rd operation that drives a well is carried out, increases working system and works, obtain Unstable operation system point, and obtain third gas well mouth aerogenesis flow q3
Step S306, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the 4th throttling gas nozzle d4
Step S307, the 4th well opening time t is pressed4It carries out the 4th to drive a well operation, increases working system and work, obtain Unstable operation system point, and obtain the 4th gas well mouth aerogenesis flow q4
Step S308, the 4th closed-in time t is pressed4sThe 4th closing well operation is carried out, the number pressure of the secondary closing well test is obtained According to the gas nozzle that will throttle at the end of closing well is changed to the 5th throttling gas nozzle d5
Step S309, the 5th well opening time t is pressed5It carries out the 5th to drive a well operation, increases working system and work, obtain Unstable operation system point, and obtain the 5th gas well mouth aerogenesis flow q5
Step S310, the 5th closed-in time t is pressed5sThe 5th closing well operation is carried out, electronic pressure gauge is taken out after closing well, Using pressure build-up test explanation is carried out, to obtain effective formation characteristics parameter.
Step S40, after the pilot production test jobs that 5 open 5 passes, using well test analysis software by the electron pressure of taking-up Meter is read out, and is drawn the 5 of gas well pilot production and is opened 5 pass duty history curve graphs, carry out well test analysis, exports explanation results.
Wherein, the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling gas nozzle d4、 5th throttling gas nozzle d5Diameter pass through the permeability k of target well and determine;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th Throttle gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 3mm, 3mm, 5mm, 7mm, 9mm respectively;
When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3、 4th throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 4mm, 4mm, 6mm, 8mm, 10mm respectively;
When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, Four throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 5mm, 5mm, 7mm, 9mm, 11mm respectively;
When permeability 0.1<k<When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th Throttle gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 6mm, 6mm, 8mm, 10mm, 12mm respectively;
As permeability k>When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling Gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 7mm, 7mm, 9mm, 11mm, 13mm respectively.
The 1st well opening time t1For 1000h, the 1st closed-in time t5sFor 2000h, when described the 5th drives a well Between t5, the 2nd well opening time t2, the 3rd well opening time t3, the 4th well opening time t4, the 5th closed-in time t5s, the 2nd closing well Time t2s, the 3rd closed-in time t3s, the 4th closed-in time t4sIt is for 24 hours.
Conventional positive sequence modified isochronal test needs the testing time grown just gas well can be made to reach stable work very System, the flowing bottomhole pressure (FBHP) of opening well and making production reach stable and closing well recovery pressure and reach original formation pressure.The present invention considers The characteristic that low permeability tight gas reservoir reserves abundance is low, anisotropism is strong, hypotonic, devises and is suitble to the rational of its strata condition Pilot production well test method is explored, is easily obtained stable working system, pressure recovery is not closed working systems variations by opening more more It influences, preferably test effect can not only be obtained and also a save steady operation system in order to well test analysis and press later extensive The testing time of well testing has potential application and popularization value.
The above is not intended to limit the present invention in any form, although the present invention is taken off by above-described embodiment Show, however, it is not intended to limit the invention, any person skilled in the art, is not departing from technical solution of the present invention range It is interior, when the technology contents using the disclosure above make a little equivalent embodiments changed or be modified to equivalent variations, as long as being not Be detached from technical solution of the present invention content, according to the technical essence of the invention to made by above example it is any it is simple modification, Equivalent variations and modification, in the range of still falling within technical solution of the present invention.

Claims (4)

1. a kind of hypotonic tight gas reservoir improves positive sequence modified isochronal test method, which is characterized in that include the following steps:
Step S10, collection and arrange low permeability tight gas reservoir exploration pilot production target well be drilled well, well logging, coring data, and Comprehensive analysis is carried out to data, obtains the basic parameter of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom;
Step S30, exploration pilot production work is carried out using the 5 improvement positive sequence test patterns for opening 5 passes to target well, wherein amplifying step by step The gas nozzle size that drives a well, to obtain the increased gas well gas testing yield that drives a well step by step;Improved positive sequence test well opening time and In closed-in time, a pass closed-in time opens well opening time more than one, remaining closed-in time is identical as well opening time;
Step S40, after the pilot production test jobs that 5 open 5 passes, using well test analysis software by the electronic pressure gauge of taking-up into Row is read, and is drawn the 5 of gas well pilot production and is opened 5 pass duty history curve graphs, carry out well test analysis, exports explanation results.
2. a kind of hypotonic tight gas reservoir according to claim 1 improves positive sequence modified isochronal test method, feature Be, in the step S30 the specific steps are:
Step S301, first throttle gas nozzle d is placed in gas well mouth1, by the 1st well opening time t1The 1st operation that drives a well is carried out, Obtain stable working system and the first gas well mouth aerogenesis flow q1
Step S302, the 1st closed-in time t is pressed1sThe 1st closing well operation is carried out, the pressure data of the secondary closing well test is obtained, closes Throttling gas nozzle is changed to the second throttling gas nozzle d at the end of well2
Step S303, the 2nd well opening time t is pressed2The 2nd operation that drives a well is carried out, is worked with small working system, is obtained unstable Determine working system point, and obtains the second gas well mouth aerogenesis flow q2
Step S304, the 2nd closed-in time t is pressed2sThe 2nd closing well operation is carried out, the pressure data of the secondary closing well test is obtained, closes Throttling gas nozzle is replaced into third throttling gas nozzle d at the end of well3
Step S305, the 3rd well opening time t is pressed3The 3rd operation that drives a well is carried out, increases working system and works, is obtained unstable Determine working system point, and obtains third gas well mouth aerogenesis flow q3
Step S306, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, the pressure data of the secondary closing well test is obtained, closes Throttling gas nozzle is changed to the 4th throttling gas nozzle d at the end of well4
Step S307, the 4th well opening time t is pressed4It carries out the 4th to drive a well operation, increases working system and work, obtain unstable Determine working system point, and obtains the 4th gas well mouth aerogenesis flow q4
Step S308, the 4th closed-in time t is pressed4sThe 4th closing well operation is carried out, the pressure data of the secondary closing well test is obtained, closes Throttling gas nozzle is changed to the 5th throttling gas nozzle d at the end of well5
Step S309, the 5th well opening time t is pressed5It carries out the 5th to drive a well operation, increases working system and work, obtain unstable Determine working system point, and obtains the 5th gas well mouth aerogenesis flow q5
Step S310, the 5th closed-in time t is pressed5sThe 5th closing well operation is carried out, electronic pressure gauge is taken out after closing well, is utilized Pressure build-up test explanation is carried out, to obtain effective formation characteristics parameter.
3. a kind of hypotonic tight gas reservoir according to claim 2 improves positive sequence modified isochronal test method, feature It is, the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling gas nozzle d4, the 5th throttling Gas nozzle d5Diameter pass through the permeability k of target well and determine;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling Gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 3mm, 3mm, 5mm, 7mm, 9mm respectively;
When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th Throttle gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 4mm, 4mm, 6mm, 8mm, 10mm respectively;
When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, Section four Gas mouth d4, the 5th throttling gas nozzle d5Diameter take 5mm, 5mm, 7mm, 9mm, 11mm respectively;
When permeability 0.1<k<When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling Gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 6mm, 6mm, 8mm, 10mm, 12mm respectively;
As permeability k>When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3, the 4th throttling gas nozzle d4, the 5th throttling gas nozzle d5Diameter take 7mm, 7mm, 9mm, 11mm, 13mm respectively.
4. a kind of hypotonic tight gas reservoir according to claim 2 improves positive sequence modified isochronal test method, feature It is, the 1st well opening time t1For 1000h, the 1st closed-in time t5sFor 2000h, the 5th well opening time t5, the 2nd well opening time t2, the 3rd well opening time t3, the 4th well opening time t4, the 5th closed-in time t5s, the 2nd closing well when Between t2s, the 3rd closed-in time t3s, the 4th closed-in time t4sIt is for 24 hours.
CN201810578242.7A 2018-06-07 2018-06-07 A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method Withdrawn CN108798648A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810578242.7A CN108798648A (en) 2018-06-07 2018-06-07 A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810578242.7A CN108798648A (en) 2018-06-07 2018-06-07 A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method

Publications (1)

Publication Number Publication Date
CN108798648A true CN108798648A (en) 2018-11-13

Family

ID=64088488

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810578242.7A Withdrawn CN108798648A (en) 2018-06-07 2018-06-07 A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method

Country Status (1)

Country Link
CN (1) CN108798648A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088974A (en) * 2019-11-29 2020-05-01 中国石油集团川庆钻探工程有限公司 Productivity evaluation method for determining unstable flowing pressure correction of low-permeability gas well

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6378627B1 (en) * 1996-09-23 2002-04-30 Intelligent Inspection Corporation Autonomous downhole oilfield tool
US20030141068A1 (en) * 2001-04-24 2003-07-31 Pierre De Rouffignac Eric In situ thermal processing through an open wellbore in an oil shale formation
CN102536222A (en) * 2012-01-09 2012-07-04 中国石油天然气集团公司 Analog evaluation device for evaluating damage of coalbed methane reservoir polluted by external fluid
CN206114018U (en) * 2016-10-09 2017-04-19 无锡洋湃科技有限公司 Measure in heterogeneous stream gas -liquid two -phase critical flow nozzle flowmeter of flow separately
US20170159422A1 (en) * 2011-12-22 2017-06-08 James N. McCoy Hydrocarbon Well Performance Monitoring System
CN107301306A (en) * 2017-08-04 2017-10-27 中国石油化工股份有限公司华北油气分公司 Dynamic open-flow capacity Forecasting Methodology for DAMAGE OF TIGHT SAND GAS RESERVOIRS pressure break horizontal well
CN107545109A (en) * 2017-08-31 2018-01-05 中国石油大学(北京) Coal bed gas field acquisition system optimization method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6378627B1 (en) * 1996-09-23 2002-04-30 Intelligent Inspection Corporation Autonomous downhole oilfield tool
US20030141068A1 (en) * 2001-04-24 2003-07-31 Pierre De Rouffignac Eric In situ thermal processing through an open wellbore in an oil shale formation
US20170159422A1 (en) * 2011-12-22 2017-06-08 James N. McCoy Hydrocarbon Well Performance Monitoring System
CN102536222A (en) * 2012-01-09 2012-07-04 中国石油天然气集团公司 Analog evaluation device for evaluating damage of coalbed methane reservoir polluted by external fluid
CN206114018U (en) * 2016-10-09 2017-04-19 无锡洋湃科技有限公司 Measure in heterogeneous stream gas -liquid two -phase critical flow nozzle flowmeter of flow separately
CN107301306A (en) * 2017-08-04 2017-10-27 中国石油化工股份有限公司华北油气分公司 Dynamic open-flow capacity Forecasting Methodology for DAMAGE OF TIGHT SAND GAS RESERVOIRS pressure break horizontal well
CN107545109A (en) * 2017-08-31 2018-01-05 中国石油大学(北京) Coal bed gas field acquisition system optimization method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
钟孚勋: "《气藏工程》", 28 February 2001, 石油工业出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088974A (en) * 2019-11-29 2020-05-01 中国石油集团川庆钻探工程有限公司 Productivity evaluation method for determining unstable flowing pressure correction of low-permeability gas well

Similar Documents

Publication Publication Date Title
Weddle et al. Mining the Bakken II–Pushing the envelope with extreme limited entry perforating
Qin et al. Interference well-test model for vertical well with double-segment fracture in a multi-well system
CN108729906A (en) A kind of hypotonic tight gas reservoir improvement backward modified isochronal test method
US7100688B2 (en) Fracture monitoring using pressure-frequency analysis
CN109594968A (en) Fracture parameters evaluation method and system after a kind of shale gas multistage pressure break horizontal well pressure
GB2459404A (en) System and method for waterflood performance monitoring
CN106599482A (en) Identification method for unconventional superpressured tight gas effective reservoir
CN107608940A (en) A kind of oil well interval pumping cycle determination method
CN108614902A (en) A kind of shale gas well creation data analysis method producing system variation
CN108894777A (en) A kind of separate stratum fracfturing commingling production oil-gas reservoir reservoir properties and characteristic of crack determination method for parameter
CN107503727A (en) A kind of layer hydraulic fracturing scope of wearing based on in-situ stress monitoring investigates method
CN104504182A (en) Method for rapidly identifying unconventional gas reservoir
CN104879064A (en) Bit allocation method based on average specific energy of well segments
CN108798648A (en) A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method
CN108798659A (en) A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well
CN110259442B (en) Coal measure stratum hydraulic fracturing fracture horizon identification method
CN104678455A (en) Terrestrial fracture-cavern reservoir identification method
CN105678082B (en) Double-pressure drop method for identifying type of oil-gas well acid fracturing communication reservoir
CN105785445A (en) Crack pattern identifying method and apparatus
Zhu Improving the production efficiency of high rank coal bed methane in the Qinshui Basin
RU2627336C1 (en) Method of developing low permeable reservoir by periodic injection of carbon dioxide gas
Marsili et al. Artesian conditions in the Chilterns Chalk aquifer (NW of the London Basin) and the implications for surface water–groundwater interactions
Carpenter Extreme limited-entry perforating enhances Bakken completions
CN106761725A (en) A kind of method that the tunnel reasonable hole sealing depth of concordant mash gas pumping drilling is determined based on coal powder quantity of bore
CN107165611B (en) A kind of method that the inefficient oil well microbial single well stimulation of low yield recovers the oil

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181113

WW01 Invention patent application withdrawn after publication