CN108756199A - Attached lifting scaffold lifting gear - Google Patents
Attached lifting scaffold lifting gear Download PDFInfo
- Publication number
- CN108756199A CN108756199A CN201810948892.6A CN201810948892A CN108756199A CN 108756199 A CN108756199 A CN 108756199A CN 201810948892 A CN201810948892 A CN 201810948892A CN 108756199 A CN108756199 A CN 108756199A
- Authority
- CN
- China
- Prior art keywords
- fixing piece
- chain
- lifting gear
- fixed pulley
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000005540 biological transmission Effects 0.000 claims abstract description 33
- 239000002965 rope Substances 0.000 claims abstract description 33
- 230000000694 effects Effects 0.000 claims abstract description 3
- 239000000725 suspension Substances 0.000 claims description 16
- 239000007787 solid Substances 0.000 claims description 4
- 230000005611 electricity Effects 0.000 claims 1
- 238000005516 engineering process Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000003028 elevating Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 230000002493 climbing Effects 0.000 description 1
- 230000029578 entry into host Effects 0.000 description 1
- 230000002349 favourable Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000001502 supplementation Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
Abstract
A kind of attached lifting scaffold lifting gear,It includes scaffold main body,It is characterized in that,It further includes lifting gear,For carrying out the fixed fixing piece of attached wall and tensioning apparatus with building structure,The fixing piece includes the first fixing piece and the second fixing piece,The lifting gear and tensioning apparatus are connect with the scaffold main body respectively,The lifting gear includes driving motor and chain,The chain is driven by the driving motor,The chain is connect with first fixing piece and the second fixing piece,First fixing piece and the second fixing piece are connected by the transmission rope being stretched on the tensioning apparatus,The tensioning apparatus,First fixing piece,Second fixing piece,Transmission rope,Pulley structure is formed between chain,When use,First fixing piece,Second fixing piece can carry out attached wall with building structure by turns and fix,And first fixing piece,Second fixing piece can by turns lift under lifting gear effect.
Description
【Technical field】
The present invention relates to construction hanging device, more particularly to a kind of attached lifting scaffold lifting gear.
【Background technology】
Currently, using attached lifting scaffold (being commonly called as climbing frame) when high-rise and construction of super highrise building more.Adhering lifting foot
Hand cradle refers to using various forms of frame structures and attached support structure, by being set on frame body or in engineering structure
Special lifting device realizes the construction scaffolding of lifting.The lifting device that attached lifting scaffold uses typically rises loop chain slowly
Cucurbit, principle are as shown in Figure 5:The chain 22 of ring-chain hoist and an attached wall fixing piece 70, tensioning apparatus 40 form pulley structure,
When work, which carries out attached wall with building structure and fixes, and when ring-chain hoist works, chain 22 is driven and drives
Scaffold lifts, and while scaffold lifts, ring-chain hoist also synchronization lifting.After lifting one layer, lifted next time
When, it just needs to remove the attached wall fixing piece 70 from current location, then be fixed at the position of higher level.Again solid
It when the fixed attached wall fixing piece 70, not only needs manually to dismount the attached wall fixing piece 70, but also needs to carry out jack, by ring-chain hoist
It refunds to suitable distance, promotion next time could be carried out.It is time-consuming and laborious when practical application, it is unfavorable for improving efficiency.This
Outside, it during carrying out jack, can not accurately be controlled, and ring-chain hoist heavier-weight, if misoperation, ring-chain hoist
Then may damage scaffold, to cause safety accident or cause security risk.
【Invention content】
Present invention seek to address that the above problem, and a kind of novel attached lifting scaffold lifting gear is provided.
To achieve the above object, the present invention provides a kind of attached lifting scaffold lifting gears comprising scaffold master
Body, which is characterized in that it further includes lifting gear, for carrying out the fixed fixing piece of attached wall and tensioning apparatus with building structure,
The fixing piece includes the first fixing piece and the second fixing piece, the lifting gear and tensioning apparatus respectively with the scaffold master
Body connects, and the lifting gear includes driving motor and chain, and the chain is driven by the driving motor, the chain and institute
The first fixing piece and the connection of the second fixing piece are stated, first fixing piece and the second fixing piece are by being stretched in the tensioning apparatus
On transmission rope connection, between the tensioning apparatus, the first fixing piece, the second fixing piece, transmission rope, chain formed pulley knot
Structure is fixed in use, first fixing piece, the second fixing piece can carry out attached wall with building structure by turns, and described first is solid
Determining part, the second fixing piece can by turns lift under lifting gear effect.
The lifting gear includes head sprocket, the first accessary sprocket wheel, the second accessary sprocket wheel, and first accessary sprocket wheel and second is from chain
Wheel is respectively arranged on the both sides of the head sprocket, and the first in-line gears are equipped on first fixing piece, is fixed described second
Part is equipped with the second in-line gears, and the chain is sheathed on the head sprocket, and one end of the chain bypasses described the successively
One in-line gears and the first accessary sprocket wheel and connect with one end of the transmission rope, the other end of the chain bypasses described second successively
In-line gears and the second accessary sprocket wheel and connect with the other end of the transmission rope.
The tensioning apparatus include the first fixed pulley, the second fixed pulley and third fixed pulley, one end of the transmission rope with
One end of the chain connects, and the other end of the transmission rope is determined around first fixed pulley, the first in-line gears, second successively
Pulley, the second in-line gears, third fixed pulley and connect with the other end of the chain.
The tensioning apparatus is equipped with pedestal, the first suspension hook is equipped on the pedestal, on the top of the scaffold main body
Or bottom end is equipped with the first sling point, first suspension hook is connect with first sling point.
It is equipped with the second sling point in the other end opposite with tensioning apparatus of the scaffold main body, the lifting gear is set
There are the second suspension hook, second suspension hook to be connect with second sling point.
First fixed pulley, the second fixed pulley and third fixed pulley are respectively arranged on the pedestal, and the second fixed pulley
Between first fixed pulley and third fixed pulley.
First in-line gears include the first driving wheel and the second driving wheel of coaxial arrangement, second in-line gears
Third driving wheel including coaxial arrangement and the 4th driving wheel, the chain bypass the first in-line gears and the second in-line gears
When, it is set around on first driving wheel and third driving wheel;The transmission rope is coaxial around the first in-line gears and second
When gear, haves mercy on and be set on the second driving wheel and the 4th driving wheel.
The favorable attributes of the present invention are, efficiently solve the above problem.The attached lifting scaffold lifting of the present invention
Device is set there are two fixing piece --- the first fixing piece and the second fixing piece, when work, one of fixing piece and building structure
It carries out attached wall to fix, another fixing piece can then be lifted with entirety and be lifted to next attached wall fixed point, under convenient
When one wheel lifting, it can directly remove former fixing piece and another fixing piece is directly anchored to next attached wall fixed point, without
Same fixing piece is carried out to repeat dismounting, artificial jack is carried out without to lifting gear.The attached lifting scaffold of the present invention
Lifting gear can be fixed and lift by turns since there are two fixing pieces for setting, need to only control driving motor rotating forward
Reversion, can lift loose another fixing piece to suitable position while elevating scaffold, under convenient
The lifting of one wheel, therefore its is very convenient to use, can save a large amount of manpower and time.In addition, the attachment liter of the present invention
Lifting device for scaffold drops, and without carrying out jack, the distance between lifting gear and scaffold main body are relatively constant, thus rise
Falling unit can not hit scaffold main body, and then safety can be improved.The attached lifting scaffold lifting gear of the present invention, knot
Structure is novel, and easy to use and safe, it has strong practicality, preferably widelys popularize.
【Description of the drawings】
Fig. 1 is the structural schematic diagram of the present invention.
Fig. 2 is the principle of the present invention schematic diagram.
Fig. 3 is the principle of the present invention schematic diagram.
Fig. 4 is the principle of the present invention schematic diagram.
Fig. 5 is the principle schematic of background technology.
Wherein, scaffold main body 10, the first sling point 11, the second sling point 12, vertical main framework 13, horizontal supporting truss
14, lifting gear 20, driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel 24, the second accessary sprocket wheel 25, the second suspension hook
26, the first fixing piece 30, the first in-line gears 31, the first driving wheel 311, the second driving wheel 312, tensioning apparatus 40, first are fixed
Pulley 41, the second fixed pulley 42, third fixed pulley 43, pedestal 44, the first suspension hook 45, the second fixing piece 50, the second in-line gears
51, third driving wheel 511, the 4th driving wheel 512, transmission rope 60, attached wall fixing piece 70.
【Specific implementation mode】
The following example is being explained further and supplementing to the present invention, is not limited in any way to the present invention.
As shown in Figure 1 to 4, its broad outlines of attached lifting scaffold lifting gear of the invention are, are equipped with two
A fixing piece:First fixing piece 30 and the second fixing piece 50, can lift by turns, and can carry out attached wall with building structure by turns
It is fixed, therefore in lifting process, can realize entire dress device by the fixed by turns and lifting by of two fixing pieces
Lifting.
The attached lifting scaffold lifting gear of the present invention includes scaffold main body 10, lifting gear 20, fixing piece and opens
Tight device 40.Institute's fixing piece includes the first fixing piece 30 and the second fixing piece 50.
As shown in Figure 1 to 4, the scaffold main body 10 is the structure lifted, need to successively be climbed with architectural engineering
Or decline, concrete structure and structural requirement can refer to known technology.Under normal conditions, the scaffold main body 10 includes perpendicular
To main frame 13, horizontal supporting truss 14 and frame body framework three parts.Vertical main framework 13 perpendicular to building structure alien invasion,
And connect with attached support structure, it is to be primarily subjected to and transmit vertical and horizontal loading vertical frame.Horizontal supporting truss
14 are parallel to building wall, are primarily subjected to frame body vertical load, are a kind of vertical load to be transferred to vertical main framework
13 horizontal supporting structure.Frame body framework be between adjacent two vertical main framework 13 and horizontal supporting truss 14 on frame
Body.
As shown in Figure 1 to 4, the tensioning apparatus 40 and lifting gear 20 are connected for convenience of setting, in the scaffold
Top, the bottom end of main body 10 are respectively equipped with the first sling point 11 and the second sling point 12.Wherein, the first sling point 11 is for connecting
Tensioning apparatus 40, the second sling point 12 is for connecting lifting gear 20.The knot of first sling point, 11 and second sling point 12
Structure and requirement, can refer to known technology, and both is oppositely arranged.In the present embodiment, first sling point 11 is set to scaffold
The top of main body 10, second sling point 12 are set to the bottom end of scaffold main body 10.In other embodiment, first hanging
Point 11 can also be set to the bottom end of scaffold main body 10, and the second sling point 12 can also be set to the top of scaffold main body 10.
As shown in Figure 1 to 4, the lifting gear 20 includes driving motor 21, chain 22, head sprocket 23, first from chain
Take turns the 24, second accessary sprocket wheel 25, the second suspension hook 26.
As shown in Figure 1 to 4, well known driving motor can be selected for providing lifting drive in the driving motor 21
21, such as conical rotor motor.
As shown in Figure 1 to 4, the head sprocket 23 is driven by the driving motor 21, and specific driving structure can refer to
Known technology.For example, when it is implemented, Electric Chain Blocks, driving motor 21, head sprocket can be selected in the lifting gear 20
23 setting can refer to the internal structure of well known electric block.The head sprocket can be driven after providing power by driving motor 21
23 rotations.
As shown in Figure 1 to 4, first accessary sprocket wheel, 24 and second accessary sprocket wheel 25 is respectively symmetrically set to the head sprocket 23
Both sides are used to be arranged the chain 22 and form pulley structure.
As shown in Figure 1 to 4, second suspension hook 26 is set on the lifting gear 20, with second sling point
12 connections.Structure and the load requirement of second suspension hook 26, can refer to known technology.
As shown in Figure 1 to 4, the lifting gear 20 is except driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel
24, except the second accessary sprocket wheel 25, the second suspension hook 26, other internal electrical structures can refer to known technology, for example, braking
Unit, control unit, deceleration unit etc..In the present embodiment, the lifting gear 20 selects ring-chain hoist.
As shown in Figure 1 to 4, first fixing piece, 30 and second fixing piece 50 is used to carry out attached wall with building structure solid
Fixed, concrete shape structure can be set as desired, for example, it can be arranged to be directly anchored in building structure,
It can be arranged to be fixedly connected with the wall-attached supporting seat being fixed in building structure.In use, the first fixing piece 30 and
A fixing piece in two fixing pieces 50 is integrally fixed in building structure, another fixing piece is with integral elevating.
As shown in Figure 1 to 4, the chain 22 and transmission rope 60 are connected for convenience, are set on first fixing piece 30
There are the first in-line gears 31, the second in-line gears 51 are equipped on second fixing piece 50.First in-line gears 31 wrap
The first driving wheel 311 and the second driving wheel 312 of coaxial arrangement are included, second in-line gears 51 include the third of coaxial arrangement
Driving wheel 511 and the 4th driving wheel 512.First driving wheel 311 and third driving wheel 511, can for chain 22 to be arranged
Select the sprocket wheel to match with the chain 22.Second driving wheel, 312 and the 4th driving wheel 512 is for being arranged transmission rope
60, the driving wheel that can be arranged the transmission rope 60 can be selected, concrete type can be depending on the type of transmission rope 60, example
Such as, the sheave for being arranged steel wire rope can be selected.
The transmission rope 60 is for being driven, and in the present embodiment, selects steel wire rope.It, also can be by having in other embodiment
There is the object of similar functions to replace.
As shown in Figure 1 to 4, the tensioning apparatus 40 includes pedestal 44, the first suspension hook 45, the first fixed pulley 41, second
Fixed pulley 42 and third fixed pulley 43.The shape of the pedestal 44 can be set as desired, and be used to be arranged described first and hang
Hook 45, the first fixed pulley 41, the second fixed pulley 42 and third fixed pulley 43.First suspension hook 45 and first sling point 11
Connection, concrete structure and load requirement, can refer to known technology.First fixed pulley 41, the second fixed pulley 42 and third
Fixed pulley 43 is for being tensioned the transmission rope 60 and forming pulley structure and be driven.First fixed pulley 41, second is calmly sliding
Wheel 42 and the setting of the interval of third fixed pulley 43, wherein the second fixed pulley 42 be set to the first fixed pulley 41 and third fixed pulley 43 it
Between.
For being driven, set-up mode is as follows for the chain 22 and the transmission rope 60:
As shown in Figure 1 to 4, the middle part of the chain 22 is sheathed on the head sprocket 23, one end of the chain 22 according to
It is secondary around first driving wheel 311, the first accessary sprocket wheel 24 and connect with one end of transmission rope 60;The other end of the chain 22 according to
It is secondary around the 4th driving wheel 512, the second accessary sprocket wheel 25 and connect with the other end of transmission rope 60.One end of the transmission rope 60 with
When chain 22 connects, the other end bypasses the first fixed pulley 41, the second driving wheel 312, the transmission of the second fixed pulley the 42, the 4th successively
Wheel 512, third fixed pulley 43 and connect with the other end of chain 22 so that tensioning apparatus 40, chain 22, transmission rope 60,
The pulley structure that closing chain type is formed between first fixing piece 30, the second fixing piece 50, lifting gear 20, can be used for being driven.
When work, by fixing piece one of in fixing piece, such as the first fixing piece 30 carries out attached wall with building structure and consolidates
It is fixed, then start the lifting gear 20, under the action of the driving motor 21, the chain 22, transmission rope 60 are passed
It is dynamic, and so that the single unit system in addition to the first fixing piece 30 is lifted, meanwhile, another fixing piece in fixing piece, such as
Second fixing piece 50 also synchronization lifting.When single unit system is lifted to desired height, by original fixing piece --- first fixes
Part 30 is detached with building structure, then by another fixing piece --- and the second fixing piece 50 carries out attached wall with building structure and fixes,
Then start lifting gear 20, can realize and successively lift.
To describe in more detail its operation principle, the present embodiment is illustrated for being promoted:
As shown in Fig. 2, current whole device is in lower floor, as lowest point is located at the positions 1F.At this point, first is fixed
Part 30 carries out attached wall with building structure and fixes, and the first fixing piece 30 is fixed on higher position position, the positions 3F as shown in Figure 2;
At this point, starting the driving motor 21, driving motor 21 rotates forward, clockwise direction as shown in Figure 2, chain 22, transmission rope 60
It is driven along mode shown in Fig. 2, to drive lifting gear 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus
40 are lifted up.
When lifting gear 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus 40 are elevated a floor,
Integrality is as shown in Figure 3:The lowest point of its whole device is located at the positions 2F, and the second fixing piece 50 is located at the positions 4F;At this point, will
First fixing piece 30 is detached with building structure, and then the second fixing piece 50 is fixed in the building structure of the positions 4F, is then driven
Dynamic motor 21 is inverted by counter clockwise direction as shown in Figure 3 so that chain 22, transmission rope 60 along direction shown in Fig. 3 into
Row transmission, drives lifting gear 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 to be lifted up.
When lifting gear 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 are elevated a floor,
Integrality is as shown in Figure 4:The lowest point of its whole device is located at the positions 3F, and the first fixing piece 30 is located at the positions 5F, at this point, will
Second fixing piece 50 is detached with building structure, and the first fixing piece 30 is then fixed on the positions 5F, then sequentially repeats above-mentioned step
Suddenly, it can successively be promoted.During being somebody's turn to do, basic ideas are to fix the first fixing piece 30 and the second fixing piece 50 by turns,
Then it is inverted by controlling the rotating forward of driving motor 21, another loose fixing piece of promotion by turns and scaffold main body
10, to realize the purpose successively promoted.
When needing to carry out step-down operation, basic principle is same as above, and when decline need to only control the rotation side of driving motor 21
To reversed opposite with rotation when being promoted.
Although being disclosed to the present invention by above example, the scope of the invention is not limited to this,
Under conditions of present inventive concept, above each component can with technical field personnel understand similar or equivalent element come
It replaces.
Claims (7)
1. a kind of attached lifting scaffold lifting gear comprising scaffold main body (10), which is characterized in that it further includes lifting
Device (20) is used to carry out the fixed fixing piece of attached wall and tensioning apparatus (40) with building structure, and the fixing piece includes first
Fixing piece (30) and the second fixing piece (50), the lifting gear (20) and tensioning apparatus (40) respectively with the scaffold main body
(10) it connects, the lifting gear (20) includes driving motor (21) and chain (22), and the chain (22) is by driving electricity
Machine (21) drives, and the chain (22) connect with first fixing piece (30) and the second fixing piece (50), and described first fixes
Part (30) and the second fixing piece (50) are connected by the transmission rope (60) being stretched on the tensioning apparatus (40), the tensioning dress
Set (40), the first fixing piece (30), the second fixing piece (50), transmission rope (60), chain form pulley structure between (22), use
When, first fixing piece (30), the second fixing piece (50) can carry out attached wall with building structure by turns and fix, and described first is solid
Determining part (30), the second fixing piece (50) can by turns lift under the lifting gear (20) effect.
2. the attached lifting scaffold lifting gear as described in claim 1, which is characterized in that the lifting gear (20) includes
Head sprocket (23), the first accessary sprocket wheel (24), the second accessary sprocket wheel (25), first accessary sprocket wheel (24) and the second accessary sprocket wheel (25) point
Not She Yu the head sprocket (23) both sides, on first fixing piece (30) be equipped with the first in-line gears (31), described
Second fixing piece (50) is equipped with the second in-line gears (51), and the chain (22) is sheathed on the head sprocket (23), and should
One end of chain (22) bypass first in-line gears (31) and the first accessary sprocket wheel (24) successively and with the transmission rope (60)
One end connection, the other end of the chain (22) bypass second in-line gears (51) and the second accessary sprocket wheel (25) successively and with
The other end of the transmission rope (60) connects.
3. the attached lifting scaffold lifting gear as described in claim 2, which is characterized in that the tensioning apparatus (40) includes
First fixed pulley (41), the second fixed pulley (42) and third fixed pulley (43), one end and the chain of the transmission rope (60)
(22) one end connection, the other end of the transmission rope (60) bypass first fixed pulley (41), the first in-line gears successively
(31), the second fixed pulley (42), the second in-line gears (51), third fixed pulley (43) and with the other end of the chain (22) connect
It connects.
4. the attached lifting scaffold lifting gear as described in claim 3, which is characterized in that the tensioning apparatus (40) is equipped with
Pedestal (44) is equipped with the first suspension hook (45) on the pedestal (44), is set on the top of the scaffold main body (10) or bottom end
There are the first sling point (11), first suspension hook (45) to be connect with first sling point (11).
5. the attached lifting scaffold lifting gear as described in claim 4, which is characterized in that in the scaffold main body (10)
The other end opposite with tensioning apparatus (40) be equipped with the second sling point (12), the lifting gear (20) be equipped with the second suspension hook
(26), second suspension hook (26) connect with second sling point (12).
6. the attached lifting scaffold lifting gear as described in claim 4, which is characterized in that first fixed pulley (41),
Second fixed pulley (42) and third fixed pulley (43) are respectively arranged on the pedestal (44), and the second fixed pulley (42) is positioned at described
Between first fixed pulley (41) and third fixed pulley (43).
7. the attached lifting scaffold lifting gear as described in claim 2, which is characterized in that first in-line gears (31)
The first driving wheel (311) including coaxial arrangement and the second driving wheel (312), second in-line gears (51) include coaxially setting
The third driving wheel (511) and the 4th driving wheel (512) set, the chain (22) are same around the first in-line gears (31) and second
When shaft gear (51), it is set around on first driving wheel (311) and third driving wheel (511);The transmission rope (60) around
When crossing the first in-line gears (31) and the second in-line gears (51), haves mercy on and be set to the second driving wheel (312) and the 4th driving wheel
(512) on.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810948892.6A CN108756199A (en) | 2018-08-20 | 2018-08-20 | Attached lifting scaffold lifting gear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810948892.6A CN108756199A (en) | 2018-08-20 | 2018-08-20 | Attached lifting scaffold lifting gear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108756199A true CN108756199A (en) | 2018-11-06 |
Family
ID=63967256
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810948892.6A Pending CN108756199A (en) | 2018-08-20 | 2018-08-20 | Attached lifting scaffold lifting gear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108756199A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680922A (en) * | 2018-12-18 | 2019-04-26 | 河北盛卓建筑设备制造有限公司 | A kind of attachment type raise scaffold hoisting mechanism |
CN112897298A (en) * | 2021-01-13 | 2021-06-04 | 太原理工大学 | Lifting device |
-
2018
- 2018-08-20 CN CN201810948892.6A patent/CN108756199A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109680922A (en) * | 2018-12-18 | 2019-04-26 | 河北盛卓建筑设备制造有限公司 | A kind of attachment type raise scaffold hoisting mechanism |
CN112897298A (en) * | 2021-01-13 | 2021-06-04 | 太原理工大学 | Lifting device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201971572U (en) | Movable arm type tower crane with suspension arm possible of being folded for dismounting | |
CN108756199A (en) | Attached lifting scaffold lifting gear | |
CN204490367U (en) | A kind of outdoor handling machine for building | |
CN109025234A (en) | A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk | |
CN210012529U (en) | Hoist and mount welding equipment suitable for heavy object lifts by crane | |
CN106698208A (en) | Hoisting equipment and hoisting method for external transportation of super high-rise building | |
CN105715028B (en) | Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear | |
CN206562264U (en) | A kind of hanging device for transport outside high-rise building | |
CN205241084U (en) | Lifting machine | |
CN208858136U (en) | Attached lifting scaffold lifting device | |
CN107651564B (en) | A kind of craning weight of same device for adjusting posture | |
CN205661838U (en) | A transportation frame for construction steel bar | |
CN105735629B (en) | Build attached lifting scaffold lifting device | |
CN201999679U (en) | Automatic reciprocating and looping system of electric block | |
CN206985557U (en) | A kind of double girder crane for preventing object crooked | |
CN210396121U (en) | Novel wet seam installation lifting means | |
CN209583455U (en) | A kind of outdoor handling machine for building | |
CN106143808B (en) | Assembled crane for container ship and assembling mode thereof | |
CN208071214U (en) | A kind of material lifting device of automatic discharging | |
CN110498350A (en) | A kind of multifunctional safe building tower crane | |
CN207245144U (en) | A kind of combination type high-altitude suspension apparatus fixed frame | |
CN2429511Y (en) | Multifunctional hoisting trolley apparatus | |
CN203922508U (en) | A kind of Portable crane device | |
CN104860212B (en) | A kind of micro lifter | |
CN109694007A (en) | A kind of super high-rise building hoisting transportation method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |