CN108776726B - 一种偏心堆载作用下的盾构隧道横向受力计算方法 - Google Patents

一种偏心堆载作用下的盾构隧道横向受力计算方法 Download PDF

Info

Publication number
CN108776726B
CN108776726B CN201810512902.1A CN201810512902A CN108776726B CN 108776726 B CN108776726 B CN 108776726B CN 201810512902 A CN201810512902 A CN 201810512902A CN 108776726 B CN108776726 B CN 108776726B
Authority
CN
China
Prior art keywords
tunnel
load
force
lining
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810512902.1A
Other languages
English (en)
Other versions
CN108776726A (zh
Inventor
魏纲
洪文强
魏新江
林心蓓
张鑫海
董北北
王新
王辰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN201810512902.1A priority Critical patent/CN108776726B/zh
Publication of CN108776726A publication Critical patent/CN108776726A/zh
Application granted granted Critical
Publication of CN108776726B publication Critical patent/CN108776726B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/06Power analysis or power optimisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Geometry (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种偏心堆载作用下的盾构隧道横向受力计算方法,包括步骤:1)建立力学计算模型;2)计算堆载对盾构隧道产生的附加荷载;3)偏心堆载引起的衬砌环内力计算:弯矩计算、轴力计算、剪切力计算。本发明的有益效果是:本发明考虑偏心堆载和盾构衬砌环间作用力的影响,基于修正惯用法,推导出衬砌围压和内力(弯矩、轴力、剪力)的计算公式;目前传统方法只能计算大面积对称堆载情况下的隧道的横向受力,而实际情况下,偏心堆载的情况更常见,本发明方法应用面更广;其次本发明方法考虑了衬砌环间作用力的影响,更符合实际情况;此外本发明方法还可以计算隧道轴线上任意位置x处衬砌的横向受力。

Description

一种偏心堆载作用下的盾构隧道横向受力计算方法
技术领域
本发明涉及一种考虑偏心堆载和隧道衬砌环间作用力的影响,基于修正惯用法提出的计算盾构隧道内力和围压的计算方法,以此推导出隧道衬砌环的弯矩、轴力和剪力的计算公式。属于地下工程技术领域。
背景技术
随着城市地铁的发展,盾构隧道的应用日益广泛。因此在地铁运营期间,盾构隧道邻域内发生的堆载工况越来越常见,其中以偏心堆载为主。上部偏心堆载会对运营盾构隧道产生附加应力,使隧道围压发生变化,破坏盾构隧道结构的原有平衡,引起隧道应力重分布。从而使盾构隧道的内力发生变化,严重时会引发接缝张开、管片开裂和螺栓失效等现象,对地铁安全造成严重影响。因此研究偏心堆载对邻近运营地铁盾构隧道横向受力的影响具有重要意义。
在理论计算方面,目前学者主要研究的是对称堆载对隧道纵向变形产生的影响,对于偏心堆载、隧道横向受力以及隧道横纵向变形之间的关系研究较少。目前尚未见文献考虑偏心堆载和隧道衬砌环间作用力的影响,由于现有的衬砌荷载模式存在不足,需作进一步的研究。
发明内容
本发明的目的是克服现有技术中的不足,提供一种偏心堆载作用下的盾构隧道横向受力计算方法,综合考虑偏心堆载和隧道衬砌环间作用力的影响,基于修正惯用法,推导出衬砌围压和内力(弯矩、轴力、剪力)的计算公式。
这种偏心堆载作用下的盾构隧道横向受力计算方法,包括以下步骤:
步骤1)建立力学计算模型
理论隧道模型如图1所示,运营地铁上方有一矩形的地面堆载。图中:L为平行隧道轴线方向的边长,B为垂直隧道轴线方向的边长;以平行于隧道轴线方向为x轴,垂直隧道轴线方向为y轴;s为隧道轴线到堆载中心的水平距离;H为隧道上覆土厚度;Hw为地下水高度;D0为隧道的外直径;P为地面堆载的大小。取隧道的一个衬砌环进行分析,环的中心坐标为(x,s,H+D0/2),其主要受到水土压力、衬砌环间作用力和自重力的作用。
无堆载工况下,隧道衬砌环受到的荷载如图2(a)所示;图2(b)为偏心堆载对隧道衬砌产生的荷载,利用Boussinesq解计算堆载作用下两端点的压力值,假设隧道两端点之间的力均匀变化,呈梯形分布。图中Pe1为垂直土压力;Pw1为顶部垂直水压力;Pg为衬砌底部为平衡垂直方向的自重力而产生的垂直土压力;qe1为顶部水平土压力;qe2为底部水平土压力;qw1为顶部水平水压力;qw2为底部水平水压力;K为地层反力系数;δ为衬砌的水平位移;Pp1为堆载引起的隧道顶部远端竖直力;Pp2为堆载引起的隧道顶部近端竖直力;qp1为堆载引起的隧道侧面底部水平力;qp2为堆载引起的隧道侧面顶部水平力;G为衬砌自重荷载;Re为衬砌形心半径。
步骤2)计算堆载对盾构隧道产生的附加荷载
设堆载上一点(α,β)的力为Pdαdβ,根据Boussinesq解积分求出隧道顶面两端的竖直力Pp1、Pp2和侧面两端的水平力qp1、qp2
Figure GDA0003337485940000021
Figure GDA0003337485940000022
Figure GDA0003337485940000023
Figure GDA0003337485940000024
式中:
Figure GDA0003337485940000025
Figure GDA0003337485940000026
Figure GDA0003337485940000027
Figure GDA0003337485940000028
步骤3)偏心堆载引起的衬砌环内力计算。
作为优选:所述步骤3)具体包括:
步骤3-1)弯矩计算
垂直三角形荷载(pp2-pp1):
Figure GDA0003337485940000029
水平三角形荷载(qp2-qp1):
Figure GDA0003337485940000031
垂直荷载pP1
Figure GDA0003337485940000032
水平荷载qp1
Figure GDA0003337485940000033
步骤3-2)轴力计算
垂直三角形荷载(pp2-pp1):
Figure GDA0003337485940000034
水平三角形荷载(qp2-qp1):
Figure GDA0003337485940000035
垂直荷载pP1
N=pp1Re·sinθ (11)
水平荷载qp1
N=qp1Re·cos2θ (12)
步骤3-3)剪切力计算
垂直三角形荷载(pp2-pp1):
Figure GDA0003337485940000036
水平三角形荷载(qp2-qp1):
Figure GDA0003337485940000037
垂直荷载pP1
Q=-pp1Re·sinθ·cosθ (15)
水平荷载qp1
Q=-qp1Re·sinθ·cosθ (16)。
本发明的有益效果是:本发明考虑偏心堆载和盾构衬砌环间作用力的影响,基于修正惯用法,推导出衬砌围压和内力(弯矩、轴力、剪力)的计算公式。目前传统方法只能计算大面积对称堆载情况下的隧道的横向受力,而实际情况下,偏心堆载的情况更常见,本发明方法应用面更广;其次本发明方法考虑了衬砌环间作用力的影响,更符合实际情况;此外本发明方法还可以计算隧道轴线上任意位置x处衬砌的横向受力。
附图说明
图1是计算模型的平面图和横截面图(其中图1(a)是计算模型的平面图,图1(b)是计算模型的横截面图);
图2是隧道受力示意图(其中图2(a)是无堆载工况隧道受力示意图,图2(b)是堆载产生荷载隧道受力示意图);
图3是隧道环间受力示意图;
图4是隧道衬砌围压示意图;
图5是弯矩对比图;
图6是轴力对比图;
图7是剪切力对比图;
图8是不同x时弯矩对比图;
图9是不同x时轴力对比图;
图10是不同x时剪切力对比图。
具体实施方式
下面结合实施例对本发明做进一步描述。下述实施例的说明只是用于帮助理解本发明。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。
首先作如下假设:(1)假定地基土是各向同性、均匀连续的半无限弹性体;(2)在计算地面堆载对土体产生的附加应力时,不考虑隧道存在的影响。
1.建立隧道计算模型
计算模型如图1所示,运营地铁上方有一矩形的地面堆载。图中:L为平行隧道轴线方向的边长,B为垂直隧道轴线方向的边长;以平行于隧道轴线方向为x轴,垂直隧道轴线方向为y轴;s为隧道轴线到堆载中心的水平距离;H为隧道上覆土厚度;Hw为地下水高度;D0为隧道的外直径;P为地面堆载的大小。
2.隧道衬砌环作用力分析
取隧道的一个衬砌环进行分析,环的中心坐标为(x,s,H+D0/2),其主要受到水土压力、衬砌环间作用力和自重力的作用。
2.1水土压力
水土压力由土压力、水压力、土层反力和地面堆载引起的附加力组成,偏心堆载对隧道衬砌产生的附加力通过式(1)-(4)计算。
无堆载工况下,隧道衬砌环受到的荷载如图2(a)所示;图2(b)为偏心堆载对隧道衬砌产生的荷载,利用Boussinesq解计算堆载作用下两端点的压力值,假设隧道两端点之间的力均匀变化,呈梯形分布。其中垂直土压力、水平土压力、水压力、地层反力和自重荷载的计算参考文献。图中Pe1为垂直土压力;Pw1为顶部垂直水压力;Pg为衬砌底部为平衡垂直方向的自重力而产生的垂直土压力;qe1为顶部水平土压力;qe2为底部水平土压力;qw1为顶部水平水压力;qw2为底部水平水压力;K为地层反力系数;δ为衬砌的水平位移;Pp1为堆载引起的隧道顶部远端竖直力;Pp2为堆载引起的隧道顶部近端竖直力;qp1为堆载引起的隧道侧面底部水平力;qp2为堆载引起的隧道侧面顶部水平力;G为衬砌自重荷载;Re为衬砌形心半径。
(1)垂直土压力
垂直土压力因隧道埋深的不同而不同,软粘土的垂直土压力直接等于全部上覆土的压力,即:
Pe1=Hγ (18)
式中:H为覆盖土厚度;γ为土体重度。
(2)水平土压力
作用于衬砌环上的侧面土压力,可按下式估算:
qe1=λPe1 (19)
qe2=λ(Pe1+γD0) (20)
(3)水压力
采用水土分算计算作用于衬砌上的水压力,为确保隧道的安全性,应考虑地下水位的影响。其中作用在顶部和底部的竖向水压力视为水平分布的均布荷载,其大小为衬砌最高点和最低点的静止水压力。水平水压力与静止水压力的大小相等,随着深度的增加而增加。其值可用下式估算:
Pw1=Hwγw (21)
Pw1=(Hw+D0w (22)
式中:γw为水的重度。
(4)土层反力
把竖向地层反力视为与地层位移无关,通过竖向力平衡得出;把作用在衬砌侧面的水平地层反力看成是衬砌向地层方向位移而产生的反力,分布如图2所示,其三角形顶点的反力可通过下式估算:
q=Kδ (23)
δ由四部分组成:土压力和水压力造成的δ1,地面堆载造成的δ2,环间轴力造成的δ3和环间剪切力造成的δ4。即:
δ=δ1234 (24)
Figure GDA0003337485940000061
式中:η为抗弯刚度下降系数;EI为抗弯刚度。
2.2衬砌环间作用力
隧道衬砌环除了受到环向四周土体施加的围压之外,还受到相邻衬砌环的轴力和剪力,受力如图3所示。图中α为隧道纵向单位长度的弯曲角度;Ft为衬砌环间剪切力;FP为环间轴力。
(1)环间轴力
由于隧道弯曲的影响,纵向轴力Fp将产生一个指向隧道直径方向的附加力:
V=0.5TEκ2Recosα (26)
式中:T为衬砌厚度;E为衬砌弹性模量;κ为隧道变形曲率。
由于环间轴力而产生的衬砌水平位移为:
δ3=TEκ2/[192(0.0454KRe 4/16+ηEI)] (27)
(2)环间剪切力
采用其他文献中的方法计算环间剪切力Ft,由此产生的衬砌水平位移为:
δ4=0.042FtD0 3/[8(0.0454KRe 4/16+ηEI)] (28)
2.3自重荷载
自重荷载是沿衬砌轴线分布的垂直荷载,一次衬砌的自重荷载可用下式估算:
Figure GDA0003337485940000071
式中:W1为单位长度衬砌的重度;g1为一次衬砌的自重力;g为重力加速度。
3.衬砌环内力计算
把衬砌环视为刚度均匀环,基于修正惯用法,考虑管片接头抗弯刚度,把管环认为具有均匀抗弯刚度ηEI,对交错接头而言,管环的截面弯矩为(1+ξ)M,ξ为弯矩增加率。分析衬砌环在水土压力、环间作用力和自重压力作用下的内力,衬砌环顺时针θ处内力(弯矩、剪力、轴力)计算公式如下:
(1)弯矩计算
垂直荷载(pe1+pw1+pP1):
Figure GDA0003337485940000072
水平荷载(qe1+qw1+qp1):
Figure GDA0003337485940000073
水平三角形荷载(qe2+qw2+qp2-qe1-qw1-qp1):
Figure GDA0003337485940000074
垂直三角形荷载(pp2-pp1):
Figure GDA0003337485940000075
地基抗力:
Figure GDA0003337485940000076
Figure GDA0003337485940000077
Figure GDA0003337485940000078
环间轴力Fp
Figure GDA0003337485940000079
环间剪切力Ft
Figure GDA00033374859400000710
自重G:
Figure GDA00033374859400000711
Figure GDA00033374859400000712
Figure GDA0003337485940000081
Figure GDA0003337485940000082
(2)轴力计算
垂直荷载(pe1+pw1+pP1):N=(pe1+pw1+pp1)Re·sinθ (40)
水平荷载(qe1+qw1+qp1):N=(qe1+qw1+qp1)Re·cos2θ (41)
水平三角形荷载(qe2+qw2+qp2-qe1-qw1-qp1):
Figure GDA0003337485940000083
垂直三角形荷载(pp2-pp1):
Figure GDA0003337485940000084
地基抗力Kδ:
Figure GDA0003337485940000085
时N=0.3536cosθ·K·δ·Re(44)
Figure GDA0003337485940000086
时N=(-0.7071cosθ+cos2θ+0.7071sin2θ·cosθ)K·δ·Re (45)
环间轴力Fp
Figure GDA0003337485940000087
环间剪切力Ft:N=-3Ftcosθ/(4π)+Ftθsinθ/(2π) (47)
自重G:
Figure GDA0003337485940000088
Figure GDA0003337485940000089
Figure GDA00033374859400000810
Figure GDA00033374859400000811
(3)剪切力计算
垂直荷载(pe1+pw1+pP1):Q=-(pe1+pw1+pp1)Re·sinθ·cosθ (50)
水平荷载(qe1+qw1+qp1):Q=-(qe1+qw1+qp1)Re·sinθ·cosθ (51)
水平三角形荷载(qe2+qw2+qp2-qe1-qw1-qp1):
Figure GDA00033374859400000812
垂直三角形荷载(pp2-pp1):
Figure GDA00033374859400000813
地基抗力Kδ:
Figure GDA00033374859400000814
时Q=0.3536sinθ·K·δ·Re (54)
Figure GDA0003337485940000091
时Q=(sinθ·cosθ-0.7071cos2θ·sinθ)K·δ·Re (55)
环间轴力Fp
Figure GDA0003337485940000092
环间剪切力Ft:Q=-3Ftsinθ/(4π)+Ft(sinθ-θcosθ)/(2π) (57)
自重G:
Figure GDA0003337485940000093
Figure GDA0003337485940000094
Figure GDA0003337485940000095
Figure GDA0003337485940000096
代入具体工况及参数进行计算,隧道外径D0=3.1m,管片宽度t=1.2m,管片厚度T=0.35m,堆载数值P=100kPa,堆载尺寸L=80m、B=40m,堆载中心离隧道轴线的水平距离s=20m,隧道覆盖土厚度H=10m,地下水高度Hw=5m,土体重度γ=18kN/m3,土体浮重度γ'=10kN/m3,水的重度γw=9.8kN/m3,土的内摩擦角
Figure GDA0003337485940000097
土的粘聚力c=30kPa,地层反力系数K=5000kN/m3,侧向土压力系数λ=0.65,隧道弹性模量E=3.45×107Pa,混凝土密度ρ1=2.6t/m3,重力加速度a=9.8m/s2,弯曲刚度有效率η=0.7,弯矩增大率ξ=0.3。
本发明考虑偏心堆载和盾构衬砌环间作用力的影响,基于修正惯用法,推导出衬砌围压和内力(弯矩、轴力、剪力)的计算公式,作算例分析。算例分析研究结果表明:偏心堆载会使隧道衬砌围压产生不对称分布,其中加载侧的围压大于非加载侧的围压,最大围压值出现在加载侧的下方;偏心堆载对加载侧的弯矩和剪力影响较大,对轴力影响较小;随着堆载数值不断增大,衬砌围压和剪力整体不断变大,零剪力值的位置不变;随着堆载中心偏移距离s变大,衬砌围压和弯矩值不断减小,当s较大时减小幅度变小;随着隧道埋深增大,衬砌围压值和轴力值变大,随着埋深增大堆载的影响在减小。
图4为当x=0m时无堆载工况和堆载工况下盾构衬砌围压的示意图,其中左侧为加载侧,图5~图7同理。图5为衬砌截面弯矩对比图,图6为轴力对比图,图7为剪切力对比图。由图可知,偏心堆载会使隧道衬砌围压产生不对称分布,其中加载侧的围压大于非加载侧的围压,最大围压出现在225°的位置处。在偏心堆载作用下,加载侧的弯矩和剪力增加幅度较大,轴力增加幅度较小;堆载对加载侧的弯矩和剪力影响较大,对轴力影响较小。图8为不同x时弯矩对比图,图9为不同x时轴力对比图,图10为不同x时剪切力对比图。如图所示,x=40m时的围压和轴力整体都在变小;正弯矩减小,负弯矩增大;正剪切力增大,负剪切力减小。因为x=40m时,堆载与计算的衬砌环之间的距离变大了,堆载对衬砌环的影响减小。衬砌环间轴力和剪切力增大,但是衬砌环间作用力的影响较小,所以被堆载的影响抵消。

Claims (1)

1.一种偏心堆载作用下的盾构隧道横向受力计算方法,其特征在于包括以下步骤:
步骤1)建立力学计算模型
运营地铁上方有一矩形的地面堆载,其中,L为平行隧道轴线方向的边长,B为垂直隧道轴线方向的边长;以平行于隧道轴线方向为x轴,垂直隧道轴线方向为y轴;s为隧道轴线到堆载中心的水平距离;H为隧道上覆土厚度;Hw为地下水高度;D0为隧道的外直径;P为地面堆载的大小;取隧道的一个衬砌环进行分析,环的中心坐标为(x,s,H+D0/2),其受到水土压力、衬砌环间作用力和自重力的作用;
计算堆载作用下两端点的压力值,设隧道两端点之间的力均匀变化,呈梯形分布;其中,Pe1为垂直土压力;Pw1为顶部垂直水压力;Pg为衬砌底部为平衡垂直方向的自重力而产生的垂直土压力;qe1为顶部水平土压力;qe2为底部水平土压力;qw1为顶部水平水压力;qw2为底部水平水压力;K为地层反力系数;δ为衬砌的水平位移;Pp1为堆载引起的隧道顶部远端竖直力;Pp2为堆载引起的隧道顶部近端竖直力;qp1为堆载引起的隧道侧面底部水平力;qp2为堆载引起的隧道侧面顶部水平力;G为衬砌自重荷载;Re为衬砌形心半径;
步骤2)计算堆载对盾构隧道产生的附加荷载
设堆载上一点(α,β)的力为Pdαdβ,求出隧道顶面两端的竖直力Pp1、Pp2和侧面两端的水平力qp1、qp2
Figure FDA0003337485930000011
Figure FDA0003337485930000012
Figure FDA0003337485930000013
Figure FDA0003337485930000014
式中:
Figure FDA0003337485930000015
Figure FDA0003337485930000016
步骤3)偏心堆载引起的衬砌环内力计算
步骤3-1)弯矩计算
垂直三角形荷载(pp2-pp1):
Figure FDA0003337485930000021
其中,θ为衬砌环顺时针度数;Re为衬砌形心半径;
水平三角形荷载(qp2-qp1):
Figure FDA0003337485930000022
垂直荷载pP1
Figure FDA0003337485930000023
水平荷载qp1
Figure FDA0003337485930000024
步骤3-2)轴力计算
垂直三角形荷载(pp2-pp1):
Figure FDA0003337485930000025
水平三角形荷载(qp2-qp1):
Figure FDA0003337485930000026
垂直荷载pP1
N=pp1Re·sinθ (11)
水平荷载qp1
N=qp1Re·cos2θ (12)
步骤3-3)剪切力计算
垂直三角形荷载(pp2-pp1):
Figure FDA0003337485930000031
水平三角形荷载(qp2-qp1):
Figure FDA0003337485930000032
垂直荷载pP1
Q=-pp1Re·sinθ·cosθ (15)
水平荷载qp1
Q=-qp1Re·sinθ·cosθ (16)。
CN201810512902.1A 2018-05-25 2018-05-25 一种偏心堆载作用下的盾构隧道横向受力计算方法 Active CN108776726B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810512902.1A CN108776726B (zh) 2018-05-25 2018-05-25 一种偏心堆载作用下的盾构隧道横向受力计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810512902.1A CN108776726B (zh) 2018-05-25 2018-05-25 一种偏心堆载作用下的盾构隧道横向受力计算方法

Publications (2)

Publication Number Publication Date
CN108776726A CN108776726A (zh) 2018-11-09
CN108776726B true CN108776726B (zh) 2022-03-15

Family

ID=64027870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810512902.1A Active CN108776726B (zh) 2018-05-25 2018-05-25 一种偏心堆载作用下的盾构隧道横向受力计算方法

Country Status (1)

Country Link
CN (1) CN108776726B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112597681B (zh) * 2020-12-22 2022-11-08 上海勘察设计研究院(集团)有限公司 一种大面积堆载引起的水平位移计算方法及计算系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105241648A (zh) * 2015-10-23 2016-01-13 长安大学 模拟黄土隧道锁脚锚管端头受力的加载装置及其使用方法
CN105787193A (zh) * 2016-03-16 2016-07-20 上海市城市建设设计研究总院 盾构隧道模型结构的三角形抗力荷载计算方法
CN106951706A (zh) * 2017-03-20 2017-07-14 浙江大学城市学院 一种地面堆载引起既有盾构隧道位移计算方法
CN107025333A (zh) * 2017-03-08 2017-08-08 广西建工集团第五建筑工程有限责任公司 一种软土地层深基坑围护结构变形估算方法
US9770203B1 (en) * 2013-01-19 2017-09-26 Bertec Corporation Force measurement system and a method of testing a subject
CN206960198U (zh) * 2017-07-20 2018-02-02 长安大学 一种适用于室内隧道模型试验的衬砌支护模具

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9770203B1 (en) * 2013-01-19 2017-09-26 Bertec Corporation Force measurement system and a method of testing a subject
CN105241648A (zh) * 2015-10-23 2016-01-13 长安大学 模拟黄土隧道锁脚锚管端头受力的加载装置及其使用方法
CN105787193A (zh) * 2016-03-16 2016-07-20 上海市城市建设设计研究总院 盾构隧道模型结构的三角形抗力荷载计算方法
CN107025333A (zh) * 2017-03-08 2017-08-08 广西建工集团第五建筑工程有限责任公司 一种软土地层深基坑围护结构变形估算方法
CN106951706A (zh) * 2017-03-20 2017-07-14 浙江大学城市学院 一种地面堆载引起既有盾构隧道位移计算方法
CN206960198U (zh) * 2017-07-20 2018-02-02 长安大学 一种适用于室内隧道模型试验的衬砌支护模具

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Analysis of Forces and Deformation Rule of Existing Shield Tunnel Caused by Ground-heaped Load;Gang Wei ET AL.;《Journal of Engineering Science and Technology Review》;20171231;第55-63页 *
堆载引起临近地铁隧道的转动与错台变形计算;魏新江,等;《岩石力学与工程学报》;20180501;第1281-1289页 *
邻近基坑施工作用下盾构隧道横向变形及开裂特性研究;杨雨冰,等;《岩石力学与工程学报》;20161231;第4082-4093页 *

Also Published As

Publication number Publication date
CN108776726A (zh) 2018-11-09

Similar Documents

Publication Publication Date Title
CN108385673B (zh) 微型上部填充滚珠套管桩及其施工方法
CN103711135B (zh) 一种联拱结构抗滑桩
CN105040715B (zh) 使用钢板桩做桥梁施工围堰方法
WO2021164432A1 (zh) 一种提升既有衡重式挡墙抗滑、抗倾覆安全性的方法
CN106988334B (zh) 一种沉井支撑结构及沉井施工方法
CN109138011B (zh) 既有建筑物地基加固与纠偏方法
CN108776726B (zh) 一种偏心堆载作用下的盾构隧道横向受力计算方法
CN206829211U (zh) 用于建筑物被动纠偏的基础加固结构
CN107326919A (zh) 一种沉井终沉阶段纠偏系统及其使用方法
CN113434947B (zh) 一种狭小空间锚桩式支护结构及设计方法
CN110943422A (zh) 一种电缆工井
CN101285302B (zh) 一种混凝土大坝沉箱加固方法
CN104612142A (zh) 一种基于复合柔性桩的整体式桥台桥梁构造及其施工方法
CN111764201A (zh) 路堑地段无砟轨道抗隆起的路基结构及其施工与设计方法
CN116257907A (zh) 一种用于水库溢洪道的凸形溢流堰设计方法
CN109902320B (zh) 一种陡坡路基椅式桩锚固深度设计计算方法
CN208501731U (zh) 一种用于较厚软弱地基中分级挡土墙结构
CN113642089B (zh) 一种盾构掘进周围地层变形及加固范围确定方法
CN206800436U (zh) 一种沉井支撑结构
CN102733414B (zh) 方锥型锚墩联合水平撑杆的水池抗浮方法
CN115238482A (zh) 一种计算大纵坡矩形隧道掘进面支护压力的方法
CN201351279Y (zh) 圆形深基坑支护
CN201292533Y (zh) 复合型套箱围堰
CN116541928B (zh) 一种管幕或管棚承载松动土压力计算方法
CN205999947U (zh) 疏桩补强掏土纠倾复合地基

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant