CN108733511A - A kind of electronic data processing method based on big data - Google Patents

A kind of electronic data processing method based on big data Download PDF

Info

Publication number
CN108733511A
CN108733511A CN201810245715.1A CN201810245715A CN108733511A CN 108733511 A CN108733511 A CN 108733511A CN 201810245715 A CN201810245715 A CN 201810245715A CN 108733511 A CN108733511 A CN 108733511A
Authority
CN
China
Prior art keywords
transistor
premises access
ustomer premises
big data
access equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810245715.1A
Other languages
Chinese (zh)
Other versions
CN108733511B (en
Inventor
蒋志群
李弘珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Guihe Technology Co., Ltd.
Original Assignee
Chengdu Shun Siyuan Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Shun Siyuan Information Technology Co Ltd filed Critical Chengdu Shun Siyuan Information Technology Co Ltd
Priority to CN201810245715.1A priority Critical patent/CN108733511B/en
Publication of CN108733511A publication Critical patent/CN108733511A/en
Application granted granted Critical
Publication of CN108733511B publication Critical patent/CN108733511B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F1/00Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
    • G06F1/26Power supply means, e.g. regulation thereof
    • HELECTRICITY
    • H03ELECTRONIC CIRCUITRY
    • H03KPULSE TECHNIQUE
    • H03K5/00Manipulating of pulses not covered by one of the other main groups of this subclass
    • HELECTRICITY
    • H03ELECTRONIC CIRCUITRY
    • H03KPULSE TECHNIQUE
    • H03K5/00Manipulating of pulses not covered by one of the other main groups of this subclass
    • H03K2005/00013Delay, i.e. output pulse is delayed after input pulse and pulse length of output pulse is dependent on pulse length of input pulse

Abstract

A kind of electronic data processing method based on big data, including:Big data information processing centre obtains the state of a plurality of clients equipment, big data information processing centre determines the priority of a plurality of clients equipment, the storage that big data information processing centre carries out data according to the priority of a plurality of clients equipment is backed up, when a plurality of clients equipment needs, big data information processing centre carries out a plurality of clients equipment the recovery of data.This method is capable of the occupancy of optimized processor and storage resource, improve electronic data processing efficiency, reduce power consumption, reasonably carry out scheduling of resource and distribution, and ensure the stable storage of readable storage medium storing program for executing, big data information processing centre itself also stablizes, and can effectively and stably supply electric power, it can delay the backup of data in time when accident and exception occur for big data information processing centre, and carry out reallocating and storing again in time.

Description

A kind of electronic data processing method based on big data
Technical field
The present invention relates to electrical signal data process fields, more specifically, are related to a kind of electronic data based on big data Processing method.
Background technology
With the fast development of the technologies such as computer and networks, modern society enters the information age, and when informationization The distinguishing feature in generation is the explosive growth of data.Particularly, big data, internet+, cloud computing, Internet of Things, artificial intelligence A series of evolution at full speed in air ports such as energy, data mining, climate change emulation, leads to data volume explosion;This is bringing society Can and user facility, improve user experience, it is more intelligent, accurately in advance obtain information while, also bring lot of challenges.Cause Become more and more huger and complicated for data, and the acquisition modes of information are more convenient, in addition network security is to a certain extent There are loopholes so that the safety of big data is concerned.For enterprise, data to be managed are increasingly huge so that letter The cost of the technologies such as breath storage, safety guarantee and operation maintenance is constantly soaring, and challenge is proposed to efficiency, economic dispatch aspect. In addition, constantly gathering and being exposed in more complicated information environment with mass data, once accident is encountered, such as Natural cause, such as earthquake, fire, heavy rain, big flood;And other reasons, such as power down, supply of electric power are unstable, artificial broken Bad, attack etc., user will sink into core data and lose or reveal, will cause dangerous and cause serious economic loss.Therefore, Under big data background, carrying out processing with security and stability to electronic data seems most important.In addition, sometimes, it is more when existing When a ustomer premises access equipment, some ustomer premises access equipments will produce the not high data of inessential either useless or importance degree, and Since these data occupy a large amount of processors and storage resource, leads to whole electronic data processing inefficiency, also create The inefficient consumption of electric power;Therefore it there is a need to and carry out rational scheduling of resource and distribution.In addition, big data information processing centre sheet Body must be stablized, it is therefore desirable to effectively and stably be supplied its power supply, and occurred in big data information processing centre When accident and exception, the backup of data can be delayed in time, and carry out reallocating and storing again in time.
Invention content
An object of the present invention is to provide a kind of electronic data processing method based on big data, and this method can optimize The occupancy of processor and storage resource, improve electronic data processing efficiency, reduce power consumption, reasonably carry out scheduling of resource and Distribution, and ensure the stable storage of readable storage medium storing program for executing, big data information processing centre itself also stablizes, can be effectively and steady Surely electric power is supplied, can delay the standby of data in time when accident and exception occur for big data information processing centre Part, and carry out reallocating and storing again in time.
The technical solution that the present invention takes to solve above-mentioned technical problem is:At a kind of electronic data based on big data Reason method, including:Big data information processing centre obtains the state of a plurality of clients equipment, and big data information processing centre determines The priority of a plurality of clients equipment, big data information processing centre carry out data according to the priority of a plurality of clients equipment Storage backup, when a plurality of clients equipment needs, big data information processing centre carries out data to a plurality of clients equipment Restore.
According to another aspect of the present invention, method further comprises the steps:In step sl, at big data information Reason is attempted to be communicated with M ustomer premises access equipment centrally through its internal communication interface, via link, to confirm that big data is believed Whether can be communicated between breath processing center and M ustomer premises access equipment;Wherein M is greater than the positive integer equal to 2;In step In rapid S2, when big data information processing centre can be communicated with M ustomer premises access equipment, in big data information processing The heart obtains the value-at-risk and the corresponding significance level of M ustomer premises access equipment of M ustomer premises access equipment, and is calculated to obtain M The evaluation coefficient of a ustomer premises access equipment, and determine according to the evaluation coefficient priority of M ustomer premises access equipment, and to M user End equipment carries out the first sequence;When the forward evaluation coefficient that sorts is higher than default extreme value, judge residing for corresponding ustomer premises access equipment Risk factor be located at state of necessity, to prevent mistake from judging and preventing the data corruption of resource occupation and ustomer premises access equipment, weight Newly obtain the ustomer premises access equipment value-at-risk and the corresponding significance level of the ustomer premises access equipment and calculate obtain the user terminal set Standby evaluation coefficient is directly entered step S8 if still critical;Otherwise proceed to step S4;In step s3, when big number When cannot be communicated according to information processing centre and N number of in M ustomer premises access equipment, the event that exclusion can not communicate is attempted Barrier, until meeting preset condition;When can only be communicated there are one ustomer premises access equipment, what acquisition can be communicated should The value-at-risk of ustomer premises access equipment and the corresponding significance level of the ustomer premises access equipment, and calculated to obtain the ustomer premises access equipment Evaluation coefficient, then immediately proceed to step S5;And when there is a plurality of clients equipment that can communicate, acquisition can be into Row communication a plurality of clients equipment value-at-risk and the corresponding significance level of multiple ustomer premises access equipment, and calculated with The evaluation coefficient of multiple ustomer premises access equipment is obtained, and determines the priority of multiple ustomer premises access equipment according to the evaluation coefficient, And the second sequence is carried out to multiple ustomer premises access equipment;And continue to step S4;Wherein N is less than the positive integer equal to M; Wherein value-at-risk refers to be easy to causeing the index of data corruption, and to refer to ustomer premises access equipment data believe big data to significance level The necessary index that breath processing center is recorded, and evaluation coefficient is the value-at-risk and the ustomer premises access equipment according to ustomer premises access equipment The weighted sum of corresponding significance level;The wherein described preset condition is:The single user's end equipment that can not be communicated first is excluded one by one Failure, until single user's end equipment trial exclude the frequency of failure reach preset times, when the use one by one to that can not communicate There are the events for when at least one ustomer premises access equipment communicated, ceasing attempt to exclude to communicate after family end equipment is excluded Barrier, and enter subsequent step, and if attempting the failure for excluding to communicate failure, cease attempt to the event for excluding to communicate Barrier, and then exit and terminate;In step s 4, big data information processing centre is called according to the evaluation coefficient of ustomer premises access equipment Comparison module and evaluation coefficient look-up table therein, and obtain the threshold value in evaluation coefficient look-up table;In step s 5, work as evaluation When one or more of coefficient is more than threshold value, step S7 is continued to;In step s 6, when evaluation coefficient is all less than threshold When value, big data information processing centre waits for the triggering of the backup request of M ustomer premises access equipment;When in M ustomer premises access equipment When one or more starts the triggering of backup request, step S7 is continued to;In the step s 7, system is evaluated in judgment step S5 Number is more than the ustomer premises access equipment of the triggering of startup backup request in the number or judgment step S6 of the ustomer premises access equipment of threshold value Number;When number is 1, the processor of big data information processing centre is set available readable storage medium storing program for executing as the user terminal The correspondence resource backup of standby information;And when number is multiple, judge that the information processing capability of big data information processing centre is The no needs for meeting the ustomer premises access equipment for needing to back up;In step s 8, when number is multiple and meets the user for needing to back up When needing of end equipment, according to the sequence of evaluation coefficient from high to low, the processor of big data information processing centre will be available Correspondence resource backup of the readable storage medium storing program for executing as the ustomer premises access equipment information;When number is multiple and is unsatisfactory for needing to back up When needing of ustomer premises access equipment, the sequence of the processor of big data information processing centre according to evaluation coefficient from high to low, according to The maximum backup capabilities that resource backup can be provided, the forward ustomer premises access equipment of selected and sorted, by available readable storage medium storing program for executing As the correspondence resource backup of the ustomer premises access equipment information, for the data of remaining ustomer premises access equipment, into delay circuit and Buffer is stored;And when there are available readable storage medium storing program for executing, the temporal data of delay disposal is sequentially stored in readable Storage medium;And in step s 9, when a plurality of clients equipment needs, big data information processing centre is to a plurality of clients Equipment carries out the recovery of data:The path for being stored in the Backup Data in readable storage medium storing program for executing is called, is created according to Backup Data The recovery document of corresponding data will be stored in the recovery document that Backup Data write-in creates in readable storage medium storing program for executing;It will backup Data recovery is symbol sebolic addressing;Symbol sebolic addressing is parsed and spliced, batch data is buffered to temporary storage module by treated In, and after determining that big data information processing centre can be communicated with corresponding ustomer premises access equipment, via data information The data that treated is buffered in temporary storage module are sent to a plurality of clients equipment into line number by the communication interface of processing center According to recovery.
According to another aspect of the present invention, the big data information processing centre in this method include power module, it is multiple Readable storage medium storing program for executing.Wherein the power supply includes multiple sub- power supplys, and every sub- power supply is connected respectively to corresponding readable storage medium storing program for executing, Sub- power supply is identical as the quantity of readable storage medium storing program for executing, wherein every sub- power supply includes with lower structure:First power transistor, source Pole connects power supply VCC, and grid connects the output of amplification module, the corresponding readable storage medium storing program for executing of the sub- power supply of each of drain electrode connection Power input;The output of the positive input terminal connection referrer module of the amplification module, the negative input end connection of the amplification module The first end of the first end and resistance R12 of resistance R11;The second end of resistance R11 connect the first power transistor drain electrode and The first end of capacitance C11;The first end of the second end connection resistance R13 of capacitance C11;The second end of resistance R13 is with resistance R12's Second end is all grounded;In the structure of the referrer module, transistor Q11, transistor Q12, transistor Q13 source electrode be all connected to Power supply VCC, and the grid of three all links together, the source electrode of the drain electrode connection transistor Q14 of transistor Q11, transistor Q12 Drain electrode connection transistor Q15 source electrode, the source electrode of the drain electrode connection transistor Q16 of transistor Q16, transistor Q14, transistor Q15, transistor Q16 grid be all connected to the output end of the first power amplifier, the drain electrode of transistor Q14 is connected to resistance The negative input end of the first end of R14 and the first power amplifier, the drain electrode of transistor Q15 be connected to the emitter of transistor Q18, The positive input terminal of the first end of resistance R15 and the first power amplifier, the second end of resistance R14 are connected to the hair of transistor Q17 The base stage and collector of both emitter-base bandgap grading, transistor Q17 and transistor Q18 are all connected to ground.The drain electrode of transistor Q16 is connected to electricity The second end of R15, the positive input terminal of the second power amplifier are hindered, the negative input end of the second power amplifier is connected to the second power The output end of amplifier and the positive input terminal that amplification module is connected as the output with reference to module.Through the above structure so that Big data information processing centre itself also stablizes, and can effectively and stably supply electric power.
According to another aspect of the present invention, transistor Q11-Q16 is PMOSFET, and transistor Q17-18 is PNP Transistor.First power amplifier is identical as the second power amplifier model
According to another aspect of the present invention, the concrete structure of the delay circuit in step S8 is:Transistor Q21, crystal Pipe Q24, transistor Q26, the respective source electrodes of transistor Q28 and capacitance C21 first end be connected to power supply supply voltage;Crystal Pipe Q23, transistor Q25, the respective source electrodes of transistor Q27 transistors Q29 are connected to digital ground voltage;The grid of transistor Q21 It is connected with the data of the grid of transistor Q22 and the remaining user equipment of input, the drain electrode of transistor Q21 and transistor The drain electrode of Q22, the second end of capacitance C21, the first end of capacitance C22, the grid of transistor Q24, transistor Q25 grid phase Even, the source electrode of transistor Q22 is connect with the drain electrode of transistor Q23;The grid of transistor Q23 connects bias, wherein when receiving When the order of the data input for the remaining user equipment that processor is sent out, which is triggered high level, when remaining use The data of family equipment all by the delay circuit after, which is triggered low level;The drain electrode of transistor Q24 and crystal The drain electrode of pipe Q25, the grid connection of the grid of transistor Q26, transistor Q27, the drain electrode of transistor Q26 is with transistor Q27's Drain electrode, the grid connection of the second end of capacitance C22, the grid of transistor Q28, transistor Q29, drain electrode and the crystalline substance of transistor Q28 The drain electrode of body pipe Q29 connects and as the output of the delay circuit, and then is input in buffer.
According to another aspect of the present invention, transistor Q21, Q24, Q26Q28 is PMOSFET, and transistor Q22, Q23, Q25, Q27, Q29 are NMOSFET.Transistor Q22, Q23, Q25, Q27, Q29 characteristic parameter is identical.
According to another aspect of the present invention, when one in readable storage medium storing program for executing is abnormal, corresponding detection The data of transmission are cut into delayer while circuit sends abnormal interrupt signal to processor, and after the output of delayed device Redundant computer readable storage medium storing program for executing is entered, processor records the backup storage of data, down times, and in the user The data backup of end equipment carries out the supplement of breakpoint data and the information record of former and later two readable storage medium storing program for executing after finishing.
According to another aspect of the present invention, a kind of electronic data processing equipment based on big data, the device are also disclosed Execute the method described in any of the above item.
Description of the drawings
In the accompanying drawings by way of example rather than the embodiment of the present invention, wherein phase are shown by way of limitation Same reference numeral indicates identical element, wherein:
Fig. 1 illustrates the electronic data processing method general flow charts based on big data.
Specific implementation mode
In the following description, refer to the attached drawing and several specific embodiments are diagrammatically shown.It will be appreciated that: It is contemplated that and other embodiment can be made without departing from the scope of the present disclosure or spirit.Therefore, described in detail below should not be by Think in a limiting sense.
According to an embodiment of the invention, a kind of electronic data processing method based on big data includes:At big data information Reason center obtains the state of a plurality of clients equipment, and big data information processing centre determines the priority of a plurality of clients equipment, The storage that big data information processing centre carries out data according to the priority of a plurality of clients equipment is backed up, and is set in a plurality of clients For when needing, big data information processing centre carries out a plurality of clients equipment the recovery of data.
Specifically, according to an embodiment of the invention, Fig. 1 illustrates the electronic data processing method flows based on big data Schematic diagram includes the following steps:
In step sl, big data information processing centre attempts and M use by its internal communication interface, via link Whether family end equipment is communicated, can be logical into row information between big data information processing centre and M ustomer premises access equipment to confirm Letter;Wherein M is greater than the positive integer equal to 2;
In step s 2, when big data information processing centre and M ustomer premises access equipment can communicate, big number The value-at-risk and the corresponding significance level of M ustomer premises access equipment of M ustomer premises access equipment are obtained according to information processing centre, and are carried out It calculates to obtain the evaluation coefficient of M ustomer premises access equipment, and determines the priority of M ustomer premises access equipment according to the evaluation coefficient, And the first sequence is carried out to M ustomer premises access equipment;When the forward evaluation coefficient that sorts is higher than default extreme value, corresponding user is judged Risk factor residing for end equipment is located at state of necessity, to prevent the wrong number judged and prevent resource occupation and ustomer premises access equipment According to damage, reacquires the value-at-risk of the ustomer premises access equipment and the corresponding significance level of the ustomer premises access equipment and calculate this The evaluation coefficient of ustomer premises access equipment is directly entered step S8 if still critical;Otherwise proceed to step S4;
In step s3, when big data information processing centre and N number of in M ustomer premises access equipment cannot be led into row information When letter, the failure for excluding to communicate is attempted, until meeting preset condition;When only there are one ustomer premises access equipment can be into row information When communication, the value-at-risk and the corresponding significance level of the ustomer premises access equipment of the ustomer premises access equipment that can be communicated are obtained, and It is calculated to obtain the evaluation coefficient of the ustomer premises access equipment, then immediately proceeds to step S5;And working as has a plurality of clients equipment When can communicate, the value-at-risk for a plurality of clients equipment that can be communicated and multiple ustomer premises access equipment are obtained Corresponding significance level, and calculated to obtain the evaluation coefficient of multiple ustomer premises access equipment, and it is true according to the evaluation coefficient The priority of fixed multiple ustomer premises access equipment, and the second sequence is carried out to multiple ustomer premises access equipment;And continue to step S4;Wherein N is less than the positive integer equal to M;Wherein value-at-risk refers to be easy to causeing the index of data corruption, and significance level is Refer to the necessary index that ustomer premises access equipment data record big data information processing centre, and evaluation coefficient is according to user The weighted sum of the value-at-risk of end equipment significance level corresponding with the ustomer premises access equipment;The wherein described preset condition is:First one by one The failure for excluding the single user's end equipment that can not be communicated reaches pre- until the trial of single user's end equipment excludes the frequency of failure If number, there are at least one ustomer premises access equipments communicated after being excluded one by one to the ustomer premises access equipment that can not be communicated When, the failure for excluding to communicate is ceased attempt to, and enter subsequent step, and lost if attempting the failure for excluding to communicate It loses, then ceases attempt to the failure for excluding to communicate, and then exit and terminate;
In step s 4, big data information processing centre calls comparison therein according to the evaluation coefficient of ustomer premises access equipment Module and evaluation coefficient look-up table, and obtain the threshold value in evaluation coefficient look-up table;
In step s 5, when one or more of evaluation coefficient is more than threshold value, step S7 is continued to;
In step s 6, when evaluation coefficient is all less than threshold value, big data information processing centre waits for M user terminal to set The triggering of standby backup request;When one or more of M ustomer premises access equipment starts the triggering of backup request, continue To step S7;
In the step s 7, in judgment step S5 evaluation coefficient be more than threshold value ustomer premises access equipment number, or judge step Start the number of the ustomer premises access equipment of the triggering of backup request in rapid S6;When number is 1, the place of big data information processing centre Device is managed using available readable storage medium storing program for executing as the correspondence resource backup of the ustomer premises access equipment information;And when number is multiple, Judge whether the information processing capability of big data information processing centre meets the needs for the ustomer premises access equipment for needing to back up;
In step s 8, when the needing of ustomer premises access equipment that number is multiple and satisfaction needs back up, it is according to evaluation The sequence of number from high to low, the processor of big data information processing centre are set available readable storage medium storing program for executing as the user terminal The correspondence resource backup of standby information;When number is multiple and is unsatisfactory for when the needing of ustomer premises access equipment for needing to back up, big data Sequence of the processor of information processing centre according to evaluation coefficient from high to low, the maximum backup that can be provided according to resource backup Ability, the forward ustomer premises access equipment of selected and sorted, using available readable storage medium storing program for executing as the correspondence of the ustomer premises access equipment information Resource backup stores the data of remaining ustomer premises access equipment into delay circuit and buffer;And it is available existing Readable storage medium storing program for executing when, the temporal data of delay disposal is sequentially stored in readable storage medium storing program for executing;And
In step s 9, when a plurality of clients equipment needs, big data information processing centre is to a plurality of clients equipment Carry out the recovery of data:The path for being stored in the Backup Data in readable storage medium storing program for executing is called, is created and is corresponded to according to Backup Data The recovery document of data will be stored in the recovery document that Backup Data write-in creates in readable storage medium storing program for executing;By Backup Data It is restored to symbol sebolic addressing;Symbol sebolic addressing is parsed and spliced, by treated, batch data is buffered in temporary storage module, and And after determining that big data information processing centre can be communicated with corresponding ustomer premises access equipment, via in processing data information The data that treated is buffered in temporary storage module are sent to a plurality of clients equipment and carry out the extensive of data by the communication interface of the heart It is multiple.
By above step, it is capable of the occupancy of optimized processor and storage resource, improves electronic data processing efficiency, reduces Power consumption reasonably carries out scheduling of resource and distribution.
Preferably, in order to enable big data information processing centre itself also stablizes, electric power can be effectively and stably supplied, It can delay the backup of data in time when accident and exception occur for big data information processing centre, and ensure readable The stable storage of storage medium, the big data information processing centre in this method includes power module, multiple readable storage medium storing program for executing. Wherein the power supply includes multiple sub- power supplys, and every sub- power supply is connected respectively to corresponding readable storage medium storing program for executing, sub- power supply with it is readable The quantity of storage medium is identical, wherein every sub- power supply includes with lower structure:First power transistor, source electrode connect power supply VCC, grid connect the output of amplification module, the power input of the corresponding readable storage medium storing program for executing of the sub- power supply of each of drain electrode connection End;The output of the positive input terminal connection referrer module of the amplification module, the of the negative input end connection resistance R11 of the amplification module The first end of one end and resistance R12;The second end of resistance R11 connect the first power transistor drain electrode and capacitance C11 the One end;The first end of the second end connection resistance R13 of capacitance C11;The second end of resistance R13 and the second end of resistance R12 all connect Ground;In the structure of the referrer module, transistor Q11, transistor Q12, transistor Q13 source electrode be all connected to power supply VCC, and The grid of three all links together, the source electrode of the drain electrode connection transistor Q14 of transistor Q11, the drain electrode connection of transistor Q12 The source electrode of transistor Q15, the source electrode of the drain electrode connection transistor Q16 of transistor Q16, transistor Q14, transistor Q15, transistor The grid of Q16 is all connected to the output end of the first power amplifier, and the drain electrode of transistor Q14 is connected to the first end of resistance R14 With the negative input end of the first power amplifier, the drain electrode of transistor Q15 be connected to the emitter of transistor Q18, resistance R15 The positive input terminal of one end and the first power amplifier, the second end of resistance R14 are connected to the emitter of transistor Q17, transistor The base stage and collector of both Q17 and transistor Q18 is all connected to ground.The drain electrode of transistor Q16 is connected to the second of resistance R15 It holds, the positive input terminal of the second power amplifier, the negative input end of the second power amplifier is connected to the defeated of the second power amplifier Outlet and the positive input terminal that amplification module is connected as the output with reference to module.Through the above structure so that big data information Processing center itself is also stablized, and electric power can be effectively and stably supplied.
Preferably, transistor Q11-Q16 is PMOSFET, and transistor Q17-18 is PNP transistor.
Preferably, first power amplifier is identical as the second power amplifier model.
Preferably, the concrete structure of the delay circuit in step S8 is:Transistor Q21, transistor Q24, transistor Q26, The first end of the respective source electrodes of transistor Q28 and capacitance C21 are connected to power supply supply voltage;Transistor Q23, transistor Q25, The respective source electrodes of transistor Q27 transistors Q29 are connected to digital ground voltage;The grid of the grid and transistor Q22 of transistor Q21 And the data of the remaining user equipment of input are connected, the drain electrode of transistor Q21 and the drain electrode of transistor Q22, capacitance C21 Second end, the first end of capacitance C22, the grid of transistor Q24, transistor Q25 grid be connected, the source electrode of transistor Q22 with The drain electrode of transistor Q23 connects;The grid of transistor Q23 connects bias, wherein when the remaining use for receiving processor and sending out When the order of the data input of family equipment, which is triggered high level, when the data of remaining user equipment all pass through After the delay circuit, which is triggered low level;The drain electrode of transistor Q24 and drain electrode, the transistor of transistor Q25 The grid connection of the grid of Q26, transistor Q27, the drain electrode of transistor Q26 and the drain electrode of transistor Q27, capacitance C22 second The grid connection at end, the grid of transistor Q28, transistor Q29, the drain electrode of transistor Q28 are connect simultaneously with the drain electrode of transistor Q29 As the output of the delay circuit, and then it is input in buffer.
Preferably, transistor Q21, Q24, Q26Q28 is PMOSFET, and transistor Q22, Q23, Q25, Q27, Q29 are equal For NMOSFET.
Preferably, transistor Q22, Q23, Q25, Q27, Q29 characteristic parameters are identical.
Preferably, in order to enable big data information processing centre occur accident and it is abnormal when can be divided again in time With with store again, above method further comprises:When one in readable storage medium storing program for executing is abnormal, corresponding detection electricity The data of transmission are cut into delayer while road direction processor sends abnormal interrupt signal, and the output of delayed device is laggard Enter to redundant computer readable storage medium storing program for executing, the backup storage of processor record data, down times, and in the user terminal The data backup of equipment carries out the supplement of breakpoint data and the information record of former and later two readable storage medium storing program for executing after finishing.
According to an embodiment of the invention, the invention also includes a kind of electronic data processing equipment based on big data, the dresses It sets and executes above each method, and include communication interface, processor, multiple readable storage medium storing program for executing, power module compares mould Block, detection circuit, delay circuit, delayer, redundant computer readable storage medium storing program for executing, buffer, temporary storage module.
To sum up, in the inventive solutions, by using a kind of electronic data processing method based on big data and Device, this method include:Big data information processing centre obtains the state of a plurality of clients equipment, big data information processing centre Determine the priority of a plurality of clients equipment, big data information processing centre is according to the priority of a plurality of clients equipment into line number According to storage backup, when a plurality of clients equipment needs, big data information processing centre is to a plurality of clients equipment into line number According to recovery.And then it is capable of the occupancy of optimized processor and storage resource, electronic data processing efficiency is improved, electric power is reduced and disappears Consumption reasonably carries out scheduling of resource and distribution, and ensures the stable storage of readable storage medium storing program for executing, big data information processing centre Itself also stablize, can effectively and stably supply electric power, when accident and exception occur for big data information processing centre It can delay the backup of data in time, and carry out reallocating and storing again in time.
Node as described herein can be back end in general sense understood by one of ordinary skill in the art.In addition, The node may also include but be not limited to the modules such as processor, controller, volatibility and or nonvolatile memory.
It will be appreciated that:The example and reality of the present invention can be realized in the form of the combination of hardware, software or hardware and software Apply example.As described above, any main body for executing this method can be stored, in the form of volatile or non-volatile storage, such as Storage device, as ROM, no matter it is erasable or rewritable whether, or in the form of a memory, such as RAM, storage core Piece, equipment or integrated circuit or on the readable medium of light or magnetic, such as CD, DVD, disk or tape.It will be appreciated that: Storage device and storage medium are suitable for storing the example of the machine readable storage of one or more programs, upon being performed, One or more of programs realize the example of the present invention.Via any medium, such as it is loaded with by wired or wireless connection Signal of communication can electronically transmit the example of the present invention, and example includes suitably identical content.
It should be noted that:Because the present invention solves the occupancy of optimized processor and storage resource, electronic data is improved Treatment effeciency reduces power consumption, reasonably carries out scheduling of resource and distribution, and ensure that the stabilization of readable storage medium storing program for executing is deposited Storage, big data information processing centre itself also stablizes, and can effectively and stably supply electric power, in big data information processing centre It can delay the backup of data when generation accident and exception in time, and the technology that in time reallocate and store again is asked Topic uses technical staff in information technology field and instructs technology hand to understand according to it after reading this description Section, and the occupancy of optimized processor and storage resource is obtained, electronic data processing efficiency is improved, reduces power consumption, rationally Ground carries out scheduling of resource and distribution, and ensures the stable storage of readable storage medium storing program for executing, big data information processing centre itself Stablize, can effectively and stably supply electric power, big data information processing centre occur accident and it is abnormal when can and When delay the backups of data, and the advantageous effects reallocated and stored again are carried out in time, so in appended claims In be claimed scheme belong to the technical solution on patent law purposes.In addition, because the skill that appended claims are claimed Art scheme can be made or used in industry, therefore the program has practicability.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Any one skilled in the art in the technical scope disclosed by the present invention, the change or replacement that can be readily occurred in, Should all it forgive within protection scope of the present invention.Unless being otherwise expressly recited, otherwise disclosed each feature is only Equivalent or similar characteristics a example for general series.Therefore, protection scope of the present invention should be with the guarantor of claims It protects subject to range.

Claims (10)

1. a kind of electronic data processing method based on big data, including:
Big data information processing centre obtains the state of a plurality of clients equipment, and big data information processing centre determines multiple users The priority of end equipment, the storage that big data information processing centre carries out data according to the priority of a plurality of clients equipment are standby Part, when a plurality of clients equipment needs, big data information processing centre carries out a plurality of clients equipment the recovery of data.
2. the electronic data processing method based on big data as described in claim 1, further comprises the steps:
In step sl, big data information processing centre attempts and M user terminal by its internal communication interface, via link Whether equipment is communicated, can be communicated between big data information processing centre and M ustomer premises access equipment with confirming;Its Middle M is greater than the positive integer equal to 2;
In step s 2, when big data information processing centre and M ustomer premises access equipment can communicate, big data letter It ceases processing center and obtains the value-at-risk and the corresponding significance level of M ustomer premises access equipment of M ustomer premises access equipment, and calculated To obtain the evaluation coefficient of M ustomer premises access equipment, and determine according to the evaluation coefficient priority of M ustomer premises access equipment, and to M A ustomer premises access equipment carries out the first sequence;When the forward evaluation coefficient that sorts is higher than default extreme value, judge that corresponding user terminal is set Standby residing risk factor is located at state of necessity, to prevent mistake from judging and preventing the data of resource occupation and ustomer premises access equipment from damaging Ruin, reacquire the ustomer premises access equipment value-at-risk and the corresponding significance level of the ustomer premises access equipment and calculate obtain the user The evaluation coefficient of end equipment is directly entered step S8 if still critical;Otherwise proceed to step S4;
In step s3, when big data information processing centre and N number of in M ustomer premises access equipment cannot communicate When, the failure for excluding to communicate is attempted, until meeting preset condition;When only there are one ustomer premises access equipments to lead into row information When letter, the value-at-risk and the corresponding significance level of the ustomer premises access equipment of the ustomer premises access equipment that can be communicated are obtained, is gone forward side by side Row is calculated to obtain the evaluation coefficient of the ustomer premises access equipment, then immediately proceeds to step S5;And working as has a plurality of clients equipment can When communicating, the value-at-risk for a plurality of clients equipment that can be communicated and multiple ustomer premises access equipment pair are obtained The significance level answered, and calculated to obtain the evaluation coefficient of multiple ustomer premises access equipment, and determined according to the evaluation coefficient The priority of multiple ustomer premises access equipment, and the second sequence is carried out to multiple ustomer premises access equipment;And continue to step S4; Wherein N is less than the positive integer equal to M;Wherein value-at-risk refers to be easy to causeing the index of data corruption, and significance level refers to The necessary index that ustomer premises access equipment data record big data information processing centre, and evaluation coefficient is according to user terminal The weighted sum of the value-at-risk of equipment significance level corresponding with the ustomer premises access equipment;The wherein described preset condition is:First arrange one by one Except the failure for the single user's end equipment that can not be communicated, reach default until the trial of single user's end equipment excludes the frequency of failure Number, there are at least one ustomer premises access equipments communicated after being excluded one by one to the ustomer premises access equipment that can not be communicated When, the failure for excluding to communicate is ceased attempt to, and enter subsequent step, and lost if attempting the failure for excluding to communicate It loses, then ceases attempt to the failure for excluding to communicate, and then exit and terminate;
In step s 4, big data information processing centre calls comparison module therein according to the evaluation coefficient of ustomer premises access equipment With evaluation coefficient look-up table, and the threshold value in evaluation coefficient look-up table is obtained;
In step s 5, when one or more of evaluation coefficient is more than threshold value, step S7 is continued to;
In step s 6, when evaluation coefficient is all less than threshold value, big data information processing centre M ustomer premises access equipment of waiting The triggering of backup request;When one or more of M ustomer premises access equipment starts the triggering of backup request, step is continued to Rapid S7;
In the step s 7, number or judgment step S6 of the evaluation coefficient more than the ustomer premises access equipment of threshold value in judgment step S5 The number of the ustomer premises access equipment of the middle triggering for starting backup request;When number is 1, the processor of big data information processing centre Using available readable storage medium storing program for executing as the correspondence resource backup of the ustomer premises access equipment information;And when number is multiple, judge Whether the information processing capability of big data information processing centre meets the needs for the ustomer premises access equipment for needing to back up;
In step s 8, when number is multiple and meets and needs when the needing of ustomer premises access equipment backed up, according to evaluation coefficient from The processor of high to Low sequence, big data information processing centre is believed available readable storage medium storing program for executing as the ustomer premises access equipment The correspondence resource backup of breath;When number is multiple and is unsatisfactory for when the needing of ustomer premises access equipment for needing to back up, big data information Sequence of the processor of processing center according to evaluation coefficient from high to low, the maximum backup energy that can be provided according to resource backup Power, the forward ustomer premises access equipment of selected and sorted are standby as the correspondence of the ustomer premises access equipment information using available readable storage medium storing program for executing Part resource stores the data of remaining ustomer premises access equipment into delay circuit and buffer;And there are available When readable storage medium storing program for executing, the temporal data of delay disposal is sequentially stored in readable storage medium storing program for executing;And
In step s 9, when a plurality of clients equipment needs, big data information processing centre carries out a plurality of clients equipment The recovery of data:The path for being stored in the Backup Data in readable storage medium storing program for executing is called, corresponding data is created according to Backup Data Recovery document, will be stored in the recovery document that the write-in of Backup Data in readable storage medium storing program for executing creates;Backup Data is restored For symbol sebolic addressing;Symbol sebolic addressing is parsed and spliced, batch data is buffered in temporary storage module by treated, and really After determining big data information processing centre and being communicated with corresponding ustomer premises access equipment, via processing data information center The data that treated is buffered in temporary storage module are sent to the recovery that a plurality of clients equipment carries out data by communication interface.
3. the electronic data processing method based on big data as claimed in claim 2, wherein:
Big data information processing centre in this method includes power module, multiple readable storage medium storing program for executing, and the wherein power supply includes Multiple sub- power supplys, every sub- power supply are connected respectively to corresponding readable storage medium storing program for executing, the quantity of sub- power supply and readable storage medium storing program for executing It is identical, wherein every sub- power supply includes with lower structure:First power transistor, source electrode connect power supply VCC, and grid connection is put The output of big module, the power input of the corresponding readable storage medium storing program for executing of the sub- power supply of each of drain electrode connection;The amplification module Positive input terminal connects the output of referrer module, the first end of the negative input end connection resistance R11 of the amplification module and resistance R12's First end;The second end of resistance R11 connects the drain electrode of the first power transistor and the first end of capacitance C11;The of capacitance C11 Two ends connect the first end of resistance R13;The second end of resistance R13 and the second end of resistance R12 are all grounded;In the referrer module In structure, transistor Q11, transistor Q12, transistor Q13 source electrode be all connected to power supply VCC, and the grid of three all connects Together, the source electrode of the drain electrode connection transistor Q14 of transistor Q11, the source electrode of the drain electrode connection transistor Q15 of transistor Q12, The source electrode of the drain electrode connection transistor Q16 of transistor Q16, transistor Q14, transistor Q15, transistor Q16 grid all connect Drain electrode to the output end of the first power amplifier, transistor Q14 is connected to the first end and the first power amplifier of resistance R14 Negative input end, the drain electrode of transistor Q15 is connected to the emitter of transistor Q18, the first end of resistance R15 and the first power and puts The positive input terminal of big device, the second end of resistance R14 are connected to the emitter of transistor Q17, transistor Q17 and transistor Q18 two The base stage and collector of person is all connected to ground, and the drain electrode of transistor Q16 is connected to the second end of resistance R15, the second power amplification The negative input end of the positive input terminal of device, the second power amplifier is connected to the output end of the second power amplifier and as with reference to mould The output of block and the positive input terminal for connecting amplification module.
4. the electronic data processing method based on big data as claimed in claim 3, wherein:
Transistor Q11-Q16 is PMOSFET, and transistor Q17-18 is PNP transistor.
5. the electronic data processing method based on big data as claimed in claim 3, wherein:
First power amplifier is identical as the second power amplifier model.
6. the electronic data processing method based on big data as described in claim 3 or 4 or 5, wherein:
The concrete structure of delay circuit in step S8 is:Transistor Q21, transistor Q24, transistor Q26, transistor Q28 are each From source electrode and capacitance C21 first end be connected to power supply supply voltage;Transistor Q23, transistor Q25, transistor Q27 are brilliant The respective source electrodes of body pipe Q29 are connected to digital ground voltage;The grid of transistor Q21 and the grid of transistor Q22 and input The data of remaining user equipment are connected, drain electrode and the drain electrode of transistor Q22, the second end of capacitance C21, the electricity of transistor Q21 It is connected to hold the first end of C22, the grid of transistor Q24, the grid of transistor Q25, source electrode and the transistor Q23 of transistor Q22 Drain electrode connection;The grid of transistor Q23 connects bias, wherein when the number for receiving the remaining user equipment that processor is sent out According to input order when, which is triggered high level, when the data of remaining user equipment all pass through the delay circuit Later, which is triggered low level;The drain electrode and the drain electrode of transistor Q25 of transistor Q24, the grid of transistor Q26, crystalline substance The grid of body pipe Q27 connects, drain electrode and the drain electrode of transistor Q27, the second end of capacitance C22, the transistor Q28 of transistor Q26 Grid, transistor Q29 grid connection, the drain electrode of transistor Q28 connect with the drain electrode of transistor Q29 and as the deferred telegram The output on road, and then be input in buffer.
7. the electronic data processing method based on big data as claimed in claim 6, wherein:
Transistor Q21, Q24, Q26Q28 are PMOSFET, and transistor Q22, Q23, Q25, Q27, Q29 are NMOSFET.
8. the electronic data processing method based on big data as claimed in claim 6, wherein:
Transistor Q22, Q23, Q25, Q27, Q29 characteristic parameter is identical.
9. the electronic data processing method based on big data as claimed in claim 6, wherein this method further comprise:When can One in storage medium is read when being abnormal, corresponding detection circuit will while sending abnormal interrupt signal to processor The data of transmission are cut into delayer, and enter redundant computer readable storage medium storing program for executing, processor after the output of delayed device Backup storage, the down times of data are recorded, and carry out breakpoint number after the data backup of the ustomer premises access equipment finishes According to supplement and former and later two readable storage medium storing program for executing information record.
10. a kind of electronic data processing equipment based on big data, which executes described in any one of above claim 2-9 Method.
CN201810245715.1A 2018-03-23 2018-03-23 Electronic data processing method based on big data Active CN108733511B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810245715.1A CN108733511B (en) 2018-03-23 2018-03-23 Electronic data processing method based on big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810245715.1A CN108733511B (en) 2018-03-23 2018-03-23 Electronic data processing method based on big data

Publications (2)

Publication Number Publication Date
CN108733511A true CN108733511A (en) 2018-11-02
CN108733511B CN108733511B (en) 2022-05-24

Family

ID=63941059

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810245715.1A Active CN108733511B (en) 2018-03-23 2018-03-23 Electronic data processing method based on big data

Country Status (1)

Country Link
CN (1) CN108733511B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101394424A (en) * 2008-10-27 2009-03-25 中国科学院计算技术研究所 Hard disc stage network data backup system and method
CN104866395A (en) * 2014-02-24 2015-08-26 中国移动通信集团福建有限公司 Data backup method, data backup system, main-backup switching method and main-backup switching system
CN105242736A (en) * 2015-10-27 2016-01-13 上海芯圣电子股份有限公司 Auxiliary LDO circuit and switching supply circuit
CN105322786A (en) * 2014-07-01 2016-02-10 王帅 DC-DC converter
WO2016183967A1 (en) * 2015-05-19 2016-11-24 中兴通讯股份有限公司 Failure alarm method and apparatus for key component, and big data management system
CN107135097A (en) * 2017-04-14 2017-09-05 北京金融资产交易所有限公司 The disaster tolerance system and disaster recovery method filed based on bookkeeping
CN107145407A (en) * 2017-05-16 2017-09-08 成都汇智远景科技有限公司 A kind of method that data are carried out with local backup
CN107249035A (en) * 2017-06-28 2017-10-13 重庆大学 A kind of shared repeated data storage of hierarchical dynamically changeable and reading mechanism

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101394424A (en) * 2008-10-27 2009-03-25 中国科学院计算技术研究所 Hard disc stage network data backup system and method
CN104866395A (en) * 2014-02-24 2015-08-26 中国移动通信集团福建有限公司 Data backup method, data backup system, main-backup switching method and main-backup switching system
CN105322786A (en) * 2014-07-01 2016-02-10 王帅 DC-DC converter
WO2016183967A1 (en) * 2015-05-19 2016-11-24 中兴通讯股份有限公司 Failure alarm method and apparatus for key component, and big data management system
CN105242736A (en) * 2015-10-27 2016-01-13 上海芯圣电子股份有限公司 Auxiliary LDO circuit and switching supply circuit
CN107135097A (en) * 2017-04-14 2017-09-05 北京金融资产交易所有限公司 The disaster tolerance system and disaster recovery method filed based on bookkeeping
CN107145407A (en) * 2017-05-16 2017-09-08 成都汇智远景科技有限公司 A kind of method that data are carried out with local backup
CN107249035A (en) * 2017-06-28 2017-10-13 重庆大学 A kind of shared repeated data storage of hierarchical dynamically changeable and reading mechanism

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张地 等: "基于双活数据中心的电商平台网站数据保护及灾备恢复策略研究", 《网络安全技术与应用》 *

Also Published As

Publication number Publication date
CN108733511B (en) 2022-05-24

Similar Documents

Publication Publication Date Title
CN101820348A (en) Method and device for carrying out overload protection on equipment in POE system
CN103034567A (en) Device and method for finding and repairing corrupted data
CN108376110A (en) A kind of automatic testing method, system and terminal device
CN108809729A (en) The fault handling method and device that CTDB is serviced in a kind of distributed system
CN108566418B (en) Intelligent processing method of electronic data
CN103810038A (en) Method and device for transferring virtual machine storage files in HA cluster
CN108304222A (en) Apparatus management/control system and method
CN108733511A (en) A kind of electronic data processing method based on big data
CN103457777B (en) Power distribution unit disaster recovery method, manager and system
CN106534262B (en) A kind of switching method of network information system failure
CN110196787B (en) Data backup and recovery system and data backup and recovery method thereof
CN108933687A (en) A kind of power consumption control method and device
CN108809689A (en) A kind of immediate processing method of electronic data
CN106354828A (en) Data fragmentation method and device for distributed database
CN103685359B (en) Data processing method and device
CN109039278A (en) Junction box of photovoltaic module, monitoring method and system
CN111552972B (en) Deep learning system based on big data
CN106850463A (en) A kind of access switch
CN115022378B (en) Transmission valve control equipment communication method and system, valve tower monitoring equipment and storage medium
CN106331039A (en) Realization method for content connection in data center network
JPH04345248A (en) Event report device
CN103092730A (en) Information storing and reading method
CN112148513A (en) Dump method and device for single point service data and storage medium
CN108846482A (en) A kind of data training method, device and server
CN116204502B (en) NAS storage service method and system with high availability

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220428

Address after: 264000 No. 101, unit 1, building 3, No. 216, Changshan Road, Changdao County, Yantai City, Shandong Province

Applicant after: Zhao Haoming

Address before: No. 1319, 13 / F, unit 1, building 5, No. 399, Fucheng avenue west section, high tech Zone, Chengdu, Sichuan 610000

Applicant before: CHENGDU ANXIN SIYUAN INFORMATION TECHNOLOGY CO.,LTD.

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220810

Address after: 271000 Taishan steel market, Tai'an City, Shandong Province

Patentee after: Shandong Guihe Technology Co., Ltd.

Address before: 264000 No. 101, unit 1, building 3, No. 216, Changshan Road, Changdao County, Yantai City, Shandong Province

Patentee before: Zhao Haoming

TR01 Transfer of patent right