Prior art keywords
channel steel
purlin
split bolt
die combination
concrete structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810763723.5A
Other languages
Chinese (zh)
Inventor
修亚光
张琴
万展君
陈华
龚达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201810763723.5A priority Critical patent/CN108755705A/en
Publication of CN108755705A publication Critical patent/CN108755705A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The present invention relates to one kind exempting from branch die combination purlin and its construction method, and the combination purlin includes a pair of of the channel steel being set at the top of support pile, is formed with casting space between the channel steel, the support pile is located in the casting space;Drawknot connects the split bolt of the channel steel;And the concrete structure in the casting space is poured and is formed in, the anchoring split bolt in the concrete structure.Beneficial effects of the present invention are:By the way that a pair of of channel steel is arranged, so that it had both been formd the steel form for pouring concrete structure, connect with concrete structure further through split bolt, achieve the effect that enhance purlin rigidity.Solving the problems, such as that construction purlin needs to take form removal and plank sheathing intensity difference in the prior art causes purlin quality bad.

Description

Exempt from branch die combination purlin and its construction method
Technical field
The present invention relates to technical field of building construction, refer in particular to one kind and exempting from branch die combination purlin and its construction method.
Background technology
During foundation pit construction, construction purlin is needed to connect multiple support piles, and increase the whole of supporting construction Body.In the prior art, it is typically employed at the top of support pile and sets up the form of plank sheathing and casting concrete come purlin of constructing, this The form of construction work of sample is needing to set up template and form removal, and construction is very cumbersome, and plank sheathing intensity is poor, causes to construct Purlin quality it is bad, the stability of supporting construction entirety can be reduced.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, one kind is provided and exempts from branch die combination purlin and its construction party Method, the purlin that can solve to construct in the prior art, which needs to take form removal and plank sheathing intensity difference, causes purlin quality is bad to ask Topic.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides one kind exempting from branch die combination purlin, including:
A pair of of channel steel at the top of support pile is formed with casting space between the channel steel, and the support pile is located at institute It states in casting space;
Drawknot connects the split bolt of the channel steel;And
The concrete structure in the casting space is poured and be formed in, the split bolt is anchored in the concrete structure.
The invention has the advantages that by the way that a pair of of channel steel is arranged, it is made not only to have formd the steel form for pouring concrete structure, but also It is connect with concrete structure by split bolt, achievees the effect that enhance purlin rigidity.
The present invention exempt from branch die combination purlin further improvement lies in that, further include the reinforcing bar being embedded in the concrete structure Cage.
The present invention exempt from branch die combination purlin further improvement lies in that, the opposite facing setting of channel steel, and on the channel steel Offer the bolt hole for adapting to the split bolt.
The present invention exempt from branch die combination purlin further improvement lies in that, the split bolt is set to two neighboring support pile Between.
The present invention exempt from branch die combination purlin further improvement lies in that, the channel steel include splicing connection multistage channel steel Section.
The present invention also provides a kind of construction methods for exempting from branch die combination purlin, including:
A pair of of channel steel is set up at the top of support pile, casting space is formed between the channel steel, and the support pile is made to be located at In the casting space;
A pair of of channel steel is connected using split bolt drawknot;And
Casting concrete forms concrete structure in space between a pair of of channel steel, and the split bolt is made to anchor In in the concrete structure.
The present invention exempt from the construction method of branch die combination purlin further improvement lies in that, further include:
Before casting concrete, steel reinforcement cage is set up in the space between a pair of of channel steel.
The present invention exempt from the construction method of branch die combination purlin further improvement lies in that, further include:
Open up the bolt hole for adapting to the split bolt on the channel steel, and by a pair of of channel steel back to setting Both sides at the top of support pile.
The present invention exempt from the construction method of branch die combination purlin further improvement lies in that, utilize split bolt drawknot connect institute A pair of of the channel steel stated includes:
The split bolt is set between two neighboring support pile.
The present invention exempt from the construction method of branch die combination purlin further improvement lies in that, the channel steel includes multistage channel steel Section, the construction method further include:
The channel steel section is spliced and is connected.
Description of the drawings
Fig. 1 is the vertical view that the present invention exempts from branch die combination purlin.
Fig. 2 is the sectional view of bowing that the present invention exempts from branch die combination purlin.
Fig. 3 is A-A sectional views in Fig. 2.
Fig. 4 is B-B sectional views in Fig. 2.
Fig. 5 is the front view that the present invention exempts from channel steel in branch die combination purlin.
Fig. 6 is the side view that the present invention exempts from channel steel in branch die combination purlin.
Fig. 7 is the use schematic diagram that the present invention exempts from branch die combination purlin.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, the present invention provides one kind exempting from branch die combination purlin, has without taking form removal, being easy to construction, saving The features such as time and manpower and high structural strength, solves construction purlin in the prior art and needs to take form removal and plank sheathing The problem that intensity difference causes purlin quality bad.
Exempt from branch die combination purlin to the present invention below in conjunction with the accompanying drawings to illustrate.
As shown in Figures 1 to 4, the present invention exempt from branch die combination purlin include a pair of of the channel steel 10 for being set to the top of support pile 91, The split bolt 11 of drawknot connection channel steel 10, the concrete structure 20 that pours and be formed between a pair of of channel steel 10 and it is embedded in concrete knot Steel reinforcement cage 30 in structure 20.
Wherein, as shown in Fig. 1, Fig. 3 and Fig. 7, channel steel 10 includes a web and the flange plate for being fixedly arranged on web both sides, channel steel 10 opposite facing settings, i.e. flange plate are located at side of the web far from support pile 91.Channel steel 10 is placed on ground, a pair of of channel steel 10 it Between be formed with casting space, and the top of support pile 91 is located in the casting space, by pouring coagulation in the casting space To form concrete structure 20, the top of support pile 91 and split bolt 11 are anchored at interior soil by concrete structure 20.Preferably, to drawing spiral shell After 11 drawknot of bolt connects channel steel 10, the surface of support pile 91 is tightly attached in the side surface of the web of channel steel 10.
As shown in Figures 2 to 4, steel reinforcement cage 30 is first placed in casting space before casting concrete, and steel reinforcement cage 30 is avoided Support pile 91 is arranged, and after concrete structure 20 pours, steel reinforcement cage 30 is embedded in concrete structure.Increase concrete structure 20 by steel reinforcement cage 30 Intensity, and then the stability of enhancing structure entirety.
The bolt hole for adapting to split bolt 11 is offered on the web of channel steel 10,11 both ends of split bolt pass through corresponding Bolt hole is simultaneously connected with corresponding channel steel 10, and specifically, the nut of split bolt 11 is tightly abutted against web far from support pile 91 Side on, to which drawknot connects a pair of of channel steel 10.And after concrete structure 20 pours, split bolt 11 is through concrete structure 20 and right It draws bolt 11 to be anchored in concrete structure 20, increases the bonding strength of channel steel 10 and concrete structure 20.
Preferably, split bolt 11 is arranged between two neighboring support pile 91, prevent the setting of split bolt 11 to perpendicular To support pile 91 have an impact.And vertically three split bolts 11 of interval setting between two neighboring support pile 91, pass through Between the quantity for increasing split bolt 11 increases the contact area of split bolt 11 and concrete structure 20, and split bolt 11 is vertical Every setting so that 10 vertical applied force of channel steel is uniform, ensures that 10 surface of channel steel is closely affixed with 91 surface of support pile, enhance structure Overall stability.
In a preferred embodiment, as shown in Figure 5 and Figure 6, channel steel 10 includes the multistage channel steel section of splicing connection, slot Junction between steel section is welded with connection strap 12 with fixation.The end face of two sections of adjacent channel steel sections to pair and fit, connect The web surface of the side surface of the front half section of item 12 and a channel steel section is affixed and welds, and the side surface of second half section and another channel steel The web surface of section is affixed and welds, to be fixedly connected with two sections of channel steel sections.Preferably, connection strap 12 is reinforcing rod, channel steel There is a plurality of the connection strap 12 of junction, and interval setting in a vertical direction between section, to enhance consolidating between channel steel section Determine intensity, and make channel steel section junction uniform force, enhances the stability of channel steel entirety.
The construction method for exempting from branch die combination purlin to the present invention below in conjunction with the accompanying drawings illustrates.
The construction method that the present invention exempts from branch die combination purlin includes:
As shown in Fig. 1, Fig. 3 and Fig. 7, a pair of of channel steel 10 is set up at the top of support pile 91, and channel steel 10 is placed in ground On so that casting space is formed between a pair of of channel steel 10, and the top of support pile 91 is located in the casting space, then utilizes 11 drawknot of split bolt connection a pair of channel steel 10.
Specifically, channel steel 10 includes a web and the flange plate for being fixedly arranged on web both sides, is opened up on the web of channel steel 10 Adapt to the bolt hole of split bolt 11.By the opposite facing both sides being arranged at the top of support pile 91 of a pair of of channel steel 10, i.e. flange plate It is arranged positioned at side of the web far from support pile 91, and the surface of the web of channel steel 10 is tightly affixed on to the table of support pile 91 Face.Then the both ends of split bolt 11 are each passed through corresponding bolt hole and screw togather nut, channel steel 10 is resisted against by nut Web so that split bolt 11 be connected with corresponding channel steel 10.
Preferably, being arranged split bolt 11 between two neighboring support pile 91, the setting pair of split bolt 11 is prevented Vertical support pile 91 has an impact.And vertically three split bolts 11 of interval setting between two neighboring support pile 91, lead to The quantity for increasing split bolt 11 is crossed, increases surface area of the split bolt 11 in casting space, and split bolt 11 is vertical Interval setting is so that 10 vertical applied force of channel steel is uniform, and guarantee 10 surface of channel steel is closely affixed with 91 surface of support pile, and enhancing finishes Structure overall stability.
As shown in Figures 1 to 4, steel reinforcement cage 30 is set up in casting space, and steel reinforcement cage 30 is made to avoid the setting of support pile 91, Then in casting space casting concrete to form concrete structure 20.The concrete structure 20 is by the top of support pile 91, split bolt 20 and in steel reinforcement cage 30 is anchored at, increase the intensity of concrete structure 20 by steel reinforcement cage 30, and pass through split bolt 20 and increase concrete The bonding strength of structure and channel steel 10.
In a preferred embodiment, as shown in Figure 5 and Figure 6, channel steel 10 includes multistage channel steel section, and the construction method is also Including:More connection straps 12 are provided, it is the end face of two sections of adjacent channel steel sections is opposite and be affixed, then by the first half of connection strap 12 The side surface of section and the web surface of a channel steel section are affixed and weld, and the web table of the side surface of second half section and another channel steel section Face is affixed and welds, to be fixedly connected with two sections of channel steel sections.Preferably, connection strap 12 is reinforcing rod, connect between channel steel section It meets place and welds a plurality of connection strap 12, and interval setting in a vertical direction, to enhance the fixing intensity between channel steel section, and Make channel steel section junction uniform force, enhances the stability of channel steel entirety.
The present invention exempts from having the beneficial effect that for branch die combination purlin and its construction method:
By the way that a pair of of channel steel is arranged, it is set both to have formd the steel form for pouring concrete structure, further through split bolt and concrete knot Structure connects, and achievees the effect that enhance purlin rigidity.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. one kind exempting from branch die combination purlin, which is characterized in that including:
A pair of of channel steel at the top of support pile, casting space is formed between the channel steel, and the support pile is located at described pour It builds in space;
Drawknot connects the split bolt of the channel steel;And
The concrete structure in the casting space is poured and be formed in, the split bolt is anchored in the concrete structure.
2. exempting from branch die combination purlin as described in claim 1, which is characterized in that further include the steel being embedded in the concrete structure Muscle cage.
3. exempting from branch die combination purlin as described in claim 1, which is characterized in that the opposite facing setting of channel steel, and the slot The bolt hole for adapting to the split bolt is offered on steel.
4. exempting from branch die combination purlin as described in claim 1, which is characterized in that the split bolt is set to two neighboring branch Between fender pile.
5. exempting from branch die combination purlin as described in claim 1, which is characterized in that the channel steel includes the multistage slot of splicing connection Steel section.
6. a kind of construction method for exempting from branch die combination purlin, which is characterized in that including:
A pair of of channel steel is set up at the top of support pile, casting space is formed between the channel steel, so that the support pile is located at described In casting space;
A pair of of channel steel is connected using split bolt drawknot;And
Casting concrete forms concrete structure in space between a pair of of channel steel, and the split bolt is made to be anchored in institute It states in concrete structure.
7. the construction method as claimed in claim 6 for exempting from branch die combination purlin, which is characterized in that further include:
Before casting concrete, steel reinforcement cage is set up in the space between a pair of of channel steel.
8. the construction method as claimed in claim 6 for exempting from branch die combination purlin, which is characterized in that further include:
The bolt hole for adapting to the split bolt is opened up on the channel steel, and a pair of of channel steel is being propped up back to setting Both sides at the top of fender pile.
9. the construction method as claimed in claim 6 for exempting from branch die combination purlin, which is characterized in that connected using split bolt drawknot Connecing a pair of of channel steel includes:
The split bolt is set between two neighboring support pile.
10. the construction method as claimed in claim 6 for exempting from branch die combination purlin, which is characterized in that the channel steel includes multistage Channel steel section, the construction method further include:
The channel steel section is spliced and is connected.
CN201810763723.5A 2018-07-12 2018-07-12 Exempt from branch die combination purlin and its construction method Pending CN108755705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810763723.5A CN108755705A (en) 2018-07-12 2018-07-12 Exempt from branch die combination purlin and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810763723.5A CN108755705A (en) 2018-07-12 2018-07-12 Exempt from branch die combination purlin and its construction method

Publications (1)

Publication Number Publication Date
CN108755705A true CN108755705A (en) 2018-11-06

Family

ID=63973609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810763723.5A Pending CN108755705A (en) 2018-07-12 2018-07-12 Exempt from branch die combination purlin and its construction method

Country Status (1)

Country Link
CN (1) CN108755705A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648379A (en) * 2020-06-17 2020-09-11 王冰璇 Supporting structure of combined plate support

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040019501A (en) * 2002-08-28 2004-03-06 홍창모 divided supporter structure for supporting a mould for forming a concrete united wall and method of forming a concrete united wall using the divided supporter structure
CN102704491A (en) * 2012-06-11 2012-10-03 上海强劲地基工程股份有限公司 Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN103981879A (en) * 2014-06-03 2014-08-13 上海隧道工程股份有限公司 Cofferdam structure and construction method thereof
CN203795832U (en) * 2014-04-30 2014-08-27 国家电网公司 Form board device for pouring concrete
CN204754191U (en) * 2015-06-30 2015-11-11 甘肃第四建设集团有限责任公司 Combination steel form instrument formula spelling device
CN105544554A (en) * 2015-10-26 2016-05-04 张继红 Assembly type foundation pit bracing structure and construction method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20040019501A (en) * 2002-08-28 2004-03-06 홍창모 divided supporter structure for supporting a mould for forming a concrete united wall and method of forming a concrete united wall using the divided supporter structure
CN102704491A (en) * 2012-06-11 2012-10-03 上海强劲地基工程股份有限公司 Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN203795832U (en) * 2014-04-30 2014-08-27 国家电网公司 Form board device for pouring concrete
CN103981879A (en) * 2014-06-03 2014-08-13 上海隧道工程股份有限公司 Cofferdam structure and construction method thereof
CN204754191U (en) * 2015-06-30 2015-11-11 甘肃第四建设集团有限责任公司 Combination steel form instrument formula spelling device
CN105544554A (en) * 2015-10-26 2016-05-04 张继红 Assembly type foundation pit bracing structure and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111648379A (en) * 2020-06-17 2020-09-11 王冰璇 Supporting structure of combined plate support

Similar Documents

Publication Publication Date Title
CN110056092A (en) Bolt plug-in type precast shear wall and superimposed sheet connecting structure and construction method up and down
CN107724540A (en) Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates
CN205531016U (en) Precast concrete post component and connected node
CN112681228B (en) River bank slope reinforcing structure for river ecological restoration and construction method thereof
CN108755705A (en) Exempt from branch die combination purlin and its construction method
CN212563272U (en) Induced seam department steel limit rubber waterstop mounting structure of tunnel
CN108316150A (en) The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam
CN217175201U (en) Assembled concrete column connected node
CN208501701U (en) Exempt from branch die combination purlin
CN106567330A (en) Sectional anchoring structure for box girder internal prestressing tendon
CN208088500U (en) A kind of prefabricated beam column crimping joint strengthening stirrup construction
US7188453B2 (en) Masonry wall supported fence and method
CN209227841U (en) Wall and Liangping face interconnection structure and assembled arthitecutral structure system
CN206902702U (en) Mixed mud built pile
CN207761049U (en) A kind of assembly concrete frame beam column connection structure
CN113152921B (en) Ground ring beam reinforcing structure and construction method
CN215290226U (en) Adjustable independent foundation reinforcing die
CN214614664U (en) Fixing device for flexible caulking plate in concrete pouring process
CN209620087U (en) One kind being used for the multi-functional device for positioning and securing of load retaining wall concrete retaining wall
CN109518687A (en) A kind of destructing finite elements pin-connected panel prestressed pile suitable for stake bottom hammer piling
CN213740656U (en) Crack reinforcing equipment for road and bridge
CN211256691U (en) Prestressed anchorage utensil is used in road bridge construction
CN211369260U (en) Precast concrete post
CN217104738U (en) Auxiliary positioning tool for hinge joint concrete pouring template of simply supported beam bridge
CN217205527U (en) Reinforcing apparatus that inclines is prevented to ancient building wall body transversely

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination