- CN207761049U CN207761049U CN201721628865.8U CN201721628865U CN207761049U CN 207761049 U CN207761049 U CN 207761049U CN 201721628865 U CN201721628865 U CN 201721628865U CN 207761049 U CN207761049 U CN 207761049U
- Authority
- CN
- China
- Prior art keywords
- concrete frame
- wedge surface
- beam column
- wedge mouth
- frame beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及混凝土框架结构技术,特别涉及一种装配式混凝土框架梁柱连接结构。The utility model relates to the concrete frame structure technology, in particular to an assembled concrete frame beam-column connection structure.
背景技术Background technique
装配式建筑在我国进入提速发展阶段。目前既有装配式框架梁柱连接方法有,一是上下层预制柱纵向受力钢筋采用挤压套筒连接;二是框架梁柱连接采用梁的上、下受力钢筋伸入节点区符合锚固要求,或受力筋贯通节点区,按要求设置箍筋,现场浇灌混凝土养护达到强度后拆模成形。该方法要求上下层预制柱预留连接挤压套筒和纵向受力钢筋偏差精确度高,预制柱在运输、吊装过程中,对挤压套筒和纵向受力钢筋需严格保护,防止碰撞而变形给构件安装带来极其不便;另外框架梁柱连接上、下受力钢筋和箍筋制作和安装,连接节点区域混凝土现场浇灌及养护,现场作业工程量大。Prefabricated buildings have entered a stage of accelerated development in my country. At present, the beam-column connection methods of the prefabricated frame are as follows: first, the longitudinal stress reinforcement of the upper and lower prefabricated columns is connected by extrusion sleeve; Requirements, or the stress bars pass through the node area, and the stirrups are set as required, and the concrete is poured on site and cured to reach the strength, and then the formwork is removed and formed. This method requires that the upper and lower prefabricated columns are reserved to connect the extruded sleeves and the longitudinally stressed steel bars with high deviation accuracy. During the transportation and hoisting of the precast columns, the extruded sleeves and the longitudinally stressed steel bars must be strictly protected to prevent collisions. The deformation brings great inconvenience to the installation of the components; in addition, the fabrication and installation of the upper and lower stressed steel bars and stirrups connecting the frame beams and columns, and the on-site pouring and curing of concrete in the connection node areas require a large amount of on-site operations.
发明内容Contents of the invention
本实用新型的目的在于提供一种改进的梁柱连接结构,以便于混凝土建筑装配施工,减少养护成本,同时减少预制柱在运输吊装过程中造成的损坏。The purpose of the utility model is to provide an improved beam-column connection structure, so as to facilitate the assembly and construction of concrete buildings, reduce maintenance costs, and at the same time reduce the damage caused by prefabricated columns during transportation and hoisting.
本实用新型采用以下技术方案实现上述目的。一种装配式混凝土框架梁柱连接,在预制梁柱构件连接端头设置有楔口面,且楔口面预留有螺栓连接孔和注浆管道,注浆管道与楔口面连通,楔口面外边缘配置金属挡板。The utility model adopts the following technical solutions to achieve the above object. A prefabricated concrete frame beam-column connection, in which a wedge surface is provided at the connection end of a prefabricated beam-column member, and bolt connection holes and grouting pipes are reserved on the wedge surface, the grouting pipeline communicates with the wedge surface, and the wedge The outer edge of the surface is equipped with a metal baffle.
所述楔口面呈“L”形。The wedge surface is "L" shaped.
本实用新型采用L形楔口连接面,并通过螺栓加注浆连接,具有构造简单、施工操作方便、传力可靠的优点。The utility model adopts an L-shaped wedge connection surface, and is connected by bolts and grouting, and has the advantages of simple structure, convenient construction and operation, and reliable force transmission.
附图说明Description of drawings
图1是本实用新型装配式混凝土框架梁的结构示意图;Fig. 1 is the structural representation of the utility model assembled concrete frame beam;
图2是图1的A向视图;Fig. 2 is the A direction view of Fig. 1;
图3是图1的俯视图;Fig. 3 is the top view of Fig. 1;
图4是本实用新型连接状态的结构示意图。Fig. 4 is a schematic diagram of the structure of the utility model in a connected state.
具体实施方式Detailed ways
以下结合附图和实施例对本实用新型作进一步说明。参见图1至图4,一种装配式混凝土框架梁柱连接,在预制梁柱构件1连接端头设置有楔口面2,且楔口面2预留有螺栓连接孔4和注浆管道5,注浆管道5与楔口面2连通,楔口面2外边缘配置金属挡板3。Below in conjunction with accompanying drawing and embodiment the utility model is described further. Referring to Figures 1 to 4, a prefabricated concrete frame beam-to-column connection is provided with a wedge surface 2 at the connection end of the prefabricated beam-column member 1, and the wedge surface 2 is reserved with bolt connection holes 4 and grouting pipes 5 , The grouting pipe 5 communicates with the wedge surface 2, and the outer edge of the wedge surface 2 is provided with a metal baffle 3.
所述楔口面2呈“L”形。The wedge surface 2 is "L" shaped.
实施例:以下列举本实用新型的一个较佳实施案例,如图4所示。在预制装配式框架梁柱时,首先,按结构计算在框架梁柱构件内力较小部位为连接面,连接面设置L形楔口面2,边缘配置金属挡板3(钢板或角钢)。再根据连接面内力大小经理论计算楔口面2,楔口面2为“L”形,在楔口面2预留一定数量(如图3中为6个)的高强螺栓连接孔4,螺栓连接孔4的数量、大小和间距还需满足构造及施工操作要求;并在楔口面2的两端设置二个注浆连接管道5。将装配式混凝土框架梁柱制作完成后,运到施工现场吊装就位,将两混凝土框架梁柱的楔口面2相对对接,并全部采用高强螺栓插入螺栓连接孔4,矫正构件位置偏差符合国家标准;采用专用工具按顺序要求分别紧固螺帽,对高强螺栓施加压力达到预定值。然后,按性能要求调制灌浆料,采用注浆机具以一定压力向注浆管道5注入灌浆料,达到灌浆料充满连接面的缝隙。对楔口面2的金属挡板3实施焊接,焊条类型、焊接质量和厚度符合要求。Embodiment: A preferred implementation example of the present utility model is listed below, as shown in FIG. 4 . When prefabricating frame beams and columns, firstly, according to the structural calculation, the part with small internal force of frame beams and columns is the connection surface, and the connection surface is provided with L-shaped wedge surface 2, and metal baffles 3 (steel plate or angle steel) are arranged on the edge. Then according to the internal force of the connection surface, the wedge surface 2 is theoretically calculated. The wedge surface 2 is "L" shaped, and a certain number of high-strength bolt connection holes 4 (6 in Figure 3) are reserved on the wedge surface 2. The number, size and spacing of the connecting holes 4 also need to meet the requirements of structure and construction operation; and two grouting connecting pipes 5 are arranged at both ends of the wedge surface 2 . After the prefabricated concrete frame beams and columns are manufactured, they are transported to the construction site and hoisted in place. The wedge faces 2 of the two concrete frame beams and columns are relatively docked, and all high-strength bolts are inserted into the bolt connection holes 4. The position deviation of the components is corrected in accordance with the national Standard; special tools are used to tighten the nuts in sequence, and the pressure on the high-strength bolts reaches the predetermined value. Then, the grouting material is prepared according to the performance requirements, and the grouting material is injected into the grouting pipe 5 with a certain pressure by using a grouting machine, so that the grouting material fills the gap of the connecting surface. Weld the metal baffle plate 3 on the wedge surface 2, and the type of welding rod, welding quality and thickness meet the requirements.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721628865.8U CN207761049U (en) | 2017-11-29 | 2017-11-29 | A kind of assembly concrete frame beam column connection structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721628865.8U CN207761049U (en) | 2017-11-29 | 2017-11-29 | A kind of assembly concrete frame beam column connection structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207761049U true CN207761049U (en) | 2018-08-24 |
Family
ID=63189011
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721628865.8U Active CN207761049U (en) | 2017-11-29 | 2017-11-29 | A kind of assembly concrete frame beam column connection structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207761049U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110565799A (en) * | 2019-08-30 | 2019-12-13 | 浙江中清大建筑产业化有限公司 | A prefabricated concrete beam-column connection method for earthquake resistance |
| CN117145055A (en) * | 2023-07-28 | 2023-12-01 | 上海港城建筑安装工程有限公司 | Prefabricated beam-column joint construction and manufacturing method |
-
2017
- 2017-11-29 CN CN201721628865.8U patent/CN207761049U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110565799A (en) * | 2019-08-30 | 2019-12-13 | 浙江中清大建筑产业化有限公司 | A prefabricated concrete beam-column connection method for earthquake resistance |
| CN117145055A (en) * | 2023-07-28 | 2023-12-01 | 上海港城建筑安装工程有限公司 | Prefabricated beam-column joint construction and manufacturing method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101949213B (en) | Special support system of building structure deformed seam template | |
| CN110593485A (en) | Main material damage-free detachable steel-concrete combined beam | |
| CN211257341U (en) | Rigid reinforced connection joint of circular steel tube concrete column and I-shaped steel beam | |
| WO2017177470A1 (en) | Assembly type steel pipe casing reinforced concrete combined joint and mounting method | |
| CN107975160B (en) | Shear wall structure with lateral connecting key groove, manufacturing and assembling method | |
| CN111335464B (en) | Beam column connecting joint of fabricated concrete structure and construction method thereof | |
| CN108316477B (en) | The connection structure and construction method of the mid-node between the flat steel tube concrete column and the steel beam | |
| CN106988455B (en) | Splice node and its construction method in steel plate concrete shear wall scene | |
| CN201296979Y (en) | Embedded part for large-sized reinforcing steel bar concrete column top beam node | |
| CN107905455A (en) | A kind of grouting sleeve for prefabricated concrete component reinforcement connection and preparation method thereof | |
| CN104179256A (en) | Rectangular concrete filled steel tube column and steel beam single-side bolt connecting joint and construction method thereof | |
| CN105672494A (en) | Grouting connecting joint and connecting method between steel core concrete column and steel beam | |
| CN107964870A (en) | A kind of detachable assembling type reinforced concrete bridge pier cushion cap connection structure | |
| CN203878753U (en) | High-strength bolt shear key structure | |
| CN106639151B (en) | Built-in X-type is to drawing steel plate type welding rectangular steel-tube concrete column and construction method | |
| CN102619286A (en) | Connecting joint of steel pipe concrete column and profile steel concrete beam | |
| CN110306729A (en) | Design and construction method of detachable sleeve grouting connection | |
| CN104153463B (en) | Assembled integrated frame system and construction method thereof | |
| CN207749409U (en) | Detachable assembling type reinforced concrete bridge pier cushion cap connection structure | |
| CN206736696U (en) | A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam | |
| CN110106977B (en) | A kind of assembled steel structure beam-column grouting anchor node | |
| CN106150085A (en) | A kind of stiffened column Formwork Installation Method | |
| CN108797799B (en) | Side plate connection type steel pipe concrete prefabricated column connection node and construction method | |
| CN215366786U (en) | UHPC and concrete combined pier | |
| CN110439141A (en) | A Tolerable Sectional Steel Connection Structure for Prefabricated Shear Walls |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |