CN108708537A - A kind of fast scaffolding and its installation method of insulating - Google Patents

A kind of fast scaffolding and its installation method of insulating Download PDF

Info

Publication number
CN108708537A
CN108708537A CN201810790640.5A CN201810790640A CN108708537A CN 108708537 A CN108708537 A CN 108708537A CN 201810790640 A CN201810790640 A CN 201810790640A CN 108708537 A CN108708537 A CN 108708537A
Authority
CN
China
Prior art keywords
bar
main body
frame body
tenon
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810790640.5A
Other languages
Chinese (zh)
Inventor
杨亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Tengda Electric Power Equipment Manufacturing Co Ltd
Original Assignee
Sichuan Tengda Electric Power Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Tengda Electric Power Equipment Manufacturing Co Ltd filed Critical Sichuan Tengda Electric Power Equipment Manufacturing Co Ltd
Priority to CN201810790640.5A priority Critical patent/CN108708537A/en
Publication of CN108708537A publication Critical patent/CN108708537A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G1/00Scaffolds primarily resting on the ground
    • E04G1/02Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means
    • E04G1/04Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section
    • E04G1/06Scaffolds primarily resting on the ground composed essentially of members elongated in one dimension only, e.g. poles, lattice masts, with or without end portions of special form, connected together by any means the members being exclusively poles, rods, beams, or other members of similar form and simple cross-section comprising members with rod-like or tubular portions fitting together end to end, with or without separate connecting pieces
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/06Stiff scaffolding clamps for connecting scaffold members of common shape
    • E04G7/22Stiff scaffolding clamps for connecting scaffold members of common shape for scaffold members in end-to-side relation

Abstract

The invention discloses a kind of fast scaffolding of insulation and its installation methods, it is related to Construction Formwork & Scaffold Technology field, to solve existing insulation, scaffold build process is cumbersome, it is long to build the time, builds the low technical problem of efficiency, it includes frame body made of being set up by upright bar and cross bar, the frame body bottom is equipped with pedestal, workbench is equipped at the top of the frame body, further include connecting the hoop component of bar assembly and suit on utility poles, the both ends of the connection bar assembly are detachably connected with frame body and hoop component respectively.The present invention has that build process is simple, builds that the time is short, builds efficient advantageous effect, can be widely applied in the livewire work of overhead transmission line road of 10KV.

Description

A kind of fast scaffolding and its installation method of insulating
Technical field
The present invention relates to Construction Formwork & Scaffold Technology fields, more particularly to a kind of fast scaffolding of insulation and its installation side Method.
Background technology
Scaffold is to ensure various work progress are smoothed out and are set up workbench.The type of scaffold is numerous More, application field is also very extensive.Scaffold is classified according to structural form, can substantially be divided into pole type scaffold, bridge-type foot hand Frame, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula scaffold door-type scaffold;Scaffold according to material not Together, gray scaffold, insulation scaffold etc. can be divided into.Different types of engineering construction can be selected not of the same race as the case may be The scaffold of class and material.
Currently, the livewire work technology of the 35KV-500KV overhead transmission lines in China is highly developed, livewire work Have become the operation to routinize on transmission line of electricity, but the relevant technologies of the overhead transmission line road livewire work of 10KV are sent out Relatively slow, livewire work of the extensive degree well below 35KV and the overhead transmission line of above of development is opened up, In recent years, as the every field of production and life is very fast to the demand growth of electricity, many power supply enterprises start to 10KV The livewire work of overhead transmission line is researched and developed, and some areas have put into effect.The livewire work of 10KV overhead transmission lines It is main to carry out operation by the way of aerial lift device with insulated arm and insulation scaffold.The advantages of livewire work is carried out using aerial lift device with insulated arm It is that easy to operate, working area is big, job position can be adjusted at any time in the movable range of bucket arm, the shortcomings that aerial lift device with insulated arm Be, in lane, field side, the mountainous region geographical locations Li Deng, limited by landform, aerial lift device with insulated arm can not carry out operation.And it adopts It is then not limited to carry out livewire work with insulation scaffold, the scaffold that insulate can be to carry out operation in field side, mountainous region, can be with The position that scaffold pedestal is adjusted according to landform, can also use on hillside, but current insulation scaffold disadvantage It is obvious that one of disadvantage is exactly that build time of scaffold very long, for higher-height scaffold, scaffold is built When must be equipped with a large amount of layback rope and Auxiliary support tool to ensure stability and the safety of scaffold, in this way, building Journey is just very cumbersome, builds the period and is just elongated, and builds time-consuming and laborious, causes the huge waste of labour, operating efficiency low.
Therefore, develop that a kind of build process is simple, builds that the time is short, builds and efficient takes formula insulation scaffold soon just It is very necessary.
Invention content
It is an object of the invention to:In order to solve, existing insulation scaffold build process is cumbersome, it is long to build the time, builds effect The low technical problem of rate, the present invention provide that a kind of build process is simple, builds that the time is short, builds efficient insulation takes foot hand soon Frame and its installation method.
The present invention specifically uses following technical scheme to achieve the goals above:
A kind of fast scaffolding of insulation, including frame body made of being set up by upright bar and cross bar, the frame body bottom is equipped with bottom Seat, the frame body top are equipped with workbench, further include connecting the hoop component of bar assembly and suit on utility poles, the company The both ends of extension bar component are detachably connected with frame body and hoop component respectively.
Operation principle:The fast scaffolding of the insulation is used primarily in the livewire work near electric pole.In use, first installing The pedestal of scaffold builds the first layer of scaffold using upright bar and cross bar, and hoop component suit is then fixed on electric pole On, the position of hoop component is flushed in the first layer upper end with scaffold, then using connection bar assembly, will connect bar assembly One end is stuck on upright bar or cross bar, and the other end is stuck on hoop component, and thus scaffold and electric pole can be fixed, Eliminate the troublesome operation using a large amount of layback rope and auxiliary support apparatus.After putting up the first layer of scaffold, then pacify The second layer, third layer etc. are filled, until reaching desired height, workbench is then mounted on topmost one layer.Passing through will Hoop component suit is fixed on electric pole, then is secured together scaffold and electric pole with connection bar assembly, and eliminating makes The tedious steps that scaffold is fixed with a large amount of layback rope and auxiliary support apparatus, build process is simple, builds the time It is short, build it is efficient.
Further, the hoop component include the first garter spring, the second garter spring and retaining mechanism, the one of first garter spring End is connected with one end of the second garter spring by retaining mechanism, the other end of first garter spring and the other end hinge of the second garter spring It connects, multiple U-shaped card slots has been respectively fixedly connected on first garter spring and the second garter spring.First garter spring of hoop component and second Garter spring is fixed to using articulated connection, fast and easy suit on electric pole, and the first garter spring and the second garter spring are pulled open when building, is set with It is closed after on to electric pole, retaining mechanism is used in combination to lock, such hoop component structure operation is simple, saves the time.This Outside, multiple U-shaped card slots are set on the first garter spring and the second garter spring, it is therefore an objective to facilitate the connection of connection bar assembly and hoop component It is fixed.
Further, the connection bar assembly includes connecting rod main body, and the both ends difference screw thread of the connecting rod main body connects It is connected to adjustable screw, the one end of the adjustable screw far from connecting rod main body, which is separately connected, is useful for catching on frame body and U-shaped The eave tile of card slot.In use, the eave tile for connecting bar assembly both ends is caught on frame body and U-shaped card slot respectively, at this point, frame body and electric wire Bar may be fixed less firm, and frame body may have weak vibrations, it is only necessary to be rotatablely connected bar main body, utilize connecting rod master Threaded connection relation between body and adjustable screw, further the distance between two adjustable screws, to tighten frame body and Electric pole ensures that frame body no longer shakes, and stability is more preferable, safety higher, this process can be realized in rotation connection bar main body, It is easy to operate, save the time.
Further, the connecting rod main body is equipped with Anti-slip cover, and the Anti-slip cover is sleeved in connecting rod main body, the two Interference fit.When being directly rotatablely connected bar main body with hand, friction is small between the palm of the hand and connecting rod main body, and rotation is easy out It now slides, relatively elaborate, when the palm of the hand is perspired, this defect is more obvious, by the way that Anti-slip cover is arranged in connecting rod main body, increases Big frictional force between the palm of the hand and connecting rod main body, and facilitate gripping, it is more laborsaving.
Further, further include connector component for connecting upright pole and cross bar, the connector component includes first Tenon, with the first fourth of the twelve Earthly Branches slot of the first tenon cooperation and the connector main body that is set in upright bar, first tenon with connect Part main body is fixedly connected, and first fourth of the twelve Earthly Branches slot is fixedly connected with the end of cross bar.It is fixed in use, being first set with connector component It in upright bar, then by first fourth of the twelve Earthly Branches slot at cross bar both ends, is attached on the first matched tenon, you can realize the firm of the two Connection.The mode of the traditional connector component generally use bolt of scaffold carries out upright bar and the fixation of cross bar, in use, needing Bolt arduously is tightened, the stability of scaffold is larger by human factor, if some connector component or certain several connector component Do not tighten, then the stability of entire scaffold just cannot be guaranteed, the personal safety of the staff to stand on scaffold just by To very big threat, in addition, when scaffold is built, it often will appear the case where bolt on connector component falls or can not find, Influence the progress that scaffold is built.Connector component uses tenon structure, and upright bar and cross bar, operation letter are fixed in a manner of inserting Just, time saving and energy saving.
Further, one end of the upright bar is equipped with the second tenon, and the other end is equipped with second fourth of the twelve Earthly Branches coordinated with the second tenon Slot.Tenon structure is used between upper layer upright bar and lower layer's upright bar, and upper layer upright bar and lower layer's upright bar can be fixed in a manner of inserting, It is easy to operate, it is time saving and energy saving.
A kind of installation method of the fast scaffolding of insulation, includes the following steps:
A. pedestal is placed on electric pole surrounding;
B. first layer upright bar is plugged into pedestal;
C. first fourth of the twelve Earthly Branches slot at cross bar both ends is plugged on the first tenon of connector component;
D. hoop component is installed on electric pole;
E. frame body is caught on into one end of eave tile, the other end catches on U-shaped card slot, and the bar main body that is rotatably connected, and tightens connecting rod The adjustable screw at main body both ends;
F. second layer upright bar is plugged into first layer upright bar;
G. repeat the above steps C to E, completes the installation of the scaffold second layer;
H. repeat the above steps F and G, completes the installation of scaffold remainder layer;
I. workbench is installed at the top of frame body.
Using the installation method, step is simple,, also can be quickly by simple training even if making unfamiliar operator Completion is built.
Beneficial effects of the present invention are as follows:
1, it is fixed on electric pole by the way that hoop component to be set with, then is fixed scaffold and electric pole with connection bar assembly To the tedious steps that scaffold is fixed using a large amount of layback rope and auxiliary support apparatus together, are eliminated, built Journey is simple, builds that the time is short, it is efficient to build.
2, using articulated connection, fast and easy suit is fixed to electric pole for the first garter spring of hoop component and the second garter spring On, the first garter spring and the second garter spring are pulled open when building, set closes after being attached on electric pole, and retaining mechanism is used in combination to lock, this The hoop component structure operation of sample is simple, saves the time.In addition, multiple U-shaped card slots are set on the first garter spring and the second garter spring, Purpose is that connection bar assembly and hoop component is facilitated to be connected and fixed.
3, using the threaded connection relation between connecting rod main body and adjustable screw, between two adjustable screws that further Distance ensure that frame body no longer shakes to tighten frame body and electric pole, stability is more preferable, safety higher, is rotatablely connected bar Main body can be realized this process, easy to operate, save the time.
4, by the way that Anti-slip cover is arranged in connecting rod main body, the frictional force between the palm of the hand and connecting rod main body is increased, and And facilitate gripping, it is more laborsaving.
5, connector component uses tenon structure, upright bar and cross bar is fixed in a manner of inserting, easy to operate, time saving province Power.
6, tenon structure is used between upper layer upright bar and lower layer's upright bar, and upper layer upright bar can be fixed in a manner of inserting under Layer upright bar, it is easy to operate, it is time saving and energy saving.
7, using the installation method, step is simple,, also can be very by simple training even if making unfamiliar operator It is fast to complete to build.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of insulate fast scaffolding and its installation method.
Fig. 2 is a kind of structural schematic diagram of the fast scaffolding hoop component of insulation.
Fig. 3 is a kind of structural schematic diagram of the fast scaffolding connection bar assembly of insulation.
Fig. 4 is a kind of structural schematic diagram A of insulation fast scaffolding upright bar and cross bar connection type.
Fig. 5 is a kind of structural schematic diagram B of insulation fast scaffolding upright bar and cross bar connection type.
Reference numeral:1- upright bars, second fourths of the twelve Earthly Branches 101- slot, the second tenons of 102-, 2- cross bars, 3- pedestals, 4- connector components, 401- connector main bodies, the first tenons of 402-, first fourths of the twelve Earthly Branches 403- slot, 5- connection bar assemblies, 501- connecting rod main bodys, 502- is adjustable Section screw rod, 503- eave tiles, 504- Anti-slip covers, 6- hoop components, the first garter springs of 601-, 602-U type card slots, 603- retaining mechanisms, The second garter springs of 604-, 7- workbenches, 8- electric poles.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with description of the invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is this hair Bright a part of the embodiment, instead of all the embodiments.Embodiments of the present invention, which are generally described and illustrated herein in the accompanying drawings Component can arrange and design with a variety of different configurations.
Therefore, below the detailed description of the embodiment of the present invention to providing in the accompanying drawings be not intended to limit it is claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiments of the present invention, this field is common The every other embodiment that technical staff is obtained without creative efforts belongs to the model that the present invention protects It encloses.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.In addition, term " the One ", " second " etc. is only used for distinguishing description, is not understood to indicate or imply relative importance.
In the description of embodiment of the present invention, it should be noted that the orientation of the instructions such as term "inner", "outside", "upper" Or position relationship be based on the orientation or positional relationship shown in the drawings or the invention product using when the orientation usually put Or position relationship, it is merely for convenience of description of the present invention and simplification of the description, does not indicate or imply the indicated device or element It must have a particular orientation, with specific azimuth configuration and operation, therefore be not considered as limiting the invention.
Embodiment 1
As shown in Figures 1 to 5, the present embodiment provides a kind of fast scaffoldings of insulation, including set up by upright bar and cross bar and At frame body, frame body bottom is equipped with pedestal, is equipped with workbench at the top of frame body, upright bar, cross bar, frame body, pedestal, workbench this A little is the general configuration of scaffold, and for the common knowledge of field technology personnel, details are not described herein again.Foot hand is taken in the insulation soon Frame further includes suit hoop component on utility poles, and hoop component includes the first garter spring, the second garter spring and retaining mechanism, and first Garter spring and the second garter spring are semi arch structure, and together with outer-hexagonal bolted splice, the two is in addition for wherein one end of the two One end is fixed with retaining mechanism, and retaining mechanism is made of outer-hexagonal bolt and hex nut, and there are two retaining mechanisms, the first hoop Two U-shaped card slots are respectively equipped on ring and the second garter spring, U-shaped card slot is integrated chemical conversion type with the first garter spring and the second garter spring, U-shaped Card slot can also be fixed to by screw on the first garter spring and the second garter spring, and 4 U-shaped card slots are distributed in cross-shaped symmetrical.This is absolutely The fast scaffolding of edge further includes more connection bar assemblies, and connection bar assembly includes connecting rod main body, and connecting rod main body is hollow Tubular structure, is laid with symmetrical internal thread on the inner wall at both ends, and the both ends of connecting rod main body are separately connected that there are two adjustable Screw rod, the screw thread in adjustable screw are external thread structure, and the external thread structure and the internal thread structure in connecting rod main body It is mutually matched, two one end of adjustable screw far from connecting rod main body are respectively connected with the hook for catching on frame body and U-shaped card slot Head, eave tile are integrated chemical conversion type with adjustable screw, eave tile can also be fixed in adjustable screw by screw, for hooking Firmly the eave tile of frame body uses U-shaped structure, and an end face of U-shaped structure opening is connect with adjustable screw, in use, U-shaped structure Upright bar or the cross bar of frame body can preferably be caught on, it is not easy to it falls off from upright bar or cross bar, the eave tile for catching on U-shaped card slot Using trapezium structure wide at the top and narrow at the bottom, in use, trapezium structure can be very easily inserted into U-shaped card slot, bar assembly will be connected It is fixed with hoop component.
Embodiment 2
As shown in Figures 1 to 5, the present embodiment is further improved on the basis of embodiment 1, is specially covered in upright bar If there are two connector components, connector component includes connector main body, the first tenon and first fourth of the twelve Earthly Branches coordinated with the first tenon Slot, connector main body are hollow rectangular parallelepiped structure, after connector main body set is set in upright bar, make to be attached by screws to upright bar On.The outer wall surrounding of connector main body has 4 the first tenons, 4 the first tenons to be distributed in cross-shaped symmetrical, the first tenon and company Fitting main body is that integration connects, and the shape of the first tenon is T fonts, and the first fourth of the twelve Earthly Branches slot is located at the both ends of cross bar, the first fourth of the twelve Earthly Branches slot with Cross bar is also integration connection, and the first fourth of the twelve Earthly Branches slot is made of the groove structure and baffle for having cut out the first tenon T shapes, baffle In the upper end of groove structure, baffle and groove structure be it is integrated connect, the effect of baffle is that groove is inserted into the by structure When on one tenon, baffle can prevent groove structure from continuing to move down, and cross bar is fixed between two upright bars to reach Purpose.In addition, the upper and lower ends of upright bar are equipped with the second tenon and the second fourth of the twelve Earthly Branches slot with the cooperation of the second tenon, the second tenon and the Two fourth of the twelve Earthly Branches slots are integrated connection with upright bar, and the second tenon is solid cylindrical structure, and is respectively cut out in the surrounding of cylinder A piece rectangular cylinder, and the second fourth of the twelve Earthly Branches slot is hollow cylindrical structure, the outer wall of the inner diameter of this cylinder and the second tenon Diameter is equal, and the inner wall surrounding of this cylinder respectively has more a rectangular cylinder, this rectangular cylinder and the second tenon are cut out Rectangular cylinder size is identical.In use, by first layer upright bar inserted base, make the second fourth of the twelve Earthly Branches slot upward, then makes the second layer vertical Second tenon of bar downward, is inserted into the second fourth of the twelve Earthly Branches slot of the first upright bar, completes the fixation of this two layers of upright bar.Upright bar and cross bar it Between, between upright bar and upright bar fixation is attached using tenon structure.The side of the upright bar and cross bar generally use bolt of scaffold Formula is fixed, in use, needing arduously to tighten bolt, the stability of scaffold is larger by human factor, if some connector Component or certain several connector component are not tightened, then the stability of entire scaffold just cannot be guaranteed, and stand on scaffold The personal safety of staff, in addition, when scaffold is built, often will appear the spiral shell on connector component just by very big threat The case where bolt falls or can not find influences the progress that scaffold is built.Therefore, the upright bar of the fast scaffolding of the insulation and cross bar it Between, tenon structure is used between upright bar and upright bar, it is easy to operate, it is time saving and energy saving.
Embodiment 3
As shown in Figures 1 to 5, in order to more easily hold connecting rod main body, keep operation more laborsaving, the present embodiment is in reality It applies and is further improved on the basis of example 2, be specially provided with Anti-slip cover in connecting rod main body, Anti-slip cover is sleeved on connecting rod It is interference fit between Anti-slip cover and connecting rod main body, it is ensured that hold anti-skidding pack into main body, and positioned at the middle of connecting rod Be not in relative movement between Anti-slip cover and connecting rod main body when row rotation.If being not provided with Anti-slip cover, directly rotated with hand When connecting rod main body, friction is small between the palm of the hand and connecting rod main body, and rotation is susceptible to sliding, relatively elaborate, works as hand This defect is more obvious when the heart is perspired, and by the way that Anti-slip cover is arranged in connecting rod main body, increases the palm of the hand and connecting rod main body Between frictional force, and facilitate gripping, it is more laborsaving.
Embodiment 4
As shown in Figures 1 to 5, the one of which installation method of the fast scaffolding of the insulation includes the following steps:
A., 4 pedestals of scaffold are placed on to the surrounding of electric pole, 4 pedestals form square shape, square Center is overlapped with the center of electric pole;
B. the second tenon of first layer upright bar is plugged into pedestal downward;
C. first fourth of the twelve Earthly Branches slot at cross bar both ends is plugged on the first tenon on upright bar connector component, after grafting, is paid attention to Check whether grafting in place, repeats the operation of this step for the first fourth of the twelve Earthly Branches slot and the first tenon, and all inserting is arrived successively by other cross bar Position;
D. hoop component is installed on electric pole, the height of the height and cross bar that ensure hoop component remains basically stable, peace When dress, the first garter spring and the second garter spring are first opened, it, will using outer-hexagonal bolt and hex nut after its set is attached on electric pole The open end of first garter spring and the second garter spring is locked, and hoop component is made to be firmly fixed on electric pole;
E. connecting rod main body is held, first cross bar is caught on the eave tile of U-shaped structure, then the eave tile of trapezium structure is inserted into In U-shaped card slot, be then rotatably connected bar main body, the adjustable screw at tightening connecting rod main body both ends, that is, shortens U-shaped structure Eave tile and trapezium structure the distance between eave tile, keep frame body more firm and electric pole be fixed, repeat this step Other three connection bar assemblies are installed in place by operation;
F. the second tenon of second layer upright bar is plugged into downward in the second fourth of the twelve Earthly Branches slot of first layer upright bar upper end;
G. repeat the above steps C to E, completes the installation of the scaffold second layer;
H. repeat the above steps F and G, completes the installation of scaffold remainder layer;
I. workbench is installed at the top of frame body.
Embodiment 5
As shown in Figures 1 to 5, another installation method of the fast scaffolding of the insulation includes the following steps:
A., 4 pedestals of scaffold are placed on to the surrounding of electric pole, 4 pedestals form square shape, square Center is overlapped with the center of electric pole;
B. the second tenon of first layer upright bar is plugged into pedestal downward;
C. first fourth of the twelve Earthly Branches slot at cross bar both ends is plugged on the first tenon on upright bar connector component, after grafting, is paid attention to Check whether grafting in place, repeats the operation of this step for the first fourth of the twelve Earthly Branches slot and the first tenon, and all inserting is arrived successively by other cross bar Position;
D. hoop component is installed on electric pole, the position of hoop component is about in the half height of the layer height, installation When, the first garter spring and the second garter spring are first opened, after its set is attached on electric pole, using outer-hexagonal bolt and hex nut by The open end of one garter spring and the second garter spring is locked, and hoop component is made to be firmly fixed on electric pole;
E. connecting rod main body is held, first upright bar is caught on the eave tile of U-shaped structure, then the eave tile of trapezium structure is inserted into In U-shaped card slot, be then rotatably connected bar main body, the adjustable screw at tightening connecting rod main body both ends, that is, shortens U-shaped structure Eave tile and trapezium structure the distance between eave tile, keep frame body more firm and electric pole be fixed, repeat this step Other three connection bar assemblies are installed in place by operation;
F. the second tenon of second layer upright bar is plugged into downward in the second fourth of the twelve Earthly Branches slot of first layer upright bar upper end;
G. repeat the above steps C to E, completes the installation of the scaffold second layer;
H. repeat the above steps F and G, completes the installation of scaffold remainder layer;
I. workbench is installed at the top of frame body.
Embodiment 5 and the difference of embodiment 4 essentially consist in, and embodiment 4 is that the one end for connecting bar assembly is connected to clip On component, the other end is connected on the cross bar of frame body, and embodiment 5 is then that the one end for connecting bar assembly is connected to hoop component On, the other end is connected in the upright bar of frame body.Both connection types can carry out unrestricted choice according to the environment of livewire work.
Embodiment 6
As shown in Figures 1 to 5, embodiment 4 and embodiment 5 can also have an another installation method, this installation method with For the main distinction of embodiment 4 and embodiment 5 on the installation direction of upright bar, the installation direction of 5 upright bar of embodiment 4 and embodiment is equal For upright bar the second tenon downward, and the installation direction of the upright bar of embodiment 6 be the second tenon upward, remaining installation steps with Embodiment 4 and embodiment 5 are identical.
The above, only presently preferred embodiments of the present invention, are not intended to limit the invention, patent protection model of the invention It encloses and is subject to claims, equivalent structure variation made by every specification and accompanying drawing content with the present invention, similarly It should be included within the scope of the present invention.

Claims (7)

1. a kind of fast scaffolding of insulation, including frame body made of being set up by upright bar (1) and cross bar (2), the frame body bottom is set There is pedestal (3), workbench (7) is equipped at the top of the frame body, which is characterized in that further includes connecting bar assembly (5) and being sleeved on The both ends of hoop component (6) on electric pole (8), the connection bar assembly (5) are detachable with frame body and hoop component (6) respectively Connection.
2. the fast scaffolding of insulation according to claim 1, which is characterized in that the hoop component (6) includes the first hoop Ring (601), the second garter spring (604) and retaining mechanism (603), one end of first garter spring (601) and the second garter spring (604) One end is connected by retaining mechanism (603), the other end of first garter spring (601) and the other end hinge of the second garter spring (604) It connects, multiple U-shaped card slots (602) has been respectively fixedly connected on first garter spring (601) and the second garter spring (604).
3. the fast scaffolding of insulation according to claim 2, which is characterized in that the connection bar assembly (5) includes connection The both ends of bar main body (501), the connecting rod main body (501) are threaded with adjustable screw (502) respectively, and two adjustable The one end of screw rod (502) far from connecting rod main body (501) is separately connected the eave tile for being useful for catching on frame body and U-shaped card slot (602) (503)。
4. the fast scaffolding of insulation according to claim 3, which is characterized in that the connecting rod main body (501) is equipped with Anti-slip cover (504), the Anti-slip cover (504) are sleeved in connecting rod main body (501), the two interference fit.
5. the fast scaffolding of insulation according to claim 1, which is characterized in that further include being used for connecting upright pole (1) and cross The connector component (4) of bar (2), the connector component (4) include the first tenon (402), coordinate with the first tenon (402) First fourth of the twelve Earthly Branches slot (403) and the connector main body (401) being set in upright bar (1), first tenon (402) and connector master Body (401) is fixedly connected, and first fourth of the twelve Earthly Branches slot (403) is fixedly connected with the end of cross bar (2).
6. the fast scaffolding of insulation according to claim 1, which is characterized in that one end of the upright bar (1) is equipped with second Tenon (102), the other end are equipped with the second fourth of the twelve Earthly Branches slot (101) coordinated with the second tenon (102).
7. a kind of installation method of the fast scaffolding of insulation as claimed in claim 3, which is characterized in that include the following steps:
A. pedestal (3) is placed on electric pole (8) surrounding;
B. first layer upright bar (1) is plugged into pedestal (3);
C. first fourth of the twelve Earthly Branches slot (403) at cross bar (2) both ends is plugged on the first tenon (402) of connector component (4);
D. hoop component (6) is installed on electric pole (8);
E. frame body being caught on into one end of eave tile (503), the other end catches on U-shaped card slot (602), and the bar main body (501) that is rotatably connected, Tighten the adjustable screw (502) at connecting rod main body (501) both ends;
F. second layer upright bar (1) is plugged into first layer upright bar (1);
G. repeat the above steps C to E, completes the installation of the scaffold second layer;
H. repeat the above steps F and G, completes the installation of scaffold remainder layer;
I. workbench (7) is installed at the top of frame body.
CN201810790640.5A 2018-07-18 2018-07-18 A kind of fast scaffolding and its installation method of insulating Pending CN108708537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810790640.5A CN108708537A (en) 2018-07-18 2018-07-18 A kind of fast scaffolding and its installation method of insulating

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810790640.5A CN108708537A (en) 2018-07-18 2018-07-18 A kind of fast scaffolding and its installation method of insulating

Publications (1)

Publication Number Publication Date
CN108708537A true CN108708537A (en) 2018-10-26

Family

ID=63875085

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810790640.5A Pending CN108708537A (en) 2018-07-18 2018-07-18 A kind of fast scaffolding and its installation method of insulating

Country Status (1)

Country Link
CN (1) CN108708537A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109392613A (en) * 2018-12-24 2019-03-01 天津市泰福钢塑管有限公司 A kind of connective stability can prevent the cultivating champignon bracket connecting piece of torsion
CN110219453A (en) * 2019-07-11 2019-09-10 昌宜(天津)模板租赁有限公司 The adjustable frame body of construction
CN110984834A (en) * 2019-12-03 2020-04-10 贵州电网有限责任公司 Ground pile type pole upper operation platform
CN115142781A (en) * 2022-06-22 2022-10-04 宁波晋畅机电科技有限公司 Garage door with regulatory function

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003055983A (en) * 2001-08-08 2003-02-26 Nippon Chuzo Kk Anchor bolt fixing structure
CN2637630Y (en) * 2003-06-14 2004-09-01 李跃明 Mortise and tenon type scaffold connecting unit and mortise and tenon type scaffold
CN203193187U (en) * 2013-04-19 2013-09-11 国家电网公司 Simple combined tower type high-altitude insulation work platform
CN205036074U (en) * 2015-07-18 2016-02-17 王亚南 High stable scaffold convenient to cooperation installation
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN205857654U (en) * 2016-08-09 2017-01-04 黑龙江省建设技术发展中心 A kind of template scaffold supporting device
CN205990757U (en) * 2016-08-22 2017-03-01 河北凯泽建材有限公司 A kind of new mortise and tenon type scaffold
WO2017207263A1 (en) * 2016-05-31 2017-12-07 Wilhelm Layher Verwaltungs-Gmbh Vertical beam assembly for a heavy-duty scaffold tower

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003055983A (en) * 2001-08-08 2003-02-26 Nippon Chuzo Kk Anchor bolt fixing structure
CN2637630Y (en) * 2003-06-14 2004-09-01 李跃明 Mortise and tenon type scaffold connecting unit and mortise and tenon type scaffold
CN203193187U (en) * 2013-04-19 2013-09-11 国家电网公司 Simple combined tower type high-altitude insulation work platform
CN205036074U (en) * 2015-07-18 2016-02-17 王亚南 High stable scaffold convenient to cooperation installation
WO2017207263A1 (en) * 2016-05-31 2017-12-07 Wilhelm Layher Verwaltungs-Gmbh Vertical beam assembly for a heavy-duty scaffold tower
CN106013750A (en) * 2016-07-07 2016-10-12 山东枣建建设集团有限公司 Disc buckle direct insertion type support frame capable of being rapidly assembled and disassembled and construction method thereof
CN205857654U (en) * 2016-08-09 2017-01-04 黑龙江省建设技术发展中心 A kind of template scaffold supporting device
CN205990757U (en) * 2016-08-22 2017-03-01 河北凯泽建材有限公司 A kind of new mortise and tenon type scaffold

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
区志刚等: "10kV带电作业专用快装绝缘脚手架的应用", 《广东输电与变电技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109392613A (en) * 2018-12-24 2019-03-01 天津市泰福钢塑管有限公司 A kind of connective stability can prevent the cultivating champignon bracket connecting piece of torsion
CN110219453A (en) * 2019-07-11 2019-09-10 昌宜(天津)模板租赁有限公司 The adjustable frame body of construction
CN110984834A (en) * 2019-12-03 2020-04-10 贵州电网有限责任公司 Ground pile type pole upper operation platform
CN115142781A (en) * 2022-06-22 2022-10-04 宁波晋畅机电科技有限公司 Garage door with regulatory function

Similar Documents

Publication Publication Date Title
CN108708537A (en) A kind of fast scaffolding and its installation method of insulating
CN207816963U (en) A kind of garden soil environment monitoring device
CN202190018U (en) Overhead ground wire ratchet wrench wire-lifting tool
CN213326235U (en) Stable and anti-shaking lifting device for building construction
CN206667880U (en) A kind of electric power line pole tower Anti-inclining monitoring device
CN201266809Y (en) Transmission line sustained center chucking tool
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN203998709U (en) A kind of super laborsaving electrical equipment lifting appliance
CN208329672U (en) A kind of industrial construction protective device
CN103950872B (en) The vertical rod lifting multi-purpose tool of a kind of electric substation high-altitude equipment
CN107840255A (en) A kind of both arms safe tower crane machine
CN206346455U (en) A kind of wall grooving apparatus
CN203654880U (en) Safety fence
CN211004327U (en) Portable pole wire lifter
CN207183495U (en) A kind of safe communication bar with anti-climbing function
CN202718373U (en) Movable operating workbench
CN205694495U (en) Saw branch mechanical device
CN112704858B (en) Climbing device with adjustable bayonet
CN208617222U (en) A kind of digging machine upright bar special hanger
CN110562871A (en) Portable pole wire lifter
CN207131159U (en) Electrical cables support meanss are faced in a kind of construction
CN206915650U (en) A kind of vehicle-mounted construction-site crane
CN201395488Y (en) Portable lifting device
CN220848904U (en) Protection device for municipal works
CN203998776U (en) A kind of microkinetic electrical equipment rotary hoisting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026