CN108764788A - A kind of construction site material information solid storing management method - Google Patents

A kind of construction site material information solid storing management method Download PDF

Info

Publication number
CN108764788A
CN108764788A CN201810477193.8A CN201810477193A CN108764788A CN 108764788 A CN108764788 A CN 108764788A CN 201810477193 A CN201810477193 A CN 201810477193A CN 108764788 A CN108764788 A CN 108764788A
Authority
CN
China
Prior art keywords
materials
machine
information
mobile terminal
live
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810477193.8A
Other languages
Chinese (zh)
Inventor
吕修峰
白旭军
王志慧
朱亚超
崔涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Original Assignee
Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd filed Critical Construction Engineering Co Ltd of China Railway 17th Bureau Group Co Ltd
Priority to CN201810477193.8A priority Critical patent/CN108764788A/en
Publication of CN108764788A publication Critical patent/CN108764788A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/087Inventory or stock management, e.g. order filling, procurement or balancing against orders
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Abstract

The present invention relates to construction site goods and material handling method, specifically a kind of construction site material information solid storing management method.The present invention solves the problems, such as that existing construction site goods and material handling method managerial confusion, inventory comb that difficulty is big, take up a large area, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor.A kind of construction site material information solid storing management method, this method are realized using following steps:1)Early-stage preparations;2)Materials warehousing:After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and is scanned to the Quick Response Code label on this batch of goods and materials by scanner;3)Goods and materials outbound:When Field Force needs to take a collection of goods and materials, Field Force is by applied ex-warehouse typing scene PC machine or live mobile terminal.The present invention is suitable for the handling of goods and materials of Modern Construction scene.

Description

A kind of construction site material information solid storing management method
Technical field
The present invention relates to construction site goods and material handling method, specifically a kind of construction site material information solid storing pipe Reason method.
Background technology
Construction site handling of goods and materials refers to building site during work progress and its management work of front and back whole goods and materials Make.Under prior art conditions, construction site handling of goods and materials is generally to be realized using the method manually spread.However put into practice table Bright, there are managerial confusion, inventory's combing difficulty for such management method greatly, take up a large area, be easy to cause valuable goods and materials loses, certainly Dynamicization degree is low, labor intensity is big, goods and materials flow to problem unknown, that trackability is poor, thus seriously affects construction efficiency. Based on this, it is necessary to a kind of completely new construction site goods and material handling method is invented, to solve existing construction site handling of goods and materials side The above problem existing for method.
Invention content
The present invention is in order to solve existing construction site goods and material handling method managerial confusion, inventory combs that difficulty is big, occupation of land face Product is big, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor asks Topic, provides a kind of construction site material information solid storing management method.
The present invention adopts the following technical scheme that realization:
A kind of construction site material information solid storing management method, this method are realized using following steps:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine; Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting.
Compared with existing construction site goods and material handling method, a kind of construction site material informationization of the present invention is three-dimensional Memory management method is based on brand new principle, realizes three-dimensional, the information system management of construction site goods and materials, thus it has pipe Reason is orderly, inventory's combing is convenient, floor space is small, it is low not easily cause valuables money loss, high degree of automation, labor intensity, The advantage that goods and materials flow direction is clear, trackability is strong, to which construction efficiency greatly improved.
The present invention efficiently solves existing construction site goods and material handling method managerial confusion, inventory combs that difficulty is big, takes up an area Area is big, be easy to cause that valuable goods and materials are lost, the degree of automation is low, labor intensity is big, goods and materials flow to that unknown, trackability is poor Problem is suitable for the handling of goods and materials of Modern Construction scene.
Description of the drawings
Fig. 1 is step 1 in the present invention)Schematic diagram.
In figure:Dotted line indicates to be wirelessly connected.
Specific implementation mode
A kind of construction site material information solid storing management method, this method are realized using following steps:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine; Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting.
The step 1)In, the interim quantity of demand for material, the calculation formula of interim safety stock are as follows:
d=D/h;
λ=d*k;
In above formula:D is the interim quantity of demand for material;λ is interim safety stock;D is material requirements total amount;H is construction rank Section division numbers;K is proportionality coefficient, and 0 k≤1 <;The value of k can be set according to actual needs.
The step 2)In, it is to be based on handling of goods and materials software realization to occur data input window on the screen of live PC machine 's.
The step 2)In, storage information includes the classifications of goods and materials, the place of production, model, test status;The storage information can It is increased and decreased according to actual needs.
The step 3)In, it is based on handling of goods and materials software realization that live PC machine, which generates outbound information,.
The control system of the closed moving goods rack formula tiered warehouse facility is PLC control system.
The scene mobile terminal, backstage mobile terminal are mobile phone.

Claims (7)

1. a kind of construction site material information solid storing management method, it is characterised in that:This method is to use following steps It realizes:
1)Early-stage preparations:
It disposes closed moving goods rack formula tiered warehouse facility respectively at the construction field (site), live PC machine, field print machine, scanner, show Field mobile terminal, in construction management department difference deployment services device, background PC computer, background printing machine, backstage mobile terminal;It will show PC machine is connect with field print machine, scanner respectively, and background PC computer is connect with background printing machine, by server respectively with envelope The control system of enclosed moving goods rack formula tiered warehouse facility, live PC machine, background PC computer connection move server with scene respectively Terminal, backstage mobile terminal are connected by internet wireless;PC machine, live mobile terminal, background PC computer, backstage are mobile at the scene Handling of goods and materials software is respectively mounted in terminal;
Then, administrative staff record preset materials and equipment classification information, material requirements total amount information, construction stage division numbers information Enter background PC computer, materials and equipment classification information, material requirements total amount information, construction stage division numbers information are sent to by background PC computer Server;On the one hand server calculates the interim quantity of demand for material, rank according to material requirements total amount, construction stage division numbers Materials and equipment classification information, is on the other hand sent to the control system of closed moving goods rack formula tiered warehouse facility by section property safety stock System, the control system of closed moving goods rack formula tiered warehouse facility is according to materials and equipment classification information to closed moving goods rack formula solid storehouse Each storage element in library carries out classification setting;
Then, Field Force proposes interim requisition plan for materials and equipment according to construction site actual conditions, and by interim goods and materials Shen It please plan typing scene PC machine or live mobile terminal, live PC machine or live mobile terminal send out interim requisition plan for materials and equipment It send to server;Server is on the one hand by interim requisition plan for materials and equipment and material requirements total amount information, interim safety inventory Amount information is matched, and on the other hand judges that interim requisition plan for materials and equipment whether beyond the interim quantity of demand for material, then will Interim requisition plan for materials and equipment, matching and judging result are sent to background PC computer, backstage mobile terminal is shown and reminded and looked into It sees;Then, administrative staff by background PC computer or backstage mobile terminal to interim requisition plan for materials and equipment, matching and judging result It is audited and is made comments and instructions, and written instructions opinion is sent to server, server is sent to live PC machine or scene by opinion is made comments and instructions Mobile terminal is shown and is reminded and checked;
If written instructions opinion is approval stage property requisition plan for materials and equipment, Field Force carries out object according to interim requisition plan for materials and equipment Money buying is marched into the arena;
If it is to reject interim requisition plan for materials and equipment to make comments and instructions opinion, cancel interim requisition plan for materials and equipment, or by Field Force It makes explanations or redjustment and modification, and will explain or redjustment and modification content typing scene PC machine or existing to interim requisition plan for materials and equipment Field mobile terminal, live PC machine or live mobile terminal will be explained or redjustment and modification content is sent to server, and server will solve It releases or redjustment and modification content is sent to background PC computer, backstage mobile terminal is shown and reminded and checked;Then, administrative staff are logical It crosses background PC computer or backstage mobile terminal explanation or redjustment and modification content audit and make comments and instructions again;Repeatedly, until Written instructions opinion is approval stage property requisition plan for materials and equipment;
2)Materials warehousing:
After a collection of purchase of goods and materials is marched into the arena, Field Force pastes on this batch of goods and materials or hangs Quick Response Code label, and passes through scanning Rifle is scanned the Quick Response Code label on this batch of goods and materials, so that there is data input window on the screen of live PC machine; Then, by data input window by storage information typing scene PC machine, storage information is sent to Field Force by live PC machine Server, server match storage information with interim requisition plan for materials and equipment;After successful match, server is to closed The control system of moving goods rack formula tiered warehouse facility sends out request instruction, the control system root of closed moving goods rack formula tiered warehouse facility Corresponding storage element is controlled according to request instruction to be moved, so that the storage element reaches operating position;Then, live This batch of goods and materials are placed in the storage element by personnel, server according to the current inventory information of storage information real-time update, add up into Information, storage account information are measured in library, and current inventory information, accumulative storage amount information, storage account information are sent to now Field PC machine, live mobile terminal, background PC computer, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials are thus completed Storage;At this point, administrative staff can by background PC computer, background printing machine to current inventory information, accumulative storage amount information, enter Library account information carries out selective dump;Field Force can be by live PC machine, field print machine to current inventory information, tired It is included in library amount information, storage account information carries out selective dump;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting;
Once accumulative storage amount information, server will add up storage amount and be compared with material requirements total amount for often update;If tired It is included in library amount and exceeds material requirements total amount, then server sends out abnormity prompt to background PC computer, backstage mobile terminal, thus reminds Administrative staff's analysis decision;
3)Goods and materials outbound:
When Field Force needs to take a collection of goods and materials, Field Force is mobile eventually by applied ex-warehouse typing scene PC machine or scene Applied ex-warehouse is sent to server by end, live PC machine or live mobile terminal, and applied ex-warehouse is sent to backstage PC by server Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to going out Library application is audited and is made comments and instructions, and written instructions opinion is sent to server, and server is sent to live PC machine by opinion is made comments and instructions Or live mobile terminal is shown and is reminded and checked;
If it is approval applied ex-warehouse to make comments and instructions opinion, Field Force is sent out by live PC machine or live mobile terminal to server Take goods and materials instruction, server is according to written instructions opinion and takes goods and materials and instructs control to closed moving goods rack formula tiered warehouse facility System sends out request instruction, and the control system of closed moving goods rack formula tiered warehouse facility controls corresponding storage according to request instruction Unit is moved, so that the storage element reaches operating position;Then, Field Force by goods and materials from the storage element It takes out, and the Quick Response Code label on goods and materials is scanned by scanner, so that live PC machine generates outbound information;So Afterwards, outbound information is sent to server by live PC machine, server according to the current inventory information of outbound information real-time update, go out Library account information, and current inventory information, outbound account information are sent to live PC machine, live mobile terminal, backstage PC Machine, backstage mobile terminal are shown and are reminded and checked, this batch of goods and materials outbound is thus completed;At this point, after administrative staff can pass through Platform PC machine, background printing machine carry out selective dump to current inventory information, outbound account information;Field Force can be by existing Field PC machine, field print machine carry out selective dump to current inventory information, outbound account information;
If it is to reject applied ex-warehouse to make comments and instructions opinion, cancel applied ex-warehouse, or made explanations to applied ex-warehouse by Field Force or Redjustment and modification, and by explanation or redjustment and modification content typing scene PC machine or live mobile terminal, live PC machine or scene are mobile Terminal will be explained or redjustment and modification content is sent to server, and server will explain or redjustment and modification content is sent to backstage PC Machine, backstage mobile terminal are shown and are reminded and checked;Then, administrative staff by background PC computer or backstage mobile terminal to solution It releases or redjustment and modification content audit and make comments and instructions again;Repeatedly, until written instructions opinion is approval applied ex-warehouse;
Primary current inventory information is often updated, server will currently quantity in stock be compared with interim safety stock; If current quantity in stock is less than interim safety stock, server to live PC machine, live mobile terminal, background PC computer, after Platform mobile terminal, which is sent out, continues relay prompting.
2. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute State step 1)In, the interim quantity of demand for material, the calculation formula of interim safety stock are as follows:
d=D/h;
λ=d*k;
In above formula:D is the interim quantity of demand for material;λ is interim safety stock;D is material requirements total amount;H is construction rank Section division numbers;K is proportionality coefficient, and 0 k≤1 <;The value of k can be set according to actual needs.
3. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute State step 2)In, it is based on handling of goods and materials software realization to occur data input window on the screen of live PC machine.
4. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute State step 2)In, storage information includes the classifications of goods and materials, the place of production, model, test status;The storage information can be according to practical need It is increased and decreased.
5. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute State step 3)In, it is based on handling of goods and materials software realization that live PC machine, which generates outbound information,.
6. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute The control system for stating closed moving goods rack formula tiered warehouse facility is PLC control system.
7. a kind of construction site material information solid storing management method according to claim 1, it is characterised in that:Institute State live mobile terminal, backstage mobile terminal is mobile phone.
CN201810477193.8A 2018-05-18 2018-05-18 A kind of construction site material information solid storing management method Pending CN108764788A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810477193.8A CN108764788A (en) 2018-05-18 2018-05-18 A kind of construction site material information solid storing management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810477193.8A CN108764788A (en) 2018-05-18 2018-05-18 A kind of construction site material information solid storing management method

Publications (1)

Publication Number Publication Date
CN108764788A true CN108764788A (en) 2018-11-06

Family

ID=64007184

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810477193.8A Pending CN108764788A (en) 2018-05-18 2018-05-18 A kind of construction site material information solid storing management method

Country Status (1)

Country Link
CN (1) CN108764788A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110555657A (en) * 2019-09-09 2019-12-10 云南电网有限责任公司西双版纳供电局 material management system, warehousing method, ex-warehouse method and ex-warehouse method
CN111709688A (en) * 2020-06-18 2020-09-25 中国银行股份有限公司 Ex-warehouse data processing method and device
CN111861347A (en) * 2020-07-31 2020-10-30 重庆华硕建设有限公司 Material management system and method for building engineering

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040098321A1 (en) * 2002-11-15 2004-05-20 Liu Zhexiong Integrated inventory management system and method
CN103832762A (en) * 2012-11-23 2014-06-04 青岛理工大学琴岛学院 Intelligent warehouse system
CN104376442A (en) * 2013-08-15 2015-02-25 赵宝珲 Intelligent article management system and method
CN106516537A (en) * 2016-09-28 2017-03-22 宋春生 Control system of intelligent warehouse
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040098321A1 (en) * 2002-11-15 2004-05-20 Liu Zhexiong Integrated inventory management system and method
CN103832762A (en) * 2012-11-23 2014-06-04 青岛理工大学琴岛学院 Intelligent warehouse system
CN104376442A (en) * 2013-08-15 2015-02-25 赵宝珲 Intelligent article management system and method
CN106516537A (en) * 2016-09-28 2017-03-22 宋春生 Control system of intelligent warehouse
CN206209852U (en) * 2016-12-02 2017-05-31 四川亚润科技有限公司 A kind of control system for Power Material field management

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110555657A (en) * 2019-09-09 2019-12-10 云南电网有限责任公司西双版纳供电局 material management system, warehousing method, ex-warehouse method and ex-warehouse method
CN111709688A (en) * 2020-06-18 2020-09-25 中国银行股份有限公司 Ex-warehouse data processing method and device
CN111861347A (en) * 2020-07-31 2020-10-30 重庆华硕建设有限公司 Material management system and method for building engineering

Similar Documents

Publication Publication Date Title
CN108764788A (en) A kind of construction site material information solid storing management method
DE112020000009T5 (en) Robotic system with coordination mechanism and method for operating this system
CN109048952A (en) A kind of robot control system and method calculate equipment and storage medium
DE102020114577A1 (en) CONTROL AND CONTROL PROCEDURES FOR ROBOTIC SYSTEM
CN107644372A (en) A kind of processing method, system and the terminal of refund of leaving a country
CN107590705A (en) Sequence information processing method, apparatus and system
CN105354667B (en) Clothing factory lean intelligent automation carries delivery system and method
CN104951380B (en) A kind of test method and system for being used to test online product
CN107545376A (en) A kind of method, apparatus and system for issuing task
CN105787644B (en) A kind of parametric control method and device of service condition
CN114638578A (en) Material acceptance method and device and material acceptance system
CN108846605A (en) A kind of quick back pieces method and express delivery cabinet
CN105868937A (en) Nuclear power station work order task switching device and method
CN110909633B (en) Method and device for determining accumulation degree, storage medium, and electronic device
CN103198534B (en) A kind of method and device utilizing ear recognition work attendance
CN106808463A (en) Carbide chip automation disk loading system and the method for a kind of integrated manipulator
CN114392931A (en) Automatic product offline control method and device
CN113283826B (en) Method and system for delivering articles out of warehouse
CN109308298A (en) Engineering project total management system
CN107016624A (en) Prefabricated components install the method and system checked and accepted
CN113537917A (en) Container management auxiliary system and method
KR20180061915A (en) Vision inspection method
CN110009075A (en) Processing method, device, storage medium and the electronic device of target information
EP2916271A1 (en) Method and system for quality assurance of services and computer program product for carrying out the method
KR102462840B1 (en) Inventory management system of rebar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106