CN108798659A - A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well - Google Patents

A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well Download PDF

Info

Publication number
CN108798659A
CN108798659A CN201810578244.6A CN201810578244A CN108798659A CN 108798659 A CN108798659 A CN 108798659A CN 201810578244 A CN201810578244 A CN 201810578244A CN 108798659 A CN108798659 A CN 108798659A
Authority
CN
China
Prior art keywords
well
gas
time
opening time
gas nozzle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810578244.6A
Other languages
Chinese (zh)
Inventor
聂仁仕
王正
樊晓辉
邓祺
周浩
欧进晶
王杰
周杰
周贤宗
陈天齐
张帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201810578244.6A priority Critical patent/CN108798659A/en
Publication of CN108798659A publication Critical patent/CN108798659A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B49/00Testing the nature of borehole walls; Formation testing; Methods or apparatus for obtaining samples of soil or well fluids, specially adapted to earth drilling or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B47/00Survey of boreholes or wells
    • E21B47/06Measuring temperature or pressure

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geophysics (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention discloses a kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well, includes the following steps:It collects and arrange low permeability tight gas reservoir exploration gas testing target well is drilled the data such as well, well logging, coring, and comprehensive analysis is carried out to data, obtain the basic parameter of gas reservoir and gas well;Exploration gas testing test jobs are carried out using the 3 positive sequence test patterns for opening 3 passes to target well, and obtain the gas well mouth aerogenesis flow in 3 operations that drive a well;After the gas testing test jobs that 3 open 3 passes, the electronic pressure gauge of taking-up is read out using well test analysis software, 3 pass duty history curve graphs are opened in draw gas well gas testing 3, are closed to 2 and 3 close test data progress well test analysis, export explanation results.This method can ensure that the successful test of hypotonic tight gas reservoir, promotes well testing test curve quality, precisely determines original formation pressure and formation characteristics parameter, evaluates prospect pit gas deliverability, see clearly stratum filtration ability.

Description

A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well
Technical field
The invention belongs to oil-gas mining technical fields, and in particular to a kind of low permeability tight gas reservoir exploration gas testing well is rationally surveyed Method for testing.
Background technology
Low permeability gas reservoir is widely distributed in the world, and stock number is big, all takes much count of the exploitation to such gas field both at home and abroad at present. Low permeability gas reservoir reservoir is fine and close, reserves abundance is low, anisotropism is strong, realizes that Efficient Development difficulty is big.To exploration gas testing initial stage Low permeability gas reservoir, in the case where development data is still not perfect, the working system that gas testing test is explored to it is studied, and can be The exploration of gas reservoir is found and rationally Efficient Development provides technical support.
Because conventional middle and high infiltration gas reservoir physical property is good, reserves abundance is high, strata pressure recovery time is short, and gas reservoir exploration gas testing is surveyed It tries to open the gas testing working system design in short-term of 2 passes frequently with conventional 2.To hypotonic tight gas reservoir, gas well is caused to try because of physical property difference Reservoir supply capacity is insufficient when gas, opens 2 passes gas testing working system in short-term according to conventional 2, then can not carry out effective well testing It explains.By taking the low permeability gas reservoirs gas testing well of Jilin Oil Field exploratory area as an example, which opens 2 passes gas testing working system in short-term using conventional 2 It is tested (see Fig. 1).The open-shut in time of the well test is shorter, and one opens only 0.581h, and two open only 0.674h, and closed-in time Much larger than well opening time, the pressure drop funnel of effect is not formed in shut-in pressure before restoring, and well-test curve is caused pressure derivative song occur Line turns over the abnormal conditions (see Fig. 2) above pressure curve, can not carry out effective well test analysis.Therefore, conventional 22 passes are opened Gas testing working system design method is no longer desirable for hypotonic tight gas reservoir in short-term.Currently, there is no scientific and reasonable hypotonic tight gas The test design method for hiding exploration gas testing carries out the reasonable Study on Test Method of gas well exploration gas testing for hypotonic tight gas reservoir, Undoubtedly have great importance.
Invention content
The present invention mainly overcomes shortcoming in the prior art, proposes that a kind of low permeability tight gas reservoir exploration gas testing is closed Test method is managed, this method can ensure that the successful test of hypotonic tight gas reservoir, promote well testing test curve quality, precisely determine former Beginning strata pressure and formation characteristics parameter evaluate prospect pit gas deliverability, see clearly stratum filtration ability.
The present invention solves the technical solution that above-mentioned technical problem is provided:A kind of low permeability tight gas reservoir exploration gas testing well Reasonable test method, includes the following steps:
Step S10, it collection and arranges low permeability tight gas reservoir exploration gas testing target well and is drilled the moneys such as well, well logging, coring Material, and comprehensive analysis is carried out to data, obtain the basic parameter of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom;
Step S30, exploration gas testing test jobs are carried out using the 3 positive sequence test patterns for opening 3 passes to target well, and obtains 3 Gas well mouth aerogenesis flow in the secondary operation that drives a well;Wherein each closed-in time is more than well opening time, in order to make the 1st time Closed-in bottom-hole pressure can be restored to original formation pressure, and enable the 2nd time and the 3rd closing well reaches radial flow;
Step S40, after the gas testing test jobs that 3 open 3 passes, using well test analysis software by the electron pressure of taking-up Meter is read out, and 3 pass duty history curve graphs are opened in draw gas well gas testing 3, is closed to 2 and 3 close test data progress well test analysis, Export explanation results.
Further embodiment is, in the step S30 the specific steps are:
Step S301, first throttle gas nozzle d is placed in gas well mouth again1, by the 1st well opening time t1The 1st time is carried out to drive a well Operation obtains first time gas well mouth aerogenesis flow q1
Step S302, the 1st closed-in time t is pressed1sThe 1st closing well operation is carried out, the second throttling is changed at the end of closing well Gas nozzle d2
Step S303, the 2nd well opening time t is pressed2The 2nd operation that drives a well is carried out, second of gas well mouth aerogenesis stream is obtained Measure q2
Step S304, the 2nd closed-in time t is pressed2sThe 2nd closing well operation is carried out, third throttling is changed at the end of closing well Gas nozzle d3
Step S305, the 3rd well opening time t is pressed3The 3rd operation that drives a well is carried out, third time gas well mouth aerogenesis stream is obtained Measure q3
Step S306, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, electronic pressure gauge is taken out after closing well.
Further embodiment is the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3's Diameter is sequentially increased, to obtain the increased gas well gas testing yield that drives a well step by step.
Further embodiment is the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3's Diameter is determined by the permeability k of target well;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter 3mm, 5mm, 7mm are taken respectively;When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third Throttle gas nozzle d3Diameter take 4mm, 6mm, 8mm respectively;When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, second section Gas mouth d2, third throttling gas nozzle d3Diameter take 5mm, 7mm, 9mm respectively;When permeability 0.1<k<When 1mD, first segment gas Mouth d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter take 6mm, 8mm, 10mm respectively;As permeability k>When 1mD, the One throttling gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter take 7mm, 9mm, 11mm respectively.
Further embodiment is the 1st in the step S30 time well opening time t1, the 2nd well opening time t2, the 3rd Secondary well opening time t3, the 1st closed-in time t1s, the 2nd closed-in time t2s, the 3rd closed-in time t3sIn want time closed-in time big In well opening time, and well opening time is determined by the following conditions:
As permeability k<When 0.001mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd well opening time t3It answers Between 200-300h;When permeability 0.001<k<When 0.01mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd time Well opening time t3It should be between 100-200h;When permeability 0.01<k<When 0.1mD, the 1st well opening time t1, when driving a well the 2nd time Between t2, the 3rd well opening time t3It should be between 50-100h;When permeability 0.1<k<When 1mD, the 1st well opening time t1, the 2nd time Well opening time t2, the 3rd well opening time t3It should be between 20-50h;As permeability k>When 1mD, the 1st well opening time t1, the 2nd time Well opening time t2, the 3rd well opening time t3It should be between 10-20h.
The beneficial effects of the invention are as follows:The present invention considers the hypotonic characteristic of low permeability tight gas reservoir, devises and is suitble to it The reasonable exploration gas testing test method of stratum actual conditions;The invention can ensure that the successful test of hypotonic tight gas reservoir, promote examination Well test curve quality precisely determines original formation pressure and formation characteristics parameter, evaluates prospect pit gas deliverability, sees clearly that stratum is oozed Stream ability provides reference for gas well fracturing measure decision and gas well rational proration etc..
Description of the drawings
Fig. 1 is Jilin Oil Field exploratory area low permeability gas reservoirs gas testing well gas testing duty history curve graph;
Fig. 2 is that low permeability gas reservoirs gas testing Jing2Guan in Jilin Oil Field exploratory area presses extensive well testing fitted figure;
Fig. 3 is that the low permeability gas reservoirs three for implementing to generate after work step of the present invention open three pass duty history curve graphs;
Fig. 4 be big ox low permeability tight gas reservoir X gas testings well three open three pass test curve figures;
Fig. 5 be big ox low permeability tight gas reservoir X gas testings well two close test curve log-log graph;
Fig. 6 be big ox low permeability tight gas reservoir X gas testings well three close test curve log-log graph.
Specific implementation mode
Further description is done to the present invention with reference to embodiment and attached drawing.
A kind of low permeability tight gas reservoir of the present invention explores the reasonable test method of gas testing well, includes the following steps:
Step S10, it collection and arranges low permeability tight gas reservoir exploration gas testing target well and is drilled the moneys such as well, well logging, coring Material, and comprehensive analysis is carried out to data, grasp the essential information of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom, then to target well, the positive sequence that 3 passes are opened using 3 tests mould Formula carries out exploration gas testing working, using the gas nozzle size that drives a well amplified step by step, to obtain the increased gas well examination that drives a well step by step Gas yield;
Step S30, first throttle gas nozzle d is placed in gas well mouth again1, by the 1st well opening time t1The 1st time is carried out to drive a well Operation, in order to exclude the leak-off working solution for being drilled well, obtain first time gas well mouth aerogenesis flow q1
Step S40, the 1st closed-in time t is pressed1sCarry out the 1st closing well operation, in order to accurately obtain prime stratum Pressure is changed to the second throttling gas nozzle d at the end of closing well2
Step S50, the 2nd well opening time t is pressed2Carry out the 2nd operation that drives a well, in order in process of production can Effective pressure drop funnel is formed, the well-test curve of test can be made to reflect the more complete seepage flow characteristics of formation fluid, is obtained Second of gas well mouth aerogenesis flow q2
Step S60, the 2nd closed-in time t is pressed2sCarry out the 2nd closing well operation, in order to test using the secondary closing well Pressure data carry out pressure build-up test explanation be changed to third at the end of closing well to obtain effective formation characteristics parameter Throttle gas nozzle d3
Step S70, the 3rd well opening time t is pressed3Carry out the 3rd operation that drives a well, in order to test whether gas well has Strong yield hoisting power obtains third time gas well mouth aerogenesis flow q3
Step S80, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, electronic pressure gauge is taken out after closing well.
Step S90, after the gas testing test jobs that 3 open 3 passes, using well test analysis software by the electron pressure of taking-up Meter is read out, and 3 pass duty history curve graphs are opened in draw gas well gas testing 3, is closed to 2 and 3 close test data progress well test analysis, Export explanation results.
The wherein described first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter be to be sequentially increased , to obtain the increased gas well gas testing yield that drives a well step by step.Purpose is original in order to enable the 1st closed-in bottom-hole pressure to be restored to Strata pressure, and enable the 2nd time and the 3rd closing well reaches radial flow.
Particularly, the first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter pass through mesh The permeability k for marking well is determined;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter 3mm, 5mm, 7mm are taken respectively;When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third Throttle gas nozzle d3Diameter take 4mm, 6mm, 8mm respectively;When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, second section Gas mouth d2, third throttling gas nozzle d3Diameter take 5mm, 7mm, 9mm respectively;When permeability 0.1<k<When 1mD, first segment gas Mouth d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter take 6mm, 8mm, 10mm respectively;As permeability k>When 1mD, the One throttling gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter take 7mm, 9mm, 11mm respectively.
The 1st well opening time t in the step S301, the 2nd well opening time t2, the 3rd well opening time t3, close the 1st time Well time t1s, the 2nd closed-in time t2s, the 3rd closed-in time t3sIn want time closed-in time to be more than well opening time, and when driving a well Between be determined by the following conditions:
As permeability k<When 0.001mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd well opening time t3It answers Between 200-300h;When permeability 0.001<k<When 0.01mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd time Well opening time t3It should be between 100-200h;When permeability 0.01<k<When 0.1mD, the 1st well opening time t1, when driving a well the 2nd time Between t2, the 3rd well opening time t3It should be between 50-100h;When permeability 0.1<k<When 1mD, the 1st well opening time t1, the 2nd time Well opening time t2, the 3rd well opening time t3It should be between 20-50h;As permeability k>When 1mD, the 1st well opening time t1, the 2nd time Well opening time t2, the 3rd well opening time t3It should be between 10-20h.
Embodiment
Ordos Basin low permeability tight gas reservoir X gas testing wells, depth 2794.5m, reservoir effective thickness 5m, storage in the well Layer porosity 10%.It has used provided in the present invention 3 to open 3 pass test methods, gas testing survey has been carried out on March 12nd, 2018 Examination.The test job system of design and the yield of test are as shown in table 1, and the bottom pressure curve of test is as shown in Figure 4.One when opening Between 1.442h, produced using 5mm gas nozzles, obtain gas production 500m3/ d, one to open the main reason for yield is smaller be the working system The mainly anti-row near wellbore zone of lower production is drilled well leak-off liquid, and well opening time is short, and the natural gas in remote well area does not have also Effect flowing.One closes time 24.325h, is more than an ETAD expected time of arrival and departure, in order to which bottom pressure can be restored to prime stratum after closing well The original formation pressure of pressure, acquisition is 18.18MPa.Two ETAD expected time of arrival and departure 24.104h are produced using 7mm gas nozzles, obtain gas production 8761m3/ d, two ETAD expected time of arrival and departure are longer, can form effective pressure drop funnel in process of production, and the well-test curve of test is made to reflect Go out the more complete seepage flow characteristics of formation fluid.Two close time 147.44h, are more than two ETAD expected time of arrival and departure, can reach radial flow, can carry out Extensive well test analysis is pressed, effective formation parameter is obtained.Three ETAD expected time of arrival and departure 35.814h are produced using 9mm gas nozzles, obtain gas production 11813m3Whether/d, test gas well have strong yield hoisting power.Three close time 182.186h, are more than three ETAD expected time of arrival and departure, can reach Radial flow carries out pressure build-up test explanation using the pressure data that the secondary closing well is tested, well test analysis are closed with comparison 2 as a result, Improve the reliability that well testing fitting is explained.
Table 1
It is closed to the two of X gas testing well tests, three pass pressure build-up curves have carried out well test analysis, the homogeneous that well test analysis is selected The compound gas-bearing formation model in twoth area of infinitely great boundary, well test analysis fitted figure is as shown in Figure 4, Figure 5, and explanation results are as shown in table 2.Pass through The test data analysis of embodiment and effective well test analysis, it was confirmed that reliability and feasibility of the invention has potential Application and popularization value.
Table 2
The above is not intended to limit the present invention in any form, although the present invention is taken off by above-described embodiment Show, however, it is not intended to limit the invention, any person skilled in the art, is not departing from technical solution of the present invention range It is interior, when the technology contents using the disclosure above make a little equivalent embodiments changed or be modified to equivalent variations, as long as being not Be detached from technical solution of the present invention content, according to the technical essence of the invention to made by above example it is any it is simple modification, Equivalent variations and modification, in the range of still falling within technical solution of the present invention.

Claims (5)

1. a kind of low permeability tight gas reservoir explores the reasonable test method of gas testing well, which is characterized in that include the following steps:
Step S10, collection and arrange low permeability tight gas reservoir exploration gas testing target well be drilled well, well logging, coring data, and Comprehensive analysis is carried out to data, obtains the basic parameter of gas reservoir and gas well;
Step S20, electronic pressure gauge is placed in target well shaft bottom;
Step S30, exploration gas testing test jobs are carried out using the 3 positive sequence test patterns for opening 3 passes to target well, and obtains 3 times and opens Gas well mouth aerogenesis flow in well operations, wherein each closed-in time is more than well opening time;
Step S40, after the gas testing test jobs that 3 open 3 passes, using well test analysis software by the electronic pressure gauge of taking-up into Row is read, and 3 pass duty history curve graphs are opened in draw gas well gas testing 3, is closed to 2 and 3 pass test datas carry out well test analysis, output Explanation results.
2. a kind of low permeability tight gas reservoir according to claim 1 explores the reasonable test method of gas testing well, which is characterized in that In the step S30 the specific steps are:
Step S301, first throttle gas nozzle d is placed in gas well mouth again1, by the 1st well opening time t1Carry out the 1st work that drives a well Industry obtains first time gas well mouth aerogenesis flow q1
Step S302, the 1st closed-in time t is pressed1sThe 1st closing well operation is carried out, the second throttling gas nozzle is changed at the end of closing well d2
Step S303, the 2nd well opening time t is pressed2The 2nd operation that drives a well is carried out, second of gas well mouth aerogenesis flow q is obtained2
Step S304, the 2nd closed-in time t is pressed2sThe 2nd closing well operation is carried out, third throttling gas nozzle is changed at the end of closing well d3
Step S305, the 3rd well opening time t is pressed3The 3rd operation that drives a well is carried out, third time gas well mouth aerogenesis flow q is obtained3
Step S306, the 3rd closed-in time t is pressed3sThe 3rd closing well operation is carried out, electronic pressure gauge is taken out after closing well.
3. a kind of low permeability tight gas reservoir according to claim 2 explores the reasonable test method of gas testing well, which is characterized in that The first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter be sequentially increased, with obtain step by step The increased gas well gas testing yield that drives a well.
4. a kind of low permeability tight gas reservoir according to claim 3 explores the reasonable test method of gas testing well, which is characterized in that The first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter pass through the permeability k of target well and determine;
As permeability k<When 0.001mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter difference Take 3mm, 5mm, 7mm;
When permeability 0.001<k<When 0.01mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3It is straight Diameter takes 4mm, 6mm, 8mm respectively;
When permeability 0.01<k<When 0.1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter 5mm, 7mm, 9mm are taken respectively;
When permeability 0.1<k<When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter difference Take 6mm, 8mm, 10mm;
As permeability k>When 1mD, first throttle gas nozzle d1, the second throttling gas nozzle d2, third throttling gas nozzle d3Diameter take respectively 7mm、9mm、11mm。
5. a kind of low permeability tight gas reservoir according to claim 2 explores the reasonable test method of gas testing well, which is characterized in that The 1st well opening time t1, the 2nd well opening time t2, the 3rd well opening time t3, the 1st closed-in time t1s, the 2nd closing well Time t2s, the 3rd closed-in time t3sIn want time closed-in time to be more than well opening time, and well opening time carried out by the following conditions it is true It is fixed:
As permeability k<When 0.001mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd well opening time t3Ying Between 200-300h;When permeability 0.001<k<When 0.01mD, the 1st well opening time t1, the 2nd well opening time t2, open the 3rd time Well time t3It should be between 100-200h;When permeability 0.01<k<When 0.1mD, the 1st well opening time t1, the 2nd well opening time t2, the 3rd well opening time t3It should be between 50-100h;When permeability 0.1<k<When 1mD, the 1st well opening time t1, open the 2nd time Well time t2, the 3rd well opening time t3It should be between 20-50h;As permeability k>When 1mD, the 1st well opening time t1, open the 2nd time Well time t2, the 3rd well opening time t3It should be between 10-20h.
CN201810578244.6A 2018-06-07 2018-06-07 A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well Pending CN108798659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810578244.6A CN108798659A (en) 2018-06-07 2018-06-07 A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810578244.6A CN108798659A (en) 2018-06-07 2018-06-07 A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well

Publications (1)

Publication Number Publication Date
CN108798659A true CN108798659A (en) 2018-11-13

Family

ID=64087470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810578244.6A Pending CN108798659A (en) 2018-06-07 2018-06-07 A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well

Country Status (1)

Country Link
CN (1) CN108798659A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356577A (en) * 2018-11-28 2019-02-19 冀光 Tight gas reservoir reserves measuring method based on gas-bearing formation Drilling ratio
CN111088974A (en) * 2019-11-29 2020-05-01 中国石油集团川庆钻探工程有限公司 Productivity evaluation method for determining unstable flowing pressure correction of low-permeability gas well
CN112211626A (en) * 2020-10-30 2021-01-12 西南石油大学 Optimization method for productivity well testing test type of heterogeneous gas reservoir gas well

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050241855A1 (en) * 2001-11-14 2005-11-03 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
CN102536222A (en) * 2012-01-09 2012-07-04 中国石油天然气集团公司 Analog evaluation device for evaluating damage of coalbed methane reservoir polluted by external fluid
CN105447238A (en) * 2015-11-16 2016-03-30 中石化石油工程技术服务有限公司 Method for estimating fracturing reformation volume of shale gas horizontal well
CN105781262A (en) * 2014-12-16 2016-07-20 中国石油化工股份有限公司 Well deliverability testing method
CN106127599A (en) * 2016-07-04 2016-11-16 中国石油大学(华东) For tight gas reservoir gas well production split method under gas gathering station production model
CN107545109A (en) * 2017-08-31 2018-01-05 中国石油大学(北京) Coal bed gas field acquisition system optimization method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050241855A1 (en) * 2001-11-14 2005-11-03 Halliburton Energy Services, Inc. Method and apparatus for a monodiameter wellbore, monodiameter casing, monobore, and/or monowell
CN102536222A (en) * 2012-01-09 2012-07-04 中国石油天然气集团公司 Analog evaluation device for evaluating damage of coalbed methane reservoir polluted by external fluid
CN105781262A (en) * 2014-12-16 2016-07-20 中国石油化工股份有限公司 Well deliverability testing method
CN105447238A (en) * 2015-11-16 2016-03-30 中石化石油工程技术服务有限公司 Method for estimating fracturing reformation volume of shale gas horizontal well
CN106127599A (en) * 2016-07-04 2016-11-16 中国石油大学(华东) For tight gas reservoir gas well production split method under gas gathering station production model
CN107545109A (en) * 2017-08-31 2018-01-05 中国石油大学(北京) Coal bed gas field acquisition system optimization method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
林加恩: "《实用试井分析方法》", 31 May 1996, 石油工业出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109356577A (en) * 2018-11-28 2019-02-19 冀光 Tight gas reservoir reserves measuring method based on gas-bearing formation Drilling ratio
CN111088974A (en) * 2019-11-29 2020-05-01 中国石油集团川庆钻探工程有限公司 Productivity evaluation method for determining unstable flowing pressure correction of low-permeability gas well
CN112211626A (en) * 2020-10-30 2021-01-12 西南石油大学 Optimization method for productivity well testing test type of heterogeneous gas reservoir gas well
CN112211626B (en) * 2020-10-30 2022-03-11 西南石油大学 Optimization method for productivity well testing test type of heterogeneous gas reservoir gas well

Similar Documents

Publication Publication Date Title
Weddle et al. Mining the Bakken II–Pushing the envelope with extreme limited entry perforating
Zhang et al. Hydraulic fracture propagation behavior and diversion characteristic in shale formation by temporary plugging fracturing
Wang et al. Experimental study on injection pressure response and fracture geometry during temporary plugging and diverting fracturing
CN109594959B (en) Fracturing oil displacement method for improving recovery economic efficiency of thin and poor reservoir of old oil field
CN109958411B (en) Horizontal well cluster perforation staged fracturing method
CN104533375A (en) Natural fractured reservoir fracturing reformation method
CN108798659A (en) A kind of low permeability tight gas reservoir exploration reasonable test method of gas testing well
Grieser et al. Lessons learned: Refracs from 1980 to present
Pope et al. Improving Stimulation Effectiveness–Field Results in the Haynesville Shale
Yushi et al. Hydraulic fracture geometry and proppant distribution in thin interbedded shale oil reservoirs
Li et al. Experimental study on the multiple fracture simultaneous propagation during extremely limited-entry fracturing
CN104463686B (en) The method for identifying shale gas reservoir with boring using techniques of discriminant analysis
CN105678082B (en) Double-pressure drop method for identifying type of oil-gas well acid fracturing communication reservoir
CN108729906A (en) A kind of hypotonic tight gas reservoir improvement backward modified isochronal test method
Forno et al. Pillar Fracturing Technique Application in the Algerian Desert for Well Production Enhancement
Groenenboom et al. Pulsed water injection during waterflooding
Pankaj et al. Application of refracturing using coiled tubing opens a new door of opportunities for unconventional reservoir stimulation
Zhou et al. Case study: YM204 obtained high petroleum production by acid fracture treatment combining fluid diversion and fracture reorientation
RU2285794C1 (en) Well bottom zone treatment method
CN107066651A (en) A kind of oil well excitement and groundwater prospecting method and the application of monitoring water injection well pressure-responsive
Astafyev et al. A Decade of Multi-Zone Fracturing Treatments in Russia
Fu et al. Practicing and Learning of Shale Gas Staged Fracturing in Sichuan Basin–A Case for the W1 Horizontal Well
CN108798648A (en) A kind of hypotonic tight gas reservoir improvement positive sequence modified isochronal test method
Ezekwe Applied reservoir management principles with case histories
Ji et al. Improving propped SRV in the long Ma Xi Shale: New concept trials and its performance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination