CN108748609A - A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole - Google Patents

A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole Download PDF

Info

Publication number
CN108748609A
CN108748609A CN201810332450.9A CN201810332450A CN108748609A CN 108748609 A CN108748609 A CN 108748609A CN 201810332450 A CN201810332450 A CN 201810332450A CN 108748609 A CN108748609 A CN 108748609A
Authority
CN
China
Prior art keywords
concrete
pvc pipe
blockwork
pipe
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810332450.9A
Other languages
Chinese (zh)
Inventor
杨超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810332450.9A priority Critical patent/CN108748609A/en
Publication of CN108748609A publication Critical patent/CN108748609A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted

Landscapes

  • Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole, it is characterised in that includes the following steps:A, the pvc pipe for preparing respective diameters according to design drawing carries out blanking according to design length;B, according to design drawing correspond to wall, building block design size, determine the size of concrete blockwork, carry out template construct;C, according to the position in provided pipe hole in design drawing, the position of corresponding concrete blockwork and the position of pvc pipe are calculated;D, e, the corresponding position fixing PVC pipe in concrete blockwork template removes concrete blockwork template, obtain concrete blockwork;F, when masonry construction, concrete blockwork is placed in corresponding position, completes the construction that pvc pipe makees provided pipe hole.The advantages of present invention has concrete blockwork simple in structure, easy to make, concrete blockwork, easy for construction, accurate positioning, and metope caused by avoiding later stage digging hole in wall destroys and reduces exterior wall leakage hidden danger.

Description

A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole
Technical field
The present invention relates to the construction methods that a kind of pvc pipe makees provided pipe hole, specifically, being a kind of based on concrete prefabricated member Pvc pipe makees the construction method in provided pipe hole.
Background technology
Building is usually vented hole, smoke evacuation hole, air-conditioner pipe hole need to synchronize reserved when with masonry construction, that is, exists Pvc pipe is placed into behind corresponding position in building process and is wrapped with mortar.But in construction, need to cut masonry It cuts, this can cause the lap of splice of masonry inadequate, and be unsatisfactory for design specification requirement.Worker in construction also often put by leakage There are deviation in pvc pipe or position, cause pipe hole is reserved to lose effect.It even can only again punch in the later stage, metope caused to destroy, Increase building waste, arrangement personnel is also needed to carry out stuff up a crack processing, undoubtedly considerably increases construction cost again.
Therefore known pvc pipe make provided pipe hole construction method there are problems that it is above-mentioned various inconvenient and.
Invention content
The purpose of the present invention is to propose that a kind of pvc pipe simple in structure, easy for construction based on concrete prefabricated member is reserved The construction method in pipe hole.
To achieve the above object, technical solution of the invention is:
A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole, it is characterised in that includes the following steps:
A, the pvc pipe for preparing respective diameters according to design drawing carries out blanking according to design length;
B, according to design drawing correspond to wall, building block design size, determine the size of concrete blockwork, carry out template system Make;
C, according to the position in provided pipe hole in design drawing, the position of corresponding concrete blockwork and the position of pvc pipe are calculated;
D, the corresponding position fixing PVC pipe in concrete blockwork template, makes pvc pipe have difference of height at the both ends of concrete blockwork, I.e. one end is high, and the other end is low;Pvc pipe is plastered and exterior-wall heat insulation design thickness in the protruded length of concrete blockwork according to inner-outer wall Depending on, pour concrete;
E, concrete blockwork template is removed, obtains and embeds the concrete blockwork that pvc pipe makees masonry provided pipe hole;
F, when masonry construction, the concrete blockwork for embedding pvc pipe and making masonry provided pipe hole is placed in corresponding position, completes to be based on concrete The pvc pipe of prefabricated component makees the construction in provided pipe hole.
The construction method that the pvc pipe based on concrete prefabricated member of the present invention makees provided pipe hole can also be arranged using technology below It applies to further realize.
Method above-mentioned, wherein difference of height of the pvc pipe at the both ends of concrete blockwork reaches 2-3cm.
Method above-mentioned, wherein preventing from blocking pvc pipe when the masonry construction.
After adopting the above technical scheme, the pvc pipe based on concrete prefabricated member of the present invention makees the construction method tool in provided pipe hole It has the advantage that:
1, the concrete blockwork that embedded pvc pipe makees masonry provided pipe hole is simple in structure, easy to make;
2, the concrete blockwork that pvc pipe makees masonry provided pipe hole is embedded, easy for construction, accurate positioning both ensure that exhaust hole, row Flue, the air-conditioner pipe hole holes Deng Guan, which are reserved, meets Design Requirement Drawing;
3, metope caused by avoiding later stage digging hole in wall destroys, reduces exterior wall leakage hidden danger.
Description of the drawings
Fig. 1 is that the embedded pvc pipe of the embodiment of the present invention makees the concrete blockwork structural schematic diagram in masonry provided pipe hole;
Fig. 2 is the use state diagram that the embedded pvc pipe of the embodiment of the present invention makees the concrete blockwork in masonry provided pipe hole.
In figure:1 concrete blockwork, 2PVC pipes.
Specific implementation mode
With reference to embodiments and its attached drawing illustrates further the present invention.
Embodiment 1
The pvc pipe based on concrete prefabricated member of the present invention makees the construction method in provided pipe hole, includes the following steps:
A, the pvc pipe for preparing respective diameters according to design drawing carries out blanking according to design length.
B, according to design drawing correspond to wall, building block design size, determine the size of concrete blockwork, carry out template It makes.
C, according to the position in provided pipe hole in design drawing, the position of corresponding concrete blockwork and the position of pvc pipe are calculated It sets.
D, the corresponding position fixing PVC pipe in concrete blockwork template makes pvc pipe have height at the both ends of concrete blockwork Difference, i.e. one end are high, and the other end is low;Pvc pipe is designed in the protruded length of concrete blockwork according to inner-outer wall plastering and exterior-wall heat insulation Depending on thickness, concrete is poured.
E, concrete blockwork template is removed, obtains and embeds the concrete blockwork that pvc pipe makees masonry provided pipe hole, Fig. 1 is this The embedded pvc pipe of inventive embodiments makees the concrete blockwork structural schematic diagram in masonry provided pipe hole.
F, when masonry construction, the concrete blockwork for embedding pvc pipe and making masonry provided pipe hole, the block are placed in corresponding position It prevents from blocking pvc pipe when body construction, completes the construction that the pvc pipe based on concrete prefabricated member makees provided pipe hole.Fig. 2 is that the present invention is implemented Example embedded pvc pipe make masonry provided pipe hole concrete blockwork use state diagram, pvc pipe in concrete blockwork two The difference of height at end reaches 3cm, it should be noted that indoors, low one end is in outdoor for the high one end of pvc pipe.
There is the present invention substantive distinguishing features and significant technological progress, the pvc pipe of the invention based on concrete prefabricated member to make pre- The construction method for staying pipe hole embeds pvc pipe using concrete blockwork and makees masonry provided pipe hole construction technology, before masonry construction, In the place that pipe hole is reserved, according to wall, the design size of building block, prefabricated corresponding concrete building block, and according to the pipe of layout design Hole size and absolute altitude, calculate corresponding position, and corresponding pvc pipe is placed in concrete building block, are placed in corresponding position when building by laying bricks or stones Concrete blockwork.This technology is easy for construction, accurate positioning, ensures that exhaust hole, smoke evacuation hole, the air-conditioner pipe hole holes Deng Guan are reserved Meet Design Requirement Drawing, avoid the later stage punch caused by finished product destroy, increase building waste influence civilized construction, arrange people Member stuff up a crack and repeat recruitment, exterior wall leakage hidden danger is also reduced, to play the effect of cost efficiency.
Above example is used for illustrative purposes only rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution should also belong to scope of the invention, should be limited by each claim.

Claims (3)

1. a kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole, it is characterised in that include the following steps:
A, the pvc pipe for preparing respective diameters according to design drawing carries out blanking according to design length;
B, according to design drawing correspond to wall, building block design size, determine the size of concrete blockwork, carry out template system Make;
C, according to the position in provided pipe hole in design drawing, the position of corresponding concrete blockwork and the position of pvc pipe are calculated;
D, the corresponding position fixing PVC pipe in concrete blockwork template, makes pvc pipe have difference of height at the both ends of concrete blockwork, I.e. one end is high, and the other end is low;Pvc pipe is plastered and exterior-wall heat insulation design thickness in the protruded length of concrete blockwork according to inner-outer wall Depending on, pour concrete;
E, concrete blockwork template is removed, obtains and embeds the concrete blockwork that pvc pipe makees masonry provided pipe hole;
F, when masonry construction, the concrete blockwork for embedding pvc pipe and making masonry provided pipe hole is placed in corresponding position, completes to be based on concrete The pvc pipe of prefabricated component makees the construction in provided pipe hole.
2. the pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole as described in claim 1, which is characterized in that institute It states difference of height of the pvc pipe at the both ends of concrete blockwork and reaches 2-3cm.
3. the pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole as described in claim 1, which is characterized in that institute It prevents from blocking pvc pipe when stating masonry construction.
CN201810332450.9A 2018-04-13 2018-04-13 A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole Pending CN108748609A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810332450.9A CN108748609A (en) 2018-04-13 2018-04-13 A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810332450.9A CN108748609A (en) 2018-04-13 2018-04-13 A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole

Publications (1)

Publication Number Publication Date
CN108748609A true CN108748609A (en) 2018-11-06

Family

ID=64010810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810332450.9A Pending CN108748609A (en) 2018-04-13 2018-04-13 A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole

Country Status (1)

Country Link
CN (1) CN108748609A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797899A (en) * 2019-03-21 2019-05-24 广西建工集团建筑工程总承包有限公司 Blockwork and its construction with air-conditioning hole
CN111136763A (en) * 2020-01-09 2020-05-12 五冶集团上海有限公司 Manufacturing method of air conditioner hole and exhaust hole concrete precast block
CN113550487A (en) * 2021-06-18 2021-10-26 广州市机电安装有限公司 Construction method of prefabricated air conditioner casing pipe

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672458U (en) * 2012-06-20 2013-01-16 中建五局第三建设有限公司 Air conditioner casing pipe prefabricating building block
CN202767335U (en) * 2012-09-28 2013-03-06 湖南东方红建设集团有限公司 Prefabricated concrete block facilitating air conditioner installation
CN207177063U (en) * 2017-08-30 2018-04-03 中建新疆建工(集团)有限公司 A kind of blockwork of pre-buried air conditioner condensate water drain bushing

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202672458U (en) * 2012-06-20 2013-01-16 中建五局第三建设有限公司 Air conditioner casing pipe prefabricating building block
CN202767335U (en) * 2012-09-28 2013-03-06 湖南东方红建设集团有限公司 Prefabricated concrete block facilitating air conditioner installation
CN207177063U (en) * 2017-08-30 2018-04-03 中建新疆建工(集团)有限公司 A kind of blockwork of pre-buried air conditioner condensate water drain bushing

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797899A (en) * 2019-03-21 2019-05-24 广西建工集团建筑工程总承包有限公司 Blockwork and its construction with air-conditioning hole
CN111136763A (en) * 2020-01-09 2020-05-12 五冶集团上海有限公司 Manufacturing method of air conditioner hole and exhaust hole concrete precast block
CN113550487A (en) * 2021-06-18 2021-10-26 广州市机电安装有限公司 Construction method of prefabricated air conditioner casing pipe

Similar Documents

Publication Publication Date Title
CN108748609A (en) A kind of pvc pipe based on concrete prefabricated member makees the construction method in provided pipe hole
CN207177063U (en) A kind of blockwork of pre-buried air conditioner condensate water drain bushing
CN103758272A (en) Construction method for embedding pipelines in autoclave aerated concrete block walls
CN104343239A (en) Electric threading pipe dark laying construction technology for aerated concrete filler wall punching
CN202767335U (en) Prefabricated concrete block facilitating air conditioner installation
CN110792200A (en) Masonry construction method without post-picking and pipe wrapping structure thereof
CN207469307U (en) A kind of gang form structure of the inspection shaft cast-in-place construction of town road pipeline
CN208363632U (en) A kind of concrete surface indent construction tool
CN202164698U (en) Steel die for sewage inspection well
CN204001270U (en) A kind of reinforced concrete wall and masonry wall syndeton
CN110219413A (en) A kind of autoclaved aerated concrete slab and preparation method thereof
RU2354784C2 (en) Dry-mix method of wall construction
DK201900051U3 (en) Building block for a foundation
CN211447334U (en) One-step prefabricated structure for building complex nodes of wall body
GB202212128D0 (en) A vegetal concrete masonry unit and method and system for manufacture thereof
CN208056620U (en) Modularization is without heat bridge Self-insulation wall plate
CN202672458U (en) Air conditioner casing pipe prefabricating building block
CN205654084U (en) Gypsum wall body mould
RU2651858C2 (en) Construction element (options)
CN105064539B (en) New wall and old wall connector
CN212078424U (en) Masonry-free slotting pipe wrapping structure
CN104047375A (en) Structure for brickwork connection and construction method
CN108301615A (en) Modularization is without heat bridge Self-insulation wall plate
CN217580790U (en) Prefabricated wall surface non-perforated building block combined wall body
RU45422U1 (en) BUILDING BLOCK

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106