CN108764788A - A kind of construction site material information solid storing management method - Google Patents
A kind of construction site material information solid storing management method Download PDFInfo
- Publication number
- CN108764788A CN108764788A CN201810477193.8A CN201810477193A CN108764788A CN 108764788 A CN108764788 A CN 108764788A CN 201810477193 A CN201810477193 A CN 201810477193A CN 108764788 A CN108764788 A CN 108764788A
- Authority
- CN
- China
- Prior art keywords
- materials
- machine
- information
- mobile terminal
- live
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Abstract
The present invention relates to construction site goods and material handling method, specifically a kind of construction site material information solid storing management method.The present invention solves the problems, such as that existing construction site goods and material handling method managerial confusion, inventory comb that difficulty is big, take up a large area, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor.A kind of construction site material information solid storing management method, this method are realized using following steps:1)Early-stage preparations;2)Materials warehousing:After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and is scanned to the Quick Response Code label on this batch of goods and materials by scanner;3)Goods and materials outbound:When Field Force needs to take a collection of goods and materials, Field Force is by applied ex-warehouse typing scene PC machine or live mobile terminal.The present invention is suitable for the handling of goods and materials of Modern Construction scene.
Description
Technical field
The present invention relates to construction site goods and material handling method, specifically a kind of construction site material information solid storing pipe
Reason method.
Background technology
Construction site handling of goods and materials refers to building site during work progress and its management work of front and back whole goods and materials
Make.Under prior art conditions, construction site handling of goods and materials is generally to be realized using the method manually spread.However put into practice table
Bright, there are managerial confusion, inventory's combing difficulty for such management method greatly, take up a large area, be easy to cause valuable goods and materials loses, certainly
Dynamicization degree is low, labor intensity is big, goods and materials flow to problem unknown, that trackability is poor, thus seriously affects construction efficiency.
Based on this, it is necessary to a kind of completely new construction site goods and material handling method is invented, to solve existing construction site handling of goods and materials side
The above problem existing for method.
Invention content
The present invention is in order to solve existing construction site goods and material handling method managerial confusion, inventory combs that difficulty is big, occupation of land face
Product is big, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor asks
Topic, provides a kind of construction site material information solid storing management method.
The present invention adopts the following technical scheme that realization:
A kind of construction site material information solid storing management method, this method are realized using following steps:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show
Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show
PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope
The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively
Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene
Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information
Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer
Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers
Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock
System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse
Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen
It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment
It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory
Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will
Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into
It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result
It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions
Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment
Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force
It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment
Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve
It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical
It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until
Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning
Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine;
Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine
Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed
The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility
Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live
This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into
Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now
Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed
Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter
Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired
It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired
It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds
Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene
Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out
Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions
Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server
Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility
System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction
Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element
It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So
Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out
Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through
Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing
Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or
Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile
Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution
It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting.
Compared with existing construction site goods and material handling method, a kind of construction site material informationization of the present invention is three-dimensional
Memory management method is based on brand new principle, realizes three-dimensional, the information system management of construction site goods and materials, thus it has pipe
Reason is orderly, inventory's combing is convenient, floor space is small, it is low not easily cause valuables money loss, high degree of automation, labor intensity,
The advantage that goods and materials flow direction is clear, trackability is strong, to which construction efficiency greatly improved.
The present invention efficiently solves existing construction site goods and material handling method managerial confusion, inventory combs that difficulty is big, takes up an area
Area is big, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor
Problem is suitable for the handling of goods and materials of Modern Construction scene.
Description of the drawings
Fig. 1 is step 1 in the present invention)Schematic diagram.
In figure:Dotted line indicates to be wirelessly connected.
Specific implementation mode
A kind of construction site material information solid storing management method, this method are realized using following steps:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show
Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show
PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope
The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively
Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene
Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information
Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer
Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers
Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock
System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse
Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen
It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment
It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory
Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will
Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into
It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result
It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions
Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment
Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force
It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment
Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve
It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical
It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until
Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning
Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine;
Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine
Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed
The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility
Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live
This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into
Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now
Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed
Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter
Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired
It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired
It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds
Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene
Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out
Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions
Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server
Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility
System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction
Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element
It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So
Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out
Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through
Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing
Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or
Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile
Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution
It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting.
The step 1)In, the interim quantity of demand for material, the calculation formula of interim safety stock are as follows:
d=D/h;
λ=d*k;
In above formula:D is the interim quantity of demand for material;λ is interim safety stock;D is material requirements total amount;H is construction rank
Section division numbers;K is proportionality coefficient, and 0 k≤1 <;The value of k can be set according to actual needs.
The step 2)In, it is to be based on handling of goods and materials software realization to occur data input window on the screen of live PC machine
's.
The step 2)In, storage information includes the classifications of goods and materials, the place of production, model, test status;The storage information can
It is increased and decreased according to actual needs.
The step 3)In, it is based on handling of goods and materials software realization that live PC machine, which generates outbound information,.
The control system of the closed moving goods rack formula tiered warehouse facility is PLC control system.
The scene mobile terminal, backstage mobile terminal are mobile phone.
Claims (7)
1. a kind of construction site material information solid storing management method, it is characterised in that:This method is to use following steps
It realizes:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show
Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show
PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope
The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively
Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene
Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information
Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer
Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers
Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock
System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse
Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen
It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment
It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory
Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will
Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into
It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result
It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions
Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment
Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force
It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment
Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve
It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical
It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until
Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning
Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine;
Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine
Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed
The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility
Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live
This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into
Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now
Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed
Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter
Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired
It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired
It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds
Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene
Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out
Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions
Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server
Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility
System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction
Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element
It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So
Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out
Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through
Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing
Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or
Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile
Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC
Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution
It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock;
If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after
Platform mobile terminal, which is sent out, continues relay prompting.
2. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
State step 1)In, the interim quantity of demand for material, the calculation formula of interim safety stock are as follows:
d=D/h;
λ=d*k;
In above formula:D is the interim quantity of demand for material;λ is interim safety stock;D is material requirements total amount;H is construction rank
Section division numbers;K is proportionality coefficient, and 0 k≤1 <;The value of k can be set according to actual needs.
3. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
State step 2)In, it is based on handling of goods and materials software realization to occur data input window on the screen of live PC machine.
4. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
State step 2)In, storage information includes the classifications of goods and materials, the place of production, model, test status;The storage information can be according to practical need
It is increased and decreased.
5. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
State step 3)In, it is based on handling of goods and materials software realization that live PC machine, which generates outbound information,.
6. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
The control system for stating closed moving goods rack formula tiered warehouse facility is PLC control system.
7. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute
State live mobile terminal, backstage mobile terminal is mobile phone.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810477193.8A CN108764788A (en) | 2018-05-18 | 2018-05-18 | A kind of construction site material information solid storing management method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810477193.8A CN108764788A (en) | 2018-05-18 | 2018-05-18 | A kind of construction site material information solid storing management method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108764788A true CN108764788A (en) | 2018-11-06 |
Family
ID=64007184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810477193.8A Pending CN108764788A (en) | 2018-05-18 | 2018-05-18 | A kind of construction site material information solid storing management method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108764788A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110555657A (en) * | 2019-09-09 | 2019-12-10 | 云南电网有限责任公司西双版纳供电局 | material management system, warehousing method, ex-warehouse method and ex-warehouse method |
CN111709688A (en) * | 2020-06-18 | 2020-09-25 | 中国银行股份有限公司 | Ex-warehouse data processing method and device |
CN111861347A (en) * | 2020-07-31 | 2020-10-30 | 重庆华硕建设有限公司 | Material management system and method for building engineering |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040098321A1 (en) * | 2002-11-15 | 2004-05-20 | Liu Zhexiong | Integrated inventory management system and method |
CN103832762A (en) * | 2012-11-23 | 2014-06-04 | 青岛理工大学琴岛学院 | Intelligent warehouse system |
CN104376442A (en) * | 2013-08-15 | 2015-02-25 | 赵宝珲 | Intelligent article management system and method |
CN106516537A (en) * | 2016-09-28 | 2017-03-22 | 宋春生 | Control system of intelligent warehouse |
CN206209852U (en) * | 2016-12-02 | 2017-05-31 | 四川亚润科技有限公司 | A kind of control system for Power Material field management |
-
2018
- 2018-05-18 CN CN201810477193.8A patent/CN108764788A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20040098321A1 (en) * | 2002-11-15 | 2004-05-20 | Liu Zhexiong | Integrated inventory management system and method |
CN103832762A (en) * | 2012-11-23 | 2014-06-04 | 青岛理工大学琴岛学院 | Intelligent warehouse system |
CN104376442A (en) * | 2013-08-15 | 2015-02-25 | 赵宝珲 | Intelligent article management system and method |
CN106516537A (en) * | 2016-09-28 | 2017-03-22 | 宋春生 | Control system of intelligent warehouse |
CN206209852U (en) * | 2016-12-02 | 2017-05-31 | 四川亚润科技有限公司 | A kind of control system for Power Material field management |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110555657A (en) * | 2019-09-09 | 2019-12-10 | 云南电网有限责任公司西双版纳供电局 | material management system, warehousing method, ex-warehouse method and ex-warehouse method |
CN111709688A (en) * | 2020-06-18 | 2020-09-25 | 中国银行股份有限公司 | Ex-warehouse data processing method and device |
CN111861347A (en) * | 2020-07-31 | 2020-10-30 | 重庆华硕建设有限公司 | Material management system and method for building engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108764788A (en) | A kind of construction site material information solid storing management method | |
DE112020000009T5 (en) | Robotic system with coordination mechanism and method for operating this system | |
CN109048952A (en) | A kind of robot control system and method calculate equipment and storage medium | |
DE102020114577A1 (en) | CONTROL AND CONTROL PROCEDURES FOR ROBOTIC SYSTEM | |
CN107644372A (en) | A kind of processing method, system and the terminal of refund of leaving a country | |
CN107590705A (en) | Sequence information processing method, apparatus and system | |
CN105354667B (en) | Clothing factory lean intelligent automation carries delivery system and method | |
CN104951380B (en) | A kind of test method and system for being used to test online product | |
CN107545376A (en) | A kind of method, apparatus and system for issuing task | |
CN105787644B (en) | A kind of parametric control method and device of service condition | |
CN114638578A (en) | Material acceptance method and device and material acceptance system | |
CN108846605A (en) | A kind of quick back pieces method and express delivery cabinet | |
CN105868937A (en) | Nuclear power station work order task switching device and method | |
CN110909633B (en) | Method and device for determining accumulation degree, storage medium, and electronic device | |
CN103198534B (en) | A kind of method and device utilizing ear recognition work attendance | |
CN106808463A (en) | Carbide chip automation disk loading system and the method for a kind of integrated manipulator | |
CN114392931A (en) | Automatic product offline control method and device | |
CN113283826B (en) | Method and system for delivering articles out of warehouse | |
CN109308298A (en) | Engineering project total management system | |
CN107016624A (en) | Prefabricated components install the method and system checked and accepted | |
CN113537917A (en) | Container management auxiliary system and method | |
KR20180061915A (en) | Vision inspection method | |
CN110009075A (en) | Processing method, device, storage medium and the electronic device of target information | |
EP2916271A1 (en) | Method and system for quality assurance of services and computer program product for carrying out the method | |
KR102462840B1 (en) | Inventory management system of rebar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |