CN108797880A - A kind of plaster tablet suspended ceiling structure - Google Patents

A kind of plaster tablet suspended ceiling structure Download PDF

Info

Publication number
CN108797880A
CN108797880A CN201710309073.2A CN201710309073A CN108797880A CN 108797880 A CN108797880 A CN 108797880A CN 201710309073 A CN201710309073 A CN 201710309073A CN 108797880 A CN108797880 A CN 108797880A
Authority
CN
China
Prior art keywords
keel
fixed
plate module
lifting
suspended ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201710309073.2A
Other languages
Chinese (zh)
Inventor
寻杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Set Construction Technology Co Ltd
Original Assignee
Qingdao Set Construction Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Set Construction Technology Co Ltd filed Critical Qingdao Set Construction Technology Co Ltd
Priority to CN201710309073.2A priority Critical patent/CN108797880A/en
Publication of CN108797880A publication Critical patent/CN108797880A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

The invention belongs to building decoration technical fields, disclose a kind of plaster tablet suspended ceiling structure, and above-mentioned plaster tablet suspended ceiling structure includes furred ceiling component and gypsum plate module.Above-mentioned furred ceiling component includes fixed keel, lifting part and the sunpender being set on roof, and above-mentioned gypsum plate module includes bearing keel.Above-mentioned gypsum plate module is installed on by bearing keel on the lifting part of furred ceiling component.Furred ceiling component is fixed on indoor roof by plaster tablet suspended ceiling structure of the present invention first in furred ceiling operation, then gypsum plate module is installed on successively on the lifting part of fixed keel, highly adjustable and leveling is quick, the setting of furred ceiling component and gypsum plate module, and assembling is quick, the setting of fixed keel, lifting part and bearing keel, configurational stabilisation is reliable, the cooperation of bearing keel and lifting part, and dismounting is simple and convenient, when carrying out furred ceiling decoration to indoor roof, operating efficiency is high.

Description

A kind of plaster tablet suspended ceiling structure
Technical field
The present invention relates to building decoration technical field more particularly to a kind of plaster tablet suspended ceiling structures.
Background technology
Furred ceiling is one of important component of indoor decoration that is, to the decoration of ceiling, according to selection decorative panel material Difference, there are many ceiling structure.Wherein, the ceiling structure most often selected when plaster tablet suspended ceiling structure is indoor decoration.By Building gypsum is that plasterboard is a kind of high-strength light, thickness is moderate, sound insulation is adiabatic made of primary raw material, easy to process and prevent The decorative panel that fire is moisture resistance.The ceiling structure processing cost that is made of plasterboard, steel joist suspended ceiling component is low, flatness is good.
Since plasterboard is finished product plank, so largely splicing is covered in entire roof applying man-hour requirement, plasterboard is hung Roof construction is a kind of furred ceiling technique for combining keel and plasterboard, and existing common construction method is to be installed first on roof Then plasterboard splicing is fixed on keel, completes closed ceiling decoration by good keel again.It is this to splice gypsum on keel The mounting means of plate, leveling is slow, and installation effectiveness is low, and structural stability is poor, and worker's on-site construction time is long, and human cost is high, And installation procedure is complicated, and there are the defects of installation quality difference.
Invention content
The purpose of the present invention is to provide a kind of modularization, leveling is quick, the simple plaster tablet suspended ceiling structure of installation procedure.
For this purpose, the present invention uses following technical scheme:A kind of plaster tablet suspended ceiling structure, including furred ceiling component and stone Cream plate module, the furred ceiling component include fixed keel, lifting part and the sunpender for being set to roof, the gypsum plate module packet Include bearing keel;
The lifting part is installed on fixed keel, and the fixed keel are fixed on sunpender, the gypsum plate module energy It is installed on by bearing keel on the lifting part of furred ceiling component;
The fixed keel can carry out leveling and height adjusting by adjusting in the fixed position on sunpender.
Preferably, the sunpender is uniformly distributed and is provided in parallel to each other multiple rows of, often arranges downrod lower end and fix that there are one solid Determine keel.Above-mentioned setting so that fixed keel are safely and reliably fixed on indoor roof, the weight of final gypsum plate module by Multiple sunpenders are shared, and the safety and reliability of the present invention is improved.
Preferably, the lifting part is provided with multiple, multiple lifting parts are uniformly arranged on fixed keel.It is above-mentioned to set It sets so that gypsum plate module can be uniformly distributed on furred ceiling component, and makes the load of furred ceiling component uniform, improves this The safety and reliability of invention.
Preferably, the lifting part is L-shaped structure part, the lifting part of " L " type is formed with fixed keel combination Horizontal groove;The bearing keel can be loaded in the horizontal groove so that gypsum plate module is fixed on furred ceiling component.On The setting of L-shaped structure part is stated, it is simple in structure, it is loaded easy to assembly, is loaded fixed safe and reliable, to improve artificial furred ceiling The efficiency of operation, and dismount the convenience safeguarded.
Preferably, the lifting part includes integrally formed mounting groove and lifting plate, peace is provided on the mounting groove Hole is filled, guide part is provided on the lifting plate;The mounting groove is sheathed on outside fixed keel, and the bearing keel is through guide part It is loaded after guiding between the horizontal groove that lifting plate and fixed keel are formed.Above-mentioned integrally formed mounting groove and lifting plate Setting, simple in structure, machine-shaping is convenient, and manufacturing cost is cheap, and securely and reliably, the setting of above-mentioned mounting hole coordinates mounting groove, So that adjusting of the lifting part on fixed keel is more convenient, simple and practical, the setting of above-mentioned guide part so that in lifting operation When, operation is more convenient.
Preferably, being provided with multiple bearing keels that are mutually parallel in the gypsum plate module, each bearing keel is loaded In on the lifting part of two neighboring fixed keel.The setting of above-mentioned bearing keel so that it is more equal that gypsum plate module suspends stress in midair It is even, to make gypsum plate module is more safe and reliable to be installed on furred ceiling component.
Preferably, there are two the bearing keel settings.The setting of above-mentioned two bearing keel, it is simple in structure, it is taking On the basis of minimum raw material, realize to the reliable installation of ceiling of plasterboard module safety.
Preferably, the gypsum plate module further includes plasterboard and the cover surface keel that is fixed on plasterboard, it is described Bearing keel is fixed on cover surface keel.The setting of above-mentioned cover surface keel, on the basis of improving decoration panel strength, Also provide lifting impetus for bearing keel, avoid bearing keel be directly fixed on plasterboard and caused by plasterboard damage It is bad.
Preferably, the cover surface keel and fixed keel are arranged in parallel, the bearing keel and fixed keel phase Mutually it is vertically arranged.Above-mentioned cover surface keel and the specific position of bearing keel to setting, it is highly practical so that adjustment and installation of the present invention When, it is simple and fast.
Preferably, the cover surface keel is provided with multiple, multiple cover surface keels are parallel and are equally spacedly set to described On plasterboard.Above-mentioned setting provides uniformly distributed and reliable impetus for plasterboard in lifting, increases gypsum plate module and hang The safety and reliability of dress.
Beneficial effects of the present invention:The setting of furred ceiling component and gypsum plate module, assembling is quick, fixed keel, lifting part With the setting of bearing keel, configurational stabilisation is reliable, the cooperation of bearing keel and lifting part, and dismounting is simple and convenient, to interior When roof carries out furred ceiling decoration, operating efficiency is high, after the completion of furred ceiling decoration when normal use, safeguards and replaces convenient, fixed keel The adjustable setting in position on sunpender so that fixed keel height on roof is adjustable, and can be quickly and easily to this hair Bright plaster tablet suspended ceiling structure carries out leveling operation.
Description of the drawings
Fig. 1 is the structural schematic diagram of plaster tablet suspended ceiling structure of the present invention;
Fig. 2 is the structural schematic diagram of furred ceiling component of the present invention;
Fig. 3 is the structural schematic diagram of gypsum plate module of the present invention;
Fig. 4 is the structural schematic diagram of lifting part of the present invention.
In figure:
1, furred ceiling component;
11, fixed keel;12, lifting part;121, mounting groove;122, plate is lifted;123, mounting hole;124, guide part;13 Sunpender;14, horizontal groove;
2, gypsum plate module;
21, bearing keel;22, plasterboard;23, cover surface keel;
100, fixing piece;200, installation part;300, connector.
Specific implementation mode
The embodiment of the present invention is described below in detail, the example of embodiment is shown in the accompanying drawings, wherein identical from beginning to end Or similar label indicates same or similar element or element with the same or similar functions.It is retouched below with reference to attached drawing The embodiment stated is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
Technical solution to further illustrate the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1-Figure 3, the present invention provides a kind of plaster tablet suspended ceiling structures.Above-mentioned plaster tablet suspended ceiling structure includes hanging Top component 1 and gypsum plate module 2.Above-mentioned furred ceiling component 1 includes the fixation keel 11 being set on roof and is installed on fixation Lifting part 12 on keel 11 is provided with bearing keel 21 in above-mentioned gypsum plate module 2.Above-mentioned gypsum plate module 2 can pass through Bearing keel 21 is installed on the lifting part 12 of furred ceiling component 1.The plaster tablet suspended ceiling structure of the present invention, it is first in furred ceiling operation First furred ceiling component 1 is fixed on indoor roof, then gypsum plate module 2 is installed on to the lifting part 12 of fixed keel 11 successively On.The setting of above-mentioned furred ceiling component 1 and gypsum plate module 2, assembling is quick, fixed keel 11, lifting part 12 and bearing keel 21 Setting, configurational stabilisation is reliable, the cooperation of bearing keel 21 and lifting part 12, dismounting it is simple and convenient, to indoor roof into When row furred ceiling is decorate, operating efficiency is high.
Specifically, in the present embodiment, above-mentioned furred ceiling component 1 further includes sunpender 13.Above-mentioned sunpender 13 passes through fixing piece 100 It is fixed on roof, above-mentioned fixed keel 11 are fixed on by installation part 200 on sunpender 13.Also, above-mentioned 11 energy of fixed keel By adjusting in the operation that the fixed position on sunpender 13 carries out leveling and height is adjusted.Above-mentioned fixed keel 11 are in sunpender 13 The upper adjustable setting in position so that the height on roof of fixed keel 11 is adjustable, and can be quickly and easily to the present invention's Plaster tablet suspended ceiling structure carries out leveling operation.
More specifically, in one embodiment, the sunpender 13 being fixed on indoor roof is uniformly distributed and sets in parallel to each other It is equipped with multiple rows of, often arranges sunpender 13 lower end and fix that there are one fixed keel 11.Above-mentioned setting so that fixed keel 11 are safely and reliably Be fixed on indoor roof, the weight of final gypsum plate module 2 is shared by multiple sunpenders 13, improve the present invention safety and Reliability.
Preferably, in a particular embodiment, above-mentioned lifting part 12 is provided with multiple, also, multiple lifting parts 12 are laid It is placed on fixed keel 11.Above-mentioned setting so that gypsum plate module 2 can be uniformly distributed on furred ceiling component 1, and to hang The load of top component 1 is uniform, improves the safety and reliability of the present invention.
More preferably, in the present embodiment, above-mentioned lifting part 12 is L-shaped structure part, the lifting part 12 of " L " type with it is solid Determine the combination of keel 11 and forms horizontal groove 14.In furred ceiling operation, above-mentioned bearing keel 21 is loaded in horizontal groove 14, from And make, gypsum plate module 2 is fixed on furred ceiling component 1.The setting of above-mentioned L-shaped structure part, simple in structure, be loaded assembling side Just, it is loaded fixed safe and reliable, to improve the efficiency of artificial furred ceiling operation, and the convenience that dismounting is safeguarded.
Specifically, in the present embodiment, above-mentioned lifting part 12 includes integrally formed mounting groove 121 and lifting plate 122.On It states and is provided with mounting hole 123 on mounting groove 121, guide part 124 is provided on above-mentioned lifting plate 122.In a particular embodiment, on It is the chamfering in the installation end setting of lifting plate 122 to state guide part 124.In specific processing, above-mentioned lifting part 12 is metal plate Part is integrally machined molding, and above-mentioned mounting hole 123 can process bolt erecting bed through the stamping process.Above-mentioned mounting groove 121 can It is freely sheathed on outside fixed keel 11, so that lifting part 12 is installed on fixed keel 11.Above-mentioned bearing keel 21 is through leading After being oriented to portion 124, it can be loaded between the horizontal groove 14 that lifting plate 122 and fixed keel 11 are formed.In installation lifting part When 12, first, mounting groove 121 is sheathed on outside fixed keel 11.Then, by lifting part 12, pass through mounting groove 121 and fixed dragon The cooperation of bone 11, the specified location of keel 11 free to slide to fixed.Then, it is worn on the mounting hole 123 of mounting groove 121 Lifting part 12 is fixed on fixed keel 11 by fastening bolt by fastening bolt.Later, when installing gypsum plate module 2, stone The bearing keel 21 of cream plate module 2 first passes around the guiding of guide part 124, is then loaded in 11 shape of lifting plate 122 and fixed keel At horizontal groove 14 between.Specifically, the sheet metal component that above-mentioned mounting groove 121 and lifting plate 122 are integrally formed.Above-mentioned one The setting of molding mounting groove 121 and lifting plate 122, simple in structure, machine-shaping is convenient, and manufacturing cost is cheap, securely and reliably, The setting of above-mentioned mounting hole 123 coordinates mounting groove 121 so that adjusting of the lifting part 12 on fixed keel 11 is more convenient, letter It is single practical, the setting of above-mentioned guide part 124 so that in lifting operation, operation is more convenient.
Specifically, in one embodiment, multiple bearing keels being mutually parallel are provided in above-mentioned gypsum plate module 2 21, each bearing keel 21 is loaded on the lifting part 12 of two neighboring fixed keel 11.The setting of above-mentioned bearing keel 21, makes Gypsum plate module 2 suspention be more uniformly stressed, to make gypsum plate module 2 it is more safe and reliable be installed on furred ceiling component 1 On.
More specifically, in the present embodiment, there are two the settings of above-mentioned bearing keel 21.Above-mentioned two bearing keel 21 Setting, it is simple in structure, on the basis of taking minimum raw material, realize the installation of ceiling safe and reliable to gypsum plate module 2.
Preferably, in one embodiment, above-mentioned gypsum plate module 2 further includes plasterboard 22 and is fixed on plasterboard 22 On cover surface keel 23.Above-mentioned bearing keel 21 is fixed on by connector 300 on cover surface keel 23.Above-mentioned cover surface keel 23 Setting, on the basis of improving decoration 22 intensity of plasterboard, also provides lifting impetus for bearing keel 21, avoids Bearing keel 21 be directly fixed on plasterboard 22 and caused by plasterboard 22 damage.
More preferably, in a particular embodiment, when actual setting, above-mentioned cover surface keel 23 is mutually flat with fixed keel 11 Row setting, above-mentioned bearing keel 21 are arranged in a mutually vertical manner with fixed keel 11.Above-mentioned tool cover surface keel 23 and bearing keel 21 have Position to setting, it is highly practical so that simple and fast when adjustment and installation of the present invention.
More specifically, in the present embodiment, above-mentioned cover surface keel 23 is provided with multiple, multiple cover surface keels 23 it is parallel and It is equally spacedly set on above-mentioned plasterboard 22.Above-mentioned setting is provided in lifting for plasterboard 22 uniformly distributed and reliable Force increases the safety and reliability of the lifting of gypsum plate module 2.
First, furred ceiling component is installed on indoor roof in specific installation by the present invention, and carry out height adjust and Leveling operation.Then, 2 level of gypsum plate module is raised up to and is fitted with fixed keel 11, also, ensure cover surface keel 23 with Fixed keel 11 are mutually parallel, and bearing keel 21 is mutually perpendicular to fixed keel 11.Later, along fixed 11 horizontal translocation stone of keel Cream plate module 2 so that bearing keel 21 is loaded in lifting part 12 and fixes in the horizontal groove 14 that keel 11 are formed, to complete At lifting operation.
In the present invention unless specifically defined or limited otherwise, the terms such as term " installation ", " fixation " should do broad sense reason Solution, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;Can be mechanical connection, it can also It is electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary the connection inside two elements. For the ordinary skill in the art, it can understand that above-mentioned term in the present invention specific contains as the case may be Justice.
In the description of specific implementation mode, the property discussed term " in the present embodiment ", " in one embodiment ", " specific reality Apply in example " etc. descriptions mean combine the embodiment description specific features or feature be contained at least one embodiment of the present invention In.And identical embodiment in a specific embodiment, is not necessarily referring to the schematic representation of above-mentioned term.Moreover, The specific features or point of description can be combined in any suitable manner in any one or more embodiments.
Obviously, the above embodiment of the present invention is just for the sake of clearly illustrating examples made by the present invention, and it is pair to be not The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this All any modification, equivalent and improvement etc., should be included in the claims in the present invention made by within the spirit and principle of invention Protection domain within.

Claims (10)

1. a kind of plaster tablet suspended ceiling structure, which is characterized in that including furred ceiling component (1) and gypsum plate module (2), the furred ceiling group Part (1) includes fixed keel (11), lifting part (12) and the sunpender (13) for being set to roof, gypsum plate module (2) packet Include bearing keel (21);
The lifting part (12) is installed on fixed keel (11), and the fixed keel (11) are fixed on sunpender (13), described Gypsum plate module (2) can be installed on the lifting part (12) of furred ceiling component (1) by bearing keel (21);
The fixed keel (11) can carry out leveling and height adjusting by adjusting in the fixed position on sunpender (13).
2. plaster tablet suspended ceiling structure according to claim 1, which is characterized in that the sunpender (13) is uniformly distributed and is mutually parallel Ground is provided with multiple rows of, often arranges sunpender (13) lower end and fixes that there are one fixed keel (11).
3. plaster tablet suspended ceiling structure according to claim 2, which is characterized in that the lifting part (12) be provided with it is multiple, Multiple lifting parts (12) are uniformly arranged on fixed keel (11).
4. plaster tablet suspended ceiling structure according to claim 3, which is characterized in that the lifting part (12) is L-shaped structure Part, the lifting part (12) of " L " type combine to form horizontal groove (14) with fixed keel (11);
The bearing keel (21) can be loaded in the horizontal groove (14) so that gypsum plate module (2) is fixed on furred ceiling group On part (1).
5. plaster tablet suspended ceiling structure according to claim 4, which is characterized in that the lifting part (12) includes being integrally formed Mounting groove (121) and lifting plate (122), be provided with mounting hole (123), the lifting plate (122) on the mounting groove (121) On be provided with guide part (124);
The mounting groove (121) is sheathed on fixed keel (11) outside, and the bearing keel (21) fills after guide part (124) guiding It is stuck between lifting plate (122) and the horizontal groove (14) of fixed keel (11) formation.
6. plaster tablet suspended ceiling structure according to claim 5, which is characterized in that be provided on the gypsum plate module (2) Multiple bearing keels (21) being mutually parallel, each bearing keel (21) are loaded in the lifting part of two neighboring fixed keel (11) (12) on.
7. plaster tablet suspended ceiling structure according to claim 6, which is characterized in that the bearing keel (21) is provided with two It is a.
8. according to any plaster tablet suspended ceiling structures of claim 1-7, which is characterized in that the gypsum plate module (2) is also Including plasterboard (22) and the cover surface keel (23) being fixed on plasterboard (22), the bearing keel (21) is fixed on clad can On keel (23).
9. plaster tablet suspended ceiling structure according to claim 8, which is characterized in that the cover surface keel (23) and fixed keel (11) arranged in parallel, the bearing keel (21) is arranged in a mutually vertical manner with fixed keel (11).
10. plaster tablet suspended ceiling structure according to claim 9, which is characterized in that the cover surface keel (23) is provided with more A, multiple cover surface keels (23) are parallel and are equally spacedly set on the plasterboard (22).
CN201710309073.2A 2017-05-04 2017-05-04 A kind of plaster tablet suspended ceiling structure Withdrawn CN108797880A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710309073.2A CN108797880A (en) 2017-05-04 2017-05-04 A kind of plaster tablet suspended ceiling structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710309073.2A CN108797880A (en) 2017-05-04 2017-05-04 A kind of plaster tablet suspended ceiling structure

Publications (1)

Publication Number Publication Date
CN108797880A true CN108797880A (en) 2018-11-13

Family

ID=64054671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710309073.2A Withdrawn CN108797880A (en) 2017-05-04 2017-05-04 A kind of plaster tablet suspended ceiling structure

Country Status (1)

Country Link
CN (1) CN108797880A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537793A (en) * 2018-12-06 2019-03-29 河南三阳建材科技有限公司 It is easily installed the ceiling structure and its installation method of leveling
CN110886425A (en) * 2019-11-19 2020-03-17 苏州金螳螂文化发展股份有限公司 Rapid leveling type ceiling mounting structure and method for striding building beam
CN111877632A (en) * 2020-07-22 2020-11-03 广东定源建设工程有限公司 Assembly type ceiling mounting component and mounting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109537793A (en) * 2018-12-06 2019-03-29 河南三阳建材科技有限公司 It is easily installed the ceiling structure and its installation method of leveling
CN109537793B (en) * 2018-12-06 2024-02-23 河南三阳建材科技有限公司 Suspended ceiling structure convenient to install and level and installation method thereof
CN110886425A (en) * 2019-11-19 2020-03-17 苏州金螳螂文化发展股份有限公司 Rapid leveling type ceiling mounting structure and method for striding building beam
CN111877632A (en) * 2020-07-22 2020-11-03 广东定源建设工程有限公司 Assembly type ceiling mounting component and mounting method
CN111877632B (en) * 2020-07-22 2021-07-06 广东定源建设工程有限公司 Assembly type ceiling mounting component and mounting method

Similar Documents

Publication Publication Date Title
CN108797880A (en) A kind of plaster tablet suspended ceiling structure
CN104929297B (en) A kind of decoration panel installation of ceiling technique
CN210395794U (en) Indoor suspended ceiling structure with high installation convenience
CN106284815B (en) Furred ceiling clean board construction technique
CN106193413A (en) One hides day rail system and a construction method
CN105625625A (en) Clamping type keel integrated suspended ceiling structure and installing method
CN105178495B (en) A kind of suspended ceiling keel system and its construction method
KR20130045711A (en) Indoor decorative curtain wall construction unit
CN108868139A (en) A kind of method of furred ceiling
CN205913226U (en) Pelmet light gauge steel framework
CN207568047U (en) A kind of furred ceiling module
CN207003900U (en) A kind of novel wall surface cladding panel structure
CN105604229A (en) Clamping type keel double integrated ceiling structure
CN206800754U (en) A kind of plaster tablet suspended ceiling structure
CN1873151B (en) Tie bar installation in use for suspended ceiling of building
CN105178496A (en) Mounting structure for curved-surface hanger plate on wall top surface
CN103290955A (en) Fixing support capable of quickly mounting integrated building external wall panel
CN205857761U (en) Level adjuster
CN113360993B (en) BIM technology-based construction method for large-area complex-modeling suspended ceiling
CN101775866B (en) Suspended ceiling
CN204983341U (en) Wall crown face curved surface hanger plate mounting structure
CN203867004U (en) Partition wall joist frame
CN210369508U (en) Gypsum board suspended ceiling structure
CN207568046U (en) A kind of suspending assembly
CN206503289U (en) A kind of steel joist suspended ceiling gypsum board mounting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181113