CN207568047U - A kind of furred ceiling module - Google Patents
A kind of furred ceiling module Download PDFInfo
- Publication number
- CN207568047U CN207568047U CN201721641499.XU CN201721641499U CN207568047U CN 207568047 U CN207568047 U CN 207568047U CN 201721641499 U CN201721641499 U CN 201721641499U CN 207568047 U CN207568047 U CN 207568047U
- Authority
- CN
- China
- Prior art keywords
- main joist
- keel
- sunpender
- main
- regulating part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Toys (AREA)
Abstract
The utility model belongs to building decoration technology field, discloses a kind of furred ceiling module, including the hangar system being hung on ceiling and mounts and mounts module in multiple in hangar system.Hangar system includes sunpender, regulating part, main joist, fastener and pin member.Sunpender is provided with multiple rows of, and regulating part is arranged on sunpender, and each arrange is lifted with main joist respectively on the downside of sunpender by regulating part.The fastener for adjusting regulating part fixed position is installed on sunpender.The pin member of fixed main joist is installed on regulating part.Mount that module includes plasterboard, the cover surface keel that is layed on plasterboard and be installed on cover surface keel both ends mount part, mounting module can mount by mounting part between adjacent two main joists in hangar system.The furred ceiling module of the utility model installation process in furred ceiling operation is easy, and after hanging on the basis of overall structure stability is ensured, can simply and efficiently be adjusted operation to main joist.
Description
Technical field
The utility model is related to building decoration technology field more particularly to a kind of furred ceiling modules.
Background technology
Furred ceiling is one of important component of indoor decoration that is, to the decoration of ceiling, according to selection decorative panel material
Difference, there are many ceiling structure.Wherein, the ceiling structure most often selected when plaster tablet suspended ceiling structure is indoor decoration.By
Building gypsum for plasterboard made of primary raw material is a kind of high-strength light, thickness is moderate, sound insulation is adiabatic, easy to process and prevent
The decorative panel that fire is moisture resistance.The ceiling structure processing cost that is made of plasterboard and keel is low, flatness is good, the structure of existing keel
Keel groove, the reinforcing rib that is set in keel groove including perforation setting and be set to keel groove notch both sides bending
Portion.
Grid for suspended ceiling specifically include as main body frame main joist and be set up between main joist to carry stone
The cover surface keel of cream plate.When carrying out furred ceiling operation by existing technology, after sunpender is lifted on ceiling, main dragon
Bone is lifted on by common lifting part on sunpender first, and cover surface keel is then set up between main joist, finally in clad can dragon
Plasterboard is installed on bone.Such lifting operation mode, complex installation process, and vertical height/level is being carried out to main joist
During the adjusting of degree and axial position, governing speed is slow, cumbersome, and can not ensure in adjusting process integrally-built steady
It is qualitative, and then influence safety and the efficiency of integral hoisting operation.
Utility model content
The purpose of this utility model is to provide a kind of furred ceiling module, furred ceiling module installation process letter in furred ceiling operation
Just, and after hanging on the basis of overall structure stability is ensured, main joist can simply and efficiently adjust and made
Industry.
For this purpose, the utility model uses following technical scheme:
A kind of furred ceiling module including the hangar system being hung on ceiling and is mounted in more in the hangar system
It is a to mount module;
The hangar system includes sunpender, regulating part, main joist, fastener and pin member, and the sunpender is provided with more
A, multiple sunpenders are set in a row to be lifted on ceiling respectively, is respectively arranged and is mutually parallel between the sunpender, on the sunpender
The regulating part is arranged with, respectively arranges and the main joist, the main dragon is lifted with by the regulating part respectively on the downside of the sunpender
Bone is sheathed on by keel groove on the regulating part, and fastener is equipped on the sunpender, and the fastener is used for the tune
Section part is fixed on the sunpender, and adjust fixed position of the regulating part in the sunpender axial direction, on the regulating part
The pin member is installed with, the pin member is set on the main joist on the regulating part for fixing sleeve;
The module that mounts includes plasterboard, the cover surface keel being layed on the plasterboard and is installed on the clad can
Keel both ends mount part, and the module that mounts can mount adjacent in the hangar system two by the part that mounts
Between the main joist.
Preferably, the regulating part includes adjusting ontology, the hanging portion for being fixed on described adjusting ontology one end, be fixed on
It is described to adjust being loaded for the ontology other end and portion and be fixed on the buckle of the adjusting ontology side;
The hanging portion can be fixed on by the fastener on the sunpender, and the portion of being loaded can be loaded in described
In the keel groove of main joist, the pin member can be installed in by described on the regulating part.
The structure setting preferably, hanging portion takes the shape of the letter U, the hanging portion are set in institute by the cavity of U-shaped structure
It states on sunpender;
The portion both sides that are loaded are respectively arranged with clamping ear, and the portion of being loaded is loaded in the keel groove of the main joist
When, two clamping ears can be respectively from two bending parts of main joist described in the clamping of inside;
The buckle L-shaped structure setting forms through slot between the buckle of L-shaped structure and the adjusting ontology,
The pin member can be plugged in the through slot.
Preferably, the pin member includes flat part and is vertically fixed on the grip part of the flat part side, institute
Stating flat part can be installed on the regulating part, and the main joist on the regulating part is set on for fixing sleeve.
Preferably, being provided with clamping groove on the flat part, the flat part is installed in by the clamping groove
On the regulating part;
The flat part takes the shape of the letter U structure setting, when the main joist is fixed, the flat part of U-shaped structure
Two side arms be fastened in the both sides of the main joist respectively;
Guide part is respectively arranged on two side arms, the guide part is used to two side arms being oriented to the master
The both sides of keel.
Preferably, the part that mounts includes hanging buckle, pedestal and the bullet being connected respectively with the hanging buckle and the pedestal
Reed;
Angle elastic variable between the hanging buckle and the pedestal, the hanging buckle can hooking in the one of the main joist
Side, the pedestal are fixed on one end of the cover surface keel.
Preferably, the hanging buckle includes connecting portion, is fixedly arranged on the hang part of the connecting portion side and is set to institute
The guide portion of one end of connecting portion is stated, the connecting portion with the spring leaf for being connected, and the hang part is for described in hooking
Main joist, the guide portion are used to import the connecting portion and the hang part between two adjacent main joists;
The pedestal include clamping portion, be set to the clamping portion one end limiting section and be set to the clamping portion
The other end guidance part, the clamping portion is installed in the keel groove of the cover surface keel, and the limiting section is described for making
Clamping portion is limited in one end of the keel groove of the cover surface keel, and the guidance part is used to the clamping portion importing the clad can
In the keel groove of keel.
Preferably, the main joist includes outer keel and included bone;
The outer keel includes outer tank body and is set to the outer bending part of the notch both sides of U-type groove in the outer tank body,
The included bone includes inner tank body and is set to the interior bending part of the notch both sides of U-type groove in the inner tank body;
The included bone is set in the U-type groove of the outer tank body, and the interior bending part is set in the outer bending part
Side, and the outer bending part setting that reclines.
Preferably, the depth of the U-type groove of the outer tank body is more than the depth of the U-type groove of the inner tank body, the outer groove
Lumen therethrough is formed between the bottom surface of body and the bottom surface of the inner tank body.
Preferably, being provided with main bone stull between the main joist adjacent in the hangar system, the main bone is horizontal
Support can be installed in simultaneously on two adjacent main joists, for being limited to the adjacent main joist.
The beneficial effects of the utility model:On the basis of sunpender, regulating part and fastener are equipped with so that main dragon
Bone also is able to carry out main joist after being lifted on ceiling the adjusting of vertical position, and leveling is carried out to main joist so as to convenient
Grade construction operations, regulating part and pin member are equipped with so that main joist also is able to after being lifted on ceiling to main dragon
Bone carries out the adjusting of lateral position, the mutual cooperation of regulating part, fastener and pin member, after main joist hanging so that whole
On the basis of body stable structure, operation can be simply and efficiently adjusted to main joist, ensure that the safety of lifting operation
And efficiency.
Include plasterboard mounts module by mounting the setting of part, and only need to will mount module presses on phase from bottom to top
Between two adjacent main joists, you can complete the lifting operation of plasterboard, compared to it is existing by nailing successively on main joist
The lifting mode of fixed cover surface keel and plasterboard, it is simple and convenient, effectively increase the construction efficiency of furred ceiling operation.
Description of the drawings
Fig. 1 is furred ceiling module and the wall segment cooperation installation omitted after ceiling described in the utility model embodiment
Structure diagram;
Fig. 2 is the structure diagram of the part of the hangar system described in the utility model embodiment;
Fig. 3 is sunpender, regulating part, fastener and the knot of pin member cooperation installation described in the utility model embodiment
Structure schematic diagram;
Fig. 4 is the structure diagram of the regulating part described in the utility model embodiment;
Fig. 5 is the side view of the regulating part described in the utility model embodiment;
Fig. 6 is the main keel structure schematic diagram described in the utility model embodiment
Fig. 7 is the structure diagram of the outer keel described in the utility model embodiment
Fig. 8 is the structure diagram of the included bone described in the utility model embodiment;
Fig. 9 is the structure diagram of the pin member described in the utility model embodiment;
Figure 10 is the structure diagram of the main bone stull described in the utility model embodiment;
Figure 11 is the structure diagram for mounting module described in the utility model embodiment;
Figure 12 is the structure diagram for mounting part described in the utility model embodiment;
Figure 13 is the structure diagram of the hanging buckle described in the utility model embodiment;
Figure 14 is the structure diagram of the pedestal described in the utility model embodiment;
Figure 15 is the structure diagram of the spring leaf described in the utility model embodiment.
In figure:
1st, hangar system;
11st, sunpender;
12nd, regulating part;121st, ontology is adjusted;122nd, hanging portion;123rd, be loaded portion;1231st, clamping ear;124th, it is buckled;
125th, through slot;
13rd, main joist;131st, outer keel;1311st, outer tank body;1312nd, outer bending part;132nd, included bone;1321st, inside groove
Body;1322nd, interior bending part;
14th, fastener;
15th, pin member;151st, flat part;1511st, groove is clamped;1512nd, side arm;1513rd, guide part;152nd, grip part;
16th, main bone stull;161st, holding division;
2nd, module is mounted;
21st, plasterboard;
22nd, cover surface keel;
23rd, part is mounted;231st, hanging buckle;2311st, connecting portion;2312nd, hang part;2313rd, guide portion;232nd, pedestal;2321、
Clamping portion;2322nd, limiting section;2323rd, guidance part;233rd, spring leaf;2331st, side plate.
Specific embodiment
The embodiment of the utility model is described below in detail, the example of embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or the element with same or like function.Below with reference to attached
The embodiment of figure description is exemplary, it is intended to for explaining the utility model, and it is not intended that limit to the utility model
System.
Further illustrate the technical solution of the utility model below with reference to the accompanying drawings and specific embodiments.
As shown in Fig. 1-Figure 15, the utility model provides a kind of furred ceiling module, including the hanging being hung on ceiling
It system 1 and mounts and mounts module 2 in multiple in hangar system 1.Wherein, hangar system 1 include sunpender 11, regulating part 12,
Main joist 13, fastener 14 and pin member 15.Sunpender 11 is provided with multiple, and multiple sunpenders 11 are set in a row is lifted on day respectively
On card, it is mutually parallel between each row's sunpender 11.Regulating part 12 is arranged on sunpender 11, each 11 downside of sunpender of arranging passes through regulating part
12 are lifted with main joist 13 respectively, specifically, main joist 13 is sheathed on by keel groove on regulating part 12.It is equipped on sunpender 11
Fastener 14, the fastener 14 are used to regulating part 12 being fixed on sunpender 11, and adjust regulating part 12 in 11 axial direction of sunpender
Fixed position.Pin member 15 is installed on regulating part 12, which is set on the main dragon on regulating part 12 for fixing sleeve
Bone 13.Wherein, module 2 is mounted to include plasterboard 21, the cover surface keel 22 being layed on plasterboard 21 and be installed on clad can dragon
22 both ends of bone mount part 23.Specifically, mounting module 2 can be mounted by mounting part 23 adjacent two in hangar system 1
Between root main joist 13.
In the utility model, on the basis of sunpender 11, regulating part 12 is equipped with fastener 14 so that main joist
13 also are able to carry out main joist 13 after being lifted on ceiling the adjusting of vertical position, and main joist 13 is carried out so as to convenient
The construction operations such as leveling, regulating part 12 are equipped with pin member 15 so that main joist 13 is rear on ceiling is lifted on to be gone back
The adjusting of lateral position, the mutual cooperation of regulating part 12, fastener 14 and pin member 15, in main dragon can be carried out to main joist 13
After bone 13 is hung so that on the basis of overall structure stabilization, can simply and efficiently be adjusted operation to main joist 13, protected
Safety and the efficiency of lifting operation are demonstrate,proved.Include plasterboard 21 mounts module 2 by mounting the setting of part 23, only need by
It mounts module 2 to press on from bottom to top between two adjacent main joists 13, you can complete the lifting operation of plasterboard 21, compare
In the existing lifting mode for fixing cover surface keel 22 and plasterboard 21 on main joist 13 successively by nailing, it is easy to operate just
Victory effectively increases the construction efficiency of furred ceiling operation.
As shown in figure 4, regulating part 12 includes adjusting ontology 121, the hanging portion 122 for being fixed on 121 one end of adjusting ontology, consolidate
It is connected in and adjusts being loaded for 121 other end of ontology and portion 123 and be fixed on the buckle 124 for adjusting ontology 121 side.Wherein, it hangs
Portion 122 can be fixed on by fastener 14 on sunpender 11, and the portion 123 that is loaded can be loaded in the keel groove of main joist 13, insert
Pin member 15 can be installed in by buckle 124 on regulating part 12.In the present embodiment, the metal plate that regulating part 12 is integrally formed
Part.The setting of above-mentioned 12 concrete structure of regulating part, processing are prepared simply, and installation exercise is convenient.
The structure setting specifically, hanging portion 122 takes the shape of the letter U, the hanging portion 122 are set in sunpender by the cavity of U-shaped structure
On 11.123 both sides of portion that are loaded are respectively arranged with clamping ear 1231, and the portion 123 that is loaded is loaded when in the keel groove of main joist 13,
Two clamping ears 1231 can be respectively from two bending parts of inside clamping main joist 13.Be buckled 124 L-shaped structure settings, L
Through slot 125 is formed between the buckle 124 of shape structure and adjusting ontology 121, pin member 15 can be plugged in the through slot 125
It is interior.The setting of above-mentioned 122 concrete structure of hanging portion so that hanging portion 122 can be stuck in by press sleeve from 11 side of sunpender and be hung
Bar 11 can also be stuck in sunpender 11 from 11 1 end cap of sunpender, simple to operate, be loaded quick.Above-mentioned clamping ear 1231
Setting so that the clamping being loaded between portion 123 and main joist 13 is more accurate reliable.The L-shaped structure of above-mentioned buckle 124 is set
It puts, when main joist 13 is lifted on sunpender 11 by regulating part 12, buckle 124 is matched with adjusting ontology 121, can be limited slotting
Vertical fixing of the pin member 15 relative to main joist 13, structure letter is effectively ensured in deflection of the pin member 15 in 13 axial direction of main joist
It is single, it is loaded conveniently.
As shown in figure 9, pin member 15 includes flat part 151 and the vertical grip part for being fixed on 151 side of flat part
152, flat part 151 can be installed on regulating part 12, and the main joist 13 on regulating part 12 is set on for fixing sleeve.In this implementation
In example, sheet metal component that pin member 15 is integrally formed.The setting of grip part 152 is conveniently operated the holding operation of personnel so that behaviour
Can easily pin member 15 be carried out card assembly and disassembly by making personnel, and can assist adjustment pin member 15 relative to main joist
13 verticality so that pin member 15 is relatively reliable to the fixation of main joist 13.
Groove 1511 is clamped specifically, being provided on flat part 151, flat part 151 is clamped by the clamping groove 1511
In on regulating part 12.Flat part 151 takes the shape of the letter U structure setting, when main joist 13 is fixed, the flat part 151 of U-shaped structure
Two side arms 1512 be fastened in the both sides of main joist 13 respectively.Also, it is respectively arranged with guide part on two side arms 1512
1513, which is used to two side arms 1512 being oriented to the both sides of main joist 13.In the present embodiment, guide part 1513
To be opened in oblique angle is led on the inside of two side arms 1512.Above-mentioned buckle 124 is with clamping being equipped with for groove 1511, to pin member
15 play limiting to positive effect, avoid in lifting, the displacement of pin member 15 and cause to lift fixed danger.It is above-mentioned
The setting of guide part 1513 so that in specific installation, pin member 15 is more convenient to the set card fixation of main joist 13, has
Effect improves construction efficiency.
As shown in figure 12, part 23 is mounted to include hanging buckle 231, pedestal 232 and respectively with hanging buckle 231 and pedestal 232 be connected
Spring leaf 233.Wherein, by the setting of spring leaf 233, the angle elastic variable between hanging buckle 231 and pedestal 232, hanging buckle
231 can hooking in the side of main joist 13, pedestal 232 is fixed on one end of cover surface keel 22.
Specifically, as shown in figure 13, hanging buckle 231 includes connecting portion 2311, the hang part for being fixedly arranged on 2311 side of connecting portion
2312 and be set to connecting portion 2311 one end guide portion 2313.Wherein, connecting portion 2311 is used for and 233 phase of spring leaf
Even, hang part 2312 is used for hooking main joist 13, and guide portion 2313 is adjacent for connecting portion 2311 and hang part 2312 to be imported
Two main joists 13 between.As shown in figure 14, pedestal 232 includes clamping portion 2321, the one end for being set to clamping portion 2321
Limiting section 2322 and be set to clamping portion 2321 the other end guidance part 2323.Wherein, clamping portion 2321 is installed in clad can
In the keel groove of keel 22, limiting section 2322 is used for the one end for the keel groove that clamping portion 2321 is made to be limited in cover surface keel 22, leads
Draw portion 2323 for clamping portion 2321 being imported in the keel groove of cover surface keel 22.In the present embodiment, connecting portion 2311, hooking
The sheet metal structural that portion 2312 and guide portion 2313 are integrally formed, and hang part 2312 is relative to 13 side of importing of main joist
Inclined side is set up, the side is consistent with the angle of inclination of the guide surface of guide portion 2313, this setting so that hooking
Importing of the portion 2312 between two main joists 13 is more safe and reliable.What clamping portion 2321 and limiting section 2322 were integrally formed
Sheet metal structural, guidance part 2323 are to lead oblique angle in what 2321 one end of clamping portion opened up.The setting of guide portion 2313, the force provided
Position is convenient to operating personnel and dismantles the module 2 that mounts of the utility model between main joist 13.The tool of pedestal 232
Body structure setting takes full advantage of the keel groove of cover surface keel 22, and the location and installation between cover surface keel 22 is convenient and reliable,
In, the setting of limiting section 2322 simply and efficiently realizes setting of the pedestal 232 in 22 one end of cover surface keel.
More specifically, as shown in figure 15, spring leaf 233 includes two side plates 2331 being arranged in a mutually vertical manner, two sides
Angle elastic variable between plate 2331, two side plates 2331 are respectively fixedly connected in connecting portion 2311 and clamping portion 2321.Above-mentioned bullet
The setting of 233 concrete structure of reed so that the angle elastic variable between hanging buckle 231 and pedestal 232, so that mounting module
2 can more easily press from bottom to top under main joist 13, during pressing, the hanging buckle at every 22 both ends of cover surface keel
231 relative to 232 elastic shrinkage of pedestal, and after pressing in place, the hanging buckle 231 at every 22 both ends of cover surface keel is relative to pedestal
232 elastic reset hookings are on the main joist 13 of both sides.
Preferably, vertical strengthening ribs are provided on connecting portion 2311, vertical strengthening ribs are along connecting portion 2311 relative to main dragon
The importing direction setting of bone 13.The setting of above-mentioned vertical strengthening ribs effectively increases connecting portion 2311 relative to main joist 13
Bending intensity in importing direction, hang part 2312 can not with main joist 13 caused by avoiding the plastic deformation of connecting portion 2311
The generation of mated condition.
More preferably, hooking slot is provided on hang part 2312, hang part 2312 can be by hooking slot hooking in master
On the bending part of 13 side of keel.The setting of above-mentioned hooking slot, simple in structure, hooking simple operation.
More preferably, the bottom surface in clamping portion 2321 is provided with through slot 125, and through slot 125 is used to accommodate cover surface keel
Reinforcing rib in 22 keel groove.The setting of above-mentioned through slot 125 effectively prevents the dragon in clamping portion 2321 and cover surface keel 22
Interfering between the reinforcing rib in bone slot so that clamping of the clamping portion 2321 in the keel groove of cover surface keel 22 is more suitable
Freely.
As Figure 6-Figure 8, main joist 13 includes outer keel 131 and included bone 132.Wherein, outer keel 131 includes outer
Groove body 1311 and be set to U-type groove in outer tank body 1311 notch both sides outer bending part 1312, included bone 132 include inside groove
Body 1321 and be set to U-type groove in inner tank body 1321 notch both sides interior bending part 1322.Specifically, included bone 132 is set
It is placed in the U-type groove of outer tank body 1311, interior bending part 1322 is set to outer 1312 inside of bending part, and the outer bending part that reclines
1312 settings.The setting of included bone 132 in the U-type groove of above-mentioned outer keel 131, compared to individual outer keel 131, effectively improves
Load weight, the thickness of outer keel 131 is constant, so that not increasing the degree of difficulty of screw installation, on this basis, included bone
The setting that 1312 phase of outer bending part of 132 interior bending part 1322 and outer keel 131 reclines does not influence existing regulating part 12 and hangs
The cooperation installation of piece installing 23.
Specifically, the depth of the U-type groove of outer tank body 1311 is more than the depth of the U-type groove of inner tank body 1321, outer tank body 1311
Bottom surface and inner tank body 1321 bottom surface between form lumen therethrough.The setting of above-mentioned lumen therethrough, it is convenient to add in 131 bottom surface of outer keel
Cartridge screw on the basis of load weight is improved, does not increase impenetrating thickness of the screw when installing additional.
Preferably, the bottom surface of outer tank body 1311 and side wall are respectively arranged with external reinforcing ribs, and the external reinforcing ribs are along outer tank body
1311 length directions extend, and the bottom surface of inner tank body 1321 and side wall be respectively arranged with interior reinforcing rib, and the interior reinforcing rib is along inner tank body
1321 length directions extend.The setting of above-mentioned external reinforcing ribs and interior reinforcing rib is not increasing outside outer keel 131 and included bone 132
Body thickness does not interfere outer keel 131 on the basis of the inserting of included bone 132, whole structural strength being effectively increased, so as to carry
The high bearing capacity of double-plate keel.
More preferably, it is interior at least external reinforcing ribs engaging 1321 side wall of inner tank body on 1311 side wall of outer tank body
Reinforcing rib, external reinforcing ribs engage with interior reinforcing rib so that included bone 132 is fixed in outer tank body 1311 at the notch of U-type groove.On
Setting is stated, passes through the external reinforcing ribs being mutually clamped and the positioning of interior reinforcing rib so that outer keel 131 and the inserting pair of included bone 132
Position is more accurate, and included bone 132 is simply and efficiently fixed in outer tank body 1311 at the notch of U-type groove.
More preferably, a plurality of external reinforcing ribs are respectively arranged in the two side walls of outer tank body 1311, inner tank body 1321
Be respectively arranged with an interior reinforcing rib in two side walls, the interior reinforcing rib in the two side walls of inner tank body 1321 respectively with outer tank body
External reinforcing ribs in 1311 two side walls at notch fasten.The setting that two groups of external reinforcing ribs engage with interior reinforcing rib,
So that the inserting fixation of included bone 132 is more safe and reliable.
In the hangar system 1 of the utility model, main bone stull 16 is provided between adjacent main joist 13, the main bone is horizontal
Support 16 can be installed in simultaneously on two adjacent main joists 13, for being limited to adjacent main joist 13.In this implementation
In example, main bone stull 16 carries out two main joists 13 clamping limiting from the upside of two adjacent main joists 13, and adjacent two
A main bone stull 16 is at least provided on root main joist 13.The setting of above-mentioned main bone stull 16, simply and reliablely realizes phase
The limiting of two adjacent main joists 13 is avoided between adjacent two main joists 13 in the hangar system 1 of the utility model
Distance change influence mount the lifting of module 2.
Specifically, as shown in Figure 10, main bone stull 16 includes two holding divisions 161, two holding divisions 161 are respectively used to card
In keel groove loaded on two adjacent main joists 13.The setting of above-mentioned two holding division 161 takes full advantage of main joist 13
Keel groove simply and reliablely realizes the limiting of two adjacent main joists 13.
In the utility model, screw thread is provided on sunpender 11, fastener 14 is nut, and nut matches to adjust with screw thread
Save installation site of the regulating part 12 in 11 axial direction of sunpender.In the present embodiment, sunpender 11 is specially screw rod, is set on each screw rod
It puts there are two nut, two nuts are fixed hanging portion 122 from upper and lower both sides.Above-mentioned sunpender 11 is specific with fastener 14
Setting so that more convenient with adjusting in the solid fixed cycle operator of lifting.
The utility model is when specifically used, and first, sunpender 11 is hung on ceiling.Then, regulating part 12 with
Main joist 13 is inserted.Later, regulating part 12 is hung on nut on sunpender 11, and passes through nut and main joist 13 is carried out
The adjusting of vertical height and levelness.Then, the adjusting of axial position is carried out to the main joist 13 for tentatively completing lifting.It
Afterwards, main joist 13 is lock onto on regulating part 12 with pin member 15.Later, main bone stull is set up between adjacent main joist 13
16 so that main joist 13 is parallel and spacing is fixed by adjacent two, so as to complete the lifting work of hangar system 1.Then, it will cover
Face keel 22 are layed on plasterboard 21, will mount part 23 and be installed on the both ends of cover surface keel 22.Finally, it is mounted assembled
Module 2 presses on from bottom to top one by one between two adjacent main joists 13 so that 231 hooking of hanging buckle is in the bending of main joist 13
In portion, so as to complete whole furred ceiling operation.
Obviously, above-described embodiment of the utility model is used for the purpose of clearly illustrating the utility model example, and
It is not the restriction to the embodiment of the utility model.For those of ordinary skill in the art, in above description
On the basis of can also make other variations or changes in different ways.There is no need and unable to give all embodiments
It is exhaustive.All any modification, equivalent and improvement made within the spirit and principles of the present invention etc., should be included in
Within the protection domain of the utility model claims.
Claims (10)
1. a kind of furred ceiling module, which is characterized in that hung including the hangar system (1) being hung on ceiling and mounting in described
Multiple in extension system (1) mount module (2);
The hangar system (1) includes sunpender (11), regulating part (12), main joist (13), fastener (14) and pin member
(15), the sunpender (11) is provided with multiple, and multiple sunpenders (11) set in a row to be lifted on ceiling respectively, respectively arranges institute
It states and is mutually parallel between sunpender (11), be arranged with the regulating part (12) on the sunpender (11), respectively arrange under the sunpender (11)
Side is lifted with the main joist (13) respectively by the regulating part (12), and the main joist (13) is sheathed on institute by keel groove
It states on regulating part (12), the fastener (14) is installed on the sunpender (11), the fastener (14) is for by the tune
Section part (12) is fixed on the sunpender (11), and adjust fixed bit of the regulating part (12) in the sunpender (11) axial direction
It puts, the pin member (15) is installed on the regulating part (12), the pin member (15) is set on the adjusting for fixing sleeve
The main joist (13) on part (12);
The module (2) that mounts includes plasterboard (21), the cover surface keel (22) being layed on the plasterboard (21) and peace
Part (23) is mounted loaded on the cover surface keel (22) both ends, the module (2) that mounts can be hung by the part (23) that mounts
Loaded between two main joists (13) adjacent in the hangar system (1).
2. furred ceiling module according to claim 1, which is characterized in that the regulating part (12) including adjust ontology (121),
It is fixed on the hanging portion (122) for adjusting ontology (121) one end, is fixed on being loaded for adjusting ontology (121) other end
Portion (123) and the buckle (124) for being fixed on described adjusting ontology (121) side;
The hanging portion (122) can be fixed on the sunpender (11) by the fastener (14), the portion that is loaded (123)
It can be loaded in the keel groove of the main joist (13), the pin member (15) can be installed in by the buckle (124)
On the regulating part (12).
3. furred ceiling module according to claim 2, which is characterized in that the hanging portion (122) takes the shape of the letter U structure setting, institute
Hanging portion (122) is stated to be set on the sunpender (11) by the cavity of U-shaped structure;
The portion that is loaded (123) both sides are respectively arranged with clamping ear (1231), and the portion that is loaded (123) is loaded in the main dragon
When in the keel groove of bone (13), two clamping ears (1231) can be respectively from two of main joist (13) described in the clamping of inside
A bending part;
Described buckle (124) L-shaped structure setting, between the buckle (124) of L-shaped structure and the adjusting ontology (121)
Through slot (125) is formed, the pin member (15) can be plugged in the through slot (125).
4. furred ceiling module according to claim 1, which is characterized in that the pin member (15) including flat part (151) with
And the grip part (152) of the flat part (151) side is vertically fixed on, the flat part (151) can be installed in the tune
It saves on part (12), the main joist (13) on the regulating part (12) is set on for fixing sleeve.
5. furred ceiling module according to claim 4, which is characterized in that be provided with clamping groove on the flat part (151)
(1511), the flat part (151) is installed in by the clamping groove (1511) on the regulating part (12);
The flat part (151) takes the shape of the letter U structure setting, when the main joist (13) is fixed, U-shaped structure it is described flat
Two side arms (1512) of plate portion (151) are fastened in the both sides of the main joist (13) respectively;
It is respectively arranged with guide part (1513) on two side arms (1512), the guide part (1513) is for will be described in two
Side arm (1512) is oriented to the both sides of the main joist (13).
6. furred ceiling module according to claim 1, which is characterized in that the part (23) that mounts includes hanging buckle (231), pedestal
(232) and respectively the spring leaf (233) being connected with the hanging buckle (231) and the pedestal (232);
Angle elastic variable between the hanging buckle (231) and the pedestal (232), the hanging buckle (231) can hooking in institute
The side of main joist (13) is stated, the pedestal (232) is fixed on one end of the cover surface keel (22).
7. furred ceiling module according to claim 6, which is characterized in that the hanging buckle (231) includes connecting portion (2311), solid
Set on the connecting portion (2311) side hang part (2312) and be set to the connecting portion (2311) one end guiding
Portion (2313), the connecting portion (2311) with the spring leaf (233) for being connected, and the hang part (2312) is for hooking institute
Main joist (13) is stated, the guide portion (2313) is adjacent for the connecting portion (2311) and the hang part (2312) to be imported
Two main joists (13) between;
Limiting section (2322) of the pedestal (232) including clamping portion (2321), the one end for being set to the clamping portion (2321)
And the guidance part (2323) of the other end of the clamping portion (2321) is set to, the clamping portion (2321) is installed in described cover
In the keel groove of face keel (22), the limiting section (2322) is for making the clamping portion (2321) be limited in the cover surface keel
(22) one end of keel groove, the guidance part (2323) by the clamping portion (2321) for importing the cover surface keel (22)
Keel groove in.
8. furred ceiling module according to claim 1, which is characterized in that the main joist (13) including outer keel (131) with
And included bone (132);
The outer keel (131) is including outer tank body (1311) and is set to the notch two of U-type groove in the outer tank body (1311)
The outer bending part (1312) of side, the included bone (132) is including inner tank body (1321) and is set to the inner tank body (1321)
The interior bending part (1322) of the notch both sides of upper U-type groove;
The included bone (132) is set in the U-type groove of the outer tank body (1311), and the interior bending part (1322) is set to institute
It states on the inside of outer bending part (1312), and outer bending part (1312) setting that reclines.
9. furred ceiling module according to claim 8, which is characterized in that the depth of the U-type groove of the outer tank body (1311) is big
In the depth of the U-type groove of the inner tank body (1321), the bottom surface of the outer tank body (1311) and the bottom of the inner tank body (1321)
Lumen therethrough is formed between face.
10. according to any furred ceiling modules of claim 1-9, which is characterized in that adjacent institute in the hangar system (1)
It states and is provided with main bone stull (16) between main joist (13), the main bone stull (16) can be installed in two adjacent institutes simultaneously
It states on main joist (13), for being limited to the adjacent main joist (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641499.XU CN207568047U (en) | 2017-11-30 | 2017-11-30 | A kind of furred ceiling module |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721641499.XU CN207568047U (en) | 2017-11-30 | 2017-11-30 | A kind of furred ceiling module |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207568047U true CN207568047U (en) | 2018-07-03 |
Family
ID=62689393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721641499.XU Active CN207568047U (en) | 2017-11-30 | 2017-11-30 | A kind of furred ceiling module |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207568047U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537793A (en) * | 2018-12-06 | 2019-03-29 | 河南三阳建材科技有限公司 | It is easily installed the ceiling structure and its installation method of leveling |
CN112411848A (en) * | 2020-10-28 | 2021-02-26 | 成都市医净净化设备科技有限公司 | Ceiling fastener for rock wool double-glass-magnesium color steel sandwich panel |
CN112982803A (en) * | 2021-03-04 | 2021-06-18 | 杭州康勋建设有限公司 | Shape suspended ceiling structure of preapring for an unfavorable turn of events |
-
2017
- 2017-11-30 CN CN201721641499.XU patent/CN207568047U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109537793A (en) * | 2018-12-06 | 2019-03-29 | 河南三阳建材科技有限公司 | It is easily installed the ceiling structure and its installation method of leveling |
CN109537793B (en) * | 2018-12-06 | 2024-02-23 | 河南三阳建材科技有限公司 | Suspended ceiling structure convenient to install and level and installation method thereof |
CN112411848A (en) * | 2020-10-28 | 2021-02-26 | 成都市医净净化设备科技有限公司 | Ceiling fastener for rock wool double-glass-magnesium color steel sandwich panel |
CN112411848B (en) * | 2020-10-28 | 2022-08-12 | 新疆西部金科建材有限公司 | Ceiling fastener for rock wool double-glass-magnesium color steel sandwich panel |
CN112982803A (en) * | 2021-03-04 | 2021-06-18 | 杭州康勋建设有限公司 | Shape suspended ceiling structure of preapring for an unfavorable turn of events |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207568047U (en) | A kind of furred ceiling module | |
CN109853826A (en) | A kind of furred ceiling mould group | |
CN204126102U (en) | A kind of sheet material fast-assembling ceiling structure | |
JP2012503116A5 (en) | ||
CA2661360A1 (en) | Suspended ceiling cloud with flexible panel | |
CN102493622A (en) | Wallboard installing component and method for installing decorative wallboard by using same | |
CN210395794U (en) | Indoor suspended ceiling structure with high installation convenience | |
CN207003900U (en) | A kind of novel wall surface cladding panel structure | |
CN201924607U (en) | Wall body vertical wire hanging instrument | |
CN108797880A (en) | A kind of plaster tablet suspended ceiling structure | |
CN207568048U (en) | A kind of hangar system | |
CN207568046U (en) | A kind of suspending assembly | |
CN214833931U (en) | Light gauge steel furred ceiling structure | |
CN203947655U (en) | A kind of hanging piece for low floor height Integral ceiling | |
CN209874218U (en) | Light keel decorative structure | |
CN206667565U (en) | A kind of ceiling structure | |
CN210947295U (en) | Wallboard fixed ground beam with adjustable high strength | |
CN201348094Y (en) | Grid-type cable bridge horizontal fast mounting bracket | |
CN205206120U (en) | Furred ceiling suspended structure | |
CN212583021U (en) | Adjustable fixing device for installing ceiling keel | |
CN103290955A (en) | Fixing support capable of quickly mounting integrated building external wall panel | |
CN203307983U (en) | Ceiling keel component | |
CN206844449U (en) | A kind of small step furred ceiling of lightgage steel joist | |
CN206110421U (en) | Stone material curtain adjustable combination pendant is hung futilely to back of body bolt formula | |
CN109853827A (en) | A kind of hangar system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |