CN108755418A - A kind of bridge incremental launching combination unit and its construction method - Google Patents

A kind of bridge incremental launching combination unit and its construction method Download PDF

Info

Publication number
CN108755418A
CN108755418A CN201810470326.9A CN201810470326A CN108755418A CN 108755418 A CN108755418 A CN 108755418A CN 201810470326 A CN201810470326 A CN 201810470326A CN 108755418 A CN108755418 A CN 108755418A
Authority
CN
China
Prior art keywords
thrustor
buttress
combination unit
incremental launching
types
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810470326.9A
Other languages
Chinese (zh)
Inventor
冉国亮
郭晓松
褚辉
柳细才
王昌裕
胡鹏飞
梅军
刘重刚
文斌
武进广
宋娟娟
白利伟
刘建明
罗晓斌
邱涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Wuhan Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201810470326.9A priority Critical patent/CN108755418A/en
Publication of CN108755418A publication Critical patent/CN108755418A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention's provides a kind of bridge incremental launching combination unit, including support, thrustor and steel box-girder, thrustor are installed in support, and steel box-girder is installed on thrustor;Support includes Y types buttress and longeron, and longeron is installed at the top of Y types buttress, and thrustor is installed on longeron.A kind of bridge incremental launching combination unit of the present invention, uses Y types buttress and is combined to form holder with longeron, and Y type holders are installed on basis or permanent bridge pier, to effectively reduce construction cost, shortens construction period.Meanwhile pushing tow buttress occupied space of the invention is smaller, can effectively reduce removal and destruction to existing building and pipeline within the scope of construction pushing tow buttress.

Description

A kind of bridge incremental launching combination unit and its construction method
Technical field
The present invention relates to technical field of bridge construction, combine the unit and its construct more particularly, to a kind of bridge incremental launching Method.
Background technology
With the fast development of bridge construction, incremental launching construction technique is widely used in bridge construction. The general bridge erection across structures such as existing railway, highways uses incremental launching method, and steel box-girder is constructed will cross over The side of object is assembled paragraph by paragraph along bridge longitudinal axis, lays pushing tow buttress in limited space between structures group and pushing tow is set Standby, pushing steel box girder slides onto predetermined spanning, then accurate adjustment girder steel along longitudinal direction, and it is in place to fall beam, removes pushing tow buttress.
Currently, domestic and abroad bridge pushing tow buttress construction technology mainly uses 4 bolt steel pipes, bridging and vertically and horizontally distributes Beam forms a pushing tow buttress, buttress need in the construction process in region structures and pipeline move and change or protect, increase Construction cost is added, has extended construction period, the steel box-girder pushing tow of the confined space can not be well adapted to.It is a kind of special to be badly in need of Pushing tow buttress, being capable of the safe and effective bridge incremental launching construction for solving the confined space.
Invention content
It is high and can utmostly utilize the bridge top of existing structure object that the present invention provides a kind of simple in structure, space availability ratio Combination unit and its construction method are pushed away, it can not conventional arrangement pushing tow under limit space to solve existing highway bridge pushing tow combination unit Buttress carries out the technical issues of bridge incremental launching construction.
According to an aspect of the present invention, a kind of bridge incremental launching combination unit, including support, thrustor and steel case are provided Beam, the thrustor are installed in the support, and the steel box-girder is installed on the thrustor;The support includes Y Type buttress and longeron, the longeron are installed at the top of the Y types buttress, and the thrustor is installed on the longeron.
On the basis of said program preferably, the Y types buttress includes bearing and holder, and two holders are symmetrically installed in On the bearing.
On the basis of said program preferably, the Y types buttress further includes lateral lateral, and the transverse direction lateral is erected at two Between the holder.
On the basis of said program preferably, further include basis, pre-embedded steel slab and pre-buried lower margin spiral shell are embedded on the basis of described Bolt, the bottom of the bearing by the pre-embedded anchoring bolts and pre-embedded steel slab be installed in it is described on the basis of.
On the basis of said program preferably, the Y types buttress further includes longitudinal lateral, it is described longitudinal direction lateral one end with it is described Lateral lateral is connected, and the other end of the longitudinal direction lateral is connected with bridge pier.
On the basis of said program preferably, the thrustor includes multigroup jack, the transverse center of the jack For the center of gravity of the steel box-girder.
On the basis of said program preferably, jack described in every group includes longitudinal jack, lateral jack and vertical thousand Jin top.
The present invention also provides a kind of construction methods of bridge incremental launching combination unit as described above, include the following steps:
Step S1 builds holder, thrustor is fixed on the longeron, and steel box-girder is made to be installed in the pushing tow dress It sets;
Step S2, adjustment thrustor are completed steel box-girder and are adjusted with the position in upper and lower three directions around.
A kind of bridge incremental launching combination unit of the present invention, uses Y types buttress and is combined to form holder with longeron, and by Y types Holder is installed on basis or permanent bridge pier, to effectively reduce construction cost, shortens construction period.
Meanwhile pushing tow buttress occupied space of the invention is smaller, can effectively reduce within the scope of construction pushing tow buttress to existing The removal and destruction of building and pipeline.
Description of the drawings
Fig. 1 is the side view of the bridge incremental launching combination unit of the present invention;
Fig. 2 is the front view of the bridge incremental launching combination unit of the present invention.
Specific implementation mode
With reference to the accompanying drawings and examples, the specific implementation mode of the present invention is described in further detail.Implement below Example is not limited to the scope of the present invention for illustrating the present invention.
Referring to Fig. 1, and combine shown in Fig. 2, the present invention provides a kind of bridge incremental launching combination unit, including support 10, Thrustor 30 and steel box-girder 40, wherein thrustor 30 is installed in support 10, and steel box-girder 40 is installed in thrustor 30 On;Support 10 includes Y types buttress 11 and longeron 20, and longeron 20 is installed in 11 top of Y types buttress, and thrustor 30 is installed in longeron On 20.
The Y types buttress 11 of the present invention includes bearing 12 and holder 13, and two holders 13 are symmetrically installed on bearing 12, make two Y-type structure is formed between a holder 13 and bearing 12.In order to further make holder 13 more stablize, it is more uniformly stressed, this hair Bright Y types buttress 11 further includes lateral lateral 14, and lateral lateral 14 is erected between two holders 13, right using lateral lateral 14 The active force of two holders 13 further strengthens the intensity of holder 13, and 20 welded type of longeron is fixed on holder 13.
The invention also includes basis 50, it is embedded with pre-embedded steel slab 15 and pre-embedded anchoring bolts 16 on basis 50, bearing 12 Bottom is anchored at by pre-embedded anchoring bolts 16 on basis 50, and pre-embedded steel slab 15 is anchored on basis 50.
Further, in order to improve the integrally-built stability under loading performance of the present invention, Y types buttress 11 of the invention also wraps Longitudinal lateral 17 is included, 17 one end of longitudinal lateral is connected with lateral lateral 14, and the other end of longitudinal lateral 17 is connected with bridge pier.
As the preferred embodiments of the invention, one end of longitudinal lateral 17 of the invention can also be connected with holder 13, The other end of longitudinal lateral 17 is connected with bridge pier, as shown in Figure 2.
The thrustor 30 of the present invention includes multigroup jack, and the transverse center of jack is the weight of the steel box-girder 40 The heart, and every group of jack includes longitudinal jack, lateral jack and vertical jack, can be realized to steel case using jack Adjusting around beam 40 and on upper and lower three directions.
The present invention also provides a kind of construction methods of bridge incremental launching combination unit as described above, include the following steps:
Step S1 builds holder 13, thrustor 30 is fixed on the longeron 20, and steel box-girder 40 is made to be installed in institute It states on thrustor 30;
Step S2, adjustment thrustor 30 are completed steel box-girder 40 and are adjusted with the position in upper and lower three directions around.
Wherein, in step S1 build holder 13 comprise the concrete steps that, pour basis 50 when and meanwhile construct basis 50 pre-embedded steel slabs 15 and pre-embedded anchoring bolts 16, construct pier shaft when pre-embedded steel slab 15 and pier shaft anchor bar in pier shaft simultaneously, to improve pier shaft Intensity;
The bearing 12 of Y types holder 13 is connect into processing by carbon dioxide gas arc welding, and ray is carried out to all weld seams Flaw detection and ultrasonic flaw detection, it is ensured that be welded to connect intensity;
Y types buttress is fixedly connected by pre-embedded anchoring bolts 16 and basis 50, and Y types buttress 11 is passed through into longitudinal direction Lateral 17 is welded and fixed with pier shaft pre-embedded steel slab 15;
Longeron 20 is finally fixed by welding in the top of holder 13, walking jack is fixed on longeron 20.
A kind of bridge incremental launching combination unit of the present invention, uses Y types buttress 11 and is combined to form holder 13 with longeron 20, and Y types holder 13 is installed on basis 50 or permanent bridge pier, to effectively reduce construction cost, shortens construction period.
Meanwhile pushing tow buttress occupied space of the invention is smaller, can effectively reduce within the scope of construction pushing tow buttress to existing The removal and destruction of building and pipeline.
A kind of bridge incremental launching combination unit provided by the invention, has following advantages:
1, pushing tow buttress of the invention can maximally utilize permanent bridge pier and basis 50, save construction cost.
2, pushing tow buttress occupied space of the invention is smaller, can effectively reduce and be constructed to existing within the scope of construction pushing tow buttress Object and moving for pipeline change and destroy.
3, the present invention is intelligent, information-based by the construction of digital control system configures, and reaches work progress and monitors entirely, is reached with this To the harmony and continuity of multiplexing kind coordinative construction.
Finally, the present processes are only preferable embodiment, are not intended to limit the scope of the present invention.It is all Within the spirit and principles in the present invention, any modification, equivalent replacement, improvement and so on should be included in the protection of the present invention Within the scope of.

Claims (8)

1. a kind of bridge incremental launching combination unit, which is characterized in that including support, thrustor and steel box-girder, the thrustor It is installed in the support, the steel box-girder is installed on the thrustor;The support includes Y types buttress and longeron, institute It states longeron to be installed at the top of the Y types buttress, the thrustor is installed on the longeron.
2. a kind of bridge incremental launching combination unit as described in claim 1, which is characterized in that the Y types buttress include bearing and Holder, two holders are symmetrically installed on the bearing.
3. a kind of bridge incremental launching combination unit as claimed in claim 2, which is characterized in that the Y types buttress further includes transverse direction Lateral, the transverse direction lateral are erected between two holders.
4. a kind of bridge incremental launching combination unit as claimed in claim 2, which is characterized in that further include basis, on the basis of described It is embedded with pre-embedded steel slab and pre-embedded anchoring bolts, the bottom of the bearing is installed by the pre-embedded anchoring bolts and pre-embedded steel slab On the basis of described.
5. a kind of bridge incremental launching combination unit as claimed in claim 3, which is characterized in that the Y types buttress further includes longitudinal direction Lateral, described longitudinal direction lateral one end are connected with the lateral lateral, and the other end of the longitudinal direction lateral is connected with bridge pier.
6. a kind of bridge incremental launching combination unit as described in claim 1, which is characterized in that the thrustor includes multigroup thousand Jin top, the transverse center of the jack are the center of gravity of the steel box-girder.
7. a kind of bridge incremental launching combination unit as claimed in claim 6, which is characterized in that jack described in every group includes longitudinal Jack, lateral jack and vertical jack.
8. a kind of construction method of bridge incremental launching combination unit as described in claim 1, which is characterized in that including following step Suddenly:
Step S1 builds holder, thrustor is fixed on the longeron, and steel box-girder is made to be installed in the thrustor On;
Step S2, adjustment thrustor are completed steel box-girder and are adjusted with the position in upper and lower three directions around.
CN201810470326.9A 2018-05-16 2018-05-16 A kind of bridge incremental launching combination unit and its construction method Pending CN108755418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810470326.9A CN108755418A (en) 2018-05-16 2018-05-16 A kind of bridge incremental launching combination unit and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810470326.9A CN108755418A (en) 2018-05-16 2018-05-16 A kind of bridge incremental launching combination unit and its construction method

Publications (1)

Publication Number Publication Date
CN108755418A true CN108755418A (en) 2018-11-06

Family

ID=64008244

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810470326.9A Pending CN108755418A (en) 2018-05-16 2018-05-16 A kind of bridge incremental launching combination unit and its construction method

Country Status (1)

Country Link
CN (1) CN108755418A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123238A (en) * 2021-04-02 2021-07-16 中国建筑第六工程局有限公司 Transverse moving erection method for wide-section steel truss girder

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196097A (en) * 1997-01-13 1998-07-28 Tone Chika Gijutsu Kk Moving support device and construction method for temporary structure using it
CN106948268A (en) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 Variable Section Steel box beam pushing tow is combined the unit and application method
CN107059602A (en) * 2017-05-13 2017-08-18 林再颐 A kind of Y type bridge piers of high-mechanic intensity
CN107841952A (en) * 2017-11-30 2018-03-27 中铁二十局集团第工程有限公司 Adhesion type high-altitude mount support and rigid frame-continuous girder end bay cast-in-place section construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10196097A (en) * 1997-01-13 1998-07-28 Tone Chika Gijutsu Kk Moving support device and construction method for temporary structure using it
CN106948268A (en) * 2017-04-24 2017-07-14 中铁七局集团武汉工程有限公司 Variable Section Steel box beam pushing tow is combined the unit and application method
CN107059602A (en) * 2017-05-13 2017-08-18 林再颐 A kind of Y type bridge piers of high-mechanic intensity
CN107841952A (en) * 2017-11-30 2018-03-27 中铁二十局集团第工程有限公司 Adhesion type high-altitude mount support and rigid frame-continuous girder end bay cast-in-place section construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113123238A (en) * 2021-04-02 2021-07-16 中国建筑第六工程局有限公司 Transverse moving erection method for wide-section steel truss girder

Similar Documents

Publication Publication Date Title
CN103452053B (en) The antidumping bracing means of Single column pier bridge
CN103243652B (en) A kind of large-span non-floor type cast-in-place beam falsework and construction method thereof
CN107761542B (en) A kind of arch oblique pull combined system bridge and its construction method
CN104005338B (en) A kind of long-span cablestayed bridges tower beam three-dimensional temporary consolidation structure
WO2012030018A1 (en) Partially/completely earth-anchored and cable-stayed bridge using a main span tension means, and method for constructing same
CN203096598U (en) Outer cladding type steel-concrete combined structure beam bridge overturn-resistant device
CN204125899U (en) A kind of long piled wharf super large framed bent cast-in-situ pile cap bed die support system
CN106702909B (en) A kind of double width steel box-girder entirety swivel structure and construction method
CN104532749A (en) Support used for construction of upper beam of main tower of suspension bridge
CN104831639B (en) A kind of ultra-wide nonprismatic continuous beam 0# block consolidation and releasing construction method
CN107435335A (en) Brick retaining wall steel bar girder hardened system and method on foundation pit enclosure top beam
CN107604827A (en) A kind of porous large-span freely-supported steel truss girder bridge erection method
CN105178200A (en) Construction method of cable-stayed combined support for construction of first segment of suspended-pouring arch bridge
CN103866693A (en) Installing method of reinforced concrete bowstring rod arch bridge arch ribs and hanging auxiliary bridge
CN210134353U (en) Bracket type hoop bracket for bent cap construction
CN101967795B (en) Novel built-in cable-truss anchoring structure and construction method thereof
CN209194353U (en) It is a kind of to ride integral type bracket suitable for the construction of Bridge High-pier 0# block
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN203866711U (en) Large span cable-stayed bridge tower beam three-way temporary consolidation structure
CN108755418A (en) A kind of bridge incremental launching combination unit and its construction method
CN110016871A (en) A kind of construction method suitable for over-height pier large span curve bridge
CN203393635U (en) Main tower cable-stayed bridge splicing formwork adopting straight-line mode substituting for arc-line mode
CN109235280A (en) The operation platform and construction method of bridge coping
CN206607506U (en) A kind of through type adds the capping construction support of passive stress trapezoid block
CN210066504U (en) Large-span cantilever truss type bent cap support system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106