CN108756199A CN201810948892.6A CN201810948892A CN108756199A CN 108756199 A CN108756199 A CN 108756199A CN 201810948892 A CN201810948892 A CN 201810948892A CN 108756199 A CN108756199 A CN 108756199A
Authority
CN
China
Prior art keywords
fixing piece
chain
lifting gear
fixed pulley
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810948892.6A
Other languages
Chinese (zh)
Inventor
朱良
陈云周
杨宗祥
李天启
王增贵
王建楠
郝正东
张晶
饶云东
吴维鑫
秦鑫
刘绍宁
罗吉祥
王继昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Jian Jian Construction Machinery Co Ltd
Original Assignee
Yunnan Jian Jian Construction Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Jian Jian Construction Machinery Co Ltd filed Critical Yunnan Jian Jian Construction Machinery Co Ltd
Priority to CN201810948892.6A priority Critical patent/CN108756199A/en
Publication of CN108756199A publication Critical patent/CN108756199A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
    • E04G3/32Hoisting devices; Safety devices
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

A kind of attached lifting scaffold lifting gear,It includes scaffold main body,It is characterized in that,It further includes lifting gear,For carrying out the fixed fixing piece of attached wall and tensioning apparatus with building structure,The fixing piece includes the first fixing piece and the second fixing piece,The lifting gear and tensioning apparatus are connect with the scaffold main body respectively,The lifting gear includes driving motor and chain,The chain is driven by the driving motor,The chain is connect with first fixing piece and the second fixing piece,First fixing piece and the second fixing piece are connected by the transmission rope being stretched on the tensioning apparatus,The tensioning apparatus,First fixing piece,Second fixing piece,Transmission rope,Pulley structure is formed between chain,When use,First fixing piece,Second fixing piece can carry out attached wall with building structure by turns and fix,And first fixing piece,Second fixing piece can by turns lift under lifting gear effect.

Description

Attached lifting scaffold lifting gear
【Technical field】
The present invention relates to construction hanging device, more particularly to a kind of attached lifting scaffold lifting gear.
【Background technology】
Currently, using attached lifting scaffold (being commonly called as climbing frame) when high-rise and construction of super highrise building more.Adhering lifting foot Hand cradle refers to using various forms of frame structures and attached support structure, by being set on frame body or in engineering structure Special lifting device realizes the construction scaffolding of lifting.The lifting device that attached lifting scaffold uses typically rises loop chain slowly Cucurbit, principle are as shown in Figure 5:The chain 22 of ring-chain hoist and an attached wall fixing piece 70, tensioning apparatus 40 form pulley structure, When work, which carries out attached wall with building structure and fixes, and when ring-chain hoist works, chain 22 is driven and drives Scaffold lifts, and while scaffold lifts, ring-chain hoist also synchronization lifting.After lifting one layer, lifted next time When, it just needs to remove the attached wall fixing piece 70 from current location, then be fixed at the position of higher level.Again solid It when the fixed attached wall fixing piece 70, not only needs manually to dismount the attached wall fixing piece 70, but also needs to carry out jack, by ring-chain hoist It refunds to suitable distance, promotion next time could be carried out.It is time-consuming and laborious when practical application, it is unfavorable for improving efficiency.This Outside, it during carrying out jack, can not accurately be controlled, and ring-chain hoist heavier-weight, if misoperation, ring-chain hoist Then may damage scaffold, to cause safety accident or cause security risk.
【Invention content】
Present invention seek to address that the above problem, and a kind of novel attached lifting scaffold lifting gear is provided.
To achieve the above object, the present invention provides a kind of attached lifting scaffold lifting gears comprising scaffold master Body, which is characterized in that it further includes lifting gear, for carrying out the fixed fixing piece of attached wall and tensioning apparatus with building structure, The fixing piece includes the first fixing piece and the second fixing piece, the lifting gear and tensioning apparatus respectively with the scaffold master Body connects, and the lifting gear includes driving motor and chain, and the chain is driven by the driving motor, the chain and institute The first fixing piece and the connection of the second fixing piece are stated, first fixing piece and the second fixing piece are by being stretched in the tensioning apparatus On transmission rope connection, between the tensioning apparatus, the first fixing piece, the second fixing piece, transmission rope, chain formed pulley knot Structure is fixed in use, first fixing piece, the second fixing piece can carry out attached wall with building structure by turns, and described first is solid Determining part, the second fixing piece can by turns lift under lifting gear effect.
The lifting gear includes head sprocket, the first accessary sprocket wheel, the second accessary sprocket wheel, and first accessary sprocket wheel and second is from chain Wheel is respectively arranged on the both sides of the head sprocket, and the first in-line gears are equipped on first fixing piece, is fixed described second Part is equipped with the second in-line gears, and the chain is sheathed on the head sprocket, and one end of the chain bypasses described the successively One in-line gears and the first accessary sprocket wheel and connect with one end of the transmission rope, the other end of the chain bypasses described second successively In-line gears and the second accessary sprocket wheel and connect with the other end of the transmission rope.
The tensioning apparatus include the first fixed pulley, the second fixed pulley and third fixed pulley, one end of the transmission rope with One end of the chain connects, and the other end of the transmission rope is determined around first fixed pulley, the first in-line gears, second successively Pulley, the second in-line gears, third fixed pulley and connect with the other end of the chain.
The tensioning apparatus is equipped with pedestal, the first suspension hook is equipped on the pedestal, on the top of the scaffold main body Or bottom end is equipped with the first sling point, first suspension hook is connect with first sling point.
It is equipped with the second sling point in the other end opposite with tensioning apparatus of the scaffold main body, the lifting gear is set There are the second suspension hook, second suspension hook to be connect with second sling point.
First fixed pulley, the second fixed pulley and third fixed pulley are respectively arranged on the pedestal, and the second fixed pulley Between first fixed pulley and third fixed pulley.
First in-line gears include the first driving wheel and the second driving wheel of coaxial arrangement, second in-line gears Third driving wheel including coaxial arrangement and the 4th driving wheel, the chain bypass the first in-line gears and the second in-line gears When, it is set around on first driving wheel and third driving wheel;The transmission rope is coaxial around the first in-line gears and second When gear, haves mercy on and be set on the second driving wheel and the 4th driving wheel.
The favorable attributes of the present invention are, efficiently solve the above problem.The attached lifting scaffold lifting of the present invention Device is set there are two fixing piece --- the first fixing piece and the second fixing piece, when work, one of fixing piece and building structure It carries out attached wall to fix, another fixing piece can then be lifted with entirety and be lifted to next attached wall fixed point, under convenient When one wheel lifting, it can directly remove former fixing piece and another fixing piece is directly anchored to next attached wall fixed point, without Same fixing piece is carried out to repeat dismounting, artificial jack is carried out without to lifting gear.The attached lifting scaffold of the present invention Lifting gear can be fixed and lift by turns since there are two fixing pieces for setting, need to only control driving motor rotating forward Reversion, can lift loose another fixing piece to suitable position while elevating scaffold, under convenient The lifting of one wheel, therefore its is very convenient to use, can save a large amount of manpower and time.In addition, the attachment liter of the present invention Lifting device for scaffold drops, and without carrying out jack, the distance between lifting gear and scaffold main body are relatively constant, thus rise Falling unit can not hit scaffold main body, and then safety can be improved.The attached lifting scaffold lifting gear of the present invention, knot Structure is novel, and easy to use and safe, it has strong practicality, preferably widelys popularize.
【Description of the drawings】
Fig. 1 is the structural schematic diagram of the present invention.
Fig. 2 is the principle of the present invention schematic diagram.
Fig. 3 is the principle of the present invention schematic diagram.
Fig. 4 is the principle of the present invention schematic diagram.
Fig. 5 is the principle schematic of background technology.
Wherein, scaffold main body 10, the first sling point 11, the second sling point 12, vertical main framework 13, horizontal supporting truss 14, lifting gear 20, driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel 24, the second accessary sprocket wheel 25, the second suspension hook 26, the first fixing piece 30, the first in-line gears 31, the first driving wheel 311, the second driving wheel 312, tensioning apparatus 40, first are fixed Pulley 41, the second fixed pulley 42, third fixed pulley 43, pedestal 44, the first suspension hook 45, the second fixing piece 50, the second in-line gears 51, third driving wheel 511, the 4th driving wheel 512, transmission rope 60, attached wall fixing piece 70.
【Specific implementation mode】
The following example is being explained further and supplementing to the present invention, is not limited in any way to the present invention.
As shown in Figure 1 to 4, its broad outlines of attached lifting scaffold lifting gear of the invention are, are equipped with two A fixing piece:First fixing piece 30 and the second fixing piece 50, can lift by turns, and can carry out attached wall with building structure by turns It is fixed, therefore in lifting process, can realize entire dress device by the fixed by turns and lifting by of two fixing pieces Lifting.
The attached lifting scaffold lifting gear of the present invention includes scaffold main body 10, lifting gear 20, fixing piece and opens Tight device 40.Institute's fixing piece includes the first fixing piece 30 and the second fixing piece 50.
As shown in Figure 1 to 4, the scaffold main body 10 is the structure lifted, need to successively be climbed with architectural engineering Or decline, concrete structure and structural requirement can refer to known technology.Under normal conditions, the scaffold main body 10 includes perpendicular To main frame 13, horizontal supporting truss 14 and frame body framework three parts.Vertical main framework 13 perpendicular to building structure alien invasion, And connect with attached support structure, it is to be primarily subjected to and transmit vertical and horizontal loading vertical frame.Horizontal supporting truss 14 are parallel to building wall, are primarily subjected to frame body vertical load, are a kind of vertical load to be transferred to vertical main framework 13 horizontal supporting structure.Frame body framework be between adjacent two vertical main framework 13 and horizontal supporting truss 14 on frame Body.
As shown in Figure 1 to 4, the tensioning apparatus 40 and lifting gear 20 are connected for convenience of setting, in the scaffold Top, the bottom end of main body 10 are respectively equipped with the first sling point 11 and the second sling point 12.Wherein, the first sling point 11 is for connecting Tensioning apparatus 40, the second sling point 12 is for connecting lifting gear 20.The knot of first sling point, 11 and second sling point 12 Structure and requirement, can refer to known technology, and both is oppositely arranged.In the present embodiment, first sling point 11 is set to scaffold The top of main body 10, second sling point 12 are set to the bottom end of scaffold main body 10.In other embodiment, first hanging Point 11 can also be set to the bottom end of scaffold main body 10, and the second sling point 12 can also be set to the top of scaffold main body 10.
As shown in Figure 1 to 4, the lifting gear 20 includes driving motor 21, chain 22, head sprocket 23, first from chain Take turns the 24, second accessary sprocket wheel 25, the second suspension hook 26.
As shown in Figure 1 to 4, well known driving motor can be selected for providing lifting drive in the driving motor 21 21, such as conical rotor motor.
As shown in Figure 1 to 4, the head sprocket 23 is driven by the driving motor 21, and specific driving structure can refer to Known technology.For example, when it is implemented, Electric Chain Blocks, driving motor 21, head sprocket can be selected in the lifting gear 20 23 setting can refer to the internal structure of well known electric block.The head sprocket can be driven after providing power by driving motor 21 23 rotations.
As shown in Figure 1 to 4, first accessary sprocket wheel, 24 and second accessary sprocket wheel 25 is respectively symmetrically set to the head sprocket 23 Both sides are used to be arranged the chain 22 and form pulley structure.
As shown in Figure 1 to 4, second suspension hook 26 is set on the lifting gear 20, with second sling point 12 connections.Structure and the load requirement of second suspension hook 26, can refer to known technology.
As shown in Figure 1 to 4, the lifting gear 20 is except driving motor 21, chain 22, head sprocket 23, the first accessary sprocket wheel 24, except the second accessary sprocket wheel 25, the second suspension hook 26, other internal electrical structures can refer to known technology, for example, braking Unit, control unit, deceleration unit etc..In the present embodiment, the lifting gear 20 selects ring-chain hoist.
As shown in Figure 1 to 4, first fixing piece, 30 and second fixing piece 50 is used to carry out attached wall with building structure solid Fixed, concrete shape structure can be set as desired, for example, it can be arranged to be directly anchored in building structure, It can be arranged to be fixedly connected with the wall-attached supporting seat being fixed in building structure.In use, the first fixing piece 30 and A fixing piece in two fixing pieces 50 is integrally fixed in building structure, another fixing piece is with integral elevating.
As shown in Figure 1 to 4, the chain 22 and transmission rope 60 are connected for convenience, are set on first fixing piece 30 There are the first in-line gears 31, the second in-line gears 51 are equipped on second fixing piece 50.First in-line gears 31 wrap The first driving wheel 311 and the second driving wheel 312 of coaxial arrangement are included, second in-line gears 51 include the third of coaxial arrangement Driving wheel 511 and the 4th driving wheel 512.First driving wheel 311 and third driving wheel 511, can for chain 22 to be arranged Select the sprocket wheel to match with the chain 22.Second driving wheel, 312 and the 4th driving wheel 512 is for being arranged transmission rope 60, the driving wheel that can be arranged the transmission rope 60 can be selected, concrete type can be depending on the type of transmission rope 60, example Such as, the sheave for being arranged steel wire rope can be selected.
The transmission rope 60 is for being driven, and in the present embodiment, selects steel wire rope.It, also can be by having in other embodiment There is the object of similar functions to replace.
As shown in Figure 1 to 4, the tensioning apparatus 40 includes pedestal 44, the first suspension hook 45, the first fixed pulley 41, second Fixed pulley 42 and third fixed pulley 43.The shape of the pedestal 44 can be set as desired, and be used to be arranged described first and hang Hook 45, the first fixed pulley 41, the second fixed pulley 42 and third fixed pulley 43.First suspension hook 45 and first sling point 11 Connection, concrete structure and load requirement, can refer to known technology.First fixed pulley 41, the second fixed pulley 42 and third Fixed pulley 43 is for being tensioned the transmission rope 60 and forming pulley structure and be driven.First fixed pulley 41, second is calmly sliding Wheel 42 and the setting of the interval of third fixed pulley 43, wherein the second fixed pulley 42 be set to the first fixed pulley 41 and third fixed pulley 43 it Between.
For being driven, set-up mode is as follows for the chain 22 and the transmission rope 60:
As shown in Figure 1 to 4, the middle part of the chain 22 is sheathed on the head sprocket 23, one end of the chain 22 according to It is secondary around first driving wheel 311, the first accessary sprocket wheel 24 and connect with one end of transmission rope 60;The other end of the chain 22 according to It is secondary around the 4th driving wheel 512, the second accessary sprocket wheel 25 and connect with the other end of transmission rope 60.One end of the transmission rope 60 with When chain 22 connects, the other end bypasses the first fixed pulley 41, the second driving wheel 312, the transmission of the second fixed pulley the 42, the 4th successively Wheel 512, third fixed pulley 43 and connect with the other end of chain 22 so that tensioning apparatus 40, chain 22, transmission rope 60, The pulley structure that closing chain type is formed between first fixing piece 30, the second fixing piece 50, lifting gear 20, can be used for being driven.
When work, by fixing piece one of in fixing piece, such as the first fixing piece 30 carries out attached wall with building structure and consolidates It is fixed, then start the lifting gear 20, under the action of the driving motor 21, the chain 22, transmission rope 60 are passed It is dynamic, and so that the single unit system in addition to the first fixing piece 30 is lifted, meanwhile, another fixing piece in fixing piece, such as Second fixing piece 50 also synchronization lifting.When single unit system is lifted to desired height, by original fixing piece --- first fixes Part 30 is detached with building structure, then by another fixing piece --- and the second fixing piece 50 carries out attached wall with building structure and fixes, Then start lifting gear 20, can realize and successively lift.
To describe in more detail its operation principle, the present embodiment is illustrated for being promoted:
As shown in Fig. 2, current whole device is in lower floor, as lowest point is located at the positions 1F.At this point, first is fixed Part 30 carries out attached wall with building structure and fixes, and the first fixing piece 30 is fixed on higher position position, the positions 3F as shown in Figure 2; At this point, starting the driving motor 21, driving motor 21 rotates forward, clockwise direction as shown in Figure 2, chain 22, transmission rope 60 It is driven along mode shown in Fig. 2, to drive lifting gear 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus 40 are lifted up.
When lifting gear 20, the second fixing piece 50, scaffold main body 10, tensioning apparatus 40 are elevated a floor, Integrality is as shown in Figure 3:The lowest point of its whole device is located at the positions 2F, and the second fixing piece 50 is located at the positions 4F;At this point, will First fixing piece 30 is detached with building structure, and then the second fixing piece 50 is fixed in the building structure of the positions 4F, is then driven Dynamic motor 21 is inverted by counter clockwise direction as shown in Figure 3 so that chain 22, transmission rope 60 along direction shown in Fig. 3 into Row transmission, drives lifting gear 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 to be lifted up.
When lifting gear 20, the first fixing piece 30, scaffold main body 10, tensioning apparatus 40 are elevated a floor, Integrality is as shown in Figure 4:The lowest point of its whole device is located at the positions 3F, and the first fixing piece 30 is located at the positions 5F, at this point, will Second fixing piece 50 is detached with building structure, and the first fixing piece 30 is then fixed on the positions 5F, then sequentially repeats above-mentioned step Suddenly, it can successively be promoted.During being somebody's turn to do, basic ideas are to fix the first fixing piece 30 and the second fixing piece 50 by turns, Then it is inverted by controlling the rotating forward of driving motor 21, another loose fixing piece of promotion by turns and scaffold main body 10, to realize the purpose successively promoted.
When needing to carry out step-down operation, basic principle is same as above, and when decline need to only control the rotation side of driving motor 21 To reversed opposite with rotation when being promoted.
Although being disclosed to the present invention by above example, the scope of the invention is not limited to this, Under conditions of present inventive concept, above each component can with technical field personnel understand similar or equivalent element come It replaces.

Claims (7)

1. a kind of attached lifting scaffold lifting gear comprising scaffold main body (10), which is characterized in that it further includes lifting Device (20) is used to carry out the fixed fixing piece of attached wall and tensioning apparatus (40) with building structure, and the fixing piece includes first Fixing piece (30) and the second fixing piece (50), the lifting gear (20) and tensioning apparatus (40) respectively with the scaffold main body (10) it connects, the lifting gear (20) includes driving motor (21) and chain (22), and the chain (22) is by driving electricity Machine (21) drives, and the chain (22) connect with first fixing piece (30) and the second fixing piece (50), and described first fixes Part (30) and the second fixing piece (50) are connected by the transmission rope (60) being stretched on the tensioning apparatus (40), the tensioning dress Set (40), the first fixing piece (30), the second fixing piece (50), transmission rope (60), chain form pulley structure between (22), use When, first fixing piece (30), the second fixing piece (50) can carry out attached wall with building structure by turns and fix, and described first is solid Determining part (30), the second fixing piece (50) can by turns lift under the lifting gear (20) effect.
2. the attached lifting scaffold lifting gear as described in claim 1, which is characterized in that the lifting gear (20) includes Head sprocket (23), the first accessary sprocket wheel (24), the second accessary sprocket wheel (25), first accessary sprocket wheel (24) and the second accessary sprocket wheel (25) point Not She Yu the head sprocket (23) both sides, on first fixing piece (30) be equipped with the first in-line gears (31), described Second fixing piece (50) is equipped with the second in-line gears (51), and the chain (22) is sheathed on the head sprocket (23), and should One end of chain (22) bypass first in-line gears (31) and the first accessary sprocket wheel (24) successively and with the transmission rope (60) One end connection, the other end of the chain (22) bypass second in-line gears (51) and the second accessary sprocket wheel (25) successively and with The other end of the transmission rope (60) connects.
3. the attached lifting scaffold lifting gear as described in claim 2, which is characterized in that the tensioning apparatus (40) includes First fixed pulley (41), the second fixed pulley (42) and third fixed pulley (43), one end and the chain of the transmission rope (60) (22) one end connection, the other end of the transmission rope (60) bypass first fixed pulley (41), the first in-line gears successively (31), the second fixed pulley (42), the second in-line gears (51), third fixed pulley (43) and with the other end of the chain (22) connect It connects.
4. the attached lifting scaffold lifting gear as described in claim 3, which is characterized in that the tensioning apparatus (40) is equipped with Pedestal (44) is equipped with the first suspension hook (45) on the pedestal (44), is set on the top of the scaffold main body (10) or bottom end There are the first sling point (11), first suspension hook (45) to be connect with first sling point (11).
5. the attached lifting scaffold lifting gear as described in claim 4, which is characterized in that in the scaffold main body (10) The other end opposite with tensioning apparatus (40) be equipped with the second sling point (12), the lifting gear (20) be equipped with the second suspension hook (26), second suspension hook (26) connect with second sling point (12).
6. the attached lifting scaffold lifting gear as described in claim 4, which is characterized in that first fixed pulley (41), Second fixed pulley (42) and third fixed pulley (43) are respectively arranged on the pedestal (44), and the second fixed pulley (42) is positioned at described Between first fixed pulley (41) and third fixed pulley (43).
7. the attached lifting scaffold lifting gear as described in claim 2, which is characterized in that first in-line gears (31) The first driving wheel (311) including coaxial arrangement and the second driving wheel (312), second in-line gears (51) include coaxially setting The third driving wheel (511) and the 4th driving wheel (512) set, the chain (22) are same around the first in-line gears (31) and second When shaft gear (51), it is set around on first driving wheel (311) and third driving wheel (511);The transmission rope (60) around When crossing the first in-line gears (31) and the second in-line gears (51), haves mercy on and be set to the second driving wheel (312) and the 4th driving wheel (512) on.
CN201810948892.6A 2018-08-20 2018-08-20 Attached lifting scaffold lifting gear Pending CN108756199A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810948892.6A CN108756199A (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting gear

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810948892.6A CN108756199A (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting gear

Publications (1)

Publication Number Publication Date
CN108756199A true CN108756199A (en) 2018-11-06

Family

ID=63967256

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810948892.6A Pending CN108756199A (en) 2018-08-20 2018-08-20 Attached lifting scaffold lifting gear

Country Status (1)

Country Link
CN (1) CN108756199A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109534205A (en) * 2018-12-13 2019-03-29 广西巨邦科技有限公司 Integrated become a full member in week automatically hangs cucurbit and its mounting structure
CN109680922A (en) * 2018-12-18 2019-04-26 河北盛卓建筑设备制造有限公司 A kind of attachment type raise scaffold hoisting mechanism
CN110005187A (en) * 2019-05-06 2019-07-12 赵宇翔 Alternately it is coupled the attachment type raise scaffold and its application method of support
CN112897298A (en) * 2021-01-13 2021-06-04 太原理工大学 Lifting device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203462739U (en) * 2013-09-12 2014-03-05 云南中一重工建筑机械有限公司 Double-hook upside down type electric chain hoist
CN204676872U (en) * 2015-06-02 2015-09-30 王德宇 A kind of lifting scaffold hoisting mechanism
CN105735629A (en) * 2015-05-17 2016-07-06 王德宇 Lifting device for building-attached lifting scaffold
CN106150059A (en) * 2015-03-23 2016-11-23 深圳市特辰科技股份有限公司 A kind of stair climbing robot
CN108149914A (en) * 2018-02-11 2018-06-12 厦门安科科技有限公司 A kind of all steel attachment type raise scaffold rotating while lifting system and method
CN208858136U (en) * 2018-08-20 2019-05-14 云南建投建筑机械有限公司 Attached lifting scaffold lifting device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203462739U (en) * 2013-09-12 2014-03-05 云南中一重工建筑机械有限公司 Double-hook upside down type electric chain hoist
CN106150059A (en) * 2015-03-23 2016-11-23 深圳市特辰科技股份有限公司 A kind of stair climbing robot
CN105735629A (en) * 2015-05-17 2016-07-06 王德宇 Lifting device for building-attached lifting scaffold
CN204676872U (en) * 2015-06-02 2015-09-30 王德宇 A kind of lifting scaffold hoisting mechanism
CN108149914A (en) * 2018-02-11 2018-06-12 厦门安科科技有限公司 A kind of all steel attachment type raise scaffold rotating while lifting system and method
CN208858136U (en) * 2018-08-20 2019-05-14 云南建投建筑机械有限公司 Attached lifting scaffold lifting device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109534205A (en) * 2018-12-13 2019-03-29 广西巨邦科技有限公司 Integrated become a full member in week automatically hangs cucurbit and its mounting structure
CN109534205B (en) * 2018-12-13 2024-05-03 广西巨邦科技有限公司 Integrated automatic turnover normal hanging hoist and mounting structure thereof
CN109680922A (en) * 2018-12-18 2019-04-26 河北盛卓建筑设备制造有限公司 A kind of attachment type raise scaffold hoisting mechanism
CN110005187A (en) * 2019-05-06 2019-07-12 赵宇翔 Alternately it is coupled the attachment type raise scaffold and its application method of support
CN112897298A (en) * 2021-01-13 2021-06-04 太原理工大学 Lifting device

Similar Documents

Publication Publication Date Title
CN108756199A (en) Attached lifting scaffold lifting gear
CN201971572U (en) Movable arm type tower crane with suspension arm possible of being folded for dismounting
CN106698208A (en) Hoisting equipment and hoisting method for external transportation of super high-rise building
WO2022252633A1 (en) Method for arranging upside-down hoisting power device in attached lifting scaffold
CN109025234A (en) A kind of building high-altitude vacantly construct with can level, vertically the track crane ship that walk
CN206562264U (en) A kind of hanging device for transport outside high-rise building
CN204490367U (en) A kind of outdoor handling machine for building
CN210012529U (en) Hoist and mount welding equipment suitable for heavy object lifts by crane
CN105735629B (en) Build attached lifting scaffold lifting device
CN208858136U (en) Attached lifting scaffold lifting device
CN105715028B (en) Continuous lowering or hoisting gear and the elevating scaffold containing continuous lowering or hoisting gear
CN204676872U (en) A kind of lifting scaffold hoisting mechanism
CN107651564B (en) A kind of craning weight of same device for adjusting posture
CN109694007A (en) A kind of super high-rise building hoisting transportation method
CN106143808B (en) Assembled crane for container ship and assembling mode thereof
CN208071214U (en) A kind of material lifting device of automatic discharging
CN110498350A (en) A kind of multifunctional safe building tower crane
CN201999679U (en) Automatic reciprocating and looping system of electric block
CN108466938A (en) A kind of transformer on-load voltage regulating tap switch boom hoisting
CN214243550U (en) Assembled hoisting accessory for building
CN113955636A (en) Hoisting equipment for assembly type building construction
CN206985557U (en) A kind of double girder crane for preventing object crooked
CN209583455U (en) A kind of outdoor handling machine for building
CN210396121U (en) Novel wet seam installation lifting means
CN211473331U (en) Hanging basket for steel structure installation

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination