CN202164698U - Steel die for sewage inspection well - Google Patents

Steel die for sewage inspection well Download PDF

Info

Publication number
CN202164698U
CN202164698U CN2011202726876U CN201120272687U CN202164698U CN 202164698 U CN202164698 U CN 202164698U CN 2011202726876 U CN2011202726876 U CN 2011202726876U CN 201120272687 U CN201120272687 U CN 201120272687U CN 202164698 U CN202164698 U CN 202164698U
Authority
CN
China
Prior art keywords
arc
formwork
inspection well
sewage inspection
sewage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2011202726876U
Other languages
Chinese (zh)
Inventor
庞吉莲
董文洁
马士玉
蒋川
曹俊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan City Chengjian Material Development Service Center
Original Assignee
Jinan Huanghe Luqiao Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Huanghe Luqiao Engineering Co filed Critical Jinan Huanghe Luqiao Engineering Co
Priority to CN2011202726876U priority Critical patent/CN202164698U/en
Application granted granted Critical
Publication of CN202164698U publication Critical patent/CN202164698U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/20Controlling water pollution; Waste water treatment
    • Y02A20/208Off-grid powered water treatment

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

本实用新型公开了一种污水检查井钢模包括分别与检查井下部内外侧壁相配的内环形模板和外环形模板,内环形模板和外环形模板上均开有接纳污水排放管的管孔。所述内环形模板和外环形模板均通过4个弧形件围合而成。所述弧形件为四分之一圆筒件,内环形模板的弧形件的两个直线侧向内折弯形成连接板,外环形模板的弧形件的两个直线侧向外折弯形成连接板,相邻弧形件通过相对的连接板对接固定。所述连接板设有一列螺栓孔,相对的两个连接板通过螺栓联接。所述管孔相对设置,穿过相邻弧形件的对接部。所述内环形模板和外环形模板的厚度为1cm-2cm。本实用新型浇筑的污水检查井强度大,管材和混凝土结构筑成一体。

Figure 201120272687

The utility model discloses a sewage inspection well steel form, which comprises inner and outer annular formworks respectively matched with the inner and outer walls of the lower part of the inspection well. Both the inner annular formwork and the outer annular formwork are provided with pipe holes for receiving sewage discharge pipes. Both the inner ring formwork and the outer ring formwork are surrounded by four arc-shaped parts. The arc-shaped piece is a quarter cylindrical piece, the two straight lines of the arc-shaped piece of the inner ring formwork are bent inward to form a connecting plate, and the two straight lines of the arc-shaped piece of the outer ring formwork are bent outward A connection plate is formed, and adjacent arc-shaped pieces are butted and fixed through the opposite connection plate. The connecting plate is provided with a row of bolt holes, and the two opposite connecting plates are connected by bolts. The tube holes are arranged oppositely and pass through the butt joints of adjacent arc-shaped pieces. The thickness of the inner ring template and the outer ring template is 1cm-2cm. The sewage inspection well poured by the utility model has high strength, and the pipe material and the concrete structure are integrated.

Figure 201120272687

Description

污水检查井钢模Sewage inspection well steel mold

技术领域 technical field

本实用新型属于模具领域,尤其涉及一种污水检查井钢模。 The utility model belongs to the field of moulds, in particular to a steel mold for sewage inspection wells.

背景技术 Background technique

污水检查井是排水管道系统上为检查和清理管道而设立的窨井,同时还起连接管段和管道系统的通风作用。目前,污水检查井多为标准砖和水泥砂浆砌筑而成的砖砌体。这种结构的污水检查井对热胀冷缩变形不明显的混凝土管材不好出现质量问题。对于常见的玻璃钢夹砂管,自身的热胀冷缩及相邻两管道连接处的热胀冷缩,对相连的污水检查井产生拉力,由于砖砌体污水检查井强度不够,出现渗水、裂缝,甚至倒塌现象,严重影响了施工进度和工程质量。 The sewage inspection well is an inspection well set up on the drainage pipeline system for inspection and cleaning of the pipeline, and it also plays a role in ventilation connecting the pipe section and the pipeline system. At present, sewage inspection wells are mostly brick masonry built with standard bricks and cement mortar. The sewage inspection well of this structure has poor quality problems for concrete pipes with inconspicuous thermal expansion and contraction deformation. For common FRP sand-filled pipes, the thermal expansion and contraction of itself and the thermal expansion and contraction of the junction of two adjacent pipes will generate tension on the connected sewage inspection well. Due to the insufficient strength of the brick masonry sewage inspection well, water seepage and cracks will appear , or even collapse, seriously affecting the construction progress and project quality.

发明内容 Contents of the invention

本实用新型要解决的技术问题是提供一种污水检查井钢模,其浇筑的污水检查井强度大,管材和混凝土结构筑成一体。 The technical problem to be solved by the utility model is to provide a sewage inspection well steel mold, the sewage inspection well poured by it has high strength, and the pipe material and the concrete structure are integrated.

为了解决上述技术问题,本实用新型的技术方案为: In order to solve the problems of the technologies described above, the technical solution of the utility model is:

一种污水检查井钢模包括分别与检查井下部内外侧壁相配的内环形模板和外环形模板,内环形模板和外环形模板上均开有接纳污水排放管的管孔。 A sewage inspection well steel mold includes inner and outer annular templates respectively matched with the inner and outer walls of the lower part of the inspection well. Both the inner annular template and the outer annular template are provided with pipe holes for receiving sewage discharge pipes.

所述内环形模板和外环形模板均通过4个弧形件围合而成。 Both the inner ring formwork and the outer ring formwork are surrounded by four arc-shaped parts.

所述弧形件为四分之一圆筒件,内环形模板的弧形件的两个直线侧向内折弯形成连接板,外环形模板的弧形件的两个直线侧向外折弯形成连接板,相邻弧形件通过相对的连接板对接固定。 The arc-shaped piece is a quarter cylindrical piece, the two straight lines of the arc-shaped piece of the inner ring formwork are bent inward to form a connecting plate, and the two straight lines of the arc-shaped piece of the outer ring formwork are bent outward A connection plate is formed, and adjacent arc-shaped pieces are butted and fixed through the opposite connection plate.

所述连接板设有一列螺栓孔,相对的两个连接板通过螺栓联接。 The connecting plate is provided with a row of bolt holes, and the two opposite connecting plates are connected by bolts.

所述管孔相对设置,穿过相邻弧形件的对接部。 The tube holes are arranged oppositely and pass through the butt joints of adjacent arc-shaped pieces.

所述内环形模板和外环形模板的厚度为1 cm -2cm。 The thickness of the inner ring template and the outer ring template is 1 cm-2cm.

通过本实用新型混凝土浇筑而成的污水检查井下部,再采用标准砖和水泥砂浆砌筑检查井至指定高度,这种结构的污水检查井的管材和混凝土结构为一整体构造。由于通过本实用新型混凝土浇筑而成的污水检查井强度较大,管材的热胀冷缩变形向管节相连处集中,管节处留有活动距离,从而彻底解决了砖砌式污水检测井因管材热胀冷缩造成的渗水、裂缝、倒塌等质量问题。 The lower part of the sewage inspection well formed by the concrete pouring of the utility model is then built with standard bricks and cement mortar to a specified height. The pipe material and concrete structure of the sewage inspection well of this structure are an integral structure. Due to the high strength of the sewage inspection well poured by the concrete of the utility model, the thermal expansion and contraction deformation of the pipes concentrates on the connection of the pipe joints, and there is a moving distance at the pipe joints, thus completely solving the problem of brick-built sewage inspection wells. Water seepage, cracks, collapse and other quality problems caused by thermal expansion and contraction of pipes.

附图说明   Description of drawings

下面结合附图对本实用新型的具体实施方式作进一步详细的说明: Below in conjunction with accompanying drawing, the specific embodiment of the present utility model is described in further detail:

图1为本实用新型的立体结构示意图. Figure 1 is a schematic diagram of the three-dimensional structure of the utility model.

图2为图1的俯视图。 FIG. 2 is a top view of FIG. 1 .

图3为图1的主视图。 Fig. 3 is a front view of Fig. 1 .

图4为图1的右视图。 Fig. 4 is a right side view of Fig. 1 .

图中:1第1弧形件,2第2弧形件,3第3弧形件,4第4弧形件,5第5弧形件,6第6弧形件,7第7弧形件,8第8弧形件, 10连接板,11管孔。 In the figure: 1 the first arc, 2 the second arc, 3 the third arc, 4 the fourth arc, 5 the fifth arc, 6 the sixth arc, 7 the seventh arc pieces, 8 arc pieces, 10 connecting plates, 11 pipe holes.

具体实施方式 Detailed ways

如图1至4所示,污水检查井钢模包括分别与检查井下部内外侧壁相配的内环形模板和外环形模板,内环形模板和外环形模板上均开有接纳污水排放管的管孔11。内环形模板和外环形模板的厚度为1cm -2cm。所述内环形模板和外环形模板均通过4个弧形件围合而成。所述弧形件为四分之一圆筒件。内环形模板由第5弧形件5、第6弧形件6、第7弧形件7和第8弧形件8对接围合构成,内环形模板的弧形件的两个直线侧向内折弯形成连接板10,连接板10设有一列螺栓孔,相对的两个连接板10通过螺栓联接。外环形模板由第1弧形件1、第2弧形件2、第3弧形件3和第4弧形件4对接围合构成,外环形模板的弧形件的两个直线侧向外折弯形成连接板10,连接板10设有一列螺栓孔,相对的两个连接板10通过螺栓联接。通过相对的连接板10的固定实现了弧形件的对接固定。所述管孔11相对设置,分别穿过第1弧形件1和第2弧形件2的对接部、第3弧形件3和第4弧形件4的对接部、第5弧形件5和第6弧形件6的对接部,以及第7弧形件7和第8弧形件8的对接部。 As shown in Figures 1 to 4, the steel formwork for sewage inspection wells includes inner and outer annular formworks that match the inner and outer walls of the lower part of the inspection well, respectively. Both the inner annular formwork and the outer annular formwork are provided with pipe holes 11 for receiving sewage discharge pipes. . The thickness of the inner ring template and the outer ring template is 1cm-2cm. Both the inner ring formwork and the outer ring formwork are surrounded by four arc-shaped parts. The arc part is a quarter cylinder part. The inner ring formwork is formed by the butt joint of the fifth arc piece 5, the sixth arc piece 6, the seventh arc piece 7 and the eighth arc piece 8, and the two straight lines of the arc piece of the inner ring formwork face inward The connecting plate 10 is formed by bending, and the connecting plate 10 is provided with a row of bolt holes, and the two opposite connecting plates 10 are connected by bolts. The outer ring formwork is composed of the first arc-shaped piece 1, the second arc-shaped piece 2, the third arc-shaped piece 3 and the fourth arc-shaped piece 4 butt joint enclosure, and the two straight sides of the arc-shaped piece of the outer ring formwork face outward The connecting plate 10 is formed by bending, and the connecting plate 10 is provided with a row of bolt holes, and the two opposite connecting plates 10 are connected by bolts. The butt fixing of the arc parts is realized by the fixing of the opposite connecting plates 10 . The pipe holes 11 are arranged oppositely, passing through the butt joint of the first arc 1 and the second arc 2, the joint of the third arc 3 and the fourth arc 4, and the fifth arc respectively. 5 and the 6th arc-shaped part 6, and the 7th arc-shaped part 7 and the 8th arc-shaped part 8 butt joint.

浇筑污水检查井方法: Pouring sewage inspection well method:

1.测量放样。施工前,先确定钢模安装位置,并用石灰或其它标志明确画出检查井内外径轮廓。 1. Measurement stakeout. Before construction, first determine the installation position of the steel mold, and clearly draw the outline of the inner and outer diameters of the inspection well with lime or other signs.

2.钢模安装。钢模安装时,应先装内环形模板,再装外环形模板。污水管道通过管孔11伸入检查井指定深度。 2. Steel mold installation. When installing the steel mold, the inner ring formwork should be installed first, and then the outer ring formwork should be installed. The sewage pipeline extends into the inspection well to a specified depth through the pipe hole 11.

3.浇筑混凝土。混凝土浇筑前内环形模板和外环形模板表面应涂抹脱模剂,在内环形模板和外环形模板间浇筑规定强度的混凝土,振捣密实。混凝土浇筑后应注意养护,一般24小时脱模。 3. Pour the concrete. Before concrete pouring, release agent should be applied on the surface of the inner and outer annular formwork, and concrete of specified strength should be poured between the inner and outer annular formwork, and compacted by vibration. Concrete should be maintained after pouring, usually demoulding within 24 hours.

4.砌筑砖砌体。脱模后,采用标准砖和水泥砂浆砌筑检查井至指定高度。 4. Build brick masonry. After demoulding, use standard bricks and cement mortar to build the inspection well to the specified height.

通过本实用新型浇筑混凝结构的污水检查井下部,彻底解决了砖砌体污水检查井引管材热胀冷缩造成的检查井渗水、裂缝、倒塌等质量问题,避免了污水闭水试验不合格无法进行下道工序,加快了工程进度,保证了工程质量。 By pouring the lower part of the sewage inspection well with a concrete structure in the utility model, the quality problems such as water seepage, cracks, and collapse of the inspection well caused by the thermal expansion and contraction of the lead pipes of the brick sewage inspection well are completely solved, and the failure of the closed water test of the sewage is avoided. The next process cannot be carried out, which speeds up the progress of the project and ensures the quality of the project.

Claims (6)

1.一种污水检查井钢模,其特征在于:包括分别与检查井下部内外侧壁相配的内环形模板和外环形模板,内环形模板和外环形模板上均开有接纳污水排放管的管孔。 1. A sewage inspection well steel mold, characterized in that: it includes an inner annular formwork and an outer annular formwork respectively matched with the inner and outer walls of the lower part of the inspection well, and the inner annular formwork and the outer annular formwork are all provided with pipe holes for receiving sewage discharge pipes . 2.根据权利要求1所述的污水检查井钢模,其特征在于:所述内环形模板和外环形模板均通过4个弧形件围合而成。 2. The steel mold for sewage inspection well according to claim 1, characterized in that: the inner annular formwork and the outer annular formwork are enclosed by four arc-shaped parts. 3.根据权利要求2所述的污水检查井钢模,其特征在于:所述弧形件为四分之一圆筒件,内环形模板的弧形件的两个直线侧向内折弯形成连接板,外环形模板的弧形件的两个直线侧向外折弯形成连接板,相邻弧形件通过相对的连接板对接固定。 3. The steel mold for sewage inspection well according to claim 2, characterized in that: the arc-shaped part is a quarter cylindrical part, and the two straight lines of the arc-shaped part of the inner annular formwork are bent inward to form As for the connection plate, the two straight lines of the arc parts of the outer ring formwork are bent outwards to form a connection plate, and the adjacent arc parts are butted and fixed by the opposite connection plates. 4.根据权利要求3所述的污水检查井钢模,其特征在于:所述连接板设有一列螺栓孔,相对的两个连接板通过螺栓联接。 4. The steel mold for sewage inspection well according to claim 3, characterized in that: the connecting plate is provided with a row of bolt holes, and the two opposite connecting plates are connected by bolts. 5.根据权利要求3所述的污水检查井钢模,其特征在于:所述管孔相对设置,穿过相邻弧形件的对接部。 5 . The steel mold for sewage inspection well according to claim 3 , wherein the pipe holes are arranged opposite to each other and pass through the butt joints of adjacent arc-shaped pieces. 6 . 6.根据权利要求4或5所述的污水检查井钢模,其特征在于:所述内环形模板和外环形模板的厚度为1 cm -2cm。 6. The sewage inspection well steel mold according to claim 4 or 5, characterized in that: the thickness of the inner annular formwork and the outer annular formwork is 1 cm -2cm.
CN2011202726876U 2011-07-29 2011-07-29 Steel die for sewage inspection well Expired - Lifetime CN202164698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202726876U CN202164698U (en) 2011-07-29 2011-07-29 Steel die for sewage inspection well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202726876U CN202164698U (en) 2011-07-29 2011-07-29 Steel die for sewage inspection well

Publications (1)

Publication Number Publication Date
CN202164698U true CN202164698U (en) 2012-03-14

Family

ID=45800536

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202726876U Expired - Lifetime CN202164698U (en) 2011-07-29 2011-07-29 Steel die for sewage inspection well

Country Status (1)

Country Link
CN (1) CN202164698U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314160A (en) * 2014-11-05 2015-01-28 重庆建工市政交通工程有限责任公司 Gully mold and use method thereof
CN106426524A (en) * 2016-10-27 2017-02-22 朱凤起 Mould special for pouring base of integrally-poured inspection well and pouring method
CN106638697A (en) * 2016-11-08 2017-05-10 安徽水安建设集团股份有限公司 Method for rapidly constructing light formwork of reinforced-concrete-cast-in-place circular draining inspection well
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof
CN113833084A (en) * 2021-11-01 2021-12-24 中铁三局集团有限公司 Steel formwork for inspection well of tunnel center ditch

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104314160A (en) * 2014-11-05 2015-01-28 重庆建工市政交通工程有限责任公司 Gully mold and use method thereof
CN104314160B (en) * 2014-11-05 2016-09-07 重庆建工市政交通工程有限责任公司 A kind of inlet for stom water mold use method
CN106426524A (en) * 2016-10-27 2017-02-22 朱凤起 Mould special for pouring base of integrally-poured inspection well and pouring method
CN106638697A (en) * 2016-11-08 2017-05-10 安徽水安建设集团股份有限公司 Method for rapidly constructing light formwork of reinforced-concrete-cast-in-place circular draining inspection well
CN108729533A (en) * 2017-04-24 2018-11-02 五冶集团上海有限公司 A kind of rainwater collection pool venthole concrete blinding and preparation method thereof
CN113833084A (en) * 2021-11-01 2021-12-24 中铁三局集团有限公司 Steel formwork for inspection well of tunnel center ditch

Similar Documents

Publication Publication Date Title
CN103061504B (en) Concrete slab Pipe installing hole to be provided construction mould and construction method
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN203022024U (en) Integrally-movable formwork for pipe gallery cast-in-situ construction
CN202164698U (en) Steel die for sewage inspection well
CN204249054U (en) A kind of making mould of concrete prefabricated inspection shaft
CN204826426U (en) Grouting sleeve for steel bar connection
CN206090861U (en) Portable built -in fitting is used in curtain installation
CN204826429U (en) Cast member reinforcing bar grout connecting piece
CN217268107U (en) Prevent infiltration reuse's outer wall I-steel and reserve entrance to a cave plugging device
CN205382390U (en) A template device for continuous reinforced concrete pavement
CN105019606A (en) Precast concrete unit steel bar grouting connecting piece and connecting method
CN206625428U (en) Pipe shaft post-cast floor slab closed system
CN210152316U (en) A prefabricated reinforcement device for reinforced concrete beams
CN201714084U (en) Extensible mould used for fabricating small-caliber cement ducts on construction site
CN103614998B (en) Concrete pouring method for lining wall based on underground diaphragm wall
CN208168362U (en) Protection pier structure for cast concrete exhaust pipe
CN210999340U (en) A casting mould for large diameter concrete pipe section
CN202164545U (en) Vertical prestressing pore canal communicating pipes and mud-jacking pipes
CN209854671U (en) Pre-buried sleeve device of prefabricated reinforced concrete component installation waterstop
CN107762053A (en) Prefabricated basement pipeline module and preparation method thereof
CN221912487U (en) A prefabricated column grouting and sealing steel mold
CN209211892U (en) One kind can be used for overhanging the molding light instrument in i-beam structure hole
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN220318582U (en) Well wall construction template of municipal administration tube well
CN110847414A (en) Electric box equipment support device, wall containing the device and integral pouring method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: JINAN URBAN CONSTRUCTION MATERIAL DEVELOPMENT SERV

Free format text: FORMER OWNER: JINAN HUANGHE LUQIAO ENGINEERING COMPANY

Effective date: 20130410

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20130410

Address after: The northern section of Huanggang Flyover District of Shandong province Ji'nan City Road 250000 No. 1

Patentee after: Jinan City Chengjian Material Development Service Center

Address before: The central Tuwu road Ji'nan City, Shandong province 250000 City No. 29

Patentee before: Jinan Huanghe Luqiao Engineering Company

CX01 Expiry of patent term

Granted publication date: 20120314

CX01 Expiry of patent term