CN108792962A - A kind of Plug-in tower crane is climbed frame apparatus and its application method - Google Patents
A kind of Plug-in tower crane is climbed frame apparatus and its application method Download PDFInfo
- Publication number
- CN108792962A CN108792962A CN201810732782.6A CN201810732782A CN108792962A CN 108792962 A CN108792962 A CN 108792962A CN 201810732782 A CN201810732782 A CN 201810732782A CN 108792962 A CN108792962 A CN 108792962A
- Authority
- CN
- China
- Prior art keywords
- upper ledge
- tower crane
- building structure
- tower
- climbed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 17
- 230000009194 climbing Effects 0.000 claims abstract description 17
- 239000010959 steel Substances 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010586 diagram Methods 0.000 description 3
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 1
- 240000002853 Nelumbo nucifera Species 0.000 description 1
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/16—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes with jibs supported by columns, e.g. towers having their lower end mounted for slewing movements
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The present invention proposes that a kind of Plug-in tower crane is climbed frame apparatus and its application method, which includes:First upper ledge, the second upper ledge, lower frame, hoist engine, steel wire rope, pull rod, wherein the lower frame bears tower crane vertical load, connecting building structure and tower body;Second upper ledge bears tower crane horizontal load, connecting building structure and tower body;The pull rod connects the lower frame and second upper ledge;First upper ledge is only connected with building structure, with tower body without connecting;The hoist engine is set at the top of tower crane, and first upper ledge or the second upper ledge are connected to by steel wire rope.Plug-in tower crane proposed by the present invention is climbed frame apparatus and its application method, during capable of efficiently solving existing tower crane climbing, removes and installation is climbed the complexity of frame, dangerous working condition, reduce the occupancy to resource, shorten the construction period.
Description
Technical field
The invention belongs to architectural engineering construction technique fields, relate generally to a kind of external hanging type for following tower body to climb together
Tower crane climbing frame apparatus and its application method.
Background technology
The external-hanging structure of existing tower crane needs twice to climb frame (upper ledge and bottom frame) as supporting structure, holds at work
Generated horizontal force, vertical force etc. in by tower crane lifting work.When tower crane climbs upwards, then need in addition again to pacify above
Fill the frame (new upper ledge) that climbs together.Original twice bottom frame in frame that climbs will move out later work, and that newly installs climbs
Frame will participate in work as the upper ledge of the following tower crane.Each tower crane climbing all by along with new upper ledge is installed, removes old bottom
The work of frame.Usual above-mentioned work is completed by adjacent tower crane, it means that the standard climbed in a tower crane
Standby work and climb work when, itself cannot not only participate in site operation work, adjacent cooperation tower crane can not participate in scene
Construction working greatly occupies resource, is affected to the duration.
Invention content
The present invention proposes that a kind of Plug-in tower crane is climbed frame apparatus and its application method, and existing tower crane can be efficiently solved
During climbing, the complexity for the frame that climbs, dangerous working condition are removed and installed, the occupancy to resource is reduced, shortens the construction period.
In order to achieve the above object, the present invention proposes that a kind of Plug-in tower crane is climbed frame apparatus, including:First upper ledge,
Two upper ledges, lower frame, hoist engine, steel wire rope, pull rod,
The wherein described lower frame bears tower crane vertical load, connecting building structure and tower body;
Second upper ledge bears tower crane horizontal load, connecting building structure and tower body;
The pull rod connects the lower frame and second upper ledge;
First upper ledge is only connected with building structure, with tower body without connecting;
The hoist engine is set at the top of tower crane, and first upper ledge or the second upper ledge are connected to by steel wire rope.
Further, first upper ledge and building structure are dismountable connection type.
Further, second upper ledge and building structure and the connection of tower body are dismountable connection type.
Further, the connection of the pull rod and the lower frame and second upper ledge is dismountable connection type.
Further, the connection of the hoist engine and first upper ledge and the second upper ledge is dismountable connection type.
In order to achieve the above object, the present invention also proposes that a kind of Plug-in tower crane is climbed frame apparatus application method, including under
Row step:
First upper ledge is promoted to by hoist engine and steel wire rope and has been climbed by the connection for releasing the first upper ledge and building structure
Respective heights after, then it is connect with building structure, the first upper ledge is withstood into plug-in tower crane tower body, it is made to bear horizontal load
Lotus, meanwhile, contacting for the second upper ledge and tower body is released, it is made to be not subjected to horizontal load;
Hoist engine is connected by steel wire rope with the second upper ledge;
Contacting for the second upper ledge and building structure is released, is promoted to next operating position, then join with building structure
System;
Steel wire rope of windlass is released, pull rod is installed on the second upper ledge, vertical load can be born, meanwhile, it releases
Pull rod on lower frame, not in the vertical load for bearing tower crane;
Contacting for lower frame and building structure is released, but tower body is kept to be connected thereto, tower crane starts work of climbing by climbing band,
Rise together with lower frame;
Tower crane completes work of climbing, and band is climbed in releasing, and lower frame is reliably connected with building structure;
Pull rod is installed on lower frame, it is made to bear tower crane vertical load, by the second upper ledge and tower body reliable links, it is made to hold
By tower crane horizontal loading, contacting for the first upper ledge and tower crane is released, makes it not by load.
Plug-in tower crane proposed by the present invention is climbed frame apparatus and its application method, can not be completed climb by other tower cranes
Frame follows installation, meanwhile, also complete the work of climbing of tower crane itself.The present invention can efficiently solve existing tower crane climbing
In the process, the complexity for the frame that climbs, dangerous working condition are removed and installed, the occupancy to resource is reduced, shortens the construction period.
Description of the drawings
The Plug-in tower crane that Fig. 1 show present pre-ferred embodiments is climbed frame apparatus structural schematic diagram.
The Plug-in tower crane that Fig. 2~Fig. 8 show present pre-ferred embodiments is climbed frame apparatus application method schematic diagram.
Specific implementation mode
The specific implementation mode of the present invention is provided below in conjunction with attached drawing, but the present invention is not limited to the following embodiments and the accompanying drawings.Root
According to following explanation and claims, advantages and features of the invention will become apparent from.It should be noted that attached drawing be all made of it is very simple
The form of change and use non-accurate ratio, be only used for conveniently, lucidly aid in illustrating the embodiment of the present invention purpose.
Referring to FIG. 1, the Plug-in tower crane that Fig. 1 show present pre-ferred embodiments is climbed frame apparatus structural schematic diagram.
The present invention proposes that a kind of Plug-in tower crane is climbed frame apparatus, including:First upper ledge 100, the second upper ledge 200, lower frame 300, elevator
Machine 400, steel wire rope 500, pull rod 600, wherein the lower frame 300 bears tower crane vertical load, connecting building structure 10 and tower body
20;Second upper ledge 200 bears tower crane horizontal load, connecting building structure 10 and tower body 20;The pull rod 600 connects described
Lower frame 300 and second upper ledge 200;First upper ledge 100 is only connected with building structure 10, with tower body 20 without even
It connects;The hoist engine 400 is set at the top of tower crane, and first upper ledge, 100 or second upper ledge is connected to by steel wire rope 500
200。
According to present pre-ferred embodiments, first upper ledge 100 is dismountable connection type with building structure 10.Institute
It is dismountable connection type that the second upper ledge 200, which is stated, with building structure 10 and the connection of tower body 20.The pull rod 600 with it is described under
The connection of frame 300 and second upper ledge 200 is dismountable connection type.The hoist engine 400 and first upper ledge 100
Connection with the second upper ledge 200 is dismountable connection type.
In order to achieve the above object, the present invention also proposes that a kind of Plug-in tower crane is climbed frame apparatus application method, including under
Row step:
As shown in Fig. 2, releasing the connection of the first upper ledge and building structure, the first upper ledge is carried by hoist engine and steel wire rope
The respective heights after the completion of climbing are risen to, then it is connect with building structure, the first upper ledge is withstood into plug-in tower crane tower body, makes it
Horizontal load is born, meanwhile, contacting for the second upper ledge and tower body is released, it is made to be not subjected to horizontal load;
As shown in figure 3, hoist engine is connected by steel wire rope with the second upper ledge;
As shown in figure 4, release contacting for the second upper ledge and building structure, it is promoted to next operating position, then with
Building structure contacts;
As shown in figure 5, releasing steel wire rope of windlass, pull rod is installed on the second upper ledge, vertical load can be born,
Meanwhile the pull rod on lower frame is released, not in the vertical load for bearing tower crane;
As shown in fig. 6, releasing contacting for lower frame and building structure, but tower body is kept to be connected thereto, tower crane is opened by climbing band
Beginning climbs work, rises together with lower frame;
Band is climbed in the work as shown in fig. 7, tower crane completion is climbed, releasing, and lower frame is reliably connected with building structure;
As shown in figure 8, installing pull rod on lower frame, it is made to bear tower crane vertical load, the second upper ledge and tower body is reliable
Contact makes it bear tower crane horizontal loading, releases contacting for the first upper ledge and tower crane, makes it not by load.
Frame apparatus and its application method in conclusion Plug-in tower crane proposed by the present invention is climbed, can not be by other towers
The installation that follows for frame of completing to climb is hung, meanwhile, also complete the work of climbing of tower crane itself.The present invention can efficiently solve existing
During having tower crane climbing, the complexity for the frame that climbs, dangerous working condition are removed and installed, the occupancy to resource is reduced, shortens the construction period.
Although the present invention has been disclosed as a preferred embodiment, however, it is not to limit the invention.Skill belonging to the present invention
Has usually intellectual in art field, without departing from the spirit and scope of the present invention, when can be used for a variety of modifications and variations.Cause
This, the scope of protection of the present invention is defined by those of the claims.
Claims (6)
- The frame apparatus 1. a kind of Plug-in tower crane is climbed, which is characterized in that including:First upper ledge, the second upper ledge, lower frame, hoist engine, Steel wire rope, pull rod,The wherein described lower frame bears tower crane vertical load, connecting building structure and tower body;Second upper ledge bears tower crane horizontal load, connecting building structure and tower body;The pull rod connects the lower frame and second upper ledge;First upper ledge is only connected with building structure, with tower body without connecting;The hoist engine is set at the top of tower crane, and first upper ledge or the second upper ledge are connected to by steel wire rope.
- The frame apparatus 2. Plug-in tower crane according to claim 1 is climbed, which is characterized in that first upper ledge is tied with building Structure is dismountable connection type.
- The frame apparatus 3. Plug-in tower crane according to claim 1 is climbed, which is characterized in that second upper ledge is tied with building The connection of structure and tower body is dismountable connection type.
- The frame apparatus 4. Plug-in tower crane according to claim 1 is climbed, which is characterized in that the pull rod and the lower frame and The connection of second upper ledge is dismountable connection type.
- The frame apparatus 5. Plug-in tower crane according to claim 1 is climbed, which is characterized in that the hoist engine and described first The connection of upper ledge and the second upper ledge is dismountable connection type.
- The frame apparatus application method 6. a kind of Plug-in tower crane is climbed, which is characterized in that include the following steps:First upper ledge is promoted to after the completion of climbing by the connection for releasing the first upper ledge and building structure by hoist engine and steel wire rope Respective heights, then it is connect with building structure, the first upper ledge is withstood into plug-in tower crane tower body, it is made to bear horizontal load, Meanwhile contacting for the second upper ledge and tower body is released, so that it is not subjected to horizontal load;Hoist engine is connected by steel wire rope with the second upper ledge;Contacting for the second upper ledge and building structure is released, is promoted to next operating position, then contact with building structure;Steel wire rope of windlass is released, pull rod is installed on the second upper ledge, vertical load can be born, meanwhile, release lower frame On pull rod, not in the vertical load for bearing tower crane;Contacting for lower frame and building structure is released, but tower body is kept to be connected thereto, tower crane starts work of climbing by climbing band, with Lower frame rises together;Tower crane completes work of climbing, and band is climbed in releasing, and lower frame is reliably connected with building structure;Pull rod is installed on lower frame, it is made to bear tower crane vertical load, by the second upper ledge and tower body reliable links, it is made to bear tower It hangs horizontal loading, releases contacting for the first upper ledge and tower crane, make it not by load.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810732782.6A CN108792962A (en) | 2018-07-05 | 2018-07-05 | A kind of Plug-in tower crane is climbed frame apparatus and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810732782.6A CN108792962A (en) | 2018-07-05 | 2018-07-05 | A kind of Plug-in tower crane is climbed frame apparatus and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108792962A true CN108792962A (en) | 2018-11-13 |
Family
ID=64075192
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810732782.6A Pending CN108792962A (en) | 2018-07-05 | 2018-07-05 | A kind of Plug-in tower crane is climbed frame apparatus and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108792962A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101847A (en) * | 2019-12-19 | 2020-05-05 | 常德市鼎城永欣机械制造有限公司 | Tower crane climbing frame |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103896165A (en) * | 2014-02-28 | 2014-07-02 | 中建钢构有限公司 | Suspension type outside climbing tower crane supporting system and turnover using method thereof |
CN105836640A (en) * | 2016-04-22 | 2016-08-10 | 中建三局集团有限公司 | Self-climbing fixing device and method for climbing tower crane |
CN107720575A (en) * | 2017-08-29 | 2018-02-23 | 中国建筑第八工程局有限公司 | A kind of towing type construction method for hanging of tower crane support system |
CN108002255A (en) * | 2017-12-28 | 2018-05-08 | 上海建工四建集团有限公司 | Movable arm tower crane climbing beam support system and its application method |
CN208561497U (en) * | 2018-07-05 | 2019-03-01 | 上海市机械施工集团有限公司 | A kind of Plug-in tower crane for following tower body to climb together is climbed frame apparatus |
-
2018
- 2018-07-05 CN CN201810732782.6A patent/CN108792962A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103896165A (en) * | 2014-02-28 | 2014-07-02 | 中建钢构有限公司 | Suspension type outside climbing tower crane supporting system and turnover using method thereof |
CN105836640A (en) * | 2016-04-22 | 2016-08-10 | 中建三局集团有限公司 | Self-climbing fixing device and method for climbing tower crane |
CN107720575A (en) * | 2017-08-29 | 2018-02-23 | 中国建筑第八工程局有限公司 | A kind of towing type construction method for hanging of tower crane support system |
CN108002255A (en) * | 2017-12-28 | 2018-05-08 | 上海建工四建集团有限公司 | Movable arm tower crane climbing beam support system and its application method |
CN208561497U (en) * | 2018-07-05 | 2019-03-01 | 上海市机械施工集团有限公司 | A kind of Plug-in tower crane for following tower body to climb together is climbed frame apparatus |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111101847A (en) * | 2019-12-19 | 2020-05-05 | 常德市鼎城永欣机械制造有限公司 | Tower crane climbing frame |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105201195B (en) | One kind can lift supporting leg type elevator hoistway construction platform and construction method | |
CN103979383B (en) | Building operation multiple layer up-down plateform system | |
CN107190964A (en) | A kind of construction method of prefabricated hoistway operation platform | |
CN109267494A (en) | A kind of hood type hydraulic climbing formwork system and construction method for cylinder pier construction | |
CN109138454A (en) | A kind of installation method of super high-rise building outline border bandy truss | |
CN109457930A (en) | Integrally hoisting steel platform and its construction method for irregular wall construction | |
CN109440985A (en) | Super high-rise building super large curtain wall unit hydraulic synchronizing lifting system and its construction method | |
CN113137054A (en) | Method for setting inverted hoisting power equipment in attached lifting scaffold | |
CN106150057B (en) | A kind of split blade type hydraulic pressure lift climbing frame | |
CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
CN107502690A (en) | A kind of point of device and replacing options with integral replacing last furnace shell | |
CN208561497U (en) | A kind of Plug-in tower crane for following tower body to climb together is climbed frame apparatus | |
CN108792962A (en) | A kind of Plug-in tower crane is climbed frame apparatus and its application method | |
CN104032966A (en) | Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks | |
CN107130517B (en) | It is a kind of fine-tuning from promotion closure mould bases base apparatus and its operating method | |
CN106758855B (en) | Arc-shaped pier cap construction arch support component and arc-shaped pier cap construction method | |
CN103741606B (en) | The construction method of soft pulling equipment fast quick change rope | |
CN204456816U (en) | One can promote supporting leg type elevator hoistway construction platform | |
CN104847108A (en) | Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure | |
CN104030176B (en) | The equalizer bar of hoisting platform truss and hanging method thereof | |
CN205134921U (en) | Building outer wall concrete constructional column hangs construction platform | |
CN105350698A (en) | Large-span dome installation construction method | |
CN106016233A (en) | Boiler roof with long span and fewer welding spots and hoisting method for boiler roof | |
CN207160721U (en) | A kind of super-huge iron tower of power transmission line supervisor | |
JP6554610B2 (en) | Assembly method for a DC converter valve |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |